Irrigation And CAD Department Tender
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Irrigation And CAD Department Tender
Civil And Construction
Irrigation Work
Opening Date23 Dec 2024
Closing Date6 Jan 2025
Tender Amount₹ 7,69,770
Costs
EMD
₹ 7,700Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
775922Tender No
87/2024-25, dt :.19.12.2024, O/o the EE/DD/ BhimavaramTender Authority
Irrigation And CAD Department ViewPurchaser Address
-Website
http://tender.apeprocurement.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Labour Charges For Sharpening the edges of Ballies remove the knots,Driving to the required depth and attached the thutties with binding wire etc completed as Directed by the Department
50
12
600
... More
Suplying of casurina ballies of size 50mm to 100mm dia. Including cost and conveyance to the site of work etc., complete.
40
40
1600
... More
Supply of 1/4 split Bamboo thatties including cost and conveyance to site of work
60
180
10800
... More
Filling foundation wells with sand in layers of 25 to 30 cm and compacting by watering, ramming as directed including cost of all materials, machinery, labour etc., complete with all leads and all lifts.
17.98
1386
24927.47
... More
Providing and laying insitu vibrated M-10 ( 28 days cube compressive strength not less than 15 N /sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for foundation filling including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts.
7.04
6841
48167.47
... More
Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N /sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for foundation filling including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts.
22.03
7137
157232.52
... More
Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 80 mm down size approved, clean, hard, graded aggregates for piers and abutments including cost of all materials, labour, machinery, formwork, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts.
26.07
8686
226444.02
... More
Providing and laying insitu vibrated M-15 (28 days cube compressive strength not less than 15 N/sqmm) grade cement concrete using 20 mm down size approved clean hard graded aggregatesfor sub-structure / super- structure works including cost of all materials,, machinery, labour, form work, scaffolding, cleaning, batching, mixing, placing in position, levelling finishing, curing etc., complete with initial lead upto 50m and all lifts.
10.21
7764
79280.04
... More
Manufacture, Supply and Delivery of R.C.C. Socket and Spigot pipes conforming to B.I.S. 458/2003 at ex-factory (rate per meter of effective length) Excluding transportation and all taxes.
2.5
6901
17252.5
... More
Laying and jointing 1000 mm dia. NP- 3 class or IRC standard hume pipes in CM 1 : 2 proportion by volume including cost of all materials ( excluding pipes and collars ), machinery, labour, aligning, packing joints with hemp, finishing, curing etc., complete with initial lead upto 50 m and all lifts.
1
1142
1142.31
... More
Excavation in all kinds of soil including cost of all materials, seigniorage, machinery, labour placing the excavated stuff for Removal of cross bund as directed etc., complete with lead up to 10 m and lift up to 3 m.
90
37
3330
... More
Shuttering Arrangements on Porabodi Minor drain
-
-
-
... More
Frabrication and supply of M.S.Shutter, frame made with ISMC 150X75 mm angle and 8 mm thick MS Plate welded to the frame, hoist beam with ISMC 150 X 75 and screw rod of 63 mm dia with threading, and other items cost including cutting, welding, drillingholes, painting with red oxide paint, two coats with anticorosive black paint, dismantling and erection charges, transportation charges and other miscellaneous items etc., complete
-
-
-
... More
Fabrication, supply, erection, testing and commissioning of sluice shutters consisting of etc.,with all accessories including cost of materials, machinery, labour etc., complete
0.22
283085
61995.68
... More
Supply of gear box to suit 63 mm dia Screw rod including fixing to hoist beam and including supply of suitable handle etc., complete. As per quotations
1
20000
20000
... More
Surface cleaning of metal surfaces by chemical cleaners and then by hand and power tool cleaners and removing dust. After cleaing, applying primary coat with one coat of zinc rich epoxy primer to a thickness of 100 micrines, followed by finishing coats 2 coats with coal tar cpoxy with material, labour, and all accessories with all leads and lifts.
8
535
4285.04
... More
HD Bolts (MAT-00110)
9
146
1314
... More
Total
-
-
769769.67
... More
Provision towards Seinorage charges
-
-
10000
... More
Provision towards NAC @ 0.10%
-
-
780
... More
Provision towards for GST @ 18%.
-
-
140499
... More
Provision towards Printing, Xerox and Photographic charges etc.,
-
-
38951
... More
Parliament - Narasapuram
Assembly - Undi
Mandal - Akividu
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%