Indian Institute Of Information Technology Tender
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Indian Institute Of Information Technology - IIIT Tender
Civil And Construction
Building Construction
Eprocure
Opening Date16 May 2024
Closing Date30 May 2024
Tender AmountRefer Documents
Costs
EMD
₹ 50,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_IITS_807616_1Bid Award Id
ViewTender No
IIITS_NIT_020R_2024Tender Authority
Indian Institute Of Information Technology ViewPurchaser Address
-Website
http://eprocure.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Supplying, laying and placing in position the Steel reinforcement for R.C.C. work for Basketball court including straightening, cutting, bending, placing in position and tying all complete. Thermo-Mechanically Treated bars of grade Fe-500D should be used after approval and instructed by the Engineer In charge
4000
-
-
Providing and laying 100 mm thick RCC 1:2:4 for Basketball court Flooring including materials, Machinery, Labor, load & lift Centering and shuttering charges, curing, smooth finishing with power trowel to receive synthetic acrylic painting as instructed by Engineer – in – charge. The concrete should be laid in panels as approved and the cost should include preparing and finishing the expansion joints with suitable approved sealants.
88
-
-
Supplying & fixing of Basket Ball goal post made of MS circular pipe with transparent acrylic back board with hoop and with suitable RCC foundation as per the manufacturers recommendations, including cost of foundation bolts, painting with suitable colour, lead & lift, labor charges, tools & plants, transport charges, incidental charges if any complete as per the instruction of the Engineer-in-charge (Refer the attached photograph of existing Basketball Goal posts in the IIITS Campus)
1
-
-
Supplying & fixing of standard size and paint finished Volleyball net posts (pair), including manufacturer recommended foundation, including cost of bolts, standard Play Net 1 No., lead & lift, labor charges, tools & plants, transport charges, incidental charges if any complete as per the instruction of the Engineer-in-charge
1
-
-
Supplying and laying of 5core x 6 sq mm copper flexible cable with suitable size PVC trunking from the power source to the light panel as directed by the Engineer-in-charge including cost of all materials, termination, tools & plants etc, complete as instructed by the Engineer In charge
30
-
-
Supplying and laying of 3core x2.5 sq mm copper flexible cable with suitable size PVC truncking / PVC pipe from the light panel to the LED light points as directed by the Engineer-in-charge including cost of all materials, termination, tools & plants etc, complete as instructed by the Engineer In charge
100
-
-
Supplying, Fixing & Testing of 200 W LED Flood lights for Basketball court & Volleyball Court lighting, including cost of all materials, wires, tools & plants etc, complete as instructed by the Engineer In charge.
5
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements