Endowments Department Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Endowments Department Tender

Works
Civil And Construction
Building Construction
Opening Date26 Oct 2024
Closing Soon11 Nov 2024
Tender Amount₹ 99,33,034 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
R.R. Masonry in CM ( 1: 6 ) using rough stone approved quarry including cost, seigniorage, conveyance of all material like cement, sand, granite stone water etc to work site from approved source and all labour charges, curing, centering etc. complete for levelling Course Concrete. As per APSS 612

32.94

4723

155581

... More
Supply of Black Granite stone including cost of stone, Rough dressing, Palamana dressing, cost of jointing including cost and conveyance of chisels, hammers all materials labour charges etc complte for Garbhalaya, Ardhamandapam & Sub-temples a)Cost of Stone

3158

284

897048

... More
Cost of stone flooring

233

227

52916

... More
Roughdressing

3070.69

94

289567

... More
Roughdressing

7702.03

114

875066

... More
Upapeeta Padmam

47

928

43859

... More
Upapeeta Kantam

55

581

31883

... More
Upapeeta Kopadakam

68

1023

69573

... More
Adhisthanam Kumudam

79

1023

80525

... More
Adhisthanam Pattika

73

1023

74727

... More
Sthambhavargam-I

462

1174

542223

... More
Sthambhavargam-2

202.12

1174

2372223

... More
Sthabhavaragam -3

173.25

1174

203334

... More
Prastharam Uttaram

244.68

1102

269653

... More
Pratsharam Kopadakam

137

2367

324283

... More
Prastharam Vyalam

91

1403

128177

... More
Pillars

126

1102

138860

... More
Pothikas

24

1726

41310

... More
Beam

306

738

225980

... More
Flooring

446

479

223094

... More
inside

1368

556

761566

... More
d) for cost of tools

3122

119

372455

... More
e) cost of jointing

113.6

113

354659

... More
Ornamental Brick Masonry in C.M(1:5) mix using II nd class bricks well burnt from any kiln, inclusive of brick bots, and madras terrace bricks, including cost & conveyance of all materials, labour charges, scaffolding charges, and curing etc., complete complying of standard specifications and as directed during execution of work for one Cu.m. a)above Prastharam level(Sri Malleswara Swamy Temple)

17.42

10023

174608

... More
ii)2nd Story

2.38

10304

24524

... More
b)for Subtemple (Sri Vinayaka&Sri Paravati Devi Temple)

4.13

10023

41397

... More
V.R.C.C (1:11/2:3) using 20 MM size HBG graded chips with nominal mix SS-5 using necessary quantity and excluding cost and conveyance of steel per cum of concrete including cost and conveyance of all materials and all labour charges, seigniorage, curing, centering ( Using Steel) etc., complete as per APSS No.403 with BIS 456-2000 but excluding the cost of steel and its fabrication charges.a) plinth beam

7.63

11486

87645

... More
b) Rcc Roof Slab 120cm Thick

58.26

13336

77697

... More
Providing High Yield Strength Deformed Bars of Fe 415 Grade of different diametres including cost & conveyance of steel including cost of binding wire and labour charges for fabrication such as cutting, bending and cranking rods, tying grills with binding wire etc complete.

1.46

89892

131433

... More
Whether proof couse with CM( 1:3) mix using 20mm thick including cost and conveyance of all materials like cement, sand and water and labour, curing, scaffolding, seigniorage charges etc., complete. As per APSS No.904

58.26

4902

28562

... More
Ornamental plastering in CM 1” to 1¼” thick base plastering in (1½:1¾)in CM i(1:3) and top finishing ½ thick with (1:2) to bring the required ornamentation including cost and conveyanceof all materials,labour charges all incidential and operational charges curing etc complete finished item of work in site for external surface as per approved drawing and as directed during execution including preparation and fixing pre cost pillars,kudam,palaka vedika,lathalu in uttara, eludandkam,pothikas,nasigudu-pushpa puskala adisthranam wherever necessary. a) above Prastharam level for Vimanam 1st story

43.02

22029

94769

... More
ii)2nd Story

15.13

23884

36138

... More
B)for Subtemple above Prastharam level for vimanam 1st story

26.26

22029

57848

... More
Supplying and fixing of brass stupi with stupi dandam including the cost and conveyance of all materials and labour charges etc complete

5.6

2919

16060

... More
Supplying and fixing of granite stone door frame including cost and conveyance of all materials and labour charges etc complete a) cost and conveyance of stone at site

93

284

26416

... More
b) palamana dressing

182.25

460

83861

... More
c) fixing in position

3

1817

5454

... More
Supplying and fixing of best teak wood door shutter with two leaves with single / double rows of padmas with necessary fittings and locking arrangments including the cost and conveyance of all materials and labour charegs etc complete

108

3192

344799

... More
Supply ing fixing of scaffolding during execution of work including cost and conveyance of all materials and labour charges etc complete a) Up to 20'-0" Height

2368.06

13

32277

... More
b) above 20'-0" Height

628.66

12

7858

... More
Plastic Emulsion painting in two coats in primary coat including cost and conveyance of all materials and labour charges etc complete

84.41

3119

26332

... More
Providing Concealed wiring / in concealed wiring using 19MM dia PVC pipe using 1 /18 , 5/16 VIR copper wires for different points with necessary specials like bends , cupplings , celing roses , including the cost and conveyance of all materials and labour etc complete.

50

650

32500



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.