Endowments Department Tender
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Endowments Department Tender
Civil And Construction
Building Construction
Opening Date30 Jan 2025
Closing Soon13 Feb 2025
Tender Amount₹ 12,87,387
Costs
EMD
₹ 12,900Document Cost
Refer DocumentsTender Fee
₹ 3,000
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
782815Tender No
A8/1653/2024, 28-01-2025Tender Authority
Endowments Department ViewPurchaser Address
-Website
http://tender.apeprocurement.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
VRCC M20 Nominal mix using 20mm size hard granite m/c graded metal(coarsed aggregate)including cost andconveyance of all materials like cement,fine aggregate(sand),coarse aggregate,water etc., to site with all steel centering,shuttering,machine mixing,laying ,vibrating, lifting,curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work as per SS(Column footings)
4.53
10205
46233
... More
Pedastals
3.4
10794
36702
... More
for columns
2.55
13499
34424
... More
first floor
0.59
13993
8256
... More
Plinth Beam
2.68
12807
34323
... More
for Beams
2.43
12328
29957
... More
for Beams@19.6"ht
1.17
12570
14708
... More
for roof slab 5" thick
38.91
14598
56803
... More
over radhasala-first floor
28.43
14841
42194
... More
Providing Hysd steel bar of different diameter including cost and conveyance of all materials and all labour charges for cutting,bending to required size and shapes placing in position with cover blocks and tying with binding wire,forming grills for reinforcement work as per approved designs and drawings and including all wastages such as overlaps couplings,welded joints,chairs,spacers etc.,complete for finished item of work in all floors
2.85
90521
257987
... More
Brick work with C.M(1:6) using 2nd class bricks from approved source including cost and conveyance of all materials like cement,sand,bricks,water etc.,to site including all taxes on all materials and such as labour charges like cement mortar mixing,scaffolding charges,construction of masonary,lift charges,curing etc.,complete for finished item of work.(For Basement)
1.71
7814
13362
... More
for superstructure
19.37
8285
160486
... More
1st floor
7.47
8594
64199
... More
second floor
1.03
9036
9307
... More
Plastering 12 mm thick in CM (1:3) with sponge finishing including cost and conveyance of all materials and all labour charges etc., complete for finished item of work as per SS(Ground floor)
37.47
4350
16301
... More
first floor
24.6
4712
11593
... More
Plastering 20 mm thick in CM (1:5) with sponge finishing including cost and conveyance of all materials and all labour charges etc., complete for finished item of work as per SS(Ground floor)
121.74
4197
51100
... More
1st floor
68.17
4559
31084
... More
second floor
16.76
4971
8333
... More
Providing impervious coat to exposed RCC roof slab surface to required slopes with CM (1:3)prop.using screened and 20mm thick(avg) mixed with water proofing compound manufactured by reputed manufacturers as approved by Engineer incharge at 1 kg per 1 bag of cement,laid over roof slab including cost and conveyance of all materials like cement, sand, water etc., to site and all operational, incidental charges on materials and all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting Grooves etc., complete for finished item of work as per SS
37.94
6301
23907
... More
over radhasala
22.13
6799
15048
... More
Gronolithie concrete flooring 20mm thick with(1:1:2)using 6mm to 12mm size hg machine crushed metal laid over cc bed already laid of Rcc slab,in alternate panels of size not exceeding 1.50mx1.50m and finishing the top surface to required smoothness and slopes and thread lining including cost of all materials,labour including seigniorage charges etc.,complete for finishing item of work
41.03
4678
19197
... More
Supplying &Fixing of Rolling Shutter made of 80x1.25mm machine rolled CRCA laths,interlocked together through their entire length and jointed together at the ends by end-locks,mounted on specially designed pipe shaft of 50mm dia nominal bore MS B-class pipe with brackets,plates,guide channels,stoppers,bottom locking plates and arrangements for inside & outside locking with push-pull operations including cost of hood cover and springs complete,painted with one coat of approved steel primer,locks,ball bearings,all accessories etc.,complete for finished item of work as per special spn:1108
36.91
5091
187913
... More
Painting to new Iron work over primary coat and two coats with Synthetic enamel paint Grade-I VOC(Volatile Organic Compound) content less than 50grams/litre of approved shade including cost and conveyance of all materials and all labour charges etc., complete for finished item of work.
81.2
2069
16806
... More
Painting to new walls with Emulsion paint 2 coats over primary coat (total3 coats) and sales & other taxes on cost of all materials including cost and conveyance of all materials and all labour charges etc., complete for finished item of work.
159.21
2560
40769
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%