Irrigation And CAD Department Tender
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Irrigation And CAD Department Tender
Civil Works Others
Opening Date5 Oct 2020
Closing Date19 Oct 2020
Tender Amount₹ 5,61,56,044 This is an estimated amount, exact amount may vary.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
353234Bid Award Id
ViewTender No
48SE/2020-2021, Dated:03.10.2020 (Tender Cum E-Auction (Reverse Tendering))Tender Authority
Irrigation And CAD Department ViewPurchaser Address
-Website
http://tender.apeprocurement.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Construction of CC Wall and CC Lining;Providing and laying insitu vibrated M-15 (28 days cube compressive strength not less than15N/sqmm) grade cement concrete using 20 mm down size approved, clean, hard, graded, aggregates for construction of side walls including cost of all materials, aggregates for construction of side walls including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, leveling, vibrating, finishing, curing etc., with initial lead upto 50 m and all lifts including all other operations necessary to complete for finished item of work as per the approved drawings or as directed by the Engineer-in-charge
5065.2
-
28388926
Construction of CC Wall and CC Lining;Providing and laying insitu vibrated M-15 (28 days cube compressive strength not less than15N/sqmm) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for bed lining of canal (75 mm thick) including finishing the junction of bed and sides to required curvature, cost of all materials, machinery, labour, formwork including supports, cleaning, batching, mixing, placing in position, leveling, vibrating, finishing, curing etc., with initial lead upto 50 m and all lifts including all other operations necessary to complete for finished item of work as per the approved drawings or as directed by the Engineer-in-charge
1410
-
8411496
Construction of CC Wall and CC Lining;Providing and filling murrum / gravely soil for foundation or around pipes including breaking clods, spreading in layers of 10 to 15 cm, watering, compaction by earth masters to achieve density control of not less than 95 percent etc., with lead upto 50 m and all lifts including all other operations necessary to complete for finished item of work as per the approved drawings or as directed by the Engineer-in-charge
6246.2
-
2157437
Construction of CC Wall and CC Lining;Manufacture, supply and delivery of NP3 300 mm dia RCC Plain ended pipes confirming to BIS 458/2003, Ex-factory, including labour and transportation including all other operations necessary to complete for finished item of work as per the approved drawings or as directed by the Engineer-in-charge
70
-
72877
Construction of CC Wall and CC Lining;Manufacture, supply and delivery of 300 mm dia collars RCC collars confirming to BIS 458/2003, Ex-factory including transportation including all other operations necessary to complete for finished item of work as per the approved drawings or as directed by the Engineer-in-charge
28
-
5051
Construction of CC Wall and CC Lining;Laying and jointing 300 mm dia. NP-3 class or IRC standard hume pipes in CM 1:2 proportion by volume including cost of all materials (excluding pipes and collars), machinery, labour, aligning, packing joints with hemp, finishing, curing etc., with initial lead upto 50m including all other operations necessary to complete for finished item of work as per the approved drawings or as directed by the Engineer-in-charge.
28
-
11508
Construction of CC Wall and CC Lining;Fabrication, supply, erection, testing and commissioning of sluice shutters consisting of kin plate, horizontal and vertical angles, stiffeners, rubber seals, clamps with all accessories for sluice shutters including cost of all materials, machinery, labour, seal fixing etc., and all other operations necessary to complete for finished item of work as per specifications and approved drawings or as directed by the Engineer-in-charge
3.61
-
750735
Construction of CC Wall and CC Lining;Rough stone pitching 0.300m thick including cost of materials and labour for protection works and bed pitching Proportion including cost of all materials, labour, packing chips and mortar, all lifts and transportation including all other operations necessary to complete for finished item of work as per the approved drawings or as directed by the Engineer-in-charge.
245
-
74627