Irrigation And CAD Department Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Irrigation And CAD Department Tender

Civil And Construction
Road Construction
Opening Date20 Jun 2022
Closing Date4 Jul 2022
Tender Amount₹ 1,48,30,160 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of Slab culverts,CC side drains,CC roads for R and R colony of Manikeswaram(Phase II);Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for foundation filing including cost of materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position, levelling, vibrating,finishing, curing etc.,complete with initial lead upto 50 m and all lifts (Cement content: 260 kg / cum with use of super plasticiser(0.4% by wt. of cement),. CA : 0.90 cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum. (IRR-CCDW-2-3)(For Bed)

515

-

2690360

... More
Construction of Slab culverts,CC side drains,CC roads for R and R colony of Manikeswaram(Phase II);Providing and laying insitu vibrated M-15( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for sub structure /super structure including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,complete with initial lead upto 50 m and all lifts. (Cement content: 280 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--50:30:20, FA : 0.45 cum) (IRR-CCDW-2-10))(For walls)

680

-

3975280

... More
Construction of Slab culverts,CC side drains,CC roads for R and R colony of Manikeswaram(Phase II);Scarifying the existing surface to a depth of 50 mm by Mechanical means and disposal of scarified material with all lifts and lead upto 1000 m as per MORT& H (5th Revision)

8520

-

75828

... More
Construction of Slab culverts,CC side drains,CC roads for R and R colony of Manikeswaram(Phase II);Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per Technical Specification Clause 405 MORD / 404 MORTH. For compacted thickness of 75 mm.(By Mechanical Means)

639

-

1006425

... More
Construction of Slab culverts,CC side drains,CC roads for R and R colony of Manikeswaram(Phase II);WMM Providing, Laying, Spreading and compacting graded HBG crushed stone aggregate to Wet Mix macadem specification ( 5th Revision) as per Table 400-13, including cost of all materials and including premixing the material with water at OMC in Mechanical mix plant carriage of mixed material by tipper to site , laying in uniform layers with paver in base courses on well prepared surface and compacting with Vibratory roller to acheive the desired density etc., as directed by the Engineer-in-Charge and as per MoRT&H specification.406 (5th revision) for finished item of work. .

680

-

1158720

... More
Construction of Slab culverts,CC side drains,CC roads for R and R colony of Manikeswaram(Phase II);Providing separation membrane of impereable plastic sheeting 125 micron thick including cost and conveyence of material and labour charges etc., complete.

4633

-

80150.9

... More
Construction of Slab culverts,CC side drains,CC roads for R and R colony of Manikeswaram(Phase II);Vibrated cement concrete M 30 grade using 20mm & 10mm HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, (excluding seigniorage) conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per MoRT&H specification 1500, 1700, 2100 & 2702 (5th Revision) and as directed by the Engineer-in-Charge for C.C Pavement.

718

-

3668262

... More
Construction of Slab culverts,CC side drains,CC roads for R and R colony of Manikeswaram(Phase II);Providing Contraction joints in CC pavement using bitumen sealent filler material as per IRC:58-1988 & IRC: 15:2002 including cost & conveyance of all materials and all labour charges complete for finished item of work as directed by the Engineer-in-charge.@ ana interval of 4.0m.

949

-

41850.9

... More
Construction of Slab culverts,CC side drains,CC roads for R and R colony of Manikeswaram(Phase II);Construction of Gravel shoulders including cost, (excluding seigniorage) charges and conveyance of all materials to work site and spreading in uniform layers by approved means, on prepared surface and compacting with vibratory roller to achieve the desired density at OMC etc., complete for finished item of work as per MoRT&H Specification 401& 408 (5th revision) and as directed by the Engineer-in-charge. ( Payment will be made based on levels for finished item of work ).

1162

-

587972

... More
Construction of Slab culverts,CC side drains,CC roads for R and R colony of Manikeswaram(Phase II);Providing and fixing 20mm thick and100 mm depth tar felt expansion joint filler board for cement concrete lining of canal including cost of all materials cost of labour complete etc for all leads and lifts.

220

-

17358

... More
Construction of Slab culverts,CC side drains,CC roads for R and R colony of Manikeswaram(Phase II);Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications for bars below 36mm dia including over laps and wastage,where they are not welded including cost and conveyance of steel, binding wire etc., lifting charges of steel , placing in position, tying with binding wire, all tools etc., and Overheads & Contractors profit complete for finished item of work (BLD-CSTN-4-1)

4.24

-

301900.72

... More
Construction of Slab culverts,CC side drains,CC roads for R and R colony of Manikeswaram(Phase II);Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for sub-structure/super structure works including cost of all materials, machinery, labour, formwork,scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts.(Cement content: 330 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum) (IRR-CCDW-2-9)

71

-

430473



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.