To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Irrigation And CAD Department Tender

Civil Works Others
Opening Date5 Oct 2020
Closing Date19 Oct 2020
Tender Amount₹ 5,61,56,044 
This is an estimated amount, exact amount may vary.
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of CC Wall and CC Lining;Providing and laying insitu vibrated M-15 (28 days cube compressive strength not less than15N/sqmm) grade cement concrete using 20 mm down size approved, clean, hard, graded, aggregates for construction of side walls including cost of all materials, aggregates for construction of side walls including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, leveling, vibrating, finishing, curing etc., with initial lead upto 50 m and all lifts including all other operations necessary to complete for finished item of work as per the approved drawings or as directed by the Engineer-in-charge

5065.2

-

28388926

... More
Construction of CC Wall and CC Lining;Providing and laying insitu vibrated M-15 (28 days cube compressive strength not less than15N/sqmm) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for bed lining of canal (75 mm thick) including finishing the junction of bed and sides to required curvature, cost of all materials, machinery, labour, formwork including supports, cleaning, batching, mixing, placing in position, leveling, vibrating, finishing, curing etc., with initial lead upto 50 m and all lifts including all other operations necessary to complete for finished item of work as per the approved drawings or as directed by the Engineer-in-charge

1410

-

8411496

... More
Construction of CC Wall and CC Lining;Providing and filling murrum / gravely soil for foundation or around pipes including breaking clods, spreading in layers of 10 to 15 cm, watering, compaction by earth masters to achieve density control of not less than 95 percent etc., with lead upto 50 m and all lifts including all other operations necessary to complete for finished item of work as per the approved drawings or as directed by the Engineer-in-charge

6246.2

-

2157437

... More
Construction of CC Wall and CC Lining;Manufacture, supply and delivery of NP3 300 mm dia RCC Plain ended pipes confirming to BIS 458/2003, Ex-factory, including labour and transportation including all other operations necessary to complete for finished item of work as per the approved drawings or as directed by the Engineer-in-charge

70

-

72877

... More
Construction of CC Wall and CC Lining;Manufacture, supply and delivery of 300 mm dia collars RCC collars confirming to BIS 458/2003, Ex-factory including transportation including all other operations necessary to complete for finished item of work as per the approved drawings or as directed by the Engineer-in-charge

28

-

5051

... More
Construction of CC Wall and CC Lining;Laying and jointing 300 mm dia. NP-3 class or IRC standard hume pipes in CM 1:2 proportion by volume including cost of all materials (excluding pipes and collars), machinery, labour, aligning, packing joints with hemp, finishing, curing etc., with initial lead upto 50m including all other operations necessary to complete for finished item of work as per the approved drawings or as directed by the Engineer-in-charge.

28

-

11508

... More
Construction of CC Wall and CC Lining;Fabrication, supply, erection, testing and commissioning of sluice shutters consisting of kin plate, horizontal and vertical angles, stiffeners, rubber seals, clamps with all accessories for sluice shutters including cost of all materials, machinery, labour, seal fixing etc., and all other operations necessary to complete for finished item of work as per specifications and approved drawings or as directed by the Engineer-in-charge

3.61

-

750735

... More
Construction of CC Wall and CC Lining;Rough stone pitching 0.300m thick including cost of materials and labour for protection works and bed pitching Proportion including cost of all materials, labour, packing chips and mortar, all lifts and transportation including all other operations necessary to complete for finished item of work as per the approved drawings or as directed by the Engineer-in-charge.

245

-

74627



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.