Endowments Department Tender
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Endowments Department Tender
Civil And Construction
Civil Works Others
Opening Date29 Sep 2022
Closing Date6 Oct 2022
Tender Amount₹ 14,91,652
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
547965Bid Award Id
ViewTender No
JTO2/190/2022.Tender Authority
Endowments Department ViewPurchaser Address
-Website
http://tender.apeprocurement.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Re Construction of Temple;VRCC M20 grade nominal mix (cement, fine aggregate, coarse aggregate) corresponding to table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and excluding seigniorage charges, sales and other taxes on all materials and including all operational incidental and labour charges such as machine mixing, laying concrete, curing, centering and shuttering etc., complete but excluding cost of steel and its fabrication charges and including over heads and contractor profit etc., complete for finished item of work.
-
-
-
Re Construction of Temple;Footings
3.54
-
33902
Re Construction of Temple;Pedastals
0.9
-
9231
Re Construction of Temple;Columns
1.05
-
13896
Re Construction of Temple;Plinth Beam
1.92
-
23796
Re Construction of Temple;Roof Beams
1.92
-
23204
Re Construction of Temple;Roof slab 120mm thick
32.92
-
48135
Re Construction of Temple;Ornamental sunshade 2'-0" wide
20.95
-
30300
Re Construction of Temple;Providing High yield strength deformed (HYS (Fe 415 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying and overheads & contractors profit complete and excluding Seignorage charges, sales and other taxes for finished item of work ( APSS No.126)
1381.13
-
109950
Re Construction of Temple;Ornamental brick work in CM (1:5) using common burnt clay bricks from approved sources usig bricks, bats and flat tiles including cost and conveyance of all materials like cement, sand, bricks etc to site importation of silpi labour, excluding scaffolding for costruction of masonry but including lift charges and soaking the bricks in clean water atleast an hour immediately before use, curing etc., and excluding Seignorage charges, sales and other taxes and including over heads and contractor profit complete for finished item of work. (as per Slipi SSR 2012)
-
-
-
Re Construction of Temple;Up to Sthambhavargam level / 2nd class Varity
5.74
-
53762
Re Construction of Temple;Above Sthambhavargam (1st Floor)
1.47
-
14300
Re Construction of Temple;Ornamental Plastering 25 mm to 40 mm thick with base plastering 12 mm to 20mm in CM (1:3) and top finishing 12 MM thick with CM (1:2) to bring the required ornamentation including fine rendering with neat cement cost and conveyance of all materials, labour charges, all incidental and operational charges curing and excluding Seignorage charges, sales and other taxes complete etc., complete for finished item of work in site for external surface as per approved drawings and as directed during execution including preparation and fixing precast pillars, Kudam, Palakai, Vedika. Lathalu in Uttar Eludhakam, Pothikas, Nasigudu, Pupha Puskala Adihishtanam, Wherever necessary including over head charges and contractor profit etc., complete.(as per Silpi SSR 2012)
-
-
-
Re Construction of Temple;Up to Sthambhavargam level / 2nd class Varity
52.64
-
66803
Re Construction of Temple;Ornamental plastering with precast cement moulds to pillars using with cement, fine sand, brick bats etc., including cost and conveyance of all materials and all labour charges, curing and operational charges etc., complete but excluding scaffolding charges for finished item of work.
-
-
-
Re Construction of Temple;Chitrakanta stambham
167.24
-
43701
Re Construction of Temple;Providing puspha pothikas including cost and coveyance of all materials and all labour charges etc., complete.
8
-
15179
Re Construction of Temple;Ceiling Plastering 12mm thick in single coat in CM (1:3) using screened sand including cost and conveyance of all materials like cement, sand, water etc., to work site, excluding seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc, and overheads & contractors profit etc., complete for finished item of work (SS 901, 903 & 904)
75.99
-
32609
Re Construction of Temple;Brick masonry for panel walls in superstructure with CM (1:6) prop: (Cement, Screened sand) using common burnt clay bricks of class as per Table-1 of IS:1077-1992, Non-Modular or traditional size 23x11x7 cms from approved source having minimum crushing strength of 35kg/sqcm. including cost and conveyance of all materials like cement, screened sand, bricks, water etc., to site, excluding seigniorage charges, sales and other taxes on all materials and such as labour charges like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, etc, and overheads & contractors profit etc., complete for finished item of work. (APSS No.501 & 504).
1.28
-
9021
Re Construction of Temple;Plastering 12mm thick in single coat in CM (1:5) using screened sand including cost and conveyance of all materials like cement, sand, water etc., to work site, excluding seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc, and overheads & contractors profit etc., complete for finished item of work (SS 901, 903 & 904)
3.62
-
1455
Re Construction of Temple;Flooring with granite stone tiles 8 to 10mm thick (mirror polished of all shades) of 1st quality and of size as approved by Engineer-in-charge with borders and design as per the approved flooring pattern as directed by the Engineer-in-charge, laying tiles using spacers of 2mm thick, set over a base coat of CM (1:8) prop. 12mm thick using screened sand over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread at the rate of 3.30 Kgs per sqm and jointed neatly with white cement paste mixed with pigment of matching shade to full depth, including cost and conveyance of all materials like cement, sand, water, tiles, white cement etc., to site (excluding cost of CC bed) excluding cost of seignorage charges, sales and other taxes on all materials, cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer-in-charge etc., and over heads & contractors profit complete for finished item of work. (APSS No.701 & 707).
32.87
-
59821
Re Construction of Temple;Supply & Application of one coat of deco orient base & two coats of acrylic exterior emulsion paint in multi colour having VOC (Volatile Organic Compound) content less than 50 grams / litre for exterior walls including cost and conveyance of all materials like paints, brushes, ropes, casino poles etc., to work site, excluding seignorage, sales & other taxes on all materials and including incidental, operational and all labour charges etc., and overheads & contractors profit complete for finished item of work in all floors. SS 911.
429.61
-
104520
Re Construction of Temple;Earth work excavation for foundations (Mannual Means) for buildings in ordinary soils and depositing on bank for all lifts and with an initial lead of 10m and up to 3m depth including all operational,incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete for finished item of work and excluding sales and other taxes etc., complete as per SS 20 B (APSS No. 308)
32.15
-
14007
Re Construction of Temple;Filling with carted filling sand in trenches,sides of foundations and basement lead in layers not exceeding 15cm thick, watering and ramming including cost and conveyance of water to work site and all operaitonal,incidental, labour charges,hire charges of T&P etc., excluding Seignorage charges, sales and other taxes and overheads & contractors profit and complete for fnished item of work (APSS No.309&310)
5.35
-
5386
Re Construction of Temple;Vibrated Plain Cement Concrete (1:5:10) (cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using coarse aggregate 40mm size hard , machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, excluding seigniorage charges sales & other taxes on all materials and including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level, curing etc.,and overheads & contractors profit complete for finished item of work . (APSS No. 402)
5.35
-
22169
Re Construction of Temple;Vibrated Cement Concrete (1:3:6) (cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using coarse aggregate 40mm size hard, machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, excluding seigniorage charges, sales & other taxes on all materials and including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level, curing etc., and including overheads & contractors profit complete for finished item of work . (APSS No. 402)
22.42
-
141226
Re Construction of Temple;Plastering 12mm thick in single coat in CM (1:5) using screened sand including cost and conveyance of all materials like cement, sand, water etc., to work site, excluding seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc, and overheads & contractors profit etc., complete for finished item of work (SS 901, 903 & 904)
60.02
-
24123
Re Construction of Temple;Supply & Application of one coat of deco orient base & two coats of acrylic exterior emulsion paint in multi colour having VOC (Volatile Organic Compound) content less than 50 grams / litre for exterior walls including cost and conveyance of all materials like paints, brushes, ropes, casino poles etc., to work site, excluding seignorage, sales & other taxes on all materials and including incidental, operational and all labour charges etc., and overheads & contractors profit complete for finished item of work in all floors. SS 911.
60.02
-
14602
Re Construction of Temple;Filling with carted filling sand in trenches,sides of foundations and basement lead in layers not exceeding 15cm thick, watering and ramming including cost and conveyance of water to work site and all operaitonal,incidental, labour charges,hire charges of T&P etc., excluding Seignorage charges, sales and other taxes and overheads & contractors profit and complete for fnished item of work (APSS No.309&310)
17.2
-
71271
Re Construction of Temple;Flooring with soft garanite cut stone (Bangolore Veriety) flooring 75 mm thick of size not less than 2-0" x2-0" over existing sand bed already laid and including cost and conveyance of stohe and three llne palamana dressing and including Jointing and errectlon and cost and conveyance of all materials i.e. chessels, hamers and stone all Incldental operatlonal labour charges for machine Cutting and ramming etc, complete for finished item of work.
1840.37
-
455823