Endowments Department Tender

... More
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Endowments Department Tender

Works
Civil And Construction
Building Construction
Opening Date25 Mar 2025
Closing Soon16 Apr 2025
Tender Amount₹ 1,08,79,547 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
R.R. Masonry in CM ( 1: 6 ) using rough granite stone approved quarry including cost, seigniorage, conveyance of all material like cement, sand, granite stone water etc to work site from approved source and all labour charges, curing, centering etc. complete for levelling Course Concrete. As per APSS 612

35.98

4518

162581.03

... More
Supply of Black Granite stone including cost of stone, Rough dressing, Palamana dressing, cost of jointing including cost and conveyance of chisels, hammers all materials labour charges etc complte (Separate sheet enclosed) A) Cost of Stone

3129.42

323

1013306.2

... More
B) Rough Dressing i) Below Sthambhavargam

3078.76

113

349808.71

... More
ii) Above Sthambhavargam

3261.55

124

407628.52

... More
C) Palamana Dressing i) Upapeetam Padmam

41.8

928

38800.01

... More
ii) Upapeeta Kantam

41.8

581

24315.06

... More
iii) Upapeeta Kapothakam

41.8

1022

42740.5

... More
iv) Adhistanam Jagathi

83.6

931

77885.1

... More
v) Adhistanam Kumudhukam

83.6

1022

85481

... More
vi) Adhistanam Pattika

83.6

1022

85481

... More
vii) Sthambhavargam -1

304.43

2366

720464.04

... More
viii) Sthambhavargam-2

120.98

2366

286311.27

... More
ix) Prastharam Uttaram

114

1102

125639.4

... More
x) Prastharam Kapothakam

114

2366

269792.4

... More
xi) Prastharam Vyalam

85.5

1403

119969.33

... More
xii) inside Palamna

798

556

444254.58

... More
xiii) Konamattam & Chandravattam

310

556

172580.1

... More
xiv) Cost of Tools

2223.1

119

265193.6

... More
xv) Cost of Jointing

2223.1

113

252566.39

... More
Ornamental Brick Masonry in CM ( 1: 5 ) mix using 2nd class moulded bricks including cost, seigniorage, conveyance of all material like cement, sand, water etc to work site from approved source and all labour charges, curing, centering etc. complete A) Vimanam 1st Storey

13.58

10100

137161.4

... More
B) Vimanam 2nd Storey

6.93

10394

72035.06

... More
c) Salaharam

15.25

9805

149538.91

... More
d) Dwajam And Balipeetam

1.84

9805

18042.73

... More
V.R.C.C (1:11/2:3) using 20 MM size HBG graded chips with nominal mix SS-5 using necessary quantity and excluding cost and conveyance of steel per cum of concrete including cost and conveyance of all materials and all labour charges, seigniorage, curing, centering ( Using Steel) etc., complete but excluding the cost of steel and its fabrication charges. c) Plinth Beam

7.64

11244

85907.29

... More
g) Roof Slab 120mm Thick

21.77

12951

28194.94

... More
Providing High Yield Strength Deformed Bars of Fe 415 Grade of different diametres including cost & conveyance of steel including cost of binding wire and labour charges for fabrication such as cutting, bending and cranking rods, tying grills with binding wire etc complete.

872.15

87238

76084.74

... More
Whether proof couse with CM( 1:3) mix using 20mm thick including cost and conveyance of all materials like cement, sand and water and labour, curing, scaffolding, seigniorage charges etc., complete. As per APSS No.904

7.53

5027

3785.73

... More
Supplying and fixing of granite stone door frame with palamana dressing with padmam , nagabhandham, padma rekulu etc., including cost and conveyance of all materials and labour charges etc complete. A) Cost and Conveyance of granite Door Frame

44.16

340

15051.94

... More
B) Five Line Palamana Dressing with Padmam,Padma Rekulu, Nagabhandam

132.48

573

76011.72

... More
C) Labour Charges Fixing them in Position

2

2045

4090.14

... More
Plastering with CM( 1:5) mix using 20mm thick including cost and conveyance of all materials like cement, sand and water and labour, curing, scaffolding, seigniorage charges etc., complete. As per APSS No.904

56.69

3574

20263.84

... More
Ornamental Plastering 1" to 1¼" thick base plastering in C.M(1:3) mix 20mm thick and top plastering with C.M (1:3) mix 12mm thick, to bring requred ornamentation inclusive of fine rendering neatly with cemnt, as per drawing including cost & conveyance of all materials, labour charges and curing etc., complete. To the requried shape ans size as per the approved Drawing and as per silpi Norms - 10 Sq.m A) Vimanam 1st Storey

100.75

22619

227893.18

... More
B) Vimanam 2nd Storey

22.44

24547

55084.14

... More
C) For Dwajam and Balipeetam

8.18

10218

8358.48

... More
Supplying and fixing of granite stone somasutram including the cost and conveyance of all materials and labour charges etc complete

1

8498

8498.4

... More
Supplying and fixing of brass stupi with stupi dandam including the cost and conveyance of all materials and labour charges etc complete

1.41

4686

6608.13

... More
Supplying and fixing of best teak wood door shutter with two leaves with single / double rows of padmas with necessary fittings and locking arrangments including the cost and conveyance of all materials and labour charegs etc complete

37.01

3692

136659.05

... More
Supply of hard granite cut stone slabs for flooring form Perur quarry including cost and converyance etc., complete with the following specifications.

-

-

-

... More
a) The size of the stone slab should not be less than 0.61mx 0.45m(2'-0"x1'-6").

-

-

-

... More
b) The thickness of the stone slabs should not be less than 100mm ( 4") in all sides.

-

-

-

... More
c) The top of the slab should be dressed with the following dressings properly.

-

-

-

... More
d) All the sides of the slabs should be dressed with following dressing to a depth of 40mm (11/2") from top surface to suit proper alignment and jointing with side slabs.

-

-

-

... More
e) The slabs should be laid horizontally and jointed properly to alignment over sand bed (excluding cost of sand bed).cement mortar bed.

-

-

-

... More
f) The joint of the slab should not be more than 6mm (1/4" thick).

-

-

-

... More
g) The slabs should be jointed with C.M(1:3) and the mortar should not come over the slab for the above item the rate is including cost and conveyance of all materials to site of work including necessary labour charges, dressing, laying, jointing but excluding cost of sand for bedmortar the bed will be paid under relevent item .( Cement mortar of 0.005 Cum/ Sqm should be used for joints.) a)cost of hard granite stone

42.14

227

9575.47

... More
b) Three line palamana dressing for hard granite stone not less than 12" x 24" uniform size and thick ness not less than 4"

127.7

244

31193.28

... More
c) Labour charges for jointing for hard granite and soft variety

127.7

45

5803.97

... More
supply ing fixing of scaffolding during execution of work including cost and conveyance of all materials and labour charges etc complete a)Upto 20'-0'' height-

4304.8

15

64572

... More
b) Upto 20'-0'' to 30'-0'' height

2520

13

34650

... More
Providing best teak wood for dwajastambam incl including the cost and conveyance of wood , labour charges for shapping , cutting the logs and erection on cut stone base , teak wood meghalalu , brass etc complete a) cost of teak wood

1.3

172694

224503.24

... More
b) loading unloading

1

7500

7500

... More
c) cutting and shapping

33

681

22495.77

... More
d) cutgranite stone bed

9

323

2914.2

... More
e) supply and fixing of meghlalu upadandams pallave etc

3.26

7548

24608.37

... More
f) Brass Bells

15

150

2250

... More
g) Erection of Dwajam

1

10000

10000

... More
Supply & application of one coat deco orient base & two coats of acrylic emulsion paint having VOC (Volatile Organic Compound) content less than 50 grams/litre for internal walls including cost and conveyance of all materials to site, sales & other taxes, incidental, operational and all labour charges etc.,and overheads & contractors profit complete for finished item of work in all floors.

188.05

2170

40812.87

... More
Earth work excavation and depositing on banks with an initial lead of 10m and initial lift of 2m in soils like in rock like shales, ordinary gravel and rock like shales, ordinary gravel stoney earth and earth mixed with fair sized boulders etc completewhich do not require blasting etc., complete for foundations as per APSS No.308.

94.49

246

23251.15

... More
Sand with filling sand from approved sources in layers not exeeding 15 cm thick, consolidating each deposited layer basement with Sand with watering and ramming with heavy rammers including all water leads, including charges for all operations, incidential, labour charge as per APSS-310

17.78

259

4609.64

... More
Plain Cement Concrete ( 1 :4 : 8 ) proportion using 40mm size HBG metal from approved quarry including cost, seigniorage, conveyance of all material from approved source and all labour charges, curing, centering etc. complete for levelling Course Concrete. As per APSS 402

8.97

3912

35090.91

... More
R.R. Masonry in CM ( 1: 6 ) using rough granite stone approved quarry including cost, seigniorage, conveyance of all material like cement, sand, granite stone water etc to work site from approved source and all labour charges, curing, centering etc. complete for levelling Course Concrete. As per APSS 612

48.06

4518

217166.32

... More
Ornamental Brick Masonry in C.M(1:5) mix using II nd class bricks well burnt from any kiln, inclusive of brick bots, and madras terrace bricks, including cost & conveyance of all materials, labour charges, scaffolding charges, and curing etc., complete complying of standard specifications and as directed during execution of work for one Cu.m. A) Upto Prastharam level

36.86

9805

361442.89

... More
B) Vimanam 1st Storey

12.48

10100

126051.12

... More
c) Vimanam 2nd Storey

6.58

10394

68396.93

... More
d) Vimanam 3rd Storey

5.08

10689

54300.63

... More
V.R.C.C (1:11/2:3) using 20 MM size HBG graded chips with nominal mix SS-5 using necessary quantity and excluding cost and conveyance of steel per cum of concrete including cost and conveyance of all materials and all labour charges, seigniorage, curing, centering ( Using Steel) etc., complete but excluding the cost of steel and its fabrication charges. A) Plinth Beam

5.38

11244

60494.93

... More
b) For Lintels

-

-

-

... More
(i) Over door frames

1.96

11806

23140.52

... More
(ii) I st storey

0.14

12217

1710.46

... More
(iii) 2nd stoorey

0.14

12824

1795.38

... More
(iv) 3rd storey

0.14

13430

1880.3

... More
c) For Roof slab 150 mm thick

-

-

-

... More
(i) For Ground Floor

12.68

12951

16422.22

... More
(ii) I st storey

7.73

13153

10167.63

... More
(iii) 2nd stoorey

3.62

13628

4933.46

... More
Providing High Yield Strength Deformed Bars of Fe 415 Grade of different diametres including cost & conveyance of steel including cost of binding wire and labour charges for fabrication such as cutting, bending and cranking rods, tying grills with binding wire etc complete.

1016.35

87238

88664.48

... More
Plastering with CM( 1:3) mix using 12mm thick including cost and conveyance of all materials like cement, sand and water and labour, curing, scaffolding, seigniorage charges etc., complete. As per APSS No.904 (i) For Ground Floor

5.31

3708

1969.02

... More
(ii) I st storey

3.22

4010

1291.24

... More
(iii) 2nd storey

1.74

4392

764.32

... More
(iv) 3rd storey

1.02

4775

487.06

... More
Plastering with CM( 1:5) mix using 20mm thick including cost and conveyance of all materials like cement, sand and water and labour, curing, scaffolding, seigniorage charges etc., complete. As per APSS No.904 (i) For Ground Floor

37.51

3574

13407.95

... More
(ii) I st storey

30.38

3876

11776.59

... More
(iii) 2nd stoorey

11.39

4219

4806.39

... More
(iv) 3rd storey

7.13

4563

3253.58

... More
Supplying and fixing of granite stone door frame with palamana dressing with padmam , nagabhandham, padma rekulu etc., including cost and conveyance of all materials and labour charges etc complete. A) Cost and Conveyance of granite Door Frame

106.69

340

36365.29

... More
B) Palamana Dressing

751.94

573

431433.09

... More
C) Labour Charges Fixing them in Position

2

2045

4090.14

... More
Ornamental Plastering 1" to 1¼" thick base plastering in C.M(1:3) mix 20mm thick and top plastering with C.M (1:3) mix 12mm thick, to bring requred ornamentation inclusive of fine rendering neatly with cemnt, as per drawing including cost & conveyance of all materials, labour charges and curing etc., complete. To the requried shape ans size as per the approved Drawing and as per silpi Norms - 10 Sq.m a) Upto sthambhavargam level

52.74

10218

53890.73

... More
(ii) I st storey

53.54

22619

121105.71

... More
(iii) 2nd stoorey

24.23

24547

59478.11

... More
(iv) 3rd storey

22.88

26474

60574.62

... More
f) Mahanasi over Rajagopuram

120

1090

130884.48

... More
g) Mukhanasi

40.5

477

19325.79

... More
Supplying and fixing of brass stupi with stupi dandam including the cost and conveyance of all materials and labour charges etc complete

8.75

4686

41007.92

... More
Supplying and fixing of iron grills enclosurre using L angles/Flats/Square with necessary lcking arrangements including the cost and conveyance of all materials and labour charges etc complete

49.01

114

5623.9

... More
Supplying and fixing of best teak wood door shutter with two leaves with single / double rows of padmas with necessary fittings and locking arrangments including the cost and conveyance of all materials and labour charegs etc complete

61.05

4885

298256.72

... More
supply ing fixing of scaffolding during execution of work including cost and conveyance of all materials and labour charges etc complete A) Up to 20'0" Height

1660

15

24900

... More
B) Upto 20'0" to 30'0" height

1245

13

17118.75

... More
Supply of hard granite cut stone slabs for flooring form Perur quarry including cost and converyance etc., complete with the following specifications.

-

-

-

... More
a) The size of the stone slab should not be less than 0.61mx 0.45m(2'-0"x1'-6").

-

-

-

... More
b) The thickness of the stone slabs should not be less than 100mm ( 4") in all sides.

-

-

-

... More
c) The top of the slab should be dressed with the following dressings properly.

-

-

-

... More
d) All the sides of the slabs should be dressed with following dressing to a depth of 40mm (11/2") from top surface to suit proper alignment and jointing with side slabs.

-

-

-

... More
e) The slabs should be laid horizontally and jointed properly to alignment over sand bed (excluding cost of sand bed).cement mortar bed.

-

-

-

... More
f) The joint of the slab should not be more than 6mm (1/4" thick).

-

-

-

... More
g) The slabs should be jointed with C.M(1:3) and the mortar should not come over the slab for the above item the rate is including cost and conveyance of all materials to site of work including necessary labour charges, dressing, laying, jointing but excluding cost of sand for bedmortar the bed will be paid under relevent item .( Cement mortar of 0.005 Cum/ Sqm should be used for joints.) a)cost of hard granite stone

38.51

227

8750.63

... More
b) Three line palamana dressing

116.7

244

28506.31

... More
c) Labour charges

116.7

45

5304.02

... More
Providing cement vigrahams using cement fine sand iron bars mesh brick bats, flat tiles, pieces etc including the cost and conveyance of all materials and labour charges etc complete (i) Ist storey Dwaraplakas

20

1937

38742.8

... More
Gopannadharies

34

1761

59875.02

... More
Kosta vigrahams

7.5

2533

19002.08

... More
2nd storey Dwarapalakas

18

1937

34868.52

... More
Gopannadharies

30

1761

52830.9

... More
Kosta vigrahams

7

2533

17735.27

... More
3rd storey Dwarapalakas

16

1937

30994.24

... More
Gopannadharies

28

1761

49308.84

... More
Kosta vigrahams

6

2533

15201.66

... More
Corner Garudas

12

1761

21132.36

... More
Corner Lions

16

1238

19814.4

... More
Painting to new walls with 2 coats of acrylic emulsion paint weather proof water-based, modified acrylic with silicon additives exterior grade having VOC (Volatile Organic Compound ) content less than 50 grams/ liter. approved brand,of first grade over cement primary making 3 coats in all to give an even shade after thouroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost and conveyance of all materials to work site and operational, labour charges and incidental charges such as scaffolding, lift charges etc., complete for finished item of work as per SS911 for internal walls.

97.7

1697

16585.65

... More
Painting to new walls with 2 coats of acrylic emulsion paint weather proof water-based, modified acrylic with silicon additives exterior grade having VOC (Volatile Organic Compound ) content less than 50 grams/ liter. of approved brand and colour over a base coat of appropriate primer of approved brand,of first grade making 3 coats in all to give an even shade after thouroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost and conveyance of all materials to work site and operational, labour charges and incidental charges such as scaffolding, lift charges etc., complete for finished item of work as per SS911 for External walls.

153.4

2170

33292.71

... More
Painting two coats with synthetic enamel paint Grade-II VOC (Volatile Organic Compound) content less than 50 grams/litre over primer coat of red oxide to new iron work including cost and conveyance of all materials to site, sales & other taxes, incidental, operational and all labour charges etc.,and overheads & contractors profit complete for finished item of work in all floors. (SS No. 1201, 1212 & 1207).

1.82

1110

202.07

... More
Earth work excavation and depositing on banks with an initial lead of 10m and initial lift of 2m in soils like in rock like shales, ordinary gravel and rock like shales, ordinary gravel stoney earth and earth mixed with fair sized boulders etc completewhich do not require blasting etc., complete for foundations as per APSS No.308.

95.51

246

23502.15

... More
Filling with carted coarse sand in trenches, sides of foundation and basement with initial lead in layers not exeeding 15 cm thick, consolidating each deposited layer basement with Sand with watering and ramming with heavy rammers including all water leads, including charges for all operations, incidential, labour charge as per APSS-309&310

15.93

259

4130.01

... More
Plain Cement Concrete ( 1 :4 : 8 ) proportion using 40mm size HBG metal from approved quarry including cost, seigniorage, conveyance of all material from approved source and all labour charges, curing, centering etc. complete for levelling Course Concrete. As per APSS 402

15.93

3912

62318.64

... More
R.R. Masonry in CM ( 1: 6 ) using rough granite stone approved quarry including cost, seigniorage, conveyance of all material like cement, sand, granite stone water etc to work site from approved source and all labour charges, curing, centering etc. complete for levelling Course Concrete. As per APSS 612

79.59

4518

359639.35

... More
V.R.C.C (1:11/2:3) using 20 MM size HBG graded chips with nominal mix SS-5 using necessary quantity and excluding cost and conveyance of steel per cum of concrete including cost and conveyance of all materials and all labour charges, seigniorage, curing, centering ( Using Steel) etc., complete but excluding the cost of steel and its fabrication charges. A) Plinth Beam

11.95

11244

134370.7

... More
Providing High Yield Strength Deformed Bars of Fe 415 Grade of different diametres including cost & conveyance of steel including cost of binding wire and labour charges for fabrication such as cutting, bending and cranking rods, tying grills with binding wire etc complete.

1194.62

87238

104216.43

... More
Brick masonry for panel walls in superstructure with CM (1:6) prop: (Cement : Screened sand) using common burnt clay bricks of class as per Table- I of IS:1077-1992, Non- Modular or traditional size 23 x 11 x 7 cms from approved source having minimum crushing strength of 35 Kg/Sqcm. including cost and conveyance of all materials like cement, screened sand, bricks, water etc., to site, excluding seigniorage charges, sales & other taxes on all materials and such as labour charges, like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, etc.,and overheads & contractors profit complete for finished item of work. (APSS No. 501 & 504).

42.98

7697

330820.93

... More
P.C.C (1:2:4) M15grade using 20 mm size HBG graded chips with niminal mix SS-5 using necessary quantity and excluding cost and conveyance of steel per cum of concrete including cost and conveyance of all materials and all labour charges, seigniorage, curing, centering (Using Steel) etc., complete as per APSS No.402 with BIS 456-2000 but excluding the cost of steel and its fabrication charges.

11.94

5119

61131.61

... More
Plastering 20mm thick single coat in CM(1:5) using screened sand including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work .(SS 901,903 & 904)

480.76

3574

171847.66

... More
Plastic Emulsion painting in two coats in primary coat including cost and conveyance of all materials and labour charges etc complete

480.76

2170

104340.3



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.