To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Irrigation And CAD Department Tender
Opening Date27 Sep 2021
Closing Date4 Oct 2021
Tender Amount₹ 17,68,155
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
447264Tender No
Short Tender Notice No 04/2021-22, 04/06/2021 (8th Call)Tender Authority
Irrigation And CAD Department ViewPurchaser Address
-Website
http://tender.apeprocurement.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Construction of Compound Wall for Angawadi building, Community hall and Construction of Toilet near;Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using coarse aggregate 40mm size hard broken trap variety from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all materials and including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc., and Overheads & Contractors profit complete for finished item of work. (APSS No. 402).
29.48
-
145336.4
... More
Construction of Compound Wall for Angawadi building, Community hall and Construction of Toilet near;Random Rubble stone masonry in CM (1:8) prop: (Cement: Sand) using hard broken trap variety carted from approved quarry including cost and conveyance of all materials like cement, sand, water, stones etc., from approved quarry, to site and including seigniorage charges, sales & other taxes on all materials including labour for cutting stones to required size and shape, mixing, of cement, mortar, construction, curing etc.,and Overheads & Contractors profit complete for finished item of work in foundation and basement. (APSS No. 601 & 615) ( BLD-CSTN-6-13 )
4.63
-
15283.63
... More
Construction of Compound Wall for Angawadi building, Community hall and Construction of Toilet near;Brick masonry for panel walls 115mm thick in superstructure with CM (1:3) prop: (cement : sand) using second class bricks of size 23 x 11 x 7 cms from approved source having minimum crushing strength of 40 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including seigniorage charges, sales & other taxes on all materials and such as labour charges, like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, etc.,and Overheads & Contractors profit complete for finished item of work. (APSS No. 501 & 504).
260.02
-
188717.32
... More
Construction of Compound Wall for Angawadi building, Community hall and Construction of Toilet near;Brick masonry for panel walls 230mm thick in superstructure with CM (1:8) prop: (cement : sand) using second class bricks of size 23 x 11 x 7 cms from approved source having minimum crushing strength of 40 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including seigniorage charges, sales & other taxes on all materials and such as labour charges, like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, etc.,and Overheads & Contractors profit complete for finished item of work. (APSS No. 501 & 504).(BLD-CSTN-5-5 ).
3.22
-
18566.52
... More
Construction of Compound Wall for Angawadi building, Community hall and Construction of Toilet near;Vibrated Reinforced Cement Concrete M20 Design Mix using 20 mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry using a minimum quantity of 330 Kgs of cement per 1 CuM of concreteincluding cost and conveyance of all materials like cement, fine aggregate, coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering, shuttering and scaffoding with props and steel plates as per the approved shuttering plan and other accessories as per norms and stability calculations, machine mixing, laying concrte, vibrating, lifting charges, curing etc., complete but exlcuding cost of steel and its fabrication charges for finished item of works (APSS No. 402&403) FOOTINGS
17.93
-
164776.7
... More
Construction of Compound Wall for Angawadi building, Community hall and Construction of Toilet near;Vibrated Reinforced Cement Concrete M20 Design Mix using 20 mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry using a minimum quantity of 330 Kgs of cement per 1 CuM of concreteincluding cost and conveyance of all materials like cement, fine aggregate, coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering, shuttering and scaffoding with props and steel plates as per the approved shuttering plan and other accessories as per norms and stability calculations, machine mixing, laying concrte, vibrating, lifting charges, curing etc., complete but exlcuding cost of steel and its fabrication charges for finished item of works (APSS No. 402&403) PEDESTAL
0.39
-
3767.01
... More
Construction of Compound Wall for Angawadi building, Community hall and Construction of Toilet near;Vibrated Reinforced Cement Concrete M20 Design Mix using 20 mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry using a minimum quantity of 330 Kgs of cement per 1 CuM of concreteincluding cost and conveyance of all materials like cement, fine aggregate, coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering, shuttering and scaffoding with props and steel plates as per the approved shuttering plan and other accessories as per norms and stability calculations, machine mixing, laying concrte, vibrating, lifting charges, curing etc., complete but exlcuding cost of steel and its fabrication charges for finished item of works (APSS No. 402&403) PLINTH BEAM
14.43
-
165266.79
... More
Construction of Compound Wall for Angawadi building, Community hall and Construction of Toilet near;Vibrated Reinforced Cement Concrete M20 Design Mix using 20 mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry using a minimum quantity of 330 Kgs of cement per 1 CuM of concreteincluding cost and conveyance of all materials like cement, fine aggregate, coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering, shuttering and scaffoding with props and steel plates as per the approved shuttering plan and other accessories as per norms and stability calculations, machine mixing, laying concrte, vibrating, lifting charges, curing etc., complete but exlcuding cost of steel and its fabrication charges for finished item of works (APSS No. 402&403) Column
12.15
-
141146.55
... More
Construction of Compound Wall for Angawadi building, Community hall and Construction of Toilet near;Vibrated Reinforced Cement Concrete M20 Design Mix using 20 mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry using a minimum quantity of 330 Kgs of cement per 1 CuM of concreteincluding cost and conveyance of all materials like cement, fine aggregate, coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering, shuttering and scaffoding with props and steel plates as per the approved shuttering plan and other accessories as per norms and stability calculations, machine mixing, laying concrte, vibrating, lifting charges, curing etc., complete but exlcuding cost of steel and its fabrication charges for finished item of works (APSS No. 402&403) ROOF BEAM
0.9
-
9184.5
... More
Construction of Compound Wall for Angawadi building, Community hall and Construction of Toilet near;Vibrated Reinforced Cement Concrete M20 Design Mix using 20 mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry using a minimum quantity of 330 Kgs of cement per 1 CuM of concreteincluding cost and conveyance of all materials like cement, fine aggregate, coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering, shuttering and scaffoding with props and steel plates as per the approved shuttering plan and other accessories as per norms and stability calculations, machine mixing, laying concrte, vibrating, lifting charges, curing etc., complete but exlcuding cost of steel and its fabrication charges for finished item of works (APSS No. 402&403) ROOF SLAB
12
-
14640
... More
Construction of Compound Wall for Angawadi building, Community hall and Construction of Toilet near;Vibrated Reinforced Cement Concrete M20 Design Mix using 20 mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry using a minimum quantity of 330 Kgs of cement per 1 CuM of concreteincluding cost and conveyance of all materials like cement, fine aggregate, coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering, shuttering and scaffoding with props and steel plates as per the approved shuttering plan and other accessories as per norms and stability calculations, machine mixing, laying concrte, vibrating, lifting charges, curing etc., complete but exlcuding cost of steel and its fabrication charges for finished item of works (APSS No. 402&403) SUNSHADE
11
-
5478
... More
Construction of Compound Wall for Angawadi building, Community hall and Construction of Toilet near;Supplying, fitting and placing Fe-415 bar reinforcement in VRCC works complete as per drawings and technical specifications for bars below 36mm dia including over laps and wastage,where they are not welded including cost and conveyance of steel, binding wire etc., lifting charges of steel , placing in position, tying with binding wire, all tools etc., and Overheads & Contractors profit complete for finished item of work ( APSS No.126 )
4.52
-
262960.04
... More
Construction of Compound Wall for Angawadi building, Community hall and Construction of Toilet near;Plastering 20mm thick single coat in CM (1:5) including cost and conveyance of all materials like cement, sand, water etc., to site, including seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., and Overheads & Contractors profit complete for finished item of work for basement .(SS 901,903 & 904) (BLD-CSTN-8-8)
945.45
-
208944.45
... More
Construction of Compound Wall for Angawadi building, Community hall and Construction of Toilet near;Plastering 12mm thick in CM(1:4) for Internal walls including cost and conveyance of all materials like cement, sand, water etc., to site, including seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer-in-charge etc., and Overheads & Contractors profit complete for finished item of work .(SS 901,903 & 904) (BLD-CSTN-8-2)
44.13
-
6531.24
... More
Construction of Compound Wall for Angawadi building, Community hall and Construction of Toilet near;Flooring with ceramic tiles, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, including seigniorage charges, etc., complete for finished item of work, .(BLD-CSTN-9-6).
4.84
-
4341.48
... More
Construction of Compound Wall for Angawadi building, Community hall and Construction of Toilet near;Providing and fixing 30mm thick Solid panel PVC door shutter consisting of frame made out of M.S. tubes of 19 gauge thickness and size of 19mm x 19mm for stiles, & 15mm x 15mm for top & bottom rails. M.S. frame shall have a coat of steel primers of approved make and manufacture. M.S. frame shall be covered with 5mm thick heat moulded PVC ?C? channel of size 30 x 50mm forming stiles, and 5mm thick, 75mm wide PVC sheets for top rail, lock rail & bottom rail on either side, and 10mm (5mm x 2) thick, 20mm wide cross PVC sheet as gap insert for top rail & bottom rail. Panelling of 5mm thick PVC sheet to be fitted in the M.S. frame welded / sealed to the stiles & rails with 30mm wide x 5mm thick PVC sheet beading on either side, and joined together with solvent cement adhesive etc. An additional 5mm thick PVC strip of 20mm width is to be stuck on the interior side of the ?C? Channel using PVC solvent adhesive. Complete as per direction of Engineer-in-charge, manufacturer?s specification & drawing for finished item of work .BMT-N.02 for Toilet Building
3.78
-
9752.4
... More
Construction of Compound Wall for Angawadi building, Community hall and Construction of Toilet near;Supplying and fixing of Iron Grill gates for compound wall including all accessories and conveyance and labour charges including all taxes etc., complete as directed by the Engineer In Charge.
1098
-
81713.16
... More
Construction of Compound Wall for Angawadi building, Community hall and Construction of Toilet near;Painting to new walls with 2 coats of water proof cement paint (Snowcem/Indocem) of shade as approved by the Engineer-In-Charge over a base coat of aproved cement primer waterbase interior Gr-1 (Asian/Berger/Nerolac/Saicoat/Indocem) making 3 coats in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc., and Overheads & Contractors profit complete for finished item of work as per SS 912 .
989.58
-
176145.24
... More
Construction of Compound Wall for Angawadi building, Community hall and Construction of Toilet near;Painting to new iron work with lapsam finish , over a primary coat ( Asian/Berger/Nerolac/Saicoat/Indocem) and painting two coats of synthetic enamel paint Grade-I (Asian/Berger/Nerolac/Indocem) of approved shade including cost and conveyance of all materials to site cost of primer coat and all labour charges etc. complete including applying sand paper on lappam coats for neat finish including sales & other taxes on cost of all materials etc.and Overheads & Contractors profit complete (APSS No.1200, 1207 & 1211) in all floors.
16.47
-
2272.86
... More
Construction of Compound Wall for Angawadi building, Community hall and Construction of Toilet near;Supply and Fixing of Ventilator of size 1.00 x 0.5 of 50mm thick Jali including cost and conveyance of all materials to site, sales & other taxes, all operational, incidental and labour charges etc., complete for finished item of work in all Floors (BMS W-17)
0.27
-
104.22
... More
Construction of Compound Wall for Angawadi building, Community hall and Construction of Toilet near;Providing dadooing to internal walls with glazed red or white full body ceramic wall tiles thickness 7.3 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and design, set over base coat of CM (1:3) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., complete including seigniorage charges, etc., complete for finished item of work.(BLD-CSTN-9-18)
25.2
-
20650.39
... More
Construction of Compound Wall for Angawadi building, Community hall and Construction of Toilet near;Filling Soak pit with stone (Coarse aggregate 80-40 mm(excluding Seigniorage) from approved quarry in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming, including all operational, incidental, labour charges, hire charges of T & P etc. complete including cost and conveyance of sand for finished item of work.(APSS No. 309 & 310).
1.5
-
2775.84
... More
Construction of Compound Wall for Angawadi building, Community hall and Construction of Toilet near;Supplying and laying, filling, jointing and testing SWG SP-1 pipe conforming to ISI 651 & 4127 with air tight Cement joints in CM (1.5:1) prop. including excavation of trenches and socket pits in any soil (except rock requiring blasting) and refilling with watering and tamping to the required slope including cost and conveyance of all materials to site and all labour charges , Overheads & Contractor profit etc., complete for finished item of work (APSS NO 1301 & 1318)
20
-
12500
... More
Construction of Compound Wall for Angawadi building, Community hall and Construction of Toilet near;Constructing 904.0 mm (3?0?) dia Brick Masonry inspection chamber as per IS - 4111: Part-1:1986 with cement mortar (1:6) prop using 2nd Class Clay Bricks of 225 mm thick from approved source having a minimum crushing strength of 10 N/sq.mm including plastering with cement mortar 1:3 prop; ½? thick both inside and outside fitted with 20? dia RCC manhole covers and frames including excavating pits up to a depth of 904 mm (3'-0") in all sorts of soils (excluding rock) and laying cement conrete (1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 mm thick as per Standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and operational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing , Overheads & Contractors profit etc., complete for finished item of work as per Standard specification.
1
-
6473
... More
Construction of Compound Wall for Angawadi building, Community hall and Construction of Toilet near;Supplying and fixing CI Nahani traps 100 mm dia Inlet- 75 mm (3") outlet pipe - 4 Kgs 1st quality ISI marked conforming to IS:1729-1979 with C.P. Grating fixing with white cement as per site requirements with standard practice for all floors including cost and conveyance of all materials to site, labour charges , Overheads & Contractors profit etc., complete for finished item of work.
4
-
1536
... More
Construction of Compound Wall for Angawadi building, Community hall and Construction of Toilet near;Supplying and fixing 580mm x 440mm long Orissa pan white glazed Water Closet 1st quality ISI marked confirming to IS:2556-Part-3-1981 with "P" or "S" trap Hindware / Parryware / Neycer with brick - ISI mark and providing masonry seat, CC squatting plate and 10 litres capacity single flush PVC low level cistern Parryware or equivalent with internal components fixed on 2 Nos. of teak wood blocks of size 76.20mm x 101.60mm using required size of nails, screws as approved by Engineer-in-charge , CP long bend , 12.70mm PVC connection with brass union nuts CP coated , 31.75mm brass plumber union , 12.70mm NP bib tap 400 gms Seiko or equivalent , P trap or S trap of Indian W.C. shall be encased on CC (1:2:4) 150mm alround well above the joint to stop leakage at the joint etc., complete including cost and conveyance of all materials to site, cost of CC bed, labour charges and seigniorage charges , Overheads & Contractors profit etc., complete for finished item of work.
2
-
9492
... More
Construction of Compound Wall for Angawadi building, Community hall and Construction of Toilet near;Supplying and fixing Indian make Flat Back Wash Hand Basin (HSW/Parryware/ Neycer) 1st quality conforming to IS:2556-Part-4:1972 of size 550mm x 400mm with 32 mm nominal size C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 and fitted with 15 mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make 400 grams Seiko/Senior/Nice/ Esso or equivalent complete with standard CI brackets including wooden blocks ,1 No.12.70mm PVC connection with brass union nuts CP coated , 1 No.12.70mm NP bib tap 400 gms Seiko or equivalent , 31.75mm dia. PVC flexible waste pipe 914.4mm length of 1st quality including cost and conveyance of all materials to site, labour charges , Overheads & Contractors profit for finished item of work
1
-
2671
... More
Construction of Compound Wall for Angawadi building, Community hall and Construction of Toilet near;Supplying and fixing NP bib taps of size 12.70mm dia of Indian make Seiko/Senior/Nice as approved by the Engineer-In-Charge including cost and conveyance of all materials, labour charges , Overheads & Contractors profit complete for finished item of work in all floors.
5
-
1430
... More
Construction of Compound Wall for Angawadi building, Community hall and Construction of Toilet near;Providing and placing on terrace (at all floor levels) polyethylene water storage tank with double layer approved brand and manufacture with cover and suitable locking arrangement and making necessary holes for inlet and outlets and over flow pipes but without fittings and base support for tanks including cost and conveyance of all materials and labour charges , Overheads & Contractors profit complete for finished item of work.
1000
-
7000