Endowments Department Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Endowments Department Tender

Civil And Construction
Civil Works Others
Opening Date29 Sep 2022
Closing Date6 Oct 2022
Tender Amount₹ 14,91,652 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Re Construction of Temple;VRCC M20 grade nominal mix (cement, fine aggregate, coarse aggregate) corresponding to table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding seigniorage charges, sales and other taxes on all materials and including all operational incidental and labour charges such as machine mixing, laying concrete, curing, centering and shuttering etc., complete but excluding cost of steel and its fabrication charges and including over heads and contractor profit etc., complete for finished item of work.

-

-

-

... More
Re Construction of Temple;Footings

3.54

-

33902

... More
Re Construction of Temple;Pedastals

0.9

-

9231

... More
Re Construction of Temple;Columns

1.05

-

13896

... More
Re Construction of Temple;Plinth Beam

1.92

-

23796

... More
Re Construction of Temple;Roof Beams

1.92

-

23204

... More
Re Construction of Temple;Roof slab 120mm thick

32.92

-

48135

... More
Re Construction of Temple;Ornamental sunshade 2'-0" wide

20.95

-

30300

... More
Re Construction of Temple;Providing High yield strength deformed (HYS (Fe 415 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying and overheads & contractors profit complete and excluding Seignorage charges, sales and other taxes for finished item of work ( APSS No.126)

1381.13

-

109950

... More
Re Construction of Temple;Ornamental brick work in CM (1:5) using common burnt clay bricks from approved sources usig bricks, bats and flat tiles including cost and conveyance of all materials like cement, sand, bricks etc to site importation of silpi labour, excluding scaffolding for costruction of masonry but including lift charges and soaking the bricks in clean water atleast an hour immediately before use, curing etc., and excluding Seignorage charges, sales and other taxes and including over heads and contractor profit complete for finished item of work. (as per Slipi SSR 2012)

-

-

-

... More
Re Construction of Temple;Up to Sthambhavargam level / 2nd class Varity

5.74

-

53762

... More
Re Construction of Temple;Above Sthambhavargam (1st Floor)

1.47

-

14300

... More
Re Construction of Temple;Ornamental Plastering 25 mm to 40 mm thick with base plastering 12 mm to 20mm in CM (1:3) and top finishing 12 MM thick with CM (1:2) to bring the required ornamentation including fine rendering with neat cement cost and conveyance of all materials, labour charges, all incidental and operational charges curing and excluding Seignorage charges, sales and other taxes complete etc., complete for finished item of work in site for external surface as per approved drawings and as directed during execution including preparation and fixing precast pillars, Kudam, Palakai, Vedika. Lathalu in Uttar Eludhakam, Pothikas, Nasigudu, Pupha Puskala Adihishtanam, Wherever necessary including over head charges and contractor profit etc., complete.(as per Silpi SSR 2012)

-

-

-

... More
Re Construction of Temple;Up to Sthambhavargam level / 2nd class Varity

52.64

-

66803

... More
Re Construction of Temple;Ornamental plastering with precast cement moulds to pillars using with cement, fine sand, brick bats etc., including cost and conveyance of all materials and all labour charges, curing and operational charges etc., complete but excluding scaffolding charges for finished item of work.

-

-

-

... More
Re Construction of Temple;Chitrakanta stambham

167.24

-

43701

... More
Re Construction of Temple;Providing puspha pothikas including cost and coveyance of all materials and all labour charges etc., complete.

8

-

15179

... More
Re Construction of Temple;Ceiling Plastering 12mm thick in single coat in CM (1:3) using screened sand including cost and conveyance of all materials like cement, sand, water etc., to work site, excluding seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc, and overheads & contractors profit etc., complete for finished item of work (SS 901, 903 & 904)

75.99

-

32609

... More
Re Construction of Temple;Brick masonry for panel walls in superstructure with CM (1:6) prop: (Cement, Screened sand) using common burnt clay bricks of class as per Table-1 of IS:1077-1992, Non-Modular or traditional size 23x11x7 cms from approved source having minimum crushing strength of 35kg/sqcm. including cost and conveyance of all materials like cement, screened sand, bricks, water etc., to site, excluding seigniorage charges, sales and other taxes on all materials and such as labour charges like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, etc, and overheads & contractors profit etc., complete for finished item of work. (APSS No.501 & 504).

1.28

-

9021

... More
Re Construction of Temple;Plastering 12mm thick in single coat in CM (1:5) using screened sand including cost and conveyance of all materials like cement, sand, water etc., to work site, excluding seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc, and overheads & contractors profit etc., complete for finished item of work (SS 901, 903 & 904)

3.62

-

1455

... More
Re Construction of Temple;Flooring with granite stone tiles 8 to 10mm thick (mirror polished of all shades) of 1st quality and of size as approved by Engineer-in-charge with borders and design as per the approved flooring pattern as directed by the Engineer-in-charge, laying tiles using spacers of 2mm thick, set over a base coat of CM (1:8) prop. 12mm thick using screened sand over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread at the rate of 3.30 Kgs per sqm and jointed neatly with white cement paste mixed with pigment of matching shade to full depth, including cost and conveyance of all materials like cement, sand, water, tiles, white cement etc., to site (excluding cost of CC bed) excluding cost of seignorage charges, sales and other taxes on all materials, cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer-in-charge etc., and over heads & contractors profit complete for finished item of work. (APSS No.701 & 707).

32.87

-

59821

... More
Re Construction of Temple;Supply & Application of one coat of deco orient base & two coats of acrylic exterior emulsion paint in multi colour having VOC (Volatile Organic Compound) content less than 50 grams / litre for exterior walls including cost and conveyance of all materials like paints, brushes, ropes, casino poles etc., to work site, excluding seignorage, sales & other taxes on all materials and including incidental, operational and all labour charges etc., and overheads & contractors profit complete for finished item of work in all floors. SS 911.

429.61

-

104520

... More
Re Construction of Temple;Earth work excavation for foundations (Mannual Means) for buildings in ordinary soils and depositing on bank for all lifts and with an initial lead of 10m and up to 3m depth including all operational,incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete for finished item of work and excluding sales and other taxes etc., complete as per SS 20 B (APSS No. 308)

32.15

-

14007

... More
Re Construction of Temple;Filling with carted filling sand in trenches,sides of foundations and basement lead in layers not exceeding 15cm thick, watering and ramming including cost and conveyance of water to work site and all operaitonal,incidental, labour charges,hire charges of T&P etc., excluding Seignorage charges, sales and other taxes and overheads & contractors profit and complete for fnished item of work (APSS No.309&310)

5.35

-

5386

... More
Re Construction of Temple;Vibrated Plain Cement Concrete (1:5:10) (cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using coarse aggregate 40mm size hard , machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, excluding seigniorage charges sales & other taxes on all materials and including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level, curing etc.,and overheads & contractors profit complete for finished item of work . (APSS No. 402)

5.35

-

22169

... More
Re Construction of Temple;Vibrated Cement Concrete (1:3:6) (cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using coarse aggregate 40mm size hard, machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, excluding seigniorage charges, sales & other taxes on all materials and including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level, curing etc., and including overheads & contractors profit complete for finished item of work . (APSS No. 402)

22.42

-

141226

... More
Re Construction of Temple;Plastering 12mm thick in single coat in CM (1:5) using screened sand including cost and conveyance of all materials like cement, sand, water etc., to work site, excluding seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc, and overheads & contractors profit etc., complete for finished item of work (SS 901, 903 & 904)

60.02

-

24123

... More
Re Construction of Temple;Supply & Application of one coat of deco orient base & two coats of acrylic exterior emulsion paint in multi colour having VOC (Volatile Organic Compound) content less than 50 grams / litre for exterior walls including cost and conveyance of all materials like paints, brushes, ropes, casino poles etc., to work site, excluding seignorage, sales & other taxes on all materials and including incidental, operational and all labour charges etc., and overheads & contractors profit complete for finished item of work in all floors. SS 911.

60.02

-

14602

... More
Re Construction of Temple;Filling with carted filling sand in trenches,sides of foundations and basement lead in layers not exceeding 15cm thick, watering and ramming including cost and conveyance of water to work site and all operaitonal,incidental, labour charges,hire charges of T&P etc., excluding Seignorage charges, sales and other taxes and overheads & contractors profit and complete for fnished item of work (APSS No.309&310)

17.2

-

71271

... More
Re Construction of Temple;Flooring with soft garanite cut stone (Bangolore Veriety) flooring 75 mm thick of size not less than 2-0" x2-0" over existing sand bed already laid and including cost and conveyance of stohe and three llne palamana dressing and including Jointing and errectlon and cost and conveyance of all materials i.e. chessels, hamers and stone all Incldental operatlonal labour charges for machine Cutting and ramming etc, complete for finished item of work.

1840.37

-

455823



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.