Endowments Department Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Endowments Department Tender

Works
Civil And Construction
Building Construction
Opening Date1 Jan 2024
Closing Date17 Jan 2024
Tender Amount₹ 28,94,220 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
VRCC- M20 Nominal mix using 20mm size H.G m/c graded metal(coarsed aggregate) from approved quarry including cost and conveyance of all materials like cement,fine aggregate(sand),coarse aggregate,water etc., to site including cost of taxes on all materials and including steel centering,shuttering,machine mixing,laying concrete,vibrating,lift charges,curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work as per SS(for Columns footings)

2.72

26395

9703.9

... More
Pedastals

1.53

15610

10202.7

... More
columns

1.53

19004

12420.7

... More
Plinth Beam

2.3

27807

12089.8

... More
for roof beams

1.79

21256

11874.8

... More
for roof slab 5" thick

39.21

55128

14059.8

... More
Providing Hysd steel bar of different diameter including cost and conveyance of all materials and all labour charges for cutting,bending to required size and shapes placing in position with cover blocks and tying with binding wire,forming grills for reinforcement work as per approved designs and drawings and including all wastages such as overlaps couplings,welded joints,chairs,spacers etc.,complete for finished item of work in all floors

1.55

139333

89892.2

... More
Brick work with C.M(1:6) using 2nd class bricks from approved source including cost and conveyance of all materials like cement,sand,bricks,water etc.,to site including all taxes on all materials and such as labour charges like cement mortar mixing,scaffolding charges,construction of masonary,lift charges,curing etc.,complete for finished item of work.(for Basement)

1.74

12997

7469.5

... More
for superstructure

12.84

101960

7940.8

... More
Brick work for partitiona walls with C.M(1:5) using 2nd class bricks from approved source including cost and conveyance of all materials like cement,sand,bricks,water etc.,to site including all taxes on all materials and such as labour charges like cement mortar mixing,scaffolding charges,construction of masonary,lift charges,curing etc.,complete for finished item of work.

42.22

42174

9989.1

... More
Plastering 12 mm thick in CM (1:3) with sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including all taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting Grooves etc., complete for finished item of work.

33.77

12501

3701.8

... More
Plastering 12mm thick in CM (1:5) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including all taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting Grooves etc., complete for finished item of work as per SS

144.98

50007

3449.2

... More
Plastering 20mm thick in CM (1:5) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including all taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting Grooves etc., complete for finished item of work as per SS

98.52

35820

3635.8

... More
Door Frame section of 63.5x100 MM.The two Vertical members are to be joined together with the horizontal member using 8x75 MM long MS Star full thread screws to be used with reverse forward speed control hand drilling machine. The ready/assembled door frame is fixed to the wall using hold fast or bolt fasteners. A minimum of 4 No.s of screws to be provided for each vertical member & minimum 2no.s for horizontal member.

24.99

26262

1050.9

... More
Providing and fixing 35mm thick BRAND FACTORY MADE MOULDED DOOR SHUTTER consisting of sold core single leaf flush door of 30mm thickness, lipped with 15mm (5mmX3) thick X 30mm width on one stiles and top rails and 10mm (5mmX2) thick X 30mm width on the other stiles and bottom rails. The inner panel laminated with 2mm thick termite proof, water proof and fire resistant moulded Pac sheet with 2,4,6 raised panel design in different panel and / or prelam colours on one side after routing the moulded design on flush door and 2mm prelam Pac sheet on other side using rubber adhesive on flush door and solvent cement adhesive on Pac lipping etc. complete as per direction of Engineer- in-Charge, manufacture specification and drawing

3.77

12893

3419.8

... More
Providing and fixing 28 -30 MM thick solid Wood Polymer Composite(WPC) single extruded door shutter with 3MM top and bottom rigid layer with an overall density of 750kg/Cum. It will be fixed to the frame using 3 inch /4 inch hinges. A minimum of 4 hinges will be required for fixing the door with the frame

3.14

12165

3874.3

... More
S&F of UPVC Three track three panels sliding window with fly proof SS wire mesh (Two nos. glazed & one no. wire mesh panels) made of (small series) frame 92 x 44 mm & sash 32 x 60 mmboth having wall thickness of 1.9 ± 0.2 mm and single glazingbead of appropriate dimension (Area of window upto 1.75 sqm).

3.16

32312

10225.4

... More
Supply and fixing jallies ( cement concrete ) of 40 mm thick as per the design approved by the Engineer-in-Charge including cost and conveyance of materials to site and labour charges etc., overheads & contractors profit complete for finished item of work in all floors.

0.56

327

583.4

... More
Flooring with Polished Vitrified tiles including cost and conveyance of all materials like marble slabs,cement, sand, water etc., to site and all operational, incidental charges on materials and all labour charges for marble laying,jointing,polishing,mixing mortar, finishing etc., complete for finished item of work as per SS

19.65

28235

14369.1

... More
Flooring with Non skid Ceramic tiles including cost and conveyance of all materials like tiles,cement, sand, water etc., to site and all operational, incidental charges on materials and all labour charges for marble laying,jointing,polishing,mixing mortar, finishing etc., complete for finished item of work as per SS

5.21

5057

9706.8

... More
Dadoing with glazed Ceramic tiles including cost and conveyance of all materials like tiles,cement, sand, water etc., to site and all operational, incidental charges on materials and all labour charges for marble laying,jointing,polishing,mixing mortar, finishing etc., complete for finished item of work as per SS

25.39

23647

9313.5

... More
Painting two coats with synthetic enamel paint Grade-II VOC (Volatile Organic Compound) content less than 50 grams/litre to new iron work including cost and conveyance of all materials to site, sales & other taxes, incidental, operational and all labour charges etc.,and overheads & contractors profit complete for finished item of work in all floors. (SS No. 1201, 1212 & 1207).

18.62

3372

1811.1

... More
Painting to new walls with Emulsion paint 2 coats over primary coat (total3 coats) and sales & other taxes on cost of all materials including cost and conveyance of all materials and all labour charges etc., complete for finished item of work.(external)

98.52

20282

2058.7

... More
Painting to new walls with Emulsion paint 2 coats over primary coat (total3 coats) and sales & other taxes on cost of all materials including cost and conveyance of all materials and all labour charges etc., complete for finished item of work.(Internal)

178.75

28881

1615.7

... More
(Construction of Rooms in First Floor)VRCC- M20 Nominal mix using 20mm size H.G m/c graded metal(coarsed aggregate) from approved quarry including cost and conveyance of all materials like cement,fine aggregate(sand),coarse aggregate,water etc., to site including cost of taxes on all materials and including steel centering,shuttering,machine mixing,laying concrete,vibrating,lift charges,curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work as per SS(for Columns )

1.21

15498

12808

... More
for roof beams

1.79

21597

12065.2

... More
for roof slab 5" thick

39.21

55875

14250.2

... More
Providing Hysd steel bar of different diameter including cost and conveyance of all materials and all labour charges for cutting,bending to required size and shapes placing in position with cover blocks and tying with binding wire,forming grills for reinforcement work as per approved designs and drawings and including all wastages such as overlaps couplings,welded joints,chairs,spacers etc.,complete for finished item of work in all floors

1

91437

91437.4

... More
Brick work with C.M(1:6) using 2nd class bricks from approved source including cost and conveyance of all materials like cement,sand,bricks,water etc.,to site including all taxes on all materials and such as labour charges like cement mortar mixing,scaffolding charges,construction of masonary,lift charges,curing etc.,complete for finished item of work.(for Superstructure)

10.5

85237

8117.8

... More
Brick work for partitiona walls with C.M(1:5) using 2nd class bricks from approved source including cost and conveyance of all materials like cement,sand,bricks,water etc.,to site including all taxes on all materials and such as labour charges like cement mortar mixing,scaffolding charges,construction of masonary,lift charges,curing etc.,complete for finished item of work.

41.94

44507

10612.1

... More
Second floor

16.2

18201

11235

... More
Plastering 12 mm thick in CM (1:3) with sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including all taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting Grooves etc., complete for finished item of work.

33.77

13462

3986.4

... More
Plastering 12mm thick in CM (1:5) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including all taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting Grooves etc., complete for finished item of work as per SS

144.98

54133

3733.8

... More
Second floor

18.47

7498

4059.8

... More
Plastering 20mm thick in CM (1:5) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including all taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting Grooves etc., complete for finished item of work as per SS

68.41

26819

3920.4

... More
Second floor

18.47

7843

4246.4

... More
Door Frame section of 63.5x100 MM.The two Vertical members are to be joined together with the horizontal member using 8x75 MM long MS Star full thread screws to be used with reverse forward speed control hand drilling machine. The ready/assembled door frame is fixed to the wall using hold fast or bolt fasteners. A minimum of 4 No.s of screws to be provided for each vertical member & minimum 2no.s for horizontal member.

24.99

26262

1050.9

... More
Providing and fixing 35mm thick BRAND FACTORY MADE MOULDED DOOR SHUTTER consisting of sold core single leaf flush door of 30mm thickness, lipped with 15mm (5mmX3) thick X 30mm width on one stiles and top rails and 10mm (5mmX2) thick X 30mm width on the other stiles and bottom rails. The inner panel laminated with 2mm thick termite proof, water proof and fire resistant moulded Pac sheet with 2,4,6 raised panel design in different panel and / or prelam colours on one side after routing the moulded design on flush door and 2mm prelam Pac sheet on other side using rubber adhesive on flush door and solvent cement adhesive on Pac lipping etc. complete as per direction of Engineer- in-Charge, manufacture specification and drawing

3.77

12893

3419.8

... More
Providing and fixing 28 -30 MM thick solid Wood Polymer Composite(WPC) single extruded door shutter with 3MM top and bottom rigid layer with an overall density of 750kg/Cum. It will be fixed to the frame using 3 inch /4 inch hinges. A minimum of 4 hinges will be required for fixing the door with the frame

3.14

12165

3874.3

... More
S&F of UPVC Three track three panels sliding window with fly proof SS wire mesh (Two nos. glazed & one no. wire mesh panels) made of (small series) frame 92 x 44 mm & sash 32 x 60 mmboth having wall thickness of 1.9 ± 0.2 mm and single glazingbead of appropriate dimension (Area of window upto 1.75 sqm).

3.16

32312

10225.4

... More
Supply and fixing jallies ( cement concrete ) of 40 mm thick as per the design approved by the Engineer-in-Charge including cost and conveyance of materials to site and labour charges etc., overheads & contractors profit complete for finished item of work in all floors.

1.4

817

583.4

... More
Gronolithie concrete flooring 20mm thick with(1:1:2)using 6mm to 12mm size hg machine crushed metal laid over cc bed already laid of Rcc slab,in alternate panels of size not exceeding 1.50mx1.50m and finishing the top surface to required smoothness and slopes and thread lining including cost of all materials,labour including seigniorage charges etc.,complete for finishing item of work

19.65

7875

4007.5

... More
Flooring with Polished Vitrified tiles including cost and conveyance of all materials like marble slabs,cement, sand, water etc., to site and all operational, incidental charges on materials and all labour charges for marble laying,jointing,polishing,mixing mortar, finishing etc., complete for finished item of work as per SS

54.34

80456

14806.1

... More
Flooring with Non skid Ceramic tiles including cost and conveyance of all materials like tiles,cement, sand, water etc., to site and all operational, incidental charges on materials and all labour charges for marble laying,jointing,polishing,mixing mortar, finishing etc., complete for finished item of work as per SS

5.21

5285

10143.8

... More
Dadoing with glazed Ceramic tiles including cost and conveyance of all materials like tiles,cement, sand, water etc., to site and all operational, incidental charges on materials and all labour charges for marble laying,jointing,polishing,mixing mortar, finishing etc., complete for finished item of work as per SS

25.39

23925

9423

... More
Providing impervious coat to exposed RCC roof slab surface to required slopes with CM (1:3)prop.using screened and 20mm thick(avg) mixed with water proofing compound manufactured by reputed manufacturers as approved by Engineer incharge at 1 kg per 1 bag of cement,laid over roof slab including cost and conveyance of all materials like cement, sand, water etc., to site and all operational, incidental charges on materials and all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting Grooves etc., complete for finished item of work as per SS

36.23

19411

5357.7

... More
Painting to new wood work and shutters with lappam finish over primary coat and two coats with Synthetic enamel paint Grade-I VOC(Volatile Organic Compound) content less than 50grams/litre of approved shade including cost and conveyance of all materials and all labour charges etc., complete for finished item of work.

47.39

8583

1811.1

... More
Painting to new walls with Emulsion paint 2 coats over primary coat (total3 coats) and sales & other taxes on cost of all materials including cost and conveyance of all materials and all labour charges etc., complete for finished item of work.(external)

86.88

17886

2058.7

... More
Painting to new walls with Emulsion paint 2 coats over primary coat (total3 coats) and sales & other taxes on cost of all materials including cost and conveyance of all materials and all labour charges etc., complete for finished item of work.(Internal)

197.22

31865

1615.7

... More
(Construction of Pongal Hall)Earth work excavation for foundation and depositing at site with intial lead of 10m and lift of 2m in mixture of gravel and ordinary gravel including all operational,incidental,labour charges etc.,complete for finished item of work as per SS. For Foundation

25.47

10323

405.3

... More
Filling with sand in foundations & basement from approved source to site including cost and conveyance of all materials and all labour charges etc., for finished item of work as per SS

8.16

10072

1234.3

... More
PCC (1:4:8) for foundation levelling courses and below flooring beds using 40mm size hard Granite metal upto Plinth level from approved quarry including cost and conveyance of all materials to site and all labour charges for mixing, laying concrete in foundations ramming in 15 cm layers finishing top surface to the required level curing etc., complete for finished item of work as per SS

3.81

18649

4894.8

... More
VRCC- M20 Nominal mix using 20mm size H.G m/c graded metal(coarsed aggregate) from approved quarry including cost and conveyance of all materials like cement,fine aggregate(sand),coarse aggregate,water etc., to site including cost of taxes on all materials and including steel centering,shuttering,machine mixing,laying concrete,vibrating,lift charges,curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work as per SS(for Columns footings)

2.72

26395

9703.9

... More
Pedastals

1.53

15610

10202.7

... More
columns

1.53

19004

12420.7

... More
Plinth Beam

1.15

13903

12089.8

... More
for roof beams

1.27

15081

11874.8

... More
for roof slab 5" thick

22.23

31255

14059.8

... More
Providing Hysd steel bar of different diameter including cost and conveyance of all materials and all labour charges for cutting,bending to required size and shapes placing in position with cover blocks and tying with binding wire,forming grills for reinforcement work as per approved designs and drawings and including all wastages such as overlaps couplings,welded joints,chairs,spacers etc.,complete for finished item of work in all floors

1

89892

89892.2

... More
Brick work with C.M(1:6) using 2nd class bricks from approved source including cost and conveyance of all materials like cement,sand,bricks,water etc.,to site including all taxes on all materials and such as labour charges like cement mortar mixing,scaffolding charges,construction of masonary,lift charges,curing etc.,complete for finished item of work.(for Basement)

1.02

7619

7469.5

... More
for superstructure

8.29

65829

7940.8

... More
Plastering 12 mm thick in CM (1:3) with sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including all taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting Grooves etc., complete for finished item of work.

19.23

6692

3480.2

... More
Plastering 12mm thick in CM (1:5) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including all taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting Grooves etc., complete for finished item of work as per SS

43.87

14656

3340.7

... More
Plastering 20mm thick in CM (1:5) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including all taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting Grooves etc., complete for finished item of work as per SS

65.91

23248

3527.3

... More
Providing impervious coat to exposed RCC roof slab surface to required slopes with CM (1:3)prop.using screened and 20mm thick(avg) mixed with water proofing compound manufactured by reputed manufacturers as approved by Engineer incharge at 1 kg per 1 bag of cement,laid over roof slab including cost and conveyance of all materials like cement, sand, water etc., to site and all operational, incidental charges on materials and all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting Grooves etc., complete for finished item of work as per SS

20.09

9977

4966.2

... More
Supply and fixing MS Grill Doors & Grills approved by the Engineer-in-Charge including cost and conveyance of materials to site and labour charges etc., overheads & contractors profit complete for finished item of work in all floors

267.75

30738

114.8

... More
Gronolithie concrete flooring 20mm thick with(1:1:2)using 6mm to 12mm size hg machine crushed metal laid over cc bed already laid of Rcc slab,in alternate panels of size not exceeding 1.50mx1.50m and finishing the top surface to required smoothness and slopes and thread lining including cost of all materials,labour including seigniorage charges etc.,complete for finishing item of work

13.24

5306

4007.5

... More
Painting two coats with synthetic enamel paint Grade-II VOC (Volatile Organic Compound) content less than 50 grams/litre to new iron work including cost and conveyance of all materials to site, sales & other taxes, incidental, operational and all labour charges etc.,and overheads & contractors profit complete for finished item of work in all floors. (SS No. 1201, 1212 & 1207).

21.58

3908

1811.1

... More
Painting to new walls with Emulsion paint 2 coats over primary coat (total3 coats) and sales & other taxes on cost of all materials including cost and conveyance of all materials and all labour charges etc., complete for finished item of work.(external)

65.91

13569

2058.7

... More
Painting to new walls with Emulsion paint 2 coats over primary coat (total3 coats) and sales & other taxes on cost of all materials including cost and conveyance of all materials and all labour charges etc., complete for finished item of work.(Internal)

63.11

10197

1615.7

... More
(Improvement works to Kalyana mandapam)Earth work excavation for foundation and depositing at site with intial lead of 10m and lift of 2m in mixture of gravel and ordinary gravel including all operational,incidental,labour charges etc.,complete for finished item of work as per SS. For Foundation

28.19

11425

405.3

... More
Filling with sand in foundations & basement from approved source to site including cost and conveyance of all materials and all labour charges etc., for finished item of work as per SS

2.66

3283

1234.3

... More
PCC (1:4:8) for foundation levelling courses and below flooring beds using 40mm size hard Granite metal upto Plinth level from approved quarry including cost and conveyance of all materials to site and all labour charges for mixing, laying concrete in foundations ramming in 15 cm layers finishing top surface to the required level curing etc., complete for finished item of work as per SS

27.03

132306

4894.8

... More
VRCC- M20 Nominal mix using 20mm size H.G m/c graded metal(coarsed aggregate) from approved quarry including cost and conveyance of all materials like cement,fine aggregate(sand),coarse aggregate,water etc., to site including cost of taxes on all materials and including steel centering,shuttering,machine mixing,laying concrete,vibrating,lift charges,curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work as per SS(for Columns footings)

4.04

39204

9703.9

... More
Pedastals

2.29

23364

10202.7

... More
columns

0.86

10682

12420.7

... More
Plinth Beam

1.7

20553

12089.8

... More
Providing Hysd steel bar of different diameter including cost and conveyance of all materials and all labour charges for cutting,bending to required size and shapes placing in position with cover blocks and tying with binding wire,forming grills for reinforcement work as per approved designs and drawings and including all wastages such as overlaps couplings,welded joints,chairs,spacers etc.,complete for finished item of work in all floors

0.7

62925

89892.2

... More
Brick work with C.M(1:6) using 2nd class bricks from approved source including cost and conveyance of all materials like cement,sand,bricks,water etc.,to site including all taxes on all materials and such as labour charges like cement mortar mixing,scaffolding charges,construction of masonary,lift charges,curing etc.,complete for finished item of work.(for Basement)

1.55

11578

7469.5

... More
for superstructure

7.77

61700

7940.8

... More
Plastering 12mm thick in CM (1:5) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including all taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting Grooves etc., complete for finished item of work as per SS

109.74

37852

3449.2

... More
Structural steel for Columns,roof truss,supports and eaves up to 1000mm, fabricated, hoisted , including all M.S. plates, gusset plates, cleats, rivets, nuts, washers etc.complete.

2000

313600

156.8

... More
Roofing will be provided with 0.5mm thick galvanized / pre painted G.I. profiled sheets fixed to the purlins with 14 size self drilling screws with neoprene washer. Side laps are stitched with self tapping / drilling screws. End laps are to be sealed with 25x3 mm Butyl tape. The sheets are provided with cinti capillary grove.

111.6

127336

1141

... More
Gronolithie concrete flooring 20mm thick with(1:1:2)using 6mm to 12mm size hg machine crushed metal laid over cc bed already laid of Rcc slab,in alternate panels of size not exceeding 1.50mx1.50m and finishing the top surface to required smoothness and slopes and thread lining including cost of all materials,labour including seigniorage charges etc.,complete for finishing item of work

93

37270

4007.5

... More
Painting two coats with synthetic enamel paint Grade-II VOC (Volatile Organic Compound) content less than 50 grams/litre to new iron work including cost and conveyance of all materials to site, sales & other taxes, incidental, operational and all labour charges etc.,and overheads & contractors profit complete for finished item of work in all floors. (SS No. 1201, 1212 & 1207).

21.58

3680

1705.4

... More
Painting to new walls with Emulsion paint 2 coats over primary coat (total3 coats) and sales & other taxes on cost of all materials including cost and conveyance of all materials and all labour charges etc., complete for finished item of work.(external)

109.74

22592

2058.7



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.