Irrigation And CAD Department Tender
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Irrigation And CAD Department Tender
Opening Date22 Mar 2021
Closing Date6 Apr 2021
Tender Amount₹ 5,51,329 This is an estimated amount, exact amount may vary.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
386943Bid Award Id
ViewTender No
IFB NO 743/2020-21 Tender Notice No 29 Dt:17-03-2021Tender Authority
Irrigation And CAD Department ViewPurchaser Address
-Website
http://tender.apeprocurement.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Construction of Lascars Quarters;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering, shuttering.(APSS No. 402 & 403 FOUNDATIONS, PLINTH, PEDESTALS (Below Plinth)Footings
2.1
-
17699
... More
Construction of Lascars Quarters;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering, shuttering.(APSS No. 402 & 403 FOUNDATIONS, PLINTH, PEDESTALS (Below Plinth) Pedastal
1.5
-
13346
... More
Construction of Lascars Quarters;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering, shuttering.(APSS No. 402 & 403 FOUNDATIONS, PLINTH, PEDESTALS (Below Plinth) Plitn beams
1.85
-
19778
... More
Construction of Lascars Quarters;Flooring with 40 mm thick Rough Kadapa/Shahabad ... mm thick stones, set over sand base including pointing with cement mortar 1:3 duly filling joints nearly, including cost of all materials like flooring stone, cement, sand, and water etc., complete, including seigniorage charges, labour charges for dressing of flooring stones etc., complete for finished item of work, for under plinth beams
5.5
-
7677
... More
Construction of Lascars Quarters;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 Coloums
2
-
20378
... More
Construction of Lascars Quarters;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 Lintels
0.2
-
2048
... More
Construction of Lascars Quarters;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering, shuttering.(APSS No. 402 & 403 , FOR LINTELS & CHEJJAS
2.5
-
1563
... More
Construction of Lascars Quarters;Masonry work in CM(1:6) prop (Cement : Sand) in superstructure with fly ash cement / lime solid blocks of size 290mm x 225mm x 140mm from approved source having minimum crushing strength of 50 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including sales & other taxes on all materials and such as labour charges, like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, overheads and contrctor profit etc., complete for finished item of work. (APSS No. 501 & 504).For Main building Basement ,
4
-
22808
... More
Construction of Lascars Quarters;Brick masonry for panel walls in superstructure with CM (1:8) prop: (Cement : Sand) using common burnt clay bricks of class as per Table- I of IS:1077-1992, Non- Modular or traditional size 23 x 11 x 7 cms from approved source having minimum crushing strength of 40 Kg/Sqcm. including cost and conveyance of all materials like cement, screened sand, bricks, water etc., to site, including sales & other taxes on all materials and such as labour charges, like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, etc.,and overheads & contractors profit complete for finished item of work. (APSS No. 501 & 504).
13
-
82446
... More
Construction of Lascars Quarters;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering, shuttering.(APSS No. 402 & 403 , FOR RCC SLABS & BEAMS a) For Roof beams
2.25
-
21420
... More
Construction of Lascars Quarters;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as b) for Rcc slabs 125 mm thick
38
-
44118
... More
Construction of Lascars Quarters;Providing High Yield strenth deformed (HYSD) / Thermo Mechanically Treated (TMT) /Mild steel (MS) bars (Fe 415/500 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc. ,and overheads & contractors profit complete for finished item of work.( APSS No.126)
0.85
-
52764
... More
Construction of Lascars Quarters;Plastering 12mm thick single coat in CM (1:5) using screened sand including cost and conveyance of all materials like cement, sand, water etc., to site, including sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work.(SS 901,903 & 904) (Internal walls) Basement
20.2
-
5919
... More
Construction of Lascars Quarters;Plastering 12mm thick single coat in CM (1:5) using screened sand including cost and conveyance of all materials like cement, sand, water etc., to site, including sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work.(SS 901,903 & 904) (Internal walls) super structure
47
-
14241
... More
Construction of Lascars Quarters;Plastering 20mm thick single coat in CM (1:4) using screened sand including cost and conveyance of all materials like cement, sand, water etc., to site, including sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work .(SS 901,903 & 904) (External walls) Basement
23
-
7406
... More
Construction of Lascars Quarters;Plastering 20mm thick single coat in CM (1:4) using screened sand including cost and conveyance of all materials like cement, sand, water etc., to site, including sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work .(SS 901,903 & 904) (External walls)super structure
90
-
29880
... More
Construction of Lascars Quarters;Ornamental ceiling plastering 12mm thick single coat in CM (1:5) using screened sand including cost and conveyance of all materials like cement, sand, water etc., to site, including sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work.(SS 901,903 & 904)
36
-
11304
... More
Construction of Lascars Quarters;Providing impervious coat to exposed RCC roof slab surfaces to required slopes with CM (1:3) prop. using screened sand 20mm thick (average) mixed with integral cement water proofing liquid confirming to IS: 2645-2003 manufactured by reputed manufacturers as approved by Engineer-in-charge at 200ml per one bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like cement, sand, water proofing compound, water etc., to site, including sales & other taxes on all materials and operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing including rounding off junctions of wall and slab etc., and overheads & contractors profit complete for finished item of work. (APSS No. 901 & 903).
36
-
15372
... More
Construction of Lascars Quarters;Flooring with polished shahabad / Tandur stone slabs of 15mm to 18mm thick set over a base coat of CM (1:8) , 12mm thick using screened sand over already laid CC bed / RCC roof slab including neat cement slurry of honey like consistency spread @ 3.3 Kgs per sqm and jointed with neat cement to full depth including cost and conveyance of all materials like cement, sand, water, flooring stones etc. complete including sales & other taxes on all materials including all labour charges like dressing of flooring stones to the required size, mixing of cement mortar, laying, lift charges , cost of base coat, water charges etc., and overheads & contractors profit complete for finished item of work. (APSS No.703 & 701)
18
-
12330
... More
Construction of Lascars Quarters;Providing skirting to internal walls to 10.00 cm height with Polished Shahabad/Tandur stone slabs 15mm to 18mm thick, length equal to flooring stones set over base coat of CM(1:3) 12 mm thick using screened sand with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointing with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., complete and overheads & contractors profit complete for finished item of work.(APSS No.701 &707)
4
-
296
... More
Construction of Lascars Quarters;White washing two coats with white lime powder of approved quality to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work, but excluding conveyance charges of materials - item no.134 (APSS No.901 & 908) for External walls Colour washing two coats with Janathacem to compound wall to give an even shade after thouroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials , labour charges and incidental such as scaffolding , lift charges etc., and overheads & contractors profit complete for finished item of work in all floors. (Internal & External walls)
194
-
10467
... More
Construction of Lascars Quarters;Supply and Fixing of 18 guage MS Plain sheet Door of size 1.20 x 2.10 mts with outer angular frame of rolled steel equal angle 40 x 40 x 6m and inner shutter angular frame rolled steel equal angle 35 x 35 x 4 mm with Double leaf shutter,MS Flats 25x4mm-3Nos for Horizontal to the Dor MS aldrop 250mm long-1No MS Tower bolt 150mm long-2Nos,MS Hinges 150mm long-4Nos with primary coat of Red oxide paint including cost,conveyance of all materials to site ,sales and other taxes on all materials and labour charges etc complete
1
-
7783
... More
Construction of Lascars Quarters;Supply and fixing of 18 guage M.S. Plain Sheet WINDOW of size 1. 20 M x 1. 20 M (Six Leafs shutters with outer angular frame of rolled steel equal angle ISA 4040 of Size 40mm x 40mm x 6mm and inner shutter angular frame of rolled steel equal angle ISA 2525 of size 25mm x 25mm x 4mm and rolled steel Tee Bars 40mm x 40mm x 6mm one number horizontally in centre of the window and 2 Nos. verticles also bended with fixtures such as M.S. Powder coated tower bolts 100mm long 6 Nos., M.S. Powder coated butt Hinges 12 Nos., M.S. Powder coated handles 125mm long 6 Nos., M.S. Powder coated wind appliance 6 Nos., and safety rods 10mm square roads at 100mm centre to centre welded horizontally to full width of window including redoxide primer grade I quality coating including cost and conveynace of all materials, labour charges etc., complete for finished item of work.
3
-
21090
... More
Construction of Lascars Quarters;Painting two coats with synthetic enamel paint Grade-II VOC (Volatile Organic Compound) content less than 50 grams/litre over primer coat of red oxide to new iron work including cost and conveyance of all materials to site, sales & other taxes, incidental, operational and all labour charges etc., and overheads & contractors profit complete for finished item of work in all floors. (SS No. 1201, 1212 & 1207).
13
-
1963
... More
Construction of Lascars Quarters;Providing semi-pervious / pervious casing embankment using soil fromapproved borrow area in layers of 25cm before compaction including cost ofall materials, machinery, labour, all operations such as excavation, sortingout,transporting, spreading in layer of specified thickness, breaking clods, sectioning,watering, compacting to density control of not less than 95 percent or asstipulated by Sheep foot roller / Vibratory roller/ 8 to 10 tonnepower roller etc., complete with initial lead upto 1 km and all lifts.
33
-
27882
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements