Endowments Department Tender
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Endowments Department Tender
Civil And Construction
Opening Date10 Jan 2025
Closing Soon24 Jan 2025
Tender Amount₹ 5,49,499
Costs
EMD
₹ 5,495Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
779559Tender No
NIT NO.EE/09/2024-25Tender Authority
Endowments Department ViewPurchaser Address
-Website
http://tender.apeprocurement.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Painting to old walls with 2 coats of acrylic emulsion paint weather proof water-based, modified acrylic with silicon additives exterior grade having VOC (Volatile Organic Compound ) content less than 50 grams/ liter. approved brand,of first grade over cement primary making 3 coats in all to give an even shade after thouroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost and conveyance of all materials to work site and operational, labour charges and incidental charges such as scaffolding, lift charges etc., complete for finished item of work as per SS911 for External walls.
687.35
157
108243.88
... More
Supply of pulmary leafs for laying in various festivals and necessary places as directed by engineer in charge, including transportation, loading and unloading, and Labour charges etc., complete for finished item of work.
3250
12
39000
... More
Hire charges for supply of Tractor with trolly for gravel dumping to the road including all labour, machinery and fuel etc., Complete for finished item of work.
20
4000
80000
... More
Hire charges for supply of Shovel 0.50 cum 75 hp/Excavator for the road and other earth work including all labour, machinery and fuel etc., Complete for finished item of work.
39
1300
50700
... More
Hire charges for supply of dozer for the road including all labour, machinery and fuel etc., Complete for finished item of work.
65
1200
78000
... More
Hire charges for erection and removal cloth pendal of flat or sloped roof with MS pipes 15 feet or casuarina postswith necessary frame work. providingwhite ceiling cloth for etc. completeand duly covering the shed with as perdirected during execution the rateincluding watch and ward and againsttheft and fire accidents,and all labour charges, as per directedby temple authorities etc., complete for finished item of work. (for day 1)
16310.04
6
97860.24
... More
Hire charges for erection and removal cloth pendal of flat or sloped roof with MS pipes 15 feet or casuarina postswith necessary frame work. providingwhite ceiling cloth for etc. completeand duly covering the shed with as perdirected during execution the rateincluding watch and ward and againsttheft and fire accidents,and all labour charges, as per directedby temple authorities etc., complete for finished item of work. (for day 2 and 3)
7852.98
3
23558.94
... More
Hire charges for erection and removal cloth pendal of flat or sloped roof with MS pipes 15 feet or casuarina postswith necessary frame work. providingwhite ceiling cloth for etc. completeand duly covering the shed with as perdirected during execution the rateincluding watch and ward and againsttheft and fire accidents,and all labour charges, as per directedby temple authorities etc., complete for finished item of work. (for day 4,5 and 6)
7852.98
1
11779.47
... More
Supply and spreading of Stone crusher dust finer than 3mm with not more than 10% passing 0.075 sieve etc., Complete.
10
1014
10145.6
... More
Gronolithik Concrete Flooring 20 mm thick with (1:1:2), using 6mm to 12 mm size hard granite machine crushed metal laid over CC bed already laid or RCC roof slab, in alternate panels of size not exceeding 1.50 m x 1.50 m and finishing the top surface to required smoothness and slopes and thread lining including cost of all materials like cement, metal, sand and water etc., complete, excluding seigniorage charges, etc., complete for finished item of work, but excluding the cost of conveyance of all materials(83)
12.5
362
4527.5
... More
Plastering 20mm thick single coat in CM (1:5) using screened sand including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., complete for finished item of work. (SS 901,903 & 904)
45
322
14495.4
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%