Indian Port Rail And Ropeway Corporation Limited Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Indian Port Rail And Ropeway Corporation Limited - IPRCL Tender

Works
Civil And Construction
Pipe Line Project
Eprocure
Opening Date29 Nov 2024
Closing Date17 Dec 2024
Tender Amount₹ 19,85,17,052 
Notes
Download

Costs

  • EMD

    ₹ 39,70,000
  • Document Cost

    ₹ 11,800
  • Tender Fee

    ₹ 11,800

Summary

Maintenance Of Railway Lines R And D Yard Of Vpa For A Period Of 3 Years Rly Lines

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
RT-3706 GFN Liners

12000

16

192000

... More
1 in 8.5 60 KG RT-4865 PSC Sleepers

5

525825

2629127

... More
Description of Materilas

-

-

-

... More
RT-3701 ERC

12000

114

1373400

... More
Combination Fishplate T-696-699

20

17048

340977

... More
C Clamp RT-5552/1

20

2625

52500

... More
Point Clamps for P&C

25

1837

45938

... More
60kg 1M long fishplate RT-5916 with upto date along with Supply Bolts and Nuts.

150

7181

1077150

... More
CI Brackets with full components T-4917

100

606

60600

... More
1 IN 8.5 60KG RT- 4966 Switch with full components with fittings & RT- 4967 CMS Crossings with R/Pads and Crossing bolts etc.(LH-15 and RH-15)

30

-

-

... More
MS Bolts with Sq Head with Hen nuts (25 x 180mm) 7" Bolts RT- 11513

-

-

-

... More
Description

-

-

-

... More
Lifting and packing for regrading the existing PSC sleepers track to required height /level in stages not exceeding 75mm or part thereof at a time, providing permissible ramp for the track, insertion of moorum/sand/stone ballast uniformly under the existing track and placing the same to safe approved gradient, gauge, cushion including levelling and one round of through packing to allow train movement at restricted speed of 15 kmph for a specified length with all leads & lifts and fixing, marking painting rail level pegs at every 30m interval Note Lifting of track shall be done

-

-

-

... More
in stages as per procedure

-

-

-

... More
prescribed in latest edition of IRPWM to get the proposed final level as per approved working profile, as directed by Engineer in-charge.(

-

-

-

... More
USSOR 083010)

-

-

-

... More
Through packing of track, as per procedure prescribed in latest edition of Indian Railways Permanent Way Manual For

-

-

-

... More
PSC sleeper Track.

-

-

-

... More
For PSC sleeper Track with Sleeper Density of 1540 Sleepers/Km or more ( 131011)

-

-

-

... More
Through packing of points and crossings, derailing switches including gauging, fittings recoupment, ballasting as required, elimination of sag and to the required alignment after Deep Screening as per procedure prescribed in latest edition of IRPWM complete as per direction of Engineer-in-charge.

-

-

-

... More
for 1 in 8.5 PSC layout

-

-

-

... More
Casual renewal of PSC sleepers on points and crossings, derailing switches and diamonds portion of any layoutincluding packing under new sleepers. All the released materials shall be stacked at specified location in a countable manner within the lead of 250m & all lift, clear of infringements, crossing of track, if any complete, as directed with contractor's vehicles, consumables, stores, labour etc. complete, as directed by Engineer in-charge. Note: Approach and Exit sleepers shall be paid as normal sleepers under relevant item.Sleepers up to 2.85 m

-

-

-

... More
length

-

-

-

... More
Sleepers of length more than

25

728

18204

... More
2.85 m and up to 4.20 m

-

-

-

... More
Sleepers of more than 4.20 m length

-

-

-

... More
Renewal of CMS Crossing of all rail sections with CMS crossing or with WCMS crossing complete with fastenings including replacement of worn-out rubber pads, liners and ERC, as required. All the released materials shall be stacked at specified

-

-

-

... More
location in a countable manner within the lead of 500m & all lift, clear of infringements, crossing of track, if any complete, as directed. with contractor's vehicles, consumables, stores, labour etc. complete, as directed by engineer in- charge. Note: Rail

-

-

-

... More
cutting and drilling shall be paid separately under relevant item.

-

-

-

... More
1 in 8½ Turnout

-

-

-

... More
Renewal of Switch Rails (Tongue rails, Stock rails and fittings) of all rail sections, under line block conditions ensuring proper

-

-

-

... More
housing & changing of stretcher bars and fittings as required. Work also includes drilling of hole,

-

-

-

... More
if any, and leading of rails laying anywhere in station yard to site of work.

-

-

-

... More
Released switch rails shall be

-

-

-

... More
stacked

-

-

-

... More
at indicated place in a countable manner within the lead of 250m & all lift, clear of infringements, crossing

-

-

-

... More
of track, if any complete, as directed. with contractor's vehicles, consumables, stores, labour etc. complete, as directed by

-

-

-

... More
engineer in-charge. Note: 1).One set means Two Tongue rails and Two Stock rails (2) One tongue & stock rail shall be

-

-

-

... More
considered as 1/2 set. (3) One tongue rail or one Stock rail shall be considered as 1/4 Set.

-

-

-

... More
1 in 8½ Switch Assembly

-

-

-

... More
Manual deep screening of Plain track/turnouts as per procedure prescribed in IRPWM, June 2020 or latest,on PSC sleepers of any density and throwing away screened muck arising out of screening on toe of bank or on cess, if low or on spoil banks above top of cutting (including throwing and leveling, if required beyond minimum 5m from the edge of cutting which are up to 3m deep or alternatively carting it up to 50m for disposing it

-

-

-

... More
off beyond cutting or

-

-

-

... More
platforms) as per direction of Engineer in-charge, including cutting cess for effective drainage on both sides, one round of kutcha packing with screened ballast and further attending to track parameter to make track fit for 20 kmph speed complete in all respect. Note : Payment shall be made for length along main line only for turnouts.Depth of 300 mm below bottom of sleeper -

-

-

-

... More
For Plain Track :

-

-

-

... More
Loading of 52kg / 60kg PSC line and special sleepers beyond 2.75 metre length including existing fittings and fastenings in

-

-

-

... More
Depot / Station / Mid-section between stations in a neat manner to departmental material train (DMT) or contractor's /

-

-

-

... More
Railway's Truck/trailer with crane or any other means including crossing of one track with free lead up to 250 metre and lift

-

-

-

... More
up to 5 metre, if required with contractor's labour, tools & plants, machinery, consumables etc. Note: In case of any damage

-

-

-

... More
to sleeper during loading,

-

-

-

... More
penalty @ In Wagon where

-

-

-

... More
mechanical handling is possible and traffic block is required.

-

-

-

... More
Loading, leading and unloading of PSC Sleepers of 52Kg / 60Kg by Railway's Rail Dolly/ Dip Lorry to the nominated location

-

-

-

... More
under traffic in case road carriage is not possible for different leads and lift up to 5 metres.

-

-

-

... More
For lead up to 500 metres

-

-

-

... More
For lead beyond 500 metre and up to 1 Km

-

-

-

... More
Pulling back of rails / panels on running track for creep adjustment or other incidental activities by removing and re-fixing all the fittings, and fastenings including squaring of sleepers and slack picking of displaced

-

-

-

... More
sleepers, as directed For rails up to 13 metre length

-

-

-

... More
For rail panel above 13 metre

1000

34

34629

... More
& up to 40 metre length

-

-

-

... More
For rail panel more than 40 metre length

1000

37

37790

... More
Insertion of rails of all types & length in track, laid on any type & density of sleeper to the specified gauge under traffic block. Rates include fastening of rail with sleepers with standard set of fastenings and fixing of fish plates and bolts or, if required, providing gap for welding and stacking of released material without infringement within 250m as directed by Engineer-in- Charge.Note: Rail drilling and

-

-

-

... More
cutting to be paid separately

-

-

-

... More
For Through Rail

1000

40

40257

... More
Renewal work

-

-

-

... More
Under Traffic Block: Dismantling of existing BG turnouts, diamond crossings and derailing switches with all types of rails and sleeper layout, removing rails, switches, crossings, sleepers & fastenings, leveling of ballast to correct profile & stacking all the released materialssleepers, fastenings, railsswitches & crossings including segregating & stacking at specified locations in a neat and countable manner, within the lead of 250m & all lift, clear of infringements,

-

-

-

... More
crossing of track, if any

-

-

-

... More
complete, as directed.

-

-

-

... More
Note: 1. This item shall be operated only when existing turnout is replaced either with new turnout in case of TTR or with plain track when existing turnout is no more required at that location. 2. Rail cutting will be paid extra under relevant…

-

-

-

... More
1 in 8% Turnout (Under

-

-

-

... More
Traffic Block)

-

-

-

... More
Diamond Crossing (Under Traffic Block)

-

-

-

... More
Under conditions not requiring Traffic Block: Dismantling of existing BG turnouts, diamond crossings and derailing switches with all types of rails and sleeper layout, removing rails, switches, crossings, sleepers & fastenings, leveling of ballast to correct profile & stacking all the released materials, sleepers, fastenings, rails, switches & crossings including segregating & stacking at specified locations in a neat and countable manner, within the lead of 250m & all lift, clear of infringements,

-

-

-

... More
crossing of track, if any complete, as directed -

-

-

-

... More
Note:1. This item shall be operated only when existing turnout is replaced either with new turnout in case of TTR or with plain track when existing turnout is no more required at that location.2. Rail cutting will be paid extra under relevant item.3. Laying of new turnout or plain track on prepared ballast bed, as required, shall be paid separately under relevant item.1 in 8½ Turnout (Under conditions not requiring

-

-

-

... More
Traffic Block

-

-

-

... More
Diamond Crossing (Under

-

-

-

... More
conditions not requiring Traffic Block)

1

37881

37882

... More
Boxing and profiling of ballast as per procedure prescribed in latest edition of IRPWM including cess dressing on both sides of track. The work will include removing excess ballast from track and putting the same in crib and shoulder by leading to a maximum of 50m including crossing of track, deweeding on ballast section etc and as directed by

-

-

-

... More
Engineer-In charge.

-

-

-

... More
Opening of level crossing up to required width from centre line of track for replacement of sleepers by digging of pucca road surface up to bottom of sleeperremoving of ballast, muck etc, screening of ballast & stacking the same near level crossing and disposing of all debris, replacing the required sleeper duly packing the sleeper to make fit for normal traffic and closing of LC surface with screened ballast to original level by proper ramming and consolidation to smooth motarable surface as directed by engineer in-

-

-

-

... More
charge

-

-

-

... More
Dismantling existing check rail of Level Crossing, blocks, bolts & nuts and stacking these in a countable manner near LC, free from any infringements as directed by

-

-

-

... More
Engineer in-charge

-

-

-

... More
Quick cutting with abrasive rail cutter of all types of rail sections including wear resistant, head hardened rails up to 110 UTS, with contractors tools & plants, equipment, consumable with

-

-

-

... More
all lead & lift etc. complete

-

-

-

... More
as directed by Engineer in- charge. 161011 Abrasive Rail Cutter will be as per RDSO Specification No. TM/SM/1 (Rev. 01 of 2012) with latest status of RDSO; Rail Cutting Wheel Abrasive Disc will be as per RDSO Specification No.TM/SM/2

-

-

-

... More
(Rev. 01 of 2020)1) 161011-

-

-

-

... More
60kg 110/90 UTS- Outisde Track

-

-

-

... More
2) 161014- 60kg 110/90 UTS-

-

-

-

... More
On Running Line

800

360

288179

... More
Drilling holes of 16 mm to 32 mm dia. with Rail Drilling machine including chamfering with appropriate chamfering tools in all types of rail section with contractor's tools & plants, equipment, consumable with all lead & lift etc. complete, as directed by Engineer in- charge. Rail Drilling Machine will be as per RDSO Specification No. TM/SM/3, dated 24.04.1991.

-

-

-

... More
1) 161041- out side track

-

-

-

... More
2) 161042- on Running line

800

64

51223

... More
Loading, leading and unloading of 52Kg/60Kg rail up to 13 metre length by Railway's Rail Dolly / Dip

-

-

-

... More
Lorry to the nominated

-

-

-

... More
location under traffic with line protection in case road carriage is not possible with different lead with a lift up to 5 metre during block period. 1)171031- For lead Up to 500

-

-

-

... More
metre.

-

-

-

... More
2) 171032- for lead beyond 500m and upto 1km.

-

-

-

... More
Lubrication of Elastic Rail Clips on PSC sleepers as per procedure ERC prescribed in latest edition of IRPWM with Railway's grease

-

-

-

... More
Slewing and realigning of curves under traffic line block condition, as directed by Engineer in-charge with contractor's labour, tools & plants. as required with general lift up to 25mm including one round of through packing, ballast profiling, loosening/tightening of P Way fittings, if required and other incidental works.

-

-

-

... More
Note: Payment will be made based on average slew calculated in each 50m length of track by averaging absolute values of positive and negative value of slews. 134015-PSC Sleeper track minimum slew upto 50mm.

-

-

-

... More
Overhauling of fish plated / welded joint track sleepers including 3 approach sleepers on either sides up to 50mm below bottom of sleepers in crib & shoulder, replacing rounded ballast, recouping deficient ballast within 50m lead, replacement of worn-out fittings supplied by VPA, as directed as per procedure prescribed in latest

-

-

-

... More
edition of IRPWM.132020

-

-

-

... More
Lubrication of fish plated rail joints under traffic, by using Grease Graphite Grade 'O' (IS:408) and Black oil supplied by contractor, for all types of rail sections as per procedure laid down in latest version of IRPWM and as directed by Engineer In 063051 charge.

-

-

-

... More
Note: Release U/S bolt & nuts is to be deposited back. If any fish bolts is jammed it should be cut with chisel and hammer and replaced with fresh fish bolt supplied.

-

-

-

... More
Renewal of seized Plate/Rail screws on PSC Sleepers by using gas or any approved methods, duly drilling holes in broken screw and

-

-

-

... More
removing existing screw

-

-

-

... More
pieces from the holes along with existing dowels and fixing new contractor's dowels (procured from RDSO approved sources) and grouting around dowel with Epoxy materials of approved specification and refixing new Railway's rail/Plate screws duly greasing the screw with specified grease with all contractor's materials, consumables, tools & plants, labour with all lead, lift.

-

-

-

... More
Note: 1.Seized screws shall be identified and marked by VPA In charge) level.

-

-

-

... More
2.  Due care shall be taken to avoid any damage to the sleeper

-

-

-

... More
3. A penalty of 50% of the basic cost of new sleeper in nearest sleeper factory shall be levied on each, if sleeper gets damaged in the process.

-

-

-

... More
Scattered renewal or replacement of missing/worn-out fittings with Railway's fittings for track/Points & Crossings sleepers including leading to required location for the work and the released fittings shall be collected and neatly stacked, as directed

-

-

-

... More
by the Engineer In charge. Note: New fittings shall be supplied from and released material shall be deposited at, nearest P.Way Stores.

-

-

-

... More
Removing seized ERC from SGCI inserts of existing track by using suitable approved chemicals and re-fixing after greasing of insert eye and ERC with Contractor's grease of specified quality as per provisions of IRPWM, as directed by Engineer in- charge. Note: 1.List of Seized ERC along with location shall be prepared after inspection of SSE/P.Way and marked prior to execution of this item. 2. Due care shall be taken to avoid any damage to the sleeper 3.A penalty of 50% of the basic cost of new sleeper in nearest sleeper factory shall be levied on each,if SGCI insert is broken or sleeper gets

-

-

-

... More
cracked in the process.06310

-

-

-

... More
Opening and refixing of Joggled fish plates provided to weld joints/rail Set of any rail section under traffic to enable examination of weld/rail by departmental official nominated by Engineer In charge and lubrication of fishplates by applying departmental Grease graphite grade 'O' (IS:408) to fishing planes and bolts by departmental black oil as per procedure laid down in latest version of IRPWM, including all tools required and as directed by Engineer-in-charge.

-

-

-

... More
Note: 1. Grease Graphite, black oil, fish bolts, K.Oil, wire brush, required for work shall be given by department and issued at concerned VPA Stores.

-

-

-

... More
2 Jammed fish bolts shall be cut using chisel and hammer and replaced with new bolt.

-

-

-

... More
Lifting for increase in ballast cushion of existing points & crossing layouts up to 75mm or part thereof including approach and exit sleepers Including one round of through packing, correcting the disturbed sleeper spacing, tightening of fittings, boxing of ballast and ramping out on either side at slope not steeper than 1 in 1000 or as directed.

-

-

-

... More
Note: Item will be paid only when lifting

-

-

-

... More
is 50mm or more.

-

-

-

... More
073011-for 1 in 8.5 Points and Crossings.

-

-

-

... More
Picking up of slacks in track of all sleeper density, duly opening up ballast, gauging, alignment, correcting longitudinal & cross levels, packing, boxing of ballast and dressing the same under traffic conditions as per procedure prescribed in latest edition of IRPWM and as directed by Engineer in- charge.Note: In-charge section Engineer should identify locations requiring packing and obtain prior approval of DEN/XEN before execution of the work when there is no Zonal Track

-

-

-

... More
Maintenance agency

-

-

-

... More
deployed in the section.1310 21-For PSC Sleeper.

-

-

-

... More
Slack picking of joint sleepers and 3 approach sleepers on either sides giving required lift to make up general track level, packing and

-

-

-

... More
profiling as directed.

-

-

-

... More
Removing weeds & bushes in ballast section and cess up to 3.95m from centre line of track in mid section & station yard, as 136100 specified by Engineer in-charge including disposal of branches, bushes outside cess/yard.

-

-

-

... More
Trimming of tree branches coming within 6m of centre line of track & those obstructing views of Curves/LCs/Signal / Indicator at locations in section & station yard, as specified by Engineer in-charge including disposal of branches, bushes outside cess/yard.

-

-

-

... More
Note: Girth of more than 20 cm will only be

-

-

-

... More
considered as tree branch.

-

-

-

... More
Collection, segregation and stacking of various scattered P.Way materials at nominated stacking location with serviceable and unserviceable ones separately within a lead up to 500 metre and lift up to 5 metre including crossing of track(s) wherever necessary as directed by Engineer-in- Charge.

-

-

-

... More
173031-Rails, switches, crossings, SEJ, Glued Joints,

-

-

-

... More
Check Rails etc.

-

-

-

... More
All type of PSC sleepers- 173032

-

-

-

... More
P.Way fittings of all types and other similar loose items 173033

-

-

-

... More
Gauging of sleepers to the required gauge as per the instructions of the site in charge, after opening of ERC, liners, resetting of gauge by shifting the sleeper manually and refitting, retightening of the fittings of the sleeper, adjusting the GR

-

-

-

... More
pads if displaced.

-

-

-

... More
Leading and spreading of 50mm size stone ballast by head / trolley/ tractor/ dumper or any other means from the stacks available at the ballast depot / on cess/ formation/ toe of the formation to the top of formation, to the locations shown by the Engineer in charge or his representative in the section and spreading the same on the formation and dumping the required balance quantity on side to enable to fill between the sleepers and to do dressing to obtain a compact and uniform specified profile as directed by Engineer in charge.

-

-

-

... More
i) For lead between 0 Mtr to

-

-

-

... More
200Mtrs

-

-

-

... More
Leading and spreading of 50mm size stone ballast by head / trolley/ tractor/ dumper or any other means from the stacks available at the ballast depot / on cess/ formation/ toe of the formation to the top of formation, to the locations shown by the Engineer in charge or his representative in the section and spreading the same on the formation and dumping the required balance quantity on side to enable to fill between the sleepers and to do dressing to obtain a compact and uniform specified profile as directed by Engineer in charge.

-

-

-

... More
ii) For lead between 200 Mtr to

-

-

-

... More
1000Mtrs

-

-

-

... More
Leading and spreading of 50mm size stone ballast by head / trolley/ tractor/ dumper or any other means from the stacks available at the ballast depot / on cess/ formation/ toe of the formation to the top of formation, to the locations shown by the Engineer in charge or his representative in the section and spreading the same on the formation and dumping the required balance quantity on side to enable to fill between the sleepers and to do dressing to obtain a compact and uniform specified profile as directed by Engineer in charge.

-

-

-

... More
iii) For lead between 1000 Mtr

-

-

-

... More
to 5000Mtrs

-

-

-

... More
Supply of Skilled labours for daily maintenance in day light hours as per the requirement

10950

863

9456968

... More
Supply of Gang Mate for daily maintenance in day light hours as per the requirement

-

-

-

... More
Supply of Key Man for daily maintenance in day light hours as per the requirement

-

-

-

... More
Supply of Black Smith for daily maintenance in day light hours as per the requirement

-

-

-

... More
JE/PWAY (2No)Ref

24

78208

1876995

... More
SSE/PWAY (1No)

-

-

-

... More
Store Clerk/Office Assistant cum Computer Operator

-

-

-

... More
Hiring of Vehicle: Supply of one four wheeler road vehicle with driver of registration not older than 4 years from the date of submission of tender, having a carrying capacity of 4+1 with all required permissions from road transport authorities. (Note: 1) The Vehicle should be available for 12 hours 2) Total Km: 3000Km/Per month - The rate quoted are inclusive of fuel/lubrication/repair and maintenance of vehicle, wages of driver, state transport taxes/permit fees, insurance of vehicle etc. 3) The Vehicle should have valid certificates to move on road and 4) However, parking charges and toll taxes if any, paid by the agency will be reimbursed on the production

-

-

-

... More
of valid receipt along with monthly bills. Further GST will

-

-

-

... More
be paid extra. 5) There shall be no minimum mileage per day,

-

-

-

... More
6) Absence of vehicle will not entitle for any exemptions from liabilities of contract, whatsoever, arrangement of alternative/substitute will be responsibility of the agency.)

-

-

-

... More
Extra Hours for Item 4 (For more Than 12 Hours)

-

-

-

... More
Extra Kms for Item 4 (For more than 3000 km. in a Month)

800

10

8400

... More
Extra day for Sunday/Holiday

12

1575

18900

... More
Hiring and operating Multi- Utility vehicle Eachier of loading capacity 5 MT with carrying capacity factory-built metal body, cargo box type or passenger cabin type or both (with 24 hours availability), including cost of fuel, lubricants, major/minor repairs, salary of drivers, toll tax, all other tax complete, operation and maintenance including running upto 1200 km in a month. The vehicle shall run on pucca, kutcha road and along the track. The contractor shall arrange road permit for vehicles for all the States of operation, as per instructions of engineer in-charge and vehicle shall not be more than three years old.

-

-

-

... More
Boxing and profiling of ballast as per procedure prescribed in latest edition of IRPWM including cess dressing on both sides of track. The work will include removing excess ballast from track and putting the same in crib and shoulder by leading to a maximum of 50m including crossing of track, deweeding on ballast section etc and as directed by Engineer-

-

-

-

... More
In charge.

-

-

-

... More
Replacing existing glued joint rail with cut rails or with glued joint rail or insertion of glued joint by cutting existing track under traffic condition by cutting rails, refixing with all rail sleeper fastenings and providing required gaps for carrying out welding as an alternative to drilling holes or joining rails with fish plates duly drilling holes as required including stacking of released material and as directed by engineer in-charge. Note: (1) Drilling holes & rail cutting will be paid separately. (2) Transportation of materials to the site of work from supply points, if more than 250m, shall be paid separately.

-

-

-

... More
Unforeseen items covered under Sl no 1 to 60 of Execution of R&D P.Way maintenance works in Visakhapatnam Port Authority for a Period of 3 Years.

-

-

-

-

-

-

... More
Rs. 12,06,71,319

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.