To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Irrigation And CAD Department Tender
Civil And Construction
Opening Date30 Sep 2024
Closing Date14 Oct 2024
Tender Amount₹ 1,99,70,357
Costs
EMD
₹ 1,99,703Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
755232Tender No
02/2024-25, Dt.26.09.2024Tender Authority
Irrigation And CAD Department ViewPurchaser Address
-Website
http://tender.apeprocurement.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Overhauling and lubrication of Hoist euipment and drive unit etc of each gate including cost of materials, labor and reuired operation as directed by the Engineer in Charge.
-
-
-
Surface cleaning of metal surfaces by chemical cleaners and then by hand and power tool cleaners and removing dust. After cleaning,applying primary coat with one coat of Zinc rich epoxy primer to athickness of 100 microns falloedby finishing coats 2 coats with Solventless Coal tar epoxy material, labour and all accessories with all leads and lifts.
-
-
-
Painting of embedded metal parts and all types of gates, stoplogs,etc, on sand blasted surfaces with one coat of inorganic zinc silicate (airless spray preferred)70+/- 5 and two super coats with a total thickness of 300 microns (each 150+/- 5) of solventless coaltar epoxy paint each coat 150 microns ( total 300 microns) cost of all materials, labour, scaffolding etc., complete with all leads and all lifts
-
-
-
Cleaning gates / hoists / embedded parts/lifting beams etc, to expose fresh metal surface for painting by sand blasting method as per specifications including cost of all abour, machinery, scaffolding, etc., complete with initial lead for sand upto 1 km and all lifts. materials,
-
-
-
Surface cleaning of metal surfaces by chemical cleaners and then by hand and power tool cleaners and removing dust. After cleaning,applying primary coat with two coats of Zinc chromite red oxide primer ,followed by finishing coats 3 coats with synthetic enamel paint with material, labour,and all accessories with all leads and lifts where surface cleaning by sand blasting is not feasible and based on specific recommendations of designers, it is to adopt surface preperation done manually by hand and power tool after cleaning by chemical treatment to remove grease, rust, scaling etc., and to form phasphate coating to prevent further rusting, before applying primer painting.
-
-
-
Supplying the under water divers,Cotton waste,Gunny Bags,Masks,Hiring Charges of compressor ,all other necessary materials ,machinery and labour required for Caulking of Construction Sluice and two River Sluices of Size 2.40m x 3.60m of Spillway of Somasila project including all other opearations necessary like diving at an average head of 15m to complete the finished item of work as directed by Engineer in charge.
-
-
-
Separation of all mechanical and Electrical parts of on downstream side in the 19th block of Spillway at dam site and placing neatly in the site as suggested by the Engineer in charge to complete the finished item of work.
-
-
-
Preparing foundation bed for masonry or concrete by benching, stepping, removing all loose material by wedging / chiselling and disposing off the same as directed and cleaning the surface with air and water jet etc. ,complete with initial lead upto 50 m and all lifts.
-
-
-
Providing and fixing 25 mm dia. 2.75 m long ribbed steel anchor rods with one end split and driven firmly using steel wedge into 1.25 m deep 45 to 50 mm dia. hole drilled in bed rock and other end provided with L- bend for embedding in concrete / masonry for spillway and appurtenant works including drilling and cleaning hole, filling hole with thick cement slurry,driving anchor rod, cost of all materials, machinery, labour, steel wedge etc., complete with initial lead upto 1 km and all lifts.
-
-
-
Providing and laying insitu vibrated M-25 ( 28 days cube compressive strength not less than 25 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates including cost of all materials, machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,complete for RCC works of gallery, sluice, spillway crest, spillway d / s face, energy dissipating structures, training walls, piers, abutments and such other locations with initial lead upto 1 km and all lifts. ( Cement content : 380 kg / cum with use of super plasticiser, CA : 0.90 cum, blending ratio of CA--65:35, FA : 0.40 cum)
-
-
-
Dewatering from the diversion channel in stipulated area in front of Sluices with oil engine driven pumpsets of capacity 10HP, including hire charges of machinery, fuel charges, sand bags,labour charges and all the accessories necessary to complete the finished item of work.
-
-
-
Formation of bund with sand bags in front of Construction sluice in the Diversion channel of the stipulated area for providing dewatering arrangement including cost of sand bags, sand, labour, laying charges etc. to complete the finished item of work.
-
-
-
Supply and Apply of Epoxy resin based Concrete bonding agent, used for bonding new cementitious materials with the old cementitious surfaces including cost of materials, machinery, labour etc., complete for finished item of work.
-
-
-
Cutting of RCC surface in the form of Groove in the Construction sliuce vent of 19th block with concrete saw cutter and removal with breaker including cost and conveyance of all materials, machinery, labour etc. and all other operations necessary to complete the finished item of work as directed by the Engineer in charge.
-
-
-
Supply and fixng of 310mm wide PVC water stopper including cost and conveyance of all materials and all other operations necessary to complete the finished item of work as directed by the Engineer in charge.
-
-
-
Closing of air vent hole at bottom in the construction sluice of 19th block including cost and conveyance of materials like structural steel plate, welding electrodes, labour charges and hire charges of welding machine etc. to complete the finished item of work as per drawing and as directed by the Engineer-In-Charge.
-
-
-