Endowments Department Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Endowments Department Tender

Opening Date28 May 2019
Closing Date11 Jun 2019
Tender Amount₹ 8,83,72,015 
This is an estimated amount, exact amount may vary.
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Plain Cement Concrete ( 1 : 5 : 10 ) proportion using 40mm size HBG Machine crushed metal from approved quarry including cost, , conveyance of all materials from approved source and all labour charges, Machine Mixing, curing, centering etc but excluding Seigniorage charges . ,and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work for levelling Course Concrete. As per APSS 402

282.09

-

3192.01

... More
Randum Rubble Masonry using Hard Granite stone in CM (1:6) including cost and conveyance of all materials to site from approved sources and all labour charges curing, scaffolding etc. complete.but excludingSeigniorage charges,and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work as per APSS no 615 for Footings Under External walls in between columns

217.81

-

3136.3

... More
Coursed Rubble Masonry 2nd sort using Hard Granite stone in CM (1:6) including cost and conveyance of all materials to site from approved sources and all labour charges curing, scaffolding etc. complete.but excludingSeigniorage charges,and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work as per A.P.S.S 612 for Basement

155.39

-

3968.85

... More
Supply and placing of the VRCC M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing, Scafoldig, all lift charges etc as per(APSS No. 403) with minimum cement content as per IS code, including steel Scafolding pipes,Jack props,, Steel centering, shuttering , vibrating, etc. complete but excluding Seigniorage charges and excluding cost of steel and its fabrication charges and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work for FOOTINGS

421.26

-

8355

... More
Supply and placing of the VRCC M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing, Scafoldig, all lift charges etc as per(APSS No. 403) with minimum cement content as per IS code, including steel Scafolding pipes,Jack props,, Steel centering, shuttering , vibrating, etc. complete but excluding Seigniorage charges and excluding cost of steel and its fabrication charges and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work for PEDASTALS

94.19

-

8930.15

... More
Supply and placing of the VRCC M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing, Scafoldig, all lift charges etc as per(APSS No. 403) with minimum cement content as per IS code, including steel Scafolding pipes,Jack props,, Steel centering, shuttering , vibrating, etc. complete but excluding Seigniorage charges and excluding cost of steel and its fabrication charges and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work For Plinth Beams

103.76

-

10870.98

... More
Supply and placing of the VRCC M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing, Scafoldig, all lift charges etc as per(APSS No. 403) with minimum cement content as per IS code, including steel Scafolding pipes,Jack props,, Steel centering, shuttering , vibrating, etc. complete but excluding Seigniorage charges and excluding cost of steel and its fabrication charges and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work FOR COLMNS Upto 3.66m ht

101.89

-

11284.5

... More
Supply and placing of the VRCC M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing, Scafoldig, all lift charges etc as per(APSS No. 403) with minimum cement content as per IS code, including steel Scafolding pipes,Jack props,, Steel centering, shuttering , vibrating, etc. complete but excluding Seigniorage charges and excluding cost of steel and its fabrication charges and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work FOR COLMNSabove 3.66m to 7.48m ht for Auditorium

9.49

-

14264.5

... More
Supply and placing of the VRCC M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing, Scafoldig, all lift charges etc as per(APSS No. 403) with minimum cement content as per IS code, including steel Scafolding pipes,Jack props,, Steel centering, shuttering , vibrating, etc. complete but excluding Seigniorage charges and excluding cost of steel and its fabrication charges and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work for Lintels

10.03

-

11170.85

... More
V RCC M25-Design Mix WEIGH BATCHER for Sunshade 60 cm wide and 62.50 mm average thicknesswith steel Centering plates and steel Scaffolding

40

-

657.4

... More
Supply and placing of the VRCC M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing, Scafoldig, all lift charges etc as per(APSS No. 403) with minimum cement content as per IS code, including steel Scafolding pipes,Jack props,, Steel centering, shuttering , vibrating, etc. complete but excluding Seigniorage charges and excluding cost of steel and its fabrication charges and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work FOR ROOF BEAMS- upto 4.11m HT (Excluding Thickness of Roof Slab 0.125)

133.57

-

11039.1

... More
Supply and placing of the VRCC M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing, Scafoldig, all lift charges etc as per(APSS No. 403) with minimum cement content as per IS code, including steel Scafolding pipes,Jack props,, Steel centering, shuttering , vibrating, etc. complete but excluding Seigniorage charges and excluding cost of steel and its fabrication charges and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work FOR ROOF BEAMS-@3.66m and below for ramp at auditorium(Excluding slab thickness

16.43

-

10283.97

... More
Supply and placing of the VRCC M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing, Scafoldig, all lift charges etc as per(APSS No. 403) with minimum cement content as per IS code, including steel Scafolding pipes,Jack props,, Steel centering, shuttering , vibrating, etc. complete but excluding Seigniorage charges and excluding cost of steel and its fabrication charges and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work FOR ROOF BEAMS @8.23mat top level for auditorium(Excluding slab thickness

24.95

-

15002.4

... More
Supply and placing of the VRCC M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing, Scafoldig, all lift charges etc as per(APSS No. 403) with minimum cement content as per IS code, including steel Scafolding pipes,Jack props,, Steel centering, shuttering , vibrating, etc. complete but excluding Seigniorage charges and excluding cost of steel and its fabrication charges and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work For ROOF SLAB 125 mm thk at 4.11m toplevel

2042.81

-

1310.43

... More
Supply and placing of the VRCC M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing, Scafoldig, all lift charges etc as per(APSS No. 403) with minimum cement content as per IS code, including steel Scafolding pipes,Jack props,, Steel centering, shuttering , vibrating, etc. complete but excluding Seigniorage charges and excluding cost of steel and its fabrication charges and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work FOR ROOF SLAB 230 mm thick for Auditorium Ramp upto3.66m ht

178.83

-

1790.24

... More
Supply and placing of the VRCC M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing, Scafoldig, all lift charges etc as per(APSS No. 403) with minimum cement content as per IS code, including steel Scafolding pipes,Jack props,, Steel centering, shuttering , vibrating, etc. complete but excluding Seigniorage charges and excluding cost of steel and its fabrication charges and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work For ROOF SLAB 125mm thk at 8.23m top level

299.94

-

1931.66

... More
Supply and placing of the VRCC M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing, Scafoldig, all lift charges etc as per(APSS No. 403) with minimum cement content as per IS code, including steel Scafolding pipes,Jack props,, Steel centering, shuttering , vibrating, etc. complete but excluding Seigniorage charges and excluding cost of steel and its fabrication charges and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work FOR ROOF SLAB 150mm THKfor stairs upto3.66m ht

25.4

-

1355.34

... More
Supply and placing of the VRCC M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing, Scafoldig, all lift charges etc as per(APSS No. 403) with minimum cement content as per IS code, including steel Scafolding pipes,Jack props,, Steel centering, shuttering , vibrating, etc. complete but excluding Seigniorage charges and excluding cost of steel and its fabrication charges and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work FOR ROOF SLAB 150mm THK for stairs above 3.66m ht to 4.25m ht

25.4

-

1440.74

... More
Vibrated Cement Concrete M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as Weigh Batching, machine mixing, laying concrete, curing etc as per(APSS No. 402& 403) with minimum cement content as per IS code, including steel Scafolding pipes,Jack props,, Steel centering, shuttering , laying concrete, vibrating, curing etc. complete but excluding Seigniorage charges and cost of steel and its fabrication charges and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work. FOR STAIR CASE STEPS

28.41

-

6435.83

... More
Filling with useful available excavated earth (excluding Rock) in trenches , sides of foundations ,and Basement with intial lead in layers not exceeding 15cms thick, consolidating each drposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges,hire charges of T&P etc.,and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work k (APSS NO 309&310)

1138.45

-

295.4

... More
Filling basement with Gravel with in layers not exceeding 15cms thick, consolidating each deposited layer by watering and ramming including cost and conveyance of gravel, water to work site and all operational, incidental, labour charges,hire charges of T&P etc., complete but excluding Seigniorage charges ,and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work (APSS NO 310)

591.82

-

588.73

... More
Construction of brick masonry in CM (1:6) mix using Common burnt clay bricks of class as per Table-1 of IS:1077-1992 Non-Modular or traditional size 23 x 11 x 7 cm having crushing strength of not less than 35 kg/cm2 including cost,and conveyance of all materials to site from approved sources and all labour charges curing, scaffolding etc. complete but excluding Seigniorage charges,and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work for superstrucuture upto3.66m as per APSS No. 504

298.5

-

5785.69

... More
Construction of brick masonry in CM (1:6) mix using Common burnt clay bricks of class as per Table-1 of IS:1077-1992 Non-Modular or traditional size 23 x 11 x 7 cm having crushing strength of not less than 35 kg/cm2 including cost,and conveyance of all materials to site from approved sources and all labour charges curing, scaffolding etc. complete but excluding Seigniorage charges,and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work for superstrucuture above 3.66m to7.76m as per APSS No. 504

48.58

-

6156.2

... More
Reinforced Brick Masonry walls with11.5 cm wide Brick masonry for super-structure in cm (1:4) using Common burnt clay bricks of class as per Table-1 of IS:1077-1992 Non-Modular or traditional size 23 x 11 x 7 cm having crushing strength of 35 kg/cm2 and using two Mild steel bars of 6mm dia in every third layer of brick masonry with free joints of main block work including cost of all materials, conveyance charges of materials and water from approved sources to work site and all operational, incidental and labour charges such as scafolding , constructing masonry lift chargrs, mixing cement mortar, curing etc.,and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work,.Including Cost and laying 2 nos 6mm M.S.Rods embedded in Cement mortar 1:4 at every 3rd Course but excluding Seigniorage charges

69.34

-

744.69

... More
Plastering 12mm thick for two coats with base coat of 8mm thick in Cm (1:5) and top coat of 4mm thick in Cm (1:3) with dubara sponge finishing including cost and conveyance of all materials, labour charges scafolding and curing etc., ,and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work but excluding Seigniorage charges for Ceiling

2829.97

-

410

... More
Plastering 20mm thick for two coats with base coat of 16mm thick in Cm (1:6) and top coat of 4mm thick in Cm (1:4) with dubara sponge finishing including cost and conveyance of all materials, all labour charges,curing scafolding &all lift chargesand including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work .but excluding Siegniorage charges, complete for Walls Outside including basement and internal walls

1678.81

-

402.87

... More
Plastering 12mm thick for two coats with base coat of 8mm thick in Cm (1:6) and top coat of 4mm thick in Cm (1:4) with dubara sponge finishing including cost and conveyance of all materials, all labour charges,curing scafolding &all lift chargesand including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work.,but excluding Siegniorage charges complete. for walls for Internal walls

2569.13

-

392.6

... More
Plastering 12mm thick for two coats with base coat of 8mm thick in Cm (1:6) and top coat of 4mm thick in Cm (1:4) with dubara sponge finishing including cost and conveyance of all materials, all labour charges,curing scafolding &all lift chargesand including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work.,but excluding Siegniorage charges complete. for walls for Internal wallsInside Auditorium walls above 3.985m with liftand extra scafolding

400.64

-

429.37

... More
RCM facia 5cm thick in CM (1:3) for drop walls, fins with rabbit wire mesh not less than30 gauge & nominal reinforcement as directed by Engineer-in-charge with dubara sponge finishing, including cost & conveyance of all materials to site, operational & incidental, cost and conveyance of cement, wire mesh, water to work site, centering, scaffolding and form work, lift charges etc., complete for finished items of work but excluding cost of steel & its fabrication charges, but excluding Seigniorage charges and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work (APSS No.403 & 903)

10.33

-

2243.13

... More
Flooring with high polished granite 16 to 18 mm thick slabs upto 8'-00(2.43M) other than black& Regular colours set over base coat of cement mortar (1:8), 20 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste mixed with pigment of matching shade to full depth, including cost and conveyance of all materials like cement, sand water and tilesetc., complete, including all labour charges for dressing ,laying of tiles etc., complete but excluding Seigniorage chargesand including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work

1697.27

-

3570.41

... More
Providing Dadooing / Skirting to internal Walls to 15cms height / raisers of steps with High polished granite 16 to 18 mm thick slab other than black &Regular colours length equal to Flooring Tiles ( 1st quality) set over base coat of cement mortar (1:3), 12 mm thick , with neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste mixed with pigment of matching shade to full depth, including cost and conveyance of all materials like cement, sand, water and tiles etc., including all labour charges for dressing ,laying of tiles etc.,, but excluding Seigniorage charges and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work, as per Standard Specifications.

112.09

-

3347.61

... More
Flooring with polished Kota slabs of 16 to 20 mm thick and 0.56 x0.56 M (22'' x22")size stones set over base coat of 20mm thick in CM (1:6) over already laid CC bed / RCC Roof Slab, including neat cement slurry of honey like consistency spread @ 3.3 kgs per sqm. & Jointed with neat cement to full depth including cost and conveyance charges of all materials like cement, sand, and water and flooring stones etc., complete, including,all labour charges for dressing ,laying and polishing of flooring stones etc., complete but excluding Seigniorage charges and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work

1525.14

-

1550.41

... More
Providing skirting to internal walls to 15 cm height/risers of steps with polished Kota slabs of 16 to 20 mm thickwith length equal to flooring stones set over base coat of CM (1:3) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost and conveyance of all materials like stone, cement, sand and water etc.,all Labour charges for Laying, polishing and dressing of kota slabs etc.,but excluding Seigniorage charges,and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work

64.6

-

2125.58

... More
Flooring with Non-skid red or white full body( Non- Porcelain ) Ceramic floor tiles of size 600 x 600 mm and thickness between 8-10 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs , of make Somany /Naveen Ceramics / Kajaria /NITCO / (as approved by Engineer-in-charge), set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste mixed with pigment of matching shade to full depth, including cost and conveyance of all materials like cement, sand water and tiles etc, all labour charges., but excluding seigniorage charges, etc.,and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work,

104.46

-

992.91

... More
Providing Dadooing / Skirting to internal Walls to 15cms height / raisers of steps with glazed red or white full body ceramic wall tiles of size 300x450 mm / 320 mm x 400 mm and thickness 6 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs of make Somany /Naveen Ceramics / Kajaria/NITCO (as approved by Engineer-in-charge), set over 12mm thick in CM (1:4) base coat and neat grey cement slurry of honey like consistency at the rate of 3.3 Kgs per Sq.mt and jointed with white cement paste mixed with pigment of matching shade to match the shade of tiles including cost and conveyance of all materials and water to work site including cost of base coat, all operational, incidental and labour charges such as mixing mortar, fixing in position, including lift charges, curing, cleaning the surface etc., complete but excludingSeigniorage charges and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work (APSS No.701)

350.61

-

626.89

... More
Flooring with precast terrazzo chequrred tiles confirming to IS: 13801 using marble agreegate of size 10mm, sand,marble powder,white cement pigments etc., with terrazzo topping not less than 6mm of tiles overall tiles not less than 20 mm thick of any colour shades set over base coat of cement mortar (1:6) 12 mm thick over CC bed already laid or RCC roof slab, including near cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed with neat cement to full depth mixed with pigment of matching shade including cost and conveyance of all materials like cement, sand water and tiles etc., complete, including,all labour charges for dressing of flooring stones and laying,curing ,complete but excluding Seigniorage charges and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work

189.33

-

726.99

... More
Granolithic Concrete Flooring 50 mm thick with (1:1:2), using 6mm to 12 mm size hard granite machine crushed metal laid over CC bed already laid or RCC roof slab, in alternate panels of size not exceeding 1.50 m x 1.50 m and finishing the top surface to required smoothness and slopes and thread lining including cost and conveyance of all materials like cement, metal, sand and water etc., complete,excluding seigniorage charges, etc.,and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work,

322.74

-

346.46

... More
Granolithic Concrete Flooring 20 mm thick with (1:1:2), using 6mm to 12 mm size hard granite machine crushed metal laid over CC bed already laid or RCC roof slab, in alternate panels of size not exceeding 1.50 m x 1.50 m and finishing the top surface to required smoothness and slopes and thread lining including cost and conveyance of all materials like cement, metal, sand and water etc., complete,excluding seigniorage charges, etc.,and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work,

50

-

334.95

... More
Supply and fixing of doors as per approved drawings with Medium teak wood frame of section 125mm x100mm with fixed fan light of 500mm at the top fixed with Plain float (Clear) glass 5mm thick using 12mm x 12mm teak Wood beading and 2Nos. of 10mm MS Square bars with fully panelled shutters(external or internal-moulded panels) with medium teak wood double shutters with styles 75mm x 35mm, top rails 75mm x 35mm, Bottom rails and lock rails 100mm x 35mm, Intermediate rails 75mm x 35mm with 20mm thick pannels including necessary Brass fittings as per IS, brass tower bolts 2Nos 300mm long,2nos 150mm long, and 370mm heavy duty aldrop in front side& fitted with 8 nos 150mm butt hinges,Brass Door fancy Handles 150mm long 4nos, 2nos brass door stopers, 2nos rubber bushes with 8nos MS Hold fasts 300mm long 40x40x5mm ISA including cost and conveyance of materials all labour charges etc., and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work as per APSS 1002

124.99

-

9706.74

... More
Supplying and fixing Doors with Medium Teak Wood frame ,( with frame of size 65x100mm ),with single shutter of 35mm thick flush door shutter using Solid bond wood block board type with commercial fly on both faces 35mmthick confirming to IS 2202 including necessary alluminium fittings heavy gauge tower bolts 2Nos( 1no 300mm long and 1 no. 150mm long) on back side and 300mm aldrop infront side fitted with 3nos 125mm alluminium butt hinges, Heavy duty Doorstopper 1 No. alluminium Door Handles 150mm long 2nos, with6 Nos MS Hold fast 300mm long 40x40x5mm ISA etc ., and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work as per SS

20.16

-

4797.8

... More
Supplying and fixing Doors with Medium Teak Wood frame ,( with frame of size 65x100mm ),with single shutter of 35mm thick flush door shutter using Solid bond wood block board type with commercial fly on both faces 35mmthick confirming to IS 2202 including necessary alluminium fittings heavy gauge tower bolts 1no 200mm long on back side and 1no Aluminium Aldrop with bolts (IS 2681)(200mm long) , 3nos 125mm Alluinium butt hinges,alluminium Flat latches 200mmlong 1no,, with 6 Nos MS Hold fast 300mm long 40x40x5mm ISA etc including cost and conveyance of all materials all labour charges etc.,and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work as per APSS 1002 for Toilets

23.94

-

5003.4

... More
Providing and fixing of Three shutter Sliding Windows made of Galvanized Steel (Base Steel as per IS 513, D quality, galvanized as per IS 277 with Zinc of 120 GSM), using factory made section powder coated with Pure polyester powder upto 50-60 microns thick with total coated thickness of 0.58 mm for Outer Frame and 0.58 mm thickness for Sliding Shutter Section, the Outer Frame for three tracks with grill provision size of 105 mm x 50 mm and without grill provision is of 90 mm x 50 mm and the Window Shutter section of 58 mm x 36 mm and the outer Frame with two integrated guide tracks of 12mm width and 24mm deep for provision to slide the Shutter / sash frame and facilitates with a water drain outlet component made of PVC and the shutter frame fitted with 5mm thick plain float glass of reputed make and fixed with EPDM weathering seal resistant accessories and handle made of Alumimium 1 No. per each shutter and cut to length miter joined with corner brackets including installation of window system at site using anchor fasteners, Silicon sealant applied at the Outer frame corners inclusive of conveyance of all materials accessories, labour charges, and erection at site and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work . Window with 3 shutters (center fixed shutter )and with Grill Window made of Outer Frame of Size 105 mm x 50 mm. Grill made of 10mm MS Square Rods for horizontal bars at a regular pitch of 150mm welded to MS flat of 12 x 6 mm. i) Center Shutter Fixed: center shutter frame made of section with size 20mm x 47mm should be fitted with 5mm thick plain float glass of reputed make, EPDM gasket all around the glass and fixed to the Outer Frame with the supporting section of size 29mm x 20mm of 0.58mm thick fixed horizontally on top and bottom of the shutter frame.

204.48

-

6415.85

... More
Supply and fixing of pre-painted steel windows & top hung and fixed louvered ventilators made of pre - painted steel (base steel as per IS 513 of -0.58 mm thick 'D" quality, Galvanized as per IS 277 with zinc of 120 GSM) primer coated with epoxy primer of 5-7 microns thick, finish painted with a polyester paint of 12-16 microns thick and back coated with 5-7 microns thick alkyd backer, section for outer frame of 46 x 52 mm and section for shutter of 46 x 46 mm, section for mullion 46 x 70 mm, and section for beading should be 18 x 25 mm and section for louvered ventilation of 33 x56mm Box section and the windows panelled with 5 mm thick plain float glass & 4 mm pinhead glass for ventilators with Ethyl propylene Diamine monomer Gasket (EPDM) and the sections cut to length mitre joined with corner bracket centre mullions fixed using mullion cap and with handle made of high grade aluminium powder coated and nylon receiver, corner brackets made of CRCA with Zinc Phosphate, Mullion caps made of glass filled nylon, frames fixed to the concrete /masonry wall by means of self expanding screws including 10 mm square guard bars with 6" pitch complete and including cost and conveyance all materials, fabrication,labour charges,fixing etc complete etc.,and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of workNCL or Equilent make Windows: Double shutter openable shutter 4'-0" x 4'0" (1219.2x1219.2mm) outer frame section size of 46 x 52 mm shutter frame section size of 46 x 46 mm Mullion section size of 46 x 70 mm

5.76

-

6711.25

... More
Ventilators Fixed Louvers (Box section) with outer frame section size of33 x 56mm Mullion section size of 33 x 56 mm

21.45

-

4892.3

... More
Supply, Fabricating and fixing Iron grill Gate in position inlcuding cost, Fabrication, labour charges for fixing etc in position and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work

115.2

-

91.97

... More
Supplying & fixing collapsible steel shutters with vertical, double channel of 20 x10x2 mm of 100 mm centre ,Bracers with flat iron 40x40x6 mm with 38 mm dia steel pulleys, the top, bottom and side vertical frames of the collapsible gate with 65x65mmx8mm MS Angle and middle guide rail at site height with 65mmx8mm MS flat for the pulleys to guide and fixed with necessary hold fasts, bolts, nuts, rivets, locking arrangements, stoppers, handles, all accessories all fixtures and painted with one coat of approved steel primer etc.,and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work as per special spn 1105

44.65

-

2889.25

... More
Supply, fabrication of stain less steel (304 grade) using 2" dia top horizontal and 11/2" dia pipes for vertical posts and 25.40mm dia pipes for middle horizontals as per design and Labour charges for Fabrication& Fixing of stainless steel railing works using stainless steel welding rods including buffing, polishing, lacquer, finishing, to present seamless finish and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work

594

-

524.9

... More
Supply & Applying Melamine Polish Glossy/Matt finish to the wood works duly cleaning the surface and applying emery paper, sand the wood with 180No.., emery paper and then with 375 No. , emery paper, clean & wipe off loose dust, applying suitable knifing paste filler/wood filler by putty knife/muslin pad, air dry for 2-3hrs, sand with 180 and 375 No. emery paper, apply two component wood sealer, air dry for 24hrs, sand with 375 No. emery paper, applying one coat of approved spraying thinner (for Spraying)/ applying one coat of approved brushing thinner or general purpose thinner (for brushing) and apply (either with spray or brush) two coats of approved brand melamine polish of approved brands such as jenson&Nicholson, Asian Paints, Berger Paints or equivalent including cost & labour charges , cost of emery paper thinner,melamine polish etc.,and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work

281.23

-

1120.4

... More
Painting to New Wood work with synthitec Enamel Paint two coats over aprimary coat of approved colour and shade duly clearing the surface and dusting of the loose particals after rubbing and applying two coats of ready mixed synthitec Enamel paint having VOC(Volatile organic compound) content less than 50 grams per litre using GRade -1 paint of ASIAN/Berger/Nerolac make to obtain smooth surface and in case of bad workmanship applying one (1)more coat as required after rubbing down the surface including cost of paint,labour charges,operation charges etc.,and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work as per APSS.No 1212

88.2

-

169.42

... More
Painting to New Iron work with synthitec Enamel Paint two coats over aprimary coat of approved colour and shade duly clearing the surface and dusting of the loose particals after rubbing and applying two coats of ready mixed synthitec Enamel paint having VOC(Volatile organic compound) content less than 50 grams per litre using GRade -1 paint of ASIAN/Berger/Nerolac make to obtain smooth surface and in case of bad workmanship applying one (1)more coat as required after rubbing down the surface including cost of paint,labour charges,operation charges etc.,and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work as per APSS.No 1212

50.29

-

160.24

... More
Providing and applying PMCC / Deco orient base or Equivalent exterior Texture of average 2 to 3 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying putty/ texture paint filler by putty knife / muslin pad, air dry for 2 - 3 hrs for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges, scaffolding charges.,and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work in all floors for external walls

763.53

-

369.5

... More
Providing and applying synthetic plaster putty or equivalent putty such as birla wall care putty of average 2 to 3 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying putty/ texture paint filler by putty knife / muslin pad, air dry for 2 - 3 hrs for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for external walls - including cost of access scaffolding and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work

291.5

-

194.5

... More
Painting to new walls with 2 coats of 2 coats of Emulsion paint using Acrylic Exterior Emulsion paint weather proof water based modified Acrylic with Silicon additives having VOC(Volatile organic compound) content less than 50 grams per litre of approved brand and shade over abase coat appropriate cement primer of approved brand , making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work as per SS 911 for External walls

291.5

-

195.2

... More
Providing and applying synthetic plaster putty or plaster of paris putty/Birla wall care putty of average 1 to 2 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying knifing paste filler by putty knife / muslin pad, air dry for 2 - 3 hrs, sand with 180 and 320 No., emery paper for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work as per SS for internal walls

5861.81

-

194.5

... More
Painting to new walls with 2 coats of plastic emulsion paint using Synthetic Polymer plastic Emulsion paint having VOC(Volatile organic compound) content less than 50 grams per litre , of approved brand and shade over abase coat appropriate cement primer of approved brand , making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work as per SS 911 for internal walls and Ceiling

5861.81

-

159.64

... More
Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) steel bars (Fe 415grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work in all floors.( APSS No.126), )

137.23

-

65462.69

... More
FIRST FLOOR Supply and placing of the VRCC M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing, Scafoldig, all lift charges etc as per(APSS No. 403) with minimum cement content as per IS code, including steel Scafolding pipes,Jack props,, Steel centering, shuttering , vibrating, etc. complete but excluding Seigniorage charges and excluding cost of steel and its fabrication charges and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work FOR COLMNS Upto 3.66m ht

60.53

-

11791.35

... More
Supply and placing of the VRCC M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing, Scafoldig, all lift charges etc as per(APSS No. 403) with minimum cement content as per IS code, including steel Scafolding pipes,Jack props,, Steel centering, shuttering , vibrating, etc. complete but excluding Seigniorage charges and excluding cost of steel and its fabrication charges and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work for Lintels

9.33

-

12543.95

... More
V RCC M25-Design Mix WEIGH BATCHER for Sunshade 60 cm wide and 62.50 mm average thicknesswith steel Centering plates and steel Scaffolding

40

-

691.45

... More
Supply and placing of the VRCC M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing, Scafoldig, all lift charges etc as per(APSS No. 403) with minimum cement content as per IS code, including steel Scafolding pipes,Jack props,, Steel centering, shuttering , vibrating, etc. complete but excluding Seigniorage charges and excluding cost of steel and its fabrication charges and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work FOR ROOF BEAMS- upto 4.11m HT (Excluding Thickness of Roof Slab 0.125)

128.23

-

11532.55

... More
Supply and placing of the VRCC M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing, Scafoldig, all lift charges etc as per(APSS No. 403) with minimum cement content as per IS code, including steel Scafolding pipes,Jack props,, Steel centering, shuttering , vibrating, etc. complete but excluding Seigniorage charges and excluding cost of steel and its fabrication charges and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work For ROOF SLAB 125 mm thk at 4.11m toplevel

2001.3

-

1369.29

... More
Supply and placing of the VRCC M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing, Scafoldig, all lift charges etc as per(APSS No. 403) with minimum cement content as per IS code, including steel Scafolding pipes,Jack props,, Steel centering, shuttering , vibrating, etc. complete but excluding Seigniorage charges and excluding cost of steel and its fabrication charges and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work FOR ROOF SLAB 150mm THKfor stairs upto3.66m ht

25.4

-

1414.73

... More
Supply and placing of the VRCC M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing, Scafoldig, all lift charges etc as per(APSS No. 403) with minimum cement content as per IS code, including steel Scafolding pipes,Jack props,, Steel centering, shuttering , vibrating, etc. complete but excluding Seigniorage charges and excluding cost of steel and its fabrication charges and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work FOR ROOF SLAB 150mm THK for stairs above 3.66m ht to 4.25m ht

25.4

-

1504.3

... More
Vibrated Cement Concrete M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as Weigh Batching, machine mixing, laying concrete, curing etc as per(APSS No. 402& 403) with minimum cement content as per IS code, including steel Scafolding pipes,Jack props,, Steel centering, shuttering , laying concrete, vibrating, curing etc. complete but excluding Seigniorage charges and cost of steel and its fabrication charges and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work. FOR STAIR CASE STEPS

2

-

6713.1

... More
Construction of brick masonry in CM (1:6) mix using Common burnt clay bricks of class as per Table-1 of IS:1077-1992 Non-Modular or traditional size 23 x 11 x 7 cm having crushing strength of not less than 35 kg/cm2 including cost,and conveyance of all materials to site from approved sources and all labour charges curing, scaffolding etc. complete but excluding Seigniorage charges,and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work for superstrucuture upto3.66m as per APSS No. 504

323.92

-

6156.15

... More
Reinforced Brick Masonry walls with11.5 cm wide Brick masonry for super-structure in cm (1:4) using Common burnt clay bricks of class as per Table-1 of IS:1077-1992 Non-Modular or traditional size 23 x 11 x 7 cm having crushing strength of 35 kg/cm2 and using two Mild steel bars of 6mm dia in every third layer of brick masonry with free joints of main block work including cost of all materials, conveyance charges of materials and water from approved sources to work site and all operational, incidental and labour charges such as scafolding , constructing masonry lift chargrs, mixing cement mortar, curing etc.,and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work,.Including Cost and laying 2 nos 6mm M.S.Rods embedded in Cement mortar 1:4 at every 3rd Course but excluding Seigniorage charges

43.45

-

816.85

... More
Plastering 12mm thick for two coats with base coat of 8mm thick in Cm (1:5) and top coat of 4mm thick in Cm (1:3) with dubara sponge finishing including cost and conveyance of all materials, labour charges scafolding and curing etc., ,and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work but excluding Seigniorage charges for Ceiling

2234.98

-

455.05

... More
Plastering 20mm thick for two coats with base coat of 16mm thick in Cm (1:6) and top coat of 4mm thick in Cm (1:4) with dubara sponge finishing including cost and conveyance of all materials, all labour charges,curing scafolding &all lift chargesand including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work .but excluding Siegniorage charges, complete for Walls Outside including and internal walls

1851.15

-

443.33

... More
Plastering 12mm thick for two coats with base coat of 8mm thick in Cm (1:6) and top coat of 4mm thick in Cm (1:4) with dubara sponge finishing including cost and conveyance of all materials, all labour charges,curing scafolding &all lift chargesand including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work.,but excluding Siegniorage charges complete. for walls for Internal walls

2810.83

-

433.06

... More
RCM facia 5cm thick in CM (1:3) for drop walls, fins with rabbit wire mesh not less than30 gauge & nominal reinforcement as directed by Engineer-in-charge with dubara sponge finishing, including cost & conveyance of all materials to site, operational & incidental, cost and conveyance of cement, wire mesh, water to work site, centering, scaffolding and form work, lift charges etc., complete for finished items of work but excluding cost of steel & its fabrication charges, but excluding Seigniorage charges and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work (APSS No.403 & 903)

3.96

-

2365.52

... More
Flooring with high polished granite 16 to 18 mm thick slabs upto 8'-00(2.43M) other than black& Regular colours set over base coat of cement mortar (1:8), 20 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste mixed with pigment of matching shade to full depth, including cost and conveyance of all materials like cement, sand water and tilesetc., complete, including all labour charges for dressing ,laying of tiles etc., complete but excluding Seigniorage chargesand including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work

464.37

-

3570.41

... More
Providing Dadooing / Skirting to internal Walls to 15cms height / raisers of steps with High polished granite 16 to 18 mm thick slab other than black &Regular colours length equal to Flooring Tiles ( 1st quality) set over base coat of cement mortar (1:3), 12 mm thick , with neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste mixed with pigment of matching shade to full depth, including cost and conveyance of all materials like cement, sand, water and tiles etc., including all labour charges for dressing ,laying of tiles etc.,, but excluding Seigniorage charges and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work, as per Standard Specifications.

36.04

-

3347.61

... More
Flooring with polished Kota slabs of 16 to 20 mm thick and 0.56 x0.56 M (22'' x22")size stones set over base coat of 20mm thick in CM (1:6) over already laid CC bed / RCC Roof Slab, including neat cement slurry of honey like consistency spread @ 3.3 kgs per sqm. & Jointed with neat cement to full depth including cost and conveyance charges of all materials like cement, sand, and water and flooring stones etc., complete, including,all labour charges for dressing ,laying and polishing of flooring stones etc., complete but excluding Seigniorage charges and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work

1426.35

-

1550.41

... More
Providing skirting to internal walls to 15 cm height/risers of steps with polished Kota slabs of 16 to 20 mm thickwith length equal to flooring stones set over base coat of CM (1:3) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost and conveyance of all materials like stone, cement, sand and water etc.,all Labour charges for Laying, polishing and dressing of kota slabs etc.,but excluding Seigniorage charges,and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work

98.12

-

2125.58

... More
Flooring with Non-skid red or white full body( Non- Porcelain ) Ceramic floor tiles of size 600 x 600 mm and thickness between 8-10 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs , of make Somany /Naveen Ceramics / Kajaria /NITCO / (as approved by Engineer-in-charge), set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste mixed with pigment of matching shade to full depth, including cost and conveyance of all materials like cement, sand water and tiles etc, all labour charges., but excluding seigniorage charges, etc.,and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work,

38.87

-

992.91

... More
Providing Dadooing / Skirting to internal Walls to 15cms height / raisers of steps with glazed red or white full body ceramic wall tiles of size 300x450 mm / 320 mm x 400 mm and thickness 6 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs of make Somany /Naveen Ceramics / Kajaria/NITCO (as approved by Engineer-in-charge), set over 12mm thick in CM (1:4) base coat and neat grey cement slurry of honey like consistency at the rate of 3.3 Kgs per Sq.mt and jointed with white cement paste mixed with pigment of matching shade to match the shade of tiles including cost and conveyance of all materials and water to work site including cost of base coat, all operational, incidental and labour charges such as mixing mortar, fixing in position, including lift charges, curing, cleaning the surface etc., complete but excludingSeigniorage charges and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work (APSS No.701)

190.34

-

626.89

... More
Supply and fixing of doors as per approved drawings with Medium teak wood frame of section 125mm x100mm with fixed fan light of 500mm at the top fixed with Plain float (Clear) glass 5mm thick using 12mm x 12mm teak Wood beading and 2Nos. of 10mm MS Square bars with fully panelled shutters(external or internal-moulded panels) with medium teak wood double shutters with styles 75mm x 35mm, top rails 75mm x 35mm, Bottom rails and lock rails 100mm x 35mm, Intermediate rails 75mm x 35mm with 20mm thick pannels including necessary Brass fittings as per IS, brass tower bolts 2Nos 300mm long,2nos 150mm long, and 370mm heavy duty aldrop in front side& fitted with 8 nos 150mm butt hinges,Brass Door fancy Handles 150mm long 4nos, 2nos brass door stopers, 2nos rubber bushes with 8nos MS Hold fasts 300mm long 40x40x5mm ISA including cost and conveyance of materials all labour charges etc., and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work as per APSS 1002

116.39

-

9706.75

... More
Supplying and fixing Doors with Medium Teak Wood frame ,( with frame of size 65x100mm ),with single shutter of 35mm thick flush door shutter using Solid bond wood block board type with commercial fly on both faces 35mmthick confirming to IS 2202 including necessary alluminium fittings heavy gauge tower bolts 2Nos( 1no 300mm long and 1 no. 150mm long) on back side and 300mm aldrop infront side fitted with 3nos 125mm alluminium butt hinges, Heavy duty Doorstopper 1 No. alluminium Door Handles 150mm long 2nos, with6 Nos MS Hold fast 300mm long 40x40x5mm ISA etc ., and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work as per SS

19.53

-

4797.8

... More
Supplying and fixing Doors with Medium Teak Wood frame ,( with frame of size 65x100mm ),with single shutter of 35mm thick flush door shutter using Solid bond wood block board type with commercial fly on both faces 35mmthick confirming to IS 2202 including necessary alluminium fittings heavy gauge tower bolts 1no 200mm long on back side and 1no Aluminium Aldrop with bolts (IS 2681)(200mm long) , 3nos 125mm Alluinium butt hinges,alluminium Flat latches 200mmlong 1no,, with 6 Nos MS Hold fast 300mm long 40x40x5mm ISA etc including cost and conveyance of all materials all labour charges etc.,and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work as per APSS 1002 for Toilets

22.34

-

5003.4

... More
Providing and fixing of Three shutter Sliding Windows made of Galvanized Steel (Base Steel as per IS 513, D quality, galvanized as per IS 277 with Zinc of 120 GSM), using factory made section powder coated with Pure polyester powder upto 50-60 microns thick with total coated thickness of 0.58 mm for Outer Frame and 0.58 mm thickness for Sliding Shutter Section, the Outer Frame for three tracks with grill provision size of 105 mm x 50 mm and without grill provision is of 90 mm x 50 mm and the Window Shutter section of 58 mm x 36 mm and the outer Frame with two integrated guide tracks of 12mm width and 24mm deep for provision to slide the Shutter / sash frame and facilitates with a water drain outlet component made of PVC and the shutter frame fitted with 5mm thick plain float glass of reputed make and fixed with EPDM weathering seal resistant accessories and handle made of Alumimium 1 No. per each shutter and cut to length miter joined with corner brackets including installation of window system at site using anchor fasteners, Silicon sealant applied at the Outer frame corners inclusive of conveyance of all materials accessories, labour charges, and erection at site and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work . Window with 3 shutters (center fixed shutter )and with Grill Window made of Outer Frame of Size 105 mm x 50 mm. Grill made of 10mm MS Square Rods for horizontal bars at a regular pitch of 150mm welded to MS flat of 12 x 6 mm. i) Center Shutter Fixed: center shutter frame made of section with size 20mm x 47mm should be fitted with 5mm thick plain float glass of reputed make, EPDM gasket all around the glass and fixed to the Outer Frame with the supporting section of size 29mm x 20mm of 0.58mm thick fixed horizontally on top and bottom of the shutter frame.

271.06

-

6415.85

... More
Supply and fixing of pre-painted steel windows & top hung and fixed louvered ventilators made of pre - painted steel (base steel as per IS 513 of -0.58 mm thick 'D" quality, Galvanized as per IS 277 with zinc of 120 GSM) primer coated with epoxy primer of 5-7 microns thick, finish painted with a polyester paint of 12-16 microns thick and back coated with 5-7 microns thick alkyd backer, section for outer frame of 46 x 52 mm and section for shutter of 46 x 46 mm, section for mullion 46 x 70 mm, and section for beading should be 18 x 25 mm and section for louvered ventilation of 33 x56mm Box section and the windows panelled with 5 mm thick plain float glass & 4 mm pinhead glass for ventilators with Ethyl propylene Diamine monomer Gasket (EPDM) and the sections cut to length mitre joined with corner bracket centre mullions fixed using mullion cap and with handle made of high grade aluminium powder coated and nylon receiver, corner brackets made of CRCA with Zinc Phosphate, Mullion caps made of glass filled nylon, frames fixed to the concrete /masonry wall by means of self expanding screws including 10 mm square guard bars with 6" pitch complete and including cost and conveyance all materials, fabrication,labour charges,fixing etc complete etc.,and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of workNCL or Equilent make Windows: Double shutter openable shutter 4'-0" x 4'0" (1219.2x1219.2mm) outer frame section size of 46 x 52 mm shutter frame section size of 46 x 46 mm Mullion section size of 46 x 70 mm

5.76

-

6711.25

... More
Ventilators Fixed Louvers (Box section) with outer frame section size of33 x 56mm Mullion section size of 33 x 56 mm

6.03

-

4892.3

... More
Supply, Fabricating and fixing Iron grill Gate in position inlcuding cost, Fabrication, labour charges for fixing etc in position and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work

115.2

-

91.97

... More
Supply, fabrication of stain less steel (304 grade) using 2" dia top horizontal and 11/2" dia pipes for vertical posts and 25.40mm dia pipes for middle horizontals as per design and Labour charges for Fabrication& Fixing of stainless steel railing works using stainless steel welding rods including buffing, polishing, lacquer, finishing, to present seamless finish and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work

288

-

524.9

... More
Supply & Applying Melamine Polish Glossy/Matt finish to the wood works duly cleaning the surface and applying emery paper, sand the wood with 180No.., emery paper and then with 375 No. , emery paper, clean & wipe off loose dust, applying suitable knifing paste filler/wood filler by putty knife/muslin pad, air dry for 2-3hrs, sand with 180 and 375 No. emery paper, apply two component wood sealer, air dry for 24hrs, sand with 375 No. emery paper, applying one coat of approved spraying thinner (for Spraying)/ applying one coat of approved brushing thinner or general purpose thinner (for brushing) and apply (either with spray or brush) two coats of approved brand melamine polish of approved brands such as jenson&Nicholson, Asian Paints, Berger Paints or equivalent including cost & labour charges , cost of emery paper thinner,melamine polish etc.,and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work

230.99

-

1120.4

... More
Painting to New Wood work with synthitec Enamel Paint two coats over aprimary coat of approved colour and shade duly clearing the surface and dusting of the loose particals after rubbing and applying two coats of ready mixed synthitec Enamel paint having VOC(Volatile organic compound) content less than 50 grams per litre using GRade -1 paint of ASIAN/Berger/Nerolac make to obtain smooth surface and in case of bad workmanship applying one (1)more coat as required after rubbing down the surface including cost of paint,labour charges,operation charges etc.,and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work as per APSS.No 1212

83.75

-

169.42

... More
Painting to New Iron work with synthitec Enamel Paint two coats over aprimary coat of approved colour and shade duly clearing the surface and dusting of the loose particals after rubbing and applying two coats of ready mixed synthitec Enamel paint having VOC(Volatile organic compound) content less than 50 grams per litre using GRade -1 paint of ASIAN/Berger/Nerolac make to obtain smooth surface and in case of bad workmanship applying one (1)more coat as required after rubbing down the surface including cost of paint,labour charges,operation charges etc.,and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work as per APSS.No 1212

5.76

-

160.24

... More
Providing and applying PMCC / Deco orient base or Equivalent exterior Texture of average 2 to 3 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying putty/ texture paint filler by putty knife / muslin pad, air dry for 2 - 3 hrs for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges, scaffolding charges.,and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work in all floors for external walls

789.68

-

369.5

... More
Providing and applying synthetic plaster putty or equivalent putty such as birla wall care putty of average 2 to 3 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying putty/ texture paint filler by putty knife / muslin pad, air dry for 2 - 3 hrs for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for external walls - including cost of access scaffolding and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work

246.52

-

194.5

... More
Painting to new walls with 2 coats of 2 coats of Emulsion paint using Acrylic Exterior Emulsion paint weather proof water based modified Acrylic with Silicon additives having VOC(Volatile organic compound) content less than 50 grams per litre of approved brand and shade over abase coat appropriate cement primer of approved brand , making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work as per SS 911 for External walls

246.52

-

195.2

... More
Providing and applying synthetic plaster putty or plaster of paris putty/Birla wall care putty of average 1 to 2 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying knifing paste filler by putty knife / muslin pad, air dry for 2 - 3 hrs, sand with 180 and 320 No., emery paper for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work as per SS for internal walls

5625.22

-

194.5

... More
Painting to new walls with 2 coats of plastic emulsion paint using Synthetic Polymer plastic Emulsion paint having VOC(Volatile organic compound) content less than 50 grams per litre , of approved brand and shade over abase coat appropriate cement primer of approved brand , making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work as per SS 911 for internal walls and Ceiling

5625.22

-

159.64

... More
Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) steel bars (Fe 415grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work in all floors.( APSS No.126), )

59.03

-

66723.85

... More
SECOND FLOOR Supply and placing of the VRCC M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing, Scafoldig, all lift charges etc as per(APSS No. 403) with minimum cement content as per IS code, including steel Scafolding pipes,Jack props,, Steel centering, shuttering , vibrating, etc. complete but excluding Seigniorage charges and excluding cost of steel and its fabrication charges and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work FOR COLMNS Upto 3.66m ht

41.99

-

11791.35

... More
Supply and placing of the VRCC M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing, Scafoldig, all lift charges etc as per(APSS No. 403) with minimum cement content as per IS code, including steel Scafolding pipes,Jack props,, Steel centering, shuttering , vibrating, etc. complete but excluding Seigniorage charges and excluding cost of steel and its fabrication charges and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work for Lintels

7.83

-

12543.95

... More
V RCC M25-Design Mix WEIGH BATCHER for Sunshade 60 cm wide and 62.50 mm average thicknesswith steel Centering plates and steel Scaffolding

42.72

-

691.45

... More
Supply and placing of the VRCC M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing, Scafoldig, all lift charges etc as per(APSS No. 403) with minimum cement content as per IS code, including steel Scafolding pipes,Jack props,, Steel centering, shuttering , vibrating, etc. complete but excluding Seigniorage charges and excluding cost of steel and its fabrication charges and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work FOR ROOF BEAMS- upto 4.11m HT (Excluding Thickness of Roof Slab 0.125)

93.32

-

12027.6

... More
Supply and placing of the VRCC M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing, Scafoldig, all lift charges etc as per(APSS No. 403) with minimum cement content as per IS code, including steel Scafolding pipes,Jack props,, Steel centering, shuttering , vibrating, etc. complete but excluding Seigniorage charges and excluding cost of steel and its fabrication charges and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work For ROOF SLAB 125 mm thk at 4.11m toplevel

1198.54

-

1426.55

... More
Supply and placing of the VRCC M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing, Scafoldig, all lift charges etc as per(APSS No. 403) with minimum cement content as per IS code, including steel Scafolding pipes,Jack props,, Steel centering, shuttering , vibrating, etc. complete but excluding Seigniorage charges and excluding cost of steel and its fabrication charges and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work FOR ROOF SLAB 150mm THKfor stairs upto3.66m ht

25.4

-

1472.7

... More
Supply and placing of the VRCC M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing, Scafoldig, all lift charges etc as per(APSS No. 403) with minimum cement content as per IS code, including steel Scafolding pipes,Jack props,, Steel centering, shuttering , vibrating, etc. complete but excluding Seigniorage charges and excluding cost of steel and its fabrication charges and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work FOR ROOF SLAB 150mm THK for stairs above 3.66m ht to 4.25m ht

46.31

-

1566.24

... More
Vibrated Cement Concrete M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as Weigh Batching, machine mixing, laying concrete, curing etc as per(APSS No. 402& 403) with minimum cement content as per IS code, including steel Scafolding pipes,Jack props,, Steel centering, shuttering , laying concrete, vibrating, curing etc. complete but excluding Seigniorage charges and cost of steel and its fabrication charges and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work. FOR STAIR CASE STEPS

2

-

6990.3

... More
Construction of brick masonry in CM (1:6) mix using Common burnt clay bricks of class as per Table-1 of IS:1077-1992 Non-Modular or traditional size 23 x 11 x 7 cm having crushing strength of not less than 35 kg/cm2 including cost,and conveyance of all materials to site from approved sources and all labour charges curing, scaffolding etc. complete but excluding Seigniorage charges,and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work for superstrucuture upto3.66m as per APSS No. 504

193.81

-

6526.55

... More
Plastering 12mm thick for two coats with base coat of 8mm thick in Cm (1:5) and top coat of 4mm thick in Cm (1:3) with dubara sponge finishing including cost and conveyance of all materials, labour charges scafolding and curing etc., ,and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work but excluding Seigniorage charges for Ceiling

1360.21

-

500.1

... More
Plastering 20mm thick for two coats with base coat of 16mm thick in Cm (1:6) and top coat of 4mm thick in Cm (1:4) with dubara sponge finishing including cost and conveyance of all materials, all labour charges,curing scafolding &all lift chargesand including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work .but excluding Siegniorage charges, complete for Walls Outside including and internal walls

1482.95

-

483.79

... More
Plastering 12mm thick for two coats with base coat of 8mm thick in Cm (1:6) and top coat of 4mm thick in Cm (1:4) with dubara sponge finishing including cost and conveyance of all materials, all labour charges,curing scafolding &all lift chargesand including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work.,but excluding Siegniorage charges complete. for walls for Internal walls

1334.73

-

473.52

... More
Flooring with high polished granite 16 to 18 mm thick slabs upto 8'-00(2.43M) other than black& Regular colours set over base coat of cement mortar (1:8), 20 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste mixed with pigment of matching shade to full depth, including cost and conveyance of all materials like cement, sand water and tilesetc., complete, including all labour charges for dressing ,laying of tiles etc., complete but excluding Seigniorage chargesand including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work

464.37

-

3570.41

... More
Providing Dadooing / Skirting to internal Walls to 15cms height / raisers of steps with High polished granite 16 to 18 mm thick slab other than black &Regular colours length equal to Flooring Tiles ( 1st quality) set over base coat of cement mortar (1:3), 12 mm thick , with neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste mixed with pigment of matching shade to full depth, including cost and conveyance of all materials like cement, sand, water and tiles etc., including all labour charges for dressing ,laying of tiles etc.,, but excluding Seigniorage charges and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work, as per Standard Specifications.

36.04

-

3347.61

... More
Flooring with polished Kota slabs of 16 to 20 mm thick and 0.56 x0.56 M (22'' x22")size stones set over base coat of 20mm thick in CM (1:6) over already laid CC bed / RCC Roof Slab, including neat cement slurry of honey like consistency spread @ 3.3 kgs per sqm. & Jointed with neat cement to full depth including cost and conveyance charges of all materials like cement, sand, and water and flooring stones etc., complete, including,all labour charges for dressing ,laying and polishing of flooring stones etc., complete but excluding Seigniorage charges and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work

808.07

-

1550.41

... More
Providing skirting to internal walls to 15 cm height/risers of steps with polished Kota slabs of 16 to 20 mm thickwith length equal to flooring stones set over base coat of CM (1:3) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost and conveyance of all materials like stone, cement, sand and water etc.,all Labour charges for Laying, polishing and dressing of kota slabs etc.,but excluding Seigniorage charges,and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work

37.78

-

2125.58

... More
providing specialized high performance acrylic polymer modified elastomeric cementitious waterproof coating to the terrace / walls / internal portion of the bathroom & toilets / internal portion of the water tanks duly cleaning of the surface from dirt, dust and other contaminations, providing and application of Two coats of High performance Acrylic polymer modified Elastomeric cementitious waterproof coating ( 1.8 Sq. Mtr. / Kg /Each Coat ) and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work.,.

1088.23

-

432.9

... More
Supply and fixing of doors as per approved drawings with Medium teak wood frame of section 125mm x100mm with fixed fan light of 500mm at the top fixed with Plain float (Clear) glass 5mm thick using 12mm x 12mm teak Wood beading and 2Nos. of 10mm MS Square bars with fully panelled shutters(external or internal-moulded panels) with medium teak wood double shutters with styles 75mm x 35mm, top rails 75mm x 35mm, Bottom rails and lock rails 100mm x 35mm, Intermediate rails 75mm x 35mm with 20mm thick pannels including necessary Brass fittings as per IS, brass tower bolts 2Nos 300mm long,2nos 150mm long, and 370mm heavy duty aldrop in front side& fitted with 8 nos 150mm butt hinges,Brass Door fancy Handles 150mm long 4nos, 2nos brass door stopers, 2nos rubber bushes with 8nos MS Hold fasts 300mm long 40x40x5mm ISA including cost and conveyance of materials all labour charges etc., and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work as per APSS 1002

95.22

-

9706.74

... More
Supplying and fixing Doors with Medium Teak Wood frame ,( with frame of size 65x100mm ),with single shutter of 35mm thick flush door shutter using Solid bond wood block board type with commercial fly on both faces 35mmthick confirming to IS 2202 including necessary alluminium fittings heavy gauge tower bolts 2Nos( 1no 300mm long and 1 no. 150mm long) on back side and 300mm aldrop infront side fitted with 3nos 125mm alluminium butt hinges, Heavy duty Doorstopper 1 No. alluminium Door Handles 150mm long 2nos, with6 Nos MS Hold fast 300mm long 40x40x5mm ISA etc ., and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work as per SS

4.41

-

4797.8

... More
Providing and fixing of Three shutter Sliding Windows made of Galvanized Steel (Base Steel as per IS 513, D quality, galvanized as per IS 277 with Zinc of 120 GSM), using factory made section powder coated with Pure polyester powder upto 50-60 microns thick with total coated thickness of 0.58 mm for Outer Frame and 0.58 mm thickness for Sliding Shutter Section, the Outer Frame for three tracks with grill provision size of 105 mm x 50 mm and without grill provision is of 90 mm x 50 mm and the Window Shutter section of 58 mm x 36 mm and the outer Frame with two integrated guide tracks of 12mm width and 24mm deep for provision to slide the Shutter / sash frame and facilitates with a water drain outlet component made of PVC and the shutter frame fitted with 5mm thick plain float glass of reputed make and fixed with EPDM weathering seal resistant accessories and handle made of Alumimium 1 No. per each shutter and cut to length miter joined with corner brackets including installation of window system at site using anchor fasteners, Silicon sealant applied at the Outer frame corners inclusive of conveyance of all materials accessories, labour charges, and erection at site and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work . Window with 3 shutters (center fixed shutter )and with Grill Window made of Outer Frame of Size 105 mm x 50 mm. Grill made of 10mm MS Square Rods for horizontal bars at a regular pitch of 150mm welded to MS flat of 12 x 6 mm. i) Center Shutter Fixed: center shutter frame made of section with size 20mm x 47mm should be fitted with 5mm thick plain float glass of reputed make, EPDM gasket all around the glass and fixed to the Outer Frame with the supporting section of size 29mm x 20mm of 0.58mm thick fixed horizontally on top and bottom of the shutter frame.

198.09

-

6415.85

... More
Supply and fixing of pre-painted steel windows & top hung and fixed louvered ventilators made of pre - painted steel (base steel as per IS 513 of -0.58 mm thick 'D" quality, Galvanized as per IS 277 with zinc of 120 GSM) primer coated with epoxy primer of 5-7 microns thick, finish painted with a polyester paint of 12-16 microns thick and back coated with 5-7 microns thick alkyd backer, section for outer frame of 46 x 52 mm and section for shutter of 46 x 46 mm, section for mullion 46 x 70 mm, and section for beading should be 18 x 25 mm and section for louvered ventilation of 33 x56mm Box section and the windows panelled with 5 mm thick plain float glass & 4 mm pinhead glass for ventilators with Ethyl propylene Diamine monomer Gasket (EPDM) and the sections cut to length mitre joined with corner bracket centre mullions fixed using mullion cap and with handle made of high grade aluminium powder coated and nylon receiver, corner brackets made of CRCA with Zinc Phosphate, Mullion caps made of glass filled nylon, frames fixed to the concrete /masonry wall by means of self expanding screws including 10 mm square guard bars with 6" pitch complete and including cost and conveyance all materials, fabrication,labour charges,fixing etc complete etc.,and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of workNCL or Equilent make Windows: Double shutter openable shutter 4'-0" x 4'0" (1219.2x1219.2mm) outer frame section size of 46 x 52 mm shutter frame section size of 46 x 46 mm Mullion section size of 46 x 70 mm

5.76

-

6147.75

... More
Ventilators Fixed Louvers (Box section) with outer frame section size of33 x 56mm Mullion section size of 33 x 56 mm

3.29

-

4892.3

... More
Supply, Fabricating and fixing Iron grill Gate in position inlcuding cost, Fabrication, labour charges for fixing etc in position and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work

115.2

-

91.97

... More
Supply, fabrication of stain less steel (304 grade) using 2" dia top horizontal and 11/2" dia pipes for vertical posts and 25.40mm dia pipes for middle horizontals as per design and Labour charges for Fabrication& Fixing of stainless steel railing works using stainless steel welding rods including buffing, polishing, lacquer, finishing, to present seamless finish and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work

288

-

524.9

... More
Supply & Applying Melamine Polish Glossy/Matt finish to the wood works duly cleaning the surface and applying emery paper, sand the wood with 180No.., emery paper and then with 375 No. , emery paper, clean & wipe off loose dust, applying suitable knifing paste filler/wood filler by putty knife/muslin pad, air dry for 2-3hrs, sand with 180 and 375 No. emery paper, apply two component wood sealer, air dry for 24hrs, sand with 375 No. emery paper, applying one coat of approved spraying thinner (for Spraying)/ applying one coat of approved brushing thinner or general purpose thinner (for brushing) and apply (either with spray or brush) two coats of approved brand melamine polish of approved brands such as jenson&Nicholson, Asian Paints, Berger Paints or equivalent including cost & labour charges , cost of emery paper thinner,melamine polish etc.,and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work

230.99

-

1120.4

... More
Painting to New Wood work with synthitec Enamel Paint two coats over aprimary coat of approved colour and shade duly clearing the surface and dusting of the loose particals after rubbing and applying two coats of ready mixed synthitec Enamel paint having VOC(Volatile organic compound) content less than 50 grams per litre using GRade -1 paint of ASIAN/Berger/Nerolac make to obtain smooth surface and in case of bad workmanship applying one (1)more coat as required after rubbing down the surface including cost of paint,labour charges,operation charges etc.,and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work as per APSS.No 1212

83.75

-

169.42

... More
Painting to New Iron work with synthitec Enamel Paint two coats over aprimary coat of approved colour and shade duly clearing the surface and dusting of the loose particals after rubbing and applying two coats of ready mixed synthitec Enamel paint having VOC(Volatile organic compound) content less than 50 grams per litre using GRade -1 paint of ASIAN/Berger/Nerolac make to obtain smooth surface and in case of bad workmanship applying one (1)more coat as required after rubbing down the surface including cost of paint,labour charges,operation charges etc.,and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work as per APSS.No 1212

5.76

-

160.24

... More
Providing and applying PMCC / Deco orient base or Equivalent exterior Texture of average 2 to 3 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying putty/ texture paint filler by putty knife / muslin pad, air dry for 2 - 3 hrs for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges, scaffolding charges.,and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work in all floors for external walls

894.76

-

369.5

... More
Providing and applying synthetic plaster putty or equivalent putty such as birla wall care putty of average 2 to 3 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying putty/ texture paint filler by putty knife / muslin pad, air dry for 2 - 3 hrs for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for external walls - including cost of access scaffolding and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work

328.69

-

194.5

... More
Painting to new walls with 2 coats of 2 coats of Emulsion paint using Acrylic Exterior Emulsion paint weather proof water based modified Acrylic with Silicon additives having VOC(Volatile organic compound) content less than 50 grams per litre of approved brand and shade over abase coat appropriate cement primer of approved brand , making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work as per SS 911 for External walls

246.52

-

195.2

... More
Providing and applying synthetic plaster putty or plaster of paris putty/Birla wall care putty of average 1 to 2 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying knifing paste filler by putty knife / muslin pad, air dry for 2 - 3 hrs, sand with 180 and 320 No., emery paper for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work as per SS for internal walls

3186.44

-

194.5

... More
Painting to new walls with 2 coats of plastic emulsion paint using Synthetic Polymer plastic Emulsion paint having VOC(Volatile organic compound) content less than 50 grams per litre , of approved brand and shade over abase coat appropriate cement primer of approved brand , making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work as per SS 911 for internal walls and Ceiling

3186.44

-

159.64

... More
Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) steel bars (Fe 415grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work in all floors.( APSS No.126), )

40.1

-

67984.95

... More
THIRD (TERRCE) FLOOR Supply and placing of the VRCC M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing, Scafoldig, all lift charges etc as per(APSS No. 403) with minimum cement content as per IS code, including steel Scafolding pipes,Jack props,, Steel centering, shuttering , vibrating, etc. complete but excluding Seigniorage charges and excluding cost of steel and its fabrication charges and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work FOR COLMNS Upto 3.66m ht

4.86

-

13269.65

... More
Supply and placing of the VRCC M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing, Scafoldig, all lift charges etc as per(APSS No. 403) with minimum cement content as per IS code, including steel Scafolding pipes,Jack props,, Steel centering, shuttering , vibrating, etc. complete but excluding Seigniorage charges and excluding cost of steel and its fabrication charges and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work for Lintels

0.22

-

13002.7

... More
V RCC M25-Design Mix WEIGH BATCHER for Sunshade 60 cm wide and 62.50 mm average thicknesswith steel Centering plates and steel Scaffolding

3.02

-

758.7

... More
Supply and placing of the VRCC M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing, Scafoldig, all lift charges etc as per(APSS No. 403) with minimum cement content as per IS code, including steel Scafolding pipes,Jack props,, Steel centering, shuttering , vibrating, etc. complete but excluding Seigniorage charges and excluding cost of steel and its fabrication charges and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work FOR ROOF BEAMS- upto 3.40m HT (Excluding Thickness of Roof Slab 0.125)

8.28

-

12971.2

... More
Supply and placing of the VRCC M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing, Scafoldig, all lift charges etc as per(APSS No. 403) with minimum cement content as per IS code, including steel Scafolding pipes,Jack props,, Steel centering, shuttering , vibrating, etc. complete but excluding Seigniorage charges and excluding cost of steel and its fabrication charges and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work For ROOF SLAB 125 mm thk at3.40m toplevel

103.74

-

1387.7

... More
Supply and placing of the VRCC M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing, Scafoldig, all lift charges etc as per(APSS No. 403) with minimum cement content as per IS code, including steel Scafolding pipes,Jack props,, Steel centering, shuttering , vibrating, etc. complete but excluding Seigniorage charges and excluding cost of steel and its fabrication charges and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work FOR ROOF SLAB 150mm THKfor Bottom slab water tank upto 3.66m ht

20.91

-

1532.09

... More
Supply and placing of the VRCC M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing, Scafoldig, all lift charges etc as per(APSS No. 403) with minimum cement content as per IS code, including steel Scafolding pipes,Jack props,, Steel centering, shuttering , vibrating, etc. complete but excluding Seigniorage charges and excluding cost of steel and its fabrication charges and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work FOR 150mm THK for Side Walls for 2tanks

31.86

-

5751.04

... More
Construction of brick masonry in CM (1:6) mix using Common burnt clay bricks of class as per Table-1 of IS:1077-1992 Non-Modular or traditional size 23 x 11 x 7 cm having crushing strength of not less than 35 kg/cm2 including cost,and conveyance of all materials to site from approved sources and all labour charges curing, scaffolding etc. complete but excluding Seigniorage charges,and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work for superstrucuture upto3.66m as per APSS No. 504 for4th Floor (3rd Floor)

104.49

-

6897.05

... More
Construction of brick masonry in CM (1:6) mix using Common burnt clay bricks of class as per Table-1 of IS:1077-1992 Non-Modular or traditional size 23 x 11 x 7 cm having crushing strength of not less than 35 kg/cm2 including cost,and conveyance of all materials to site from approved sources and all labour charges curing, scaffolding etc. complete but excluding Seigniorage charges,and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work for superstrucuture upto3.66m as per APSS No. 504 for 5th Floor(4th F)

17.1

-

7267.45

... More
Plastering 12mm thick for two coats with base coat of 8mm thick in Cm (1:5) and top coat of 4mm thick in Cm (1:3) with dubara sponge finishing including cost and conveyance of all materials, labour charges scafolding and curing etc., ,and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work but excluding Seigniorage charges for Ceiling

106.21

-

545.16

... More
Plastering 20mm thick for two coats with base coat of 16mm thick in Cm (1:6) and top coat of 4mm thick in Cm (1:4) with dubara sponge finishing including cost and conveyance of all materials, all labour charges,curing scafolding &all lift chargesand including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work .but excluding Siegniorage charges, complete for Walls Outside including and internal walls

650.7

-

524.25

... More
Plastering 12mm thick for two coats with base coat of 8mm thick in Cm (1:6) and top coat of 4mm thick in Cm (1:4) with dubara sponge finishing including cost and conveyance of all materials, all labour charges,curing scafolding &all lift chargesand including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work.,but excluding Siegniorage charges complete. for walls for Internal walls

546.21

-

513.98

... More
Plastering with CM(1:3) mix 8 mm thick including cost and conveyance of all materials,curing and labour charges,scafolding,lift charges etc., and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work.,but excluding Siegniorage charges complete. for Water tank outside - Side walls

35.23

-

250.33

... More
Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg of water proof compound per bag of cement laid over roof when it is green including cost of all materials, conveyance charges of materials and including all operational, incidental and labour charges for mixing mortar, laying, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc,, and including overheads & contractors profit , excluding GSTon all materials etc., complete,but excluding Siegniorage charges complete. for finished item of work over terrace. as per APSS 903

49.03

-

491.8

... More
Supplying and fixing Cast Iron Manhole frame and cover 50.80 cm dia light weight ( 20 kgs) and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work.,

1

-

2469

... More
providing specialized high performance acrylic polymer modified elastomeric cementitious waterproof coating to the terrace / walls / internal portion of the bathroom & toilets / internal portion of the water tanks duly cleaning of the surface from dirt, dust and other contaminations, providing and application of Two coats of High performance Acrylic polymer modified Elastomeric cementitious waterproof coating ( 1.8 Sq. Mtr. / Kg /Each Coat ) and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work.,

1088.23

-

432.9

... More
Supplying and fixing Doors with Medium Teak Wood frame ,( with frame of size 65x100mm ),with single shutter of 35mm thick flush door shutter using Solid bond wood block board type with commercial fly on both faces 35mmthick confirming to IS 2202 including necessary alluminium fittings heavy gauge tower bolts 2Nos( 1no 300mm long and 1 no. 150mm long) on back side and 300mm aldrop infront side fitted with 3nos 125mm alluminium butt hinges, Heavy duty Doorstopper 1 No. alluminium Door Handles 150mm long 2nos, with6 Nos MS Hold fast 300mm long 40x40x5mm ISA etc ., and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work as per SS

4.41

-

4797.8

... More
Supply and fixing of pre-painted steel windows & top hung and fixed louvered ventilators made of pre - painted steel (base steel as per IS 513 of -0.58 mm thick 'D" quality, Galvanized as per IS 277 with zinc of 120 GSM) primer coated with epoxy primer of 5-7 microns thick, finish painted with a polyester paint of 12-16 microns thick and back coated with 5-7 microns thick alkyd backer, section for outer frame of 46 x 52 mm and section for shutter of 46 x 46 mm, section for mullion 46 x 70 mm, and section for beading should be 18 x 25 mm and section for louvered ventilation of 33 x56mm Box section and the windows panelled with 5 mm thick plain float glass & 4 mm pinhead glass for ventilators with Ethyl propylene Diamine monomer Gasket (EPDM) and the sections cut to length mitre joined with corner bracket centre mullions fixed using mullion cap and with handle made of high grade aluminium powder coated and nylon receiver, corner brackets made of CRCA with Zinc Phosphate, Mullion caps made of glass filled nylon, frames fixed to the concrete /masonry wall by means of self expanding screws including 10 mm square guard bars with 6" pitch complete and including cost and conveyance all materials, fabrication,labour charges,fixing etc complete etc.,and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of workNCL or Equilent make Windows: Double shutter openable shutter 4'-0" x 4'0" (1219.2x1219.2mm) outer frame section size of 46 x 52 mm shutter frame section size of 46 x 46 mm Mullion section size of 46 x 70 mm

5.76

-

6147.75

... More
Painting to New Wood work with synthitec Enamel Paint two coats over aprimary coat of approved colour and shade duly clearing the surface and dusting of the loose particals after rubbing and applying two coats of ready mixed synthitec Enamel paint having VOC(Volatile organic compound) content less than 50 grams per litre using GRade -1 paint of ASIAN/Berger/Nerolac make to obtain smooth surface and in case of bad workmanship applying one (1)more coat as required after rubbing down the surface including cost of paint,labour charges,operation charges etc.,and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work as per APSS.No 1212

4.41

-

169.42

... More
Providing and applying PMCC / Deco orient base or Equivalent exterior Texture of average 2 to 3 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying putty/ texture paint filler by putty knife / muslin pad, air dry for 2 - 3 hrs for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges, scaffolding charges.,and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work in all floors for external walls

133.41

-

369.5

... More
Providing and applying synthetic plaster putty or equivalent putty such as birla wall care putty of average 2 to 3 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying putty/ texture paint filler by putty knife / muslin pad, air dry for 2 - 3 hrs for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for external walls - including cost of access scaffolding and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work

82.17

-

194.5

... More
Painting to new walls with 2 coats of 2 coats of Emulsion paint using Acrylic Exterior Emulsion paint weather proof water based modified Acrylic with Silicon additives having VOC(Volatile organic compound) content less than 50 grams per litre of approved brand and shade over abase coat appropriate cement primer of approved brand , making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work as per SS 911 for External walls

82.17

-

195.2

... More
Providing and applying synthetic plaster putty or plaster of paris putty/Birla wall care putty of average 1 to 2 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying knifing paste filler by putty knife / muslin pad, air dry for 2 - 3 hrs, sand with 180 and 320 No., emery paper for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work as per SS for internal walls

652.41

-

194.5

... More
Painting to new walls with 2 coats of plastic emulsion paint using Synthetic Polymer plastic Emulsion paint having VOC(Volatile organic compound) content less than 50 grams per litre , of approved brand and shade over abase coat appropriate cement primer of approved brand , making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work as per SS 911 for internal walls and Ceiling

652.41

-

159.64

... More
Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) steel bars (Fe 415grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work in all floors.( APSS No.126), )

9.46

-

69246.1

... More
Internal Water suppy &sanitary fittings Cost, Supplying & Fixing Indian make Flat Back Wash Hand Basin (HSW/Parryware/Neycer) 1st qualityof size 660 x 460mm with single Chrome finish Piller cock Jaquar make continental series, conforming to IS:2556-Part-4-1972 with waste fittings likeWaste coupling Jaquar make chain, 32 mm nominal size C.P fitting with parallel pipe, thread conforming to IS:2963-1979 and fitted with 15mm dia.Chrome finish Piller cock Jaquar make continental series, complete with standard CI brackets including wooden block, CP Bottle trap Jaquar make, 15 mm dia CP Anglular stop cock with wall flange Jaquar make continental series and15mm inlet PVC connection with unions complete, including cutting and making good the walls where ever required for different floors, including cost, and conveyance of all materials and all labour charges etc., complete,and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work

12

-

6144.3

... More
Cost, Supply and fixing of white glazed European Water Closet of first quality confirming to IS 2556 part-2, 1973 of Hindusthan/Neycer/Parryware make white glazed with "P" trap ISI mark including plastic seat and lid with rubber or plastic buffers as per IS-2548, 1996, P.V.C low level cistern with internal components with short bend equilent to Parryware slimline 10 lts Capacity, fixed as per the direction of Engineer in charge,with 1no., 12.7 mm dia Anglular stop cock with wall flange Jaquar make continental series chrome finish with 12.7 mm PVC connection with brass union nut and ‘P’ trap of European water closet shall be encased in C.C. (1:2:4), 6" thick alround well above the joint to stop leakage at the joint including cost, and conveyance of all materials and C.C. bed etc., complete for different floors, including all labour charges for all operations complete and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work

32

-

5402.4

... More
Supplying and fixing white glazed flat backhalf stall urinals of size 590mmx375mmx390mm 1st qualityconforming to IS:2556-1995 with standard CP Spreader of overall size 95x95x57mm confirming to IS:2556-part6,sec-6-1974 fixed with screws complete indian make (HSW /Parry / Neycer) with NP Push Cock 1st quility of makes Seiko/Senior/ Nice/CERA/Hindware and including cost,conveyance,all labour charges for fixing etc.,and overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work

11

-

3309.35

... More
Providing &fixing 16 to 20mm thick White Marble stone gangsaw cut slab any variety table rubbed,edges rounded and Polished of size 75x50cms deep fixed in Urinal partitions by cutting a chase of appropriate width with chase cutter and embedding the stone in the chase with epoxy grout or with C.C.1:2:4( using 6mmsize H.G.Metal)as per directions of Engineer-in-charge and Finished smooth including cost,conveyance,all labour charges for fixing etc.,and overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work

8

-

635.38

... More
Supplying & fixing Stainless steel sink size 36"x18" (914.4 x 457.2 mm) 1 mm thick with accessories including cost and conveyance of all materials and all labour charges etc including .,and overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work

17

-

7495.75

... More
Cost, supply and fixing of TV shape mirror with plastic frame of size 609.6 x 457.2 mm including cost and conveyance of all materials and all labour charges etc including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work

18

-

513.55

... More
Cost, supply and fixing of UPVC Sudhakar/Prince or equivalent quality U.V. resistant SWR Floor trap of 4" (101.60mm)as per IS standards with CP special grating with frame and cover of 1st quality including cost and conveyance of all materials and all labour charges etc and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work

37

-

194.3

... More
Cost, supply and fixing of UPVC Sudhakar/Prince or equivalent quality U.V. resistant SWR Nahany trap of 4" (101.60mm) dia as per IS standards with CP special grating with frame and cover of 1st quality including cost and conveyance of all materials and all labour charges etc and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work

14

-

155.65

... More
Cost, supply and fixing of12.7mm dia N.P. Push Cock ist quality heavy type with NP screws of make Seiko/Senior/ Nice/CERA/Hindware including cost and conveyance of all materials and all labour charges etc and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work

20

-

265.86

... More
Cost, supply and laying of Primium make CPVC pipes and fittings to meet the requirement of ASTM-D 2846 and are produced in CTS(Copper Tube sizes 1/2" to2" SDR13.5 pipes are made from idential CPVC Compounds having same phisical Properties for Hot & Cold water confirming to IS 15778-2007 of ASHIRVAD / Prince/Kissan make with malleable specials such as Tees, Elbows, Check nuts, Unions, Bushes etc, solvent cement including fixing in walls, ceiling floors and making bores in walls, ceiling etc and making good the chased surface in cement mortor and complete, when making a transition use metal threads fittings including including cost,conveyance,all labour charges for fixing etc.,and overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work as directed by the Engineer-in charge 22.20mm dia OD pipe SDR 13.5:

157.75

-

96.6

... More
Cost, supply and laying of Primium make CPVC pipes and fittings to meet the requirement of ASTM-D 2846 and are produced in CTS(Copper Tube sizes 1/2" to2" SDR13.5 pipes are made from idential CPVC Compounds having same phisical Properties for Hot & Cold water confirming to IS 15778-2007 of ASHIRVAD / Prince/Kissan make with malleable specials such as Tees, Elbows, Check nuts, Unions, Bushes etc, solvent cement including fixing in walls, ceiling floors and making bores in walls, ceiling etc and making good the chased surface in cement mortor and complete, when making a transition use metal threads fittings including including cost,conveyance,all labour charges for fixing etc.,and overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work as directed by the Engineer-in charge 28.60mm dia OD pipe SDR 13.5:

10

-

139.75

... More
Cost, supply and fixing of GI Pipe Medium grade properties and weight as per IS 1239 ISI mark with GI fittings including cost ,conveyance of pipes and its fittings and labour charges etc and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work (makes: pipes Tata,Zenith,SAIL, Fittings HB). 50mm Dia Pipe Line:

150

-

514.4

... More
Cost, supply and fixing of GI Pipe Medium grade properties and weight as per IS 1239 ISI mark with GI fittings including cost ,conveyance of pipes and its fittings and labour charges etc and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work (makes: pipes Tata,Zenith,SAIL, Fittings HB). 32mm Dia Pipe Line:

190

-

419.55

... More
Cost, supply and fixing of Gunmetal (GM peet) gate valve as per IS 778 Class I Indian make Heavy type including cost conveyance of all materials and all labour charges etc and including and overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work 50mm Dia:

1

-

3610.12

... More
Cost, supply and fixing of Gunmetal (GM peet) gate valve as per IS 778 Class I Indian make Heavy type including cost conveyance of all materials and all labour charges etc and including and overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work 32mm Dia

10

-

1822.1

... More
Cost, supply and fixing of Gunmetal (GM peet) gate valve as per IS 778 Class I Indian make Heavy type including cost conveyance of all materials and all labour charges etc and including and overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work 25mmd1a

18

-

1206.6

... More
Supplying, laying, fixing in position and testing on wall / under floor Prince / Sudhakar PVC / SWR pipes & fittings (as per ISI standards) 4 kg /cm2 for sanitary lines with specials of approved make as per manufactrurers specification including cutting the pipes to the required lengths, jointing with specials wherever required including chiselling & restoring the wall to original condition wherever required as directed by Engineer-in-charge and fixing with clamps, door bends including testing if necessary cowls etc., complete including cost and conveyance of all materials, and all labour charges and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work 110mm dia

497

-

374.75

... More
Supplying, laying, fixing in position and testing on wall / under floor Prince / Sudhakar PVC / SWR pipes & fittings (as per ISI standards) 4 kg /cm2 for sanitary lines with specials of approved make as per manufactrurers specification including cutting the pipes to the required lengths, jointing with specials wherever required including chiselling & restoring the wall to original condition wherever required as directed by Engineer-in-charge and fixing with clamps, door bends including testing if necessary cowls etc., complete including cost and conveyance of all materials, and all labour charges and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work 75 mm dia

120

-

224.5

... More
Constructing 457.2 mm x 457.2 mm (1'6"x1'6") brick in CM 1:6 prop. Masonry. Inspection chamber up to 914.4 mm (3'0") and fitted with light weight 457.2 mm x 457.2 mm (1'6"x1'6") C.I frame and cover of 20 K g)including cost,conveyance,all labour charges etc.,and overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work

6

-

3678.85

... More
Constructing 914.40 mm x 457.2 mm (3'0"x1'6") brick in CM 1:6 prop. Masonry. Inspection chamber up to 914.4 mm (3'0") and fitted with light weight914.4 mm x 457.2 mm (1'6"x1'6") C.I frame and cover of 40 Kg.including cost,conveyance,all labour charges and overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work

18

-

6103.4

... More
Supplying, laying, jointing and testing 152.4 mm SWG SP-1 pipes of ISI make confirming to ISI 651 & 4127 with airtight cement joints in CM ( 1.5:1) prop. Including excavation of trenches and socket pits in an soil ( except rock requiring blasting ) upto 914.4 mm ( 3' 0'') depth and refilling with watering and tamping.including cost,conveyance,all labour charges for fixing etc.,and overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work

35

-

690.78

... More
Supply & Fixing of Bibcock cum Health Faucet with 1m long tube and wall hook of Jaquar Continental series, Chrome Finish with 7 years warranty including cost and conveyance of all materials and all labour charges etc and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work

12

-

3146

... More
Cost, supply and fixing of Chrome finish Bib Cock Jaquar make continental serieswith 7 years warranty including cost and conveyance of all materials and all labour charges etc and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work

19

-

924.85

... More
Cost, supply and fixing of Chrome finish Angle stop cock with wall flange Jaquar make continental serieswith 7 years warranty including cost and conveyance of all materials and all labour charges etc and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work

18

-

854.4

... More
Cost, supply and fixing of towel rod Chrome finish(CP) of 24" long and 3/4" dia including cost and conveyance of all materials and all labour charges etc and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work .

12

-

387.45

... More
providing and laying of well burnt cinder Agreegates as per IS: 2686:1977 including cost, conveyance of all material from approved source and all labour charges,etc.and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work

2.9

-

971.85

... More
Constructing 904.0 mm (3'0'') dia brick masonry inspection chamber as per IS 4111: part-I 1986 with cement mortor (1:6) prop usig 2nd class clay bricks of 225mm thick from approved source having a minimum crushing strength of 5 N/Sqmm including plastering wit cement mortor (1:3) prop 1/2'' thick both inside and outside fittted with 20'' dia RCC manhole covers and frames including excavating pits upto a depth of 904 mm ( 3' '0'') in all sorts of soils (excluding rock) and laying cement concrete (1:4:8) 150mm thick using 40mm HBG metal and PCC (1:2:4) benching and channel 100mm thick as per standard specifications and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials ad all incidental and operations, labour charges like mixing cement mortar, constructing masonry, lift charges, curing etcand including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work as per standard specification.

10

-

6269.28

... More
Constructing 904.0 mm (3'0'') dia brick masonry inspection chamber as per IS 4111: part-I 1986 with cement mortor (1:6) prop usig 2nd class clay bricks of 225mm thick from approved source having a minimum crushing strength of 5 N/Sqmm including plastering wit cement mortor (1:3) prop 1/2'' thick both inside and outside fittted with 20'' dia RCC manhole covers and frames including excavating pits upto a depth of 1524 mm (5' '0'') in all sorts of soils (excluding rock) and laying cement concrete (1:4:8) 150mm thick using 40mm HBG metal and PCC (1:2:4) benching and channel 100mm thick as per standard specifications and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials ad all incidental and operations, labour charges like mixing cement mortar, constructing masonry, lift charges, curing etcand including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work as per standard specification.

3

-

9792.48

... More
Excavation of trenches and socket pits in aOrdinary soils ( except rock requiring blasting ) by Mechnical meas upto 3m depth nd refilling with excavated useful earth , watering and tamping after laying, Jointing &Testing of of pipes.upto 3m depthand including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work as per standard specification.

280.26

-

128.34

... More
Manufacture, Supply, & Delivery of Unplasticised Non-pressure polyvinylchloride(PVC-U) pipes160 mm dia (Outer) Pipe series (S 20) of dark (any shade of brown) for use in underground drainage & sewerage system conforming to IS 15328/2003) with solvent cement jointing as per specification inclusive of transportation to the sub-divisionalstores anywhere in A.Pand excluding all taxes(GST) and including laying and jointing of pipes with line and gradient and all other charges etc., including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work as per standard specification.

350

-

438.16

... More
Construction of Septic tank Earthwork in excavation for Foundations by mechanically in ordinary soils and depositing on bank for all liftsand with intial lead of 10m including all operational ,incidental , labour charges such as shoring,sheeting, planking, strutting etc.,,and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work but Excluding seigniorage etc.,as per SS20B (APSS 308)

242.03

-

98.99

... More
PCC mix (1:4:8) mix using 40mm gauge hard granite machine crushed metal including cost of machine mixing, laying levelling, tamping, curing and conveyance of all materials and all labour charges but excluding Seigniorage charges etc.,and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work etc complete for levelling course concrete.

11.87

-

3335.57

... More
Construction of Random Rubble stone masonry in CM (1:6) mix using rough stone granite including cost,and conveyance of all materials to site from approved sources and all labour charges curing, scaffolding etc.but excluding Seigniorage chargesetc.,and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work complete for basement and superstrucuture as per APSS No. 615

11.78

-

3136.29

... More
VRCC M25 Design Mix Concrete corresponding to IS 456 usingWEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc as per(APSS No. 403) with minimum cement content as per IS code including steel centering, shuttering , Scafolding, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication chargesbut excluding Seigniorage charges and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work a) For Raft

9.92

-

8355

... More
VRCC M25 Design Mix Concrete corresponding to IS 456 usingWEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc as per(APSS No. 403) with minimum cement content as per IS code including steel centering, shuttering , Scafolding, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication chargesbut excluding Seigniorage charges and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work i) For Side wall 250mm+150mm thick - for Septic tank -

21.8

-

14049.4

... More
VRCC M25 Design Mix Concrete corresponding to IS 456 usingWEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc as per(APSS No. 403) with minimum cement content as per IS code including steel centering, shuttering , Scafolding, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication chargesbut excluding Seigniorage charges and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work c) For Side wall 100mm thick - for valve chambers alround

1.2

-

20298.25

... More
VRCC M25 Design Mix Concrete corresponding to IS 456 usingWEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc as per(APSS No. 403) with minimum cement content as per IS code including steel centering, shuttering , Scafolding, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication chargesbut excluding Seigniorage charges and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work For Roof Beams- Sock pit

0.34

-

8889.35

... More
VRCC M25 Design Mix Concrete corresponding to IS 456 usingWEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc as per(APSS No. 403) with minimum cement content as per IS code including steel centering, shuttering , Scafolding, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication chargesbut excluding Seigniorage charges and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work For top slab 115mm thick

59.21

-

1028.9

... More
VRCC M25 Design Mix Concrete corresponding to IS 456 usingWEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc as per(APSS No. 403) with minimum cement content as per IS code including steel centering, shuttering , Scafolding, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication chargesbut excluding Seigniorage charges and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work for Precast Slabs for inlet and outlet chambers

0.22

-

8355

... More
RCM facia 5cm thick in CM (1:3) for drop walls, fins with rabbit wire mesh not less than30 gauge & nominal reinforcement as directed by Engineer-in-charge with dubara sponge finishing, including cost & conveyance of all materials to site, operational & incidental, cost and conveyance of cement, wire mesh, water to work site, centering, scaffolding and form work, lift charges etc., complete for finished items of work but excluding cost of steel & its fabrication charges, but excluding Seigniorage charges,and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work (APSS No.403 & 903)

4.1

-

2243.13

... More
Construction of brick masonry with Dry Joints using bricks 23x11x7cm class as per Table -1 of IS:1077:1992 having crushing strength of not less than 35 kg/cm2 including cost, and conveyance of all materials to site from approved sources and all labour charges curing, scaffolding etc. but Excluding Seigniorage Charges and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work as per APSS No. 504

4.1

-

5785.69

... More
Supplying & laying Brick aggregate in soakpit.and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work

9.2

-

646.65

... More
Plastering with CM(1:3) mix 8 mm thick single coat including cost and conveyance of all materials,,curing and labour charges etc., complete but excluding seigniorage chargesand including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work

38.09

-

250.33

... More
Plastering with CM(1:4) 20 mm thick two coats with neat tapi finishing including cost and conveyance of all materials, and curing, labour charges etc.,but excluding seigniorage charges and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work

8.4

-

293.81

... More
Providing impervious coat to exposed RCC walls surface with CM(1:3), 12mm thick with 1kg of water proof compound per bag of cement laid over roof when it is green including cost of all materials, conveyance charges of materials and including all operational, incidental and labour charges for mixing mortar, laying, rendering smooth and , curing, etc,but excluding seigniorage charges,and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work over terrace. as per APSS 903

99.54

-

401.48

... More
Providing impervious coat to exposed RCC walls surface with CM(1:3), 20mm thick with 1kg of water proof compound per bag of cement laid over roof when it is green including cost of all materials, conveyance charges of materials and including all operational, incidental and labour charges for mixing mortar, laying, rendering smooth and , curing, etc,but excluding seigniorage charges,and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work over terrace. as per APSS 903

41.23

-

421.58

... More
Filling with useful available excavated earth (excluding Rock) in trenches , sides of foundations ,and Basement with intial lead in layers not exceeding 15cms thick, consolidating each drposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges,hire charges of T&P etc.,and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work(APSS NO 309&310)

49.86

-

295.4

... More
Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) steel bars (Fe 415grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work in all floors.( APSS No.126), )

4.09

-

65462.69

... More
Manufacture as per BIS:12592 (Part 1&2) Supply & Delivery SFRC(Steel Fabricated Reinforced Concrete) manhole covers and frames of size 600x600mm(24x24 MD 10) with ISI marking any where in A.P., F.O.R. destination including, loading, un-loading & stacking at site &Fixing charges etc and including overheads & contractors profit , excluding GSTon all materials etc., complete for finished item of work

6

-

2416.63



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.