Endowments Department Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Endowments Department Tender

Works
Civil And Construction
Building Construction
Opening Date30 Jan 2025
Closing Soon13 Feb 2025
Tender Amount₹ 12,87,387 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
VRCC M20 Nominal mix using 20mm size hard granite m/c graded metal(coarsed aggregate)including cost andconveyance of all materials like cement,fine aggregate(sand),coarse aggregate,water etc., to site with all steel centering,shuttering,machine mixing,laying ,vibrating, lifting,curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work as per SS(Column footings)

4.53

10205

46233

... More
Pedastals

3.4

10794

36702

... More
for columns

2.55

13499

34424

... More
first floor

0.59

13993

8256

... More
Plinth Beam

2.68

12807

34323

... More
for Beams

2.43

12328

29957

... More
for Beams@19.6"ht

1.17

12570

14708

... More
for roof slab 5" thick

38.91

14598

56803

... More
over radhasala-first floor

28.43

14841

42194

... More
Providing Hysd steel bar of different diameter including cost and conveyance of all materials and all labour charges for cutting,bending to required size and shapes placing in position with cover blocks and tying with binding wire,forming grills for reinforcement work as per approved designs and drawings and including all wastages such as overlaps couplings,welded joints,chairs,spacers etc.,complete for finished item of work in all floors

2.85

90521

257987

... More
Brick work with C.M(1:6) using 2nd class bricks from approved source including cost and conveyance of all materials like cement,sand,bricks,water etc.,to site including all taxes on all materials and such as labour charges like cement mortar mixing,scaffolding charges,construction of masonary,lift charges,curing etc.,complete for finished item of work.(For Basement)

1.71

7814

13362

... More
for superstructure

19.37

8285

160486

... More
1st floor

7.47

8594

64199

... More
second floor

1.03

9036

9307

... More
Plastering 12 mm thick in CM (1:3) with sponge finishing including cost and conveyance of all materials and all labour charges etc., complete for finished item of work as per SS(Ground floor)

37.47

4350

16301

... More
first floor

24.6

4712

11593

... More
Plastering 20 mm thick in CM (1:5) with sponge finishing including cost and conveyance of all materials and all labour charges etc., complete for finished item of work as per SS(Ground floor)

121.74

4197

51100

... More
1st floor

68.17

4559

31084

... More
second floor

16.76

4971

8333

... More
Providing impervious coat to exposed RCC roof slab surface to required slopes with CM (1:3)prop.using screened and 20mm thick(avg) mixed with water proofing compound manufactured by reputed manufacturers as approved by Engineer incharge at 1 kg per 1 bag of cement,laid over roof slab including cost and conveyance of all materials like cement, sand, water etc., to site and all operational, incidental charges on materials and all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting Grooves etc., complete for finished item of work as per SS

37.94

6301

23907

... More
over radhasala

22.13

6799

15048

... More
Gronolithie concrete flooring 20mm thick with(1:1:2)using 6mm to 12mm size hg machine crushed metal laid over cc bed already laid of Rcc slab,in alternate panels of size not exceeding 1.50mx1.50m and finishing the top surface to required smoothness and slopes and thread lining including cost of all materials,labour including seigniorage charges etc.,complete for finishing item of work

41.03

4678

19197

... More
Supplying &Fixing of Rolling Shutter made of 80x1.25mm machine rolled CRCA laths,interlocked together through their entire length and jointed together at the ends by end-locks,mounted on specially designed pipe shaft of 50mm dia nominal bore MS B-class pipe with brackets,plates,guide channels,stoppers,bottom locking plates and arrangements for inside & outside locking with push-pull operations including cost of hood cover and springs complete,painted with one coat of approved steel primer,locks,ball bearings,all accessories etc.,complete for finished item of work as per special spn:1108

36.91

5091

187913

... More
Painting to new Iron work over primary coat and two coats with Synthetic enamel paint Grade-I VOC(Volatile Organic Compound) content less than 50grams/litre of approved shade including cost and conveyance of all materials and all labour charges etc., complete for finished item of work.

81.2

2069

16806

... More
Painting to new walls with Emulsion paint 2 coats over primary coat (total3 coats) and sales & other taxes on cost of all materials including cost and conveyance of all materials and all labour charges etc., complete for finished item of work.

159.21

2560

40769



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.