To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Irrigation And CAD Department Tender

Civil And Construction
Road Construction
Opening Date15 Aug 2022
Closing Date30 Aug 2022
Tender Amount₹ 3,68,77,343 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of SLRB at Km 35.800;Providing impervious hearting for breached / damaged portion of embankment with soil from approved dump areas in layers of 10 to 15 cm before compaction including cost of all materials, machinery, labour, all operations such as collection of soil,sorting out, spreading soil to specified thickness, breaking clods, sectioning, watering, compacting each layer to density control of not less than 98 percent or as stipulated by rolling or by using mechanical tampers etc., complete with initial lead upto 1 km and all lifts.

1067

-

217668

... More
Construction of SLRB at Km 35.800;Providing and laying insitu vibrated M-10 ( 28 days cube compressive strength not less than 10 N /sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for foundation filling including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts.

36

-

186322

... More
Construction of SLRB at Km 35.800;Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N /sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for foundation filling including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts.

224

-

1216298

... More
Construction of SLRB at Km 35.800;Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for sub-structure / super- structure works including cost of all materials,machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position,levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. (upto 1st floor )

123

-

1024319

... More
Construction of SLRB at Km 35.800;Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for sub-structure / super- structure works including cost of all materials,machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position,levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. (upto 2nd floor )

43

-

366136

... More
Construction of SLRB at Km 35.800;Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for foundation filling including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts.

14

-

81220

... More
Construction of SLRB at Km 35.800;Providing and laying insitu vibrated M-25 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for foundation filling including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts.

283

-

1679407

... More
Construction of SLRB at Km 35.800;Providing and laying insitu vibrated M-25 ( 28 days cube compressive strength not less than 25 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for sub-structure / super- structure works including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts for 1st Floor.

137

-

1191653

... More
Construction of SLRB at Km 35.800;Providing and laying insitu vibrated M-25 ( 28 days cube compressive strength not less than 25 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for sub-structure / super- structure works including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts for 2nd Floor.

129

-

1162122

... More
Construction of SLRB at Km 35.800;Providing and laying insitu vibrated M-25 ( 28 days cube compressive strength not less than 25 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for sub-structure / super- structure works including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts for 3rd Floor.

104

-

969197

... More
Construction of SLRB at Km 35.800;Providing and laying insitu vibrated M-25 ( 28 days cube compressive strength not less than 25 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for sub-structure / super- structure works including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts for 4th Floor.

88

-

847422

... More
Construction of SLRB at Km 35.800;Providing and laying insitu vibrated M-25 ( 28 days cube compressive strength not less than 25 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for sub-structure / super- structure works including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts for 5th Floor.

46

-

476578

... More
Construction of SLRB at Km 35.800;Providing and laying insitu vibrated M-25 ( 28 days cube compressive strength not less than 25 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for sub-structure / super- structure works including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts for 6th Floor.

17

-

158299

... More
Construction of SLRB at Km 35.800;Providing and laying insitu vibrated M-30 ( 28 days cube compressive strength not less than 30 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for sub-structure / super- structure works including cost of all materials,machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position,levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts.

29

-

192981

... More
Construction of SLRB at Km 35.800;Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for deck slab & kerb including cost of all materials,machinery, labour, formwork,scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts.

71

-

683318

... More
Construction of SLRB at Km 35.800;Providing and laying insitu vibrated M-30 ( 28 days cube compressive strength not less than 30 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for deck slab & kerb including cost of all materials,machinery, labour, formwork,scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. - for approach slab

7

-

70627

... More
Construction of SLRB at Km 35.800;Providing and laying insitu vibrated M-30 ( 28 days cube compressive strength not less than 30 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for deck slab & kerb including cost of all materials,machinery, labour, formwork,scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts.

414

-

4177094

... More
Construction of SLRB at Km 35.800;Providing and laying insitu M- 25 ( 28 days cube compressive strength not less than 25 N /sqmm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for wearing coat including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position in alternate panels, levelling, compacting,finishing, curing, packing joints with asphalt mortar etc., complete with initial lead upto 50 m and all lifts.

9

-

50176

... More
Construction of SLRB at Km 35.800;Providing and laying insitu M- 35 ( 28 days cube compressive strength not less than 35 N /sqmm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for wearing coat including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position in alternate panels, levelling, compacting,finishing, curing, packing joints with asphalt mortar etc., complete with initial lead upto 50 m and all lifts.

43

-

253064

... More
Construction of SLRB at Km 35.800;Providing, fabricating and placing in position reinforcement steel bars for RCC works including cleaning, straightening, cutting, bending, hooking, lapping, welding 1.25 mm dia soft annealed steel wire, including cost of all materials, machinery, labour etc.,wherever required,tying with complete with initial lead upto 50 and all lifts.

138

-

10343197

... More
Construction of SLRB at Km 35.800;Providing and fixing 100 mm dia perforated PVC pipes 40 cm long for Weep holes including cost of all materials, labour, drilling 8 mm dia holes etc. complete with all leads and lifts.

20

-

4378

... More
Construction of SLRB at Km 35.800;Providing & fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing & Technical Specification. Filler joint

139

-

22476

... More
Construction of SLRB at Km 35.800;Supplying, fitting and fixing in position true to line and level elastomeric neoprene bearing conforming to IRC: 83 (Part-II) section IX and clause 2005 of MoRTH specifications complete including all accessories as per drawing and Technical Specifications.

208040

-

129019

... More
Construction of SLRB at Km 35.800;Providing and laying insitu vibrated M-10 ( 28 days cube compressive strength not less than 10 N /sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for bed and side lining of canal including finishing the junction of bed and sides to required curveture, cost of all materials, machinery, labour, formwork including supports, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts

318

-

1819373

... More
Construction of SLRB at Km 35.800;Supplying and fixing of CI drainage spouts complete as per MoRT&H Specification No.2705 and as per drawing BD / 1-69.

32

-

52067

... More
Construction of SLRB at Km 35.800;Forming embankment with Side earth by mechanical means upto SDR including pre-watering of soil , removal of top soil, excavation of soils , depositing the soils on the embankment, spreading soil, breaking clods, sectioning , grading and consolidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H, including all hire and operational charges of T&P and excluding seigniorage charges, complete for finished item of work as per MoRT&H specification 305 (5th revision) (Payment will be made based on level for finished item of work).

481

-

76720

... More
Construction of SLRB at Km 35.800;Construction of Granular sub-base by providing HBG material confirming to Grading -V of MoRT&H Table 400-1&2 including cost, seigniorage charges and conveyance of all materials to work site and spreading in uniform layers with motor grader or by approved means, on prepared surface mixing by mix in place method with Rotavator / approved means at OMC and compacting with vibratory roller to achieve the desired density etc., complete for finished item of work as per MoRT&H Specification 401 (5th revision) and as directed by the Engineer-in-charge. ( Payment will be made based on levels for finished item of work )

258

-

695774

... More
Construction of SLRB at Km 35.800;Providing, Laying, Spreading and compacting graded HBG crushed stone aggregate to Wet Mix macadam specification including cost, (excluding seigniorage) of all materials and including premixing the material with water at OMC in Mechanical mix plant carriage of mixed material by tipper to site , laying in uniform layers with paver in base courses on well prepared surface and compacting with Vibratory roller to achieve the desired density etc., as directed by the Engineer-in-Charge and as per MoRT&H specification.406 (5th revision) for finished item of work. (Payment will be made based on levels for finished item of work)

258

-

766518

... More
Construction of SLRB at Km 35.800;Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per Technical Specification Clause 502 MORD (for use on Wet mix macadam & WBM) including contractors profit,Over head charges, excluding taxes etc. complete for Prime Coat

1031

-

57117

... More
Construction of SLRB at Km 35.800;Providing and applying tack coat with Bitumen emulsion (Rapid setting - RS-1) using emulsion distributor at the rate of 0.25 kg per sqm on the prepared granular surfaces treated with primer / (or dry and hungry bituminous surface) & cleaned with Hydraulic broom as per Technical Specification Clause 503 of MORD, including cost of all materials, labour, conveyance, hire charges of machinary, royalties, OH & CP, excluding taxes etc. complete

1031

-

18352

... More
Construction of SLRB at Km 35.800;Providing and laying semi dense bituminous concrete with 40-60 TPH batch type HMP producing an average output of 37.5 tonnes per hour using crushed aggregates of specified grading (Grading II using 9.50 mm nominal size), premixed with bituminous binder @ 4.5 to 5 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORD specification clause No. 509 complete in all respects,including cost of all materials, labour, conveyance, hire charges of machinary, OH & CP, royalties etc complete but excluding GST & Seignorage charges for finished item of work.

258

-

2587224

... More
Construction of SLRB at Km 35.800;Construction of earthen shoulders with barrowed useful selected earth obtained from with laboratory MDD not less than 1.75 gms/cc. obtained from approved source by mechanical means with all leads and lifts including excavation of soils at borrowed area, conveyance of soil, depositing the soil on the shoulder, spreading soil, breaking clods, sectioning, grading and consolidation with 8 to 10 Tonnes Power Road Roller @ OMC to achive the desired density, including all hire and operational charges of T&P and seigniorage charges, complete for finished item of work as per MoRT&H specification 305 (5th revision)

188

-

77606

... More
Construction of SLRB at Km 35.800;Lifting of water from rivers/drains to agricultural fields and where there is no element of excavation- Water lifting charges using 5 Hp Diesel driven pump

14

-

5522

... More
Construction of SLRB at Km 35.800;Providing and fixing 20 mm thick 100 mm depth tarfelt expansion joint filler boards for cement concrete lining of canal including cost of all materials, labour etc., complete with all leads and lifts.

910

-

71799

... More
Construction of SLRB at Km 35.800;Providing and forming 35 mm wide and 10 mm thick construction / contraction joints for concrete lining by mastic filler including cost of all materials, labour etc., complete with all leads and lifts.

910

-

24024

... More
Construction of SLRB at Km 35.800;Laying filter of Size 600 x600 x750 mm in Bed and Sides filling with 12 mm to 40 mm HG machine Crushed metal and sand in bed including Excavation of drains and Cost of procuring of all materials including 50 m lead and for all lifts.

70

-

26621

... More
Construction of SLRB at Km 35.800;Laying and fixing of 100 mm Dia 300 mm long precast porus CC plugs in bed and sides using 1.181 Kgs of cement per each using 20 mm HG metal and placing in local filters of size 600x600x750 mm in size including Excavation of drains and Cost of procuring of all materials including 50 m lead and for all lifts.

70

-

42217

... More
Construction of SLRB at Km 35.800;(Manufacture,supply and delivery of R.C.C. plian ended pipes pipes conforming to B.I.S. 458/2003 , Ex-Factory, excluding Transportation,Taxes & Duties for NP3 class 1200mm dia)- ( Cost and conveyance pipes 1200mm dia of NP3 class )

3

-

25539

... More
Construction of SLRB at Km 35.800;Manufacuring, supply and deliery 1200 mm dia. NP- 3 class of R.C.C plain ended pipes Collars conforming to BIS 458/2003 including Tranportation

2

-

3180

... More
Construction of SLRB at Km 35.800;Laying and jointing 1200 mm dia. NP- 3 class or IRC standard hume pipes in CM 1 : 2 proportion by volume including cost of all materials ( excluding pipes and collars ), machinery, labour, aligning, packing joints with hemp, finishing, curing etc., complete with initial lead upto 50 m and all lifts.

8

-

94816

... More
Construction of SLRB at Km 35.800;Providing casing embankment using semi-pervious soil available from excavation in layers of 25 to 30 cm before compaction including cost of all materials, machinery, labour , all other operations such as re-excavation, sorting out, transportation , spreading in layers of specified thickness, breaking clods, sectioning, watering, compacting to specified density control of not less than 90 percent using 2 Tonne Roller as stipulated etc.,complete with initial lead upto 1 km and all lifts.

3

-

305

... More
Construction of SLRB at Km 35.800;Filling foundation wells with sand in layers of 25 to 30 cm and compacting by watering,ramming as directed including cost of all materials, machinery, labour etc., complete with all leads and all lifts.. - Sand cushion

3

-

3416



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.