Endowments Department Tender
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Endowments Department Tender
Civil And Construction
Building Construction
Opening Date16 Mar 2024
Closing Date23 Mar 2024
Tender Amount₹ 38,17,686
Costs
EMD
₹ 38,177Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
734347Tender No
P/COE/517/2024Tender Authority
Endowments Department ViewPurchaser Address
-Website
http://tender.apeprocurement.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Plain Cement Concrete ( 1 :4 : 8 ) proportion using 40mm size HBG metal from approved quarry including cost, seigniorage, conveyance of all material from approved source and all labour charges, curing, centering etc. complete for levelling Course Concrete
4.08
17118
4195.81
R.R. Masonry in CM ( 1: 6 ) using rough granite stone approved quarry including cost, seigniorage, conveyance of all material like cement, sand, granite stone water etc to work site from approved source and all labour charges, curing, centering etc. com
7.32
38554
5266.96
Supply of Black Granite stone including cost of stone, Rough dressing, Palamana dressing, cost of jointing including cost and conveyance of chisels, hammers all materials labour charges etc complte (Separate sheet enclosed) a) Cost of stone
464.82
132022
284.03
b) Rough dressing
671.16
63290
94.3
C) Palaman dressing for Upapeetam
104
76804
738.5
Palamana for Vyalam and roof
128.88
71748
556.71
Palamana for Sun Shade
26.6
62951
2366.6
Palamana for Pillars
156
171922
1102.07
Palamana for Pothikas
18
19837
1102.07
D) Cost of Tools
433.48
51709
119.29
D) Cost of Jointing
433.48
49247
113.61
b) Re-Construction of Sri Vinayaka and Sri Subramanya swamy Mandapams
-
-
-
Earth work excavation and depositing on banks with an initial lead of 10m and initial lift of 2m in soils like in rock like shales, ordinary gravel and rock like shales, ordinary gravel stoney earth and earth mixed with fair sized boulders etc complete
24.47
7083
289.49
Sand with filling sand from approved sources in layers not exeeding 15 cm thick, consolidating each deposited layer basement with Sand with watering and ramming with heavy rammers including all water leads, including charges for all operations, incidenti
10.24
7380
720.79
Plain Cement Concrete ( 1 :4 : 8 ) proportion using 40mm size HBG metal from approved quarry including cost, seigniorage, conveyance of all material from approved source and all labour charges, curing, centering etc. complete for levelling Course Concrete
4.08
17118
4195.81
R.R. Masonry in CM ( 1: 6 ) using rough granite stone approved quarry including cost, seigniorage, conveyance of all material like cement, sand, granite stone water etc to work site from approved source and all labour charges, curing, centering etc. com
10.9
57409
5266.96
Supply of Black Granite stone including cost of stone, Rough dressing, Palamana dressing, cost of jointing including cost and conveyance of chisels, hammers all materials labour charges etc complte (Separate sheet enclosed) a) Cost of stone
1408.42
400033
284.03
b) Rough dressing
1632
153897
94.3
C) Palaman dressing for Upapeetam
232
171332
738.5
Palamana for Vylam
18
25256
1403.15
Palamana for kantam and sikharam
126
298191
2366.6
Palamana forRoof
149.76
83372
556.71
Palamana for Sunshade
53.2
125903
2366.6
Palamana for Pillars
312
343845
1102.07
Palamana for Pothikas
36
39674
1102.07
D) Cost of Tools
807.52
96329
119.29
D) Cost of Jointing
807.52
91742
113.61
C) Construction of Pothuraju mandpam in the premises of Sri Moolasthana Yellamma Temple
-
-
-
Earth work excavation and depositing on banks with an initial lead of 10m and initial lift of 2m in soils like in rock like shales, ordinary gravel and rock like shales, ordinary gravel stoney earth and earth mixed with fair sized boulders etc complete
13.76
5228
379.96
Sand with filling sand from approved sources in layers not exeeding 15 cm thick, consolidating each deposited layer basement with Sand with watering and ramming with heavy rammers including all water leads, including charges for all operations, incidenti
3.52
4688
1331.85
Plain Cement Concrete ( 1 :4 : 8 ) proportion using 40mm size HBG metal from approved quarry including cost, seigniorage, conveyance of all material from approved source and all labour charges, curing, centering etc. complete for levelling Course Concrete
2.29
10381
4533.6
R.R. Masonry in CM ( 1: 6 ) using rough granite stone approved quarry including cost, seigniorage, conveyance of all material like cement, sand, granite stone water etc to work site from approved source and all labour charges, curing, centering etc. com
6.8
35819
5267.63
Supply of Black Granite stone including cost of stone, Rough dressing, Palamana dressing, cost of jointing including cost and conveyance of chisels, hammers all materials labour charges etc complte (Separate sheet enclosed) a) Cost of stone
1110.14
315313
284.03
b) Rough dressing
514.91
48556
94.3
C) Palaman dressing for Upapeetam
104
76804
738.5
Palamana for Vyalam
12
16837
1403.15
Palamana for Kantam and sikharam
126
298191
2366.6
Palamana for Roof
49.92
27790
556.71
Palamana for Sun Shade
26.6
62951
2366.6
Palamana for Pillars
108
119023
1102.07
Palamana for Pothikas
18
19837
1102.07
D) Cost of Tools
396.98
47355
119.29
D) Cost of Jointing
396.98
45100
113.61
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements