Endowments Department Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Endowments Department Tender

Works
Civil And Construction
Building Construction
Opening Date8 Jan 2024
Closing Date22 Jan 2024
Tender Amount₹ 1,66,57,499 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
P.C.C(1:4:8) prop.nominal mix for foundation levelling courses and below flooring beds using 40mm size H.G.metal upto Plinth level from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including all taxes on all materials and all labour charges for mixing, laying concrete in foundations ramming in 15 cm layers finishing top surface to the required level curing etc., complete for finished item of work as per SS

61.52

270251

4392.9

... More
RR Masonary work with C.M(1:6) using hard granite stone including cost and conveyance of all materials like cement,sand,bricks,water etc.,to site including all taxes on all materials and such as labour charges like cement mortar mixing,scaffolding charges,construction of masonary,lift charges,curing etc.,complete for finished item of work.

83.77

417912

4988.8

... More
VRCC- M20 Nominal mix using 20mm size H.G m/c graded metal(coarsed aggregate) from approved quarry including cost and conveyance of all materials like cement,fine aggregate(sand),coarse aggregate,water etc., to site including cost of taxes on all materials and including steel centering,shuttering,machine mixing,laying concrete,vibrating,lift charges,curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work as per SS

-

-

-

... More
Column footings

215.02

1978614

9202

... More
Columns

21.1

251489

11918.9

... More
Plinth Beam

6.76

78334

11587.9

... More
Roof Beam

17.5

199026

11372.9

... More
Roof Slab 5" thick

368.25

495572

13457.5

... More
staicase slab 6 " thick

21.62

33372

15435.8

... More
Providing Hysd steel bar of different diameter including cost and conveyance of all materials and all labour charges for cutting,bending to required size and shapes placing in position with cover blocks and tying with binding wire,forming grills for reinforcement work as per approved designs and drawings and including all wastages such as overlaps couplings,welded joints,chairs,spacers etc.,complete for finished item of work in all floors

15.1

1321345

87506.3

... More
Brick work with C.M(1:6) using 2nd class bricks from approved source including cost and conveyance of all materials like cement,sand,bricks,water etc.,to site including all taxes on all materials and such as labour charges like cement mortar mixing,scaffolding charges,construction of masonary,lift charges,curing etc.,complete for finished item of work.(For Basement)

13.08

102441

7831.9

... More
for supers structure

76.01

631126

8303.2

... More
Plastering 12 mm thick in CM (1:3) with sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including all taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting Grooves etc., complete for finished item of work.

268.33

101135

3769.05

... More
Painting to new walls with Emulsion paint 2 coats over primary coat (total3 coats) and sales & other taxes on cost of all materials including cost and conveyance of all materials and all labour charges etc., complete for finished item of work.

268.33

55241

2058.7

... More
(Construction of 1st Floor)VRCC- M20 Nominal mix using 20mm size H.G m/c graded metal(coarsed aggregate) from approved quarry including cost and conveyance of all materials like cement,fine aggregate(sand),coarse aggregate,water etc., to site including cost of taxes on all materials and including steel centering,shuttering,machine mixing,laying concrete,vibrating,lift charges,curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work as per SS

-

-

-

... More
Columns

12.4

152596

12306.1

... More
Roof Beam

17.5

202358

11563.3

... More
Lintels

1.25

15620

12495.85

... More
Roof Slab 5" thick

368.25

502584

13647.9

... More
staicase slab 6 " thick

21.62

33784

15626.2

... More
kodangai

41.27

53300

1291.5

... More
Providing Hysd steel bar of different diameter including cost and conveyance of all materials and all labour charges for cutting,bending to required size and shapes placing in position with cover blocks and tying with binding wire,forming grills for reinforcement work as per approved designs and drawings and including all wastages such as overlaps couplings,welded joints,chairs,spacers etc.,complete for finished item of work in all floors

10

890514

89051.44

... More
Brick work with C.M(1:6) using 2nd class bricks from approved source including cost and conveyance of all materials like cement,sand,bricks,water etc.,to site including all taxes on all materials and such as labour charges like cement mortar mixing,scaffolding charges,construction of masonary,lift charges,curing etc.,complete for finished item of work.(For Super Structure)

33.99

288242

8480.2

... More
Brick work for partitiona walls with C.M(1:5) using 2nd class bricks from approved source including cost and conveyance of all materials like cement,sand,bricks,water etc.,to site including all taxes on all materials and such as labour charges like cement mortar mixing,scaffolding charges,construction of masonary,lift charges,curing etc.,complete for finished item of work.(for patition walls)

471.3

519175

11015.8

... More
second floor

103.23

120146

11638.65

... More
Door Frame section of 63.5x100 MM.The two Vertical members are to be joined together with the horizontal member using 8x75 MM long MS Star full thread screws to be used with reverse forward speed control hand drilling machine. The ready/assembled door frame is fixed to the wall using hold fast or bolt fasteners. A minimum of 4 No.s of screws to be provided for each vertical member & minimum 2no.s for horizontal member.

101.19

106345

1050.94

... More
Providing of 35mm thick Facotry made Prelaminated ABS (Acrolynitrile Butadyne Styrene) Door shutter moulded in different designs, consisting of all round Frame made out of water proof solid foam PVC bar of size 20x32mm, reinforced by 32x 32mm - 2nos. for vertical made out of LVL(Laminated Veneer Lumber), core material of 32 mm thick high density craft paper honey comb board, sandwiched on both sides with prelaminated ABS sheet thickness of 1.5mm . PVC edge banding of size 0.45mm on the vertical sides.for each shutter and ISI make S.S round lock complete for finished item of work.

28.88

230012

7964.4

... More
Providing and fixing 28 -30 MM thick solid Wood Polymer Composite(WPC) single extruded door shutter with 3MM top and bottom rigid layer with an overall density of 750kg/Cum. It will be fixed to the frame using 3 inch /4 inch hinges. A minimum of 4 hinges will be required for fixing the door with the frame

12.56

48661

3874.3

... More
S&F of UPVC Three track three panels sliding window with fly proof SS wire mesh (Two nos. glazed & one no. wire mesh panels) made of (small series) frame 92 x 44 mm & sash 32 x 60 mmboth having wall thickness of 1.9 ± 0.2 mm and single glazingbead of appropriate dimension (Area of window upto 1.75 sqm).

43.9

448893

10225.35

... More
Plastering 12 mm thick in CM (1:3) with sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including all taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting Grooves etc., complete for finished item of work.

268.33

108770

4053.6

... More
Plastering 20mm thick in CM (1:5) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including all taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting Grooves etc., complete for finished item of work as per SS

1212.58

486790

4014.5

... More
second floor

223.67

97084

4340.5

... More
Flooring with Vitrified tiles including cost and conveyance of all materials like tiles,cement, sand, water etc., to site and all operational, incidental charges on materials and all labour charges for marble laying,jointing,polishing,mixing mortar, finishing etc., complete for finished item of work as per SS

227.06

337350

14857.3

... More
Flooring with Non skid ceramic size 300mmx300mm tiles including cost and conveyance of all materials like marble slabs,cement, sand, water etc., to site and all operational, incidental charges on materials and all labour charges for laying,jointing,mixing mortar, finishing etc., complete for finished item of work as per SS

81.61

83202

10195.1

... More
Providing dadooing to walls with glazed tiles including cost and conveyance of all materials like marble slabs,cement, sand, water etc., to site and all operational, incidental charges on materials and all labour charges for laying,jointing,mixing mortar, finishing etc., complete for finished item of work as per SS

177.26

167940

9474.2

... More
Painting to new wood work and flush shutters with lappam finish over primary coat and two coats with Synthetic enamel paint Grade-I VOC(Volatile Organic Compound) content less than 50grams/litre of approved shade including cost and conveyance of all materials and all labour charges etc., complete for finished item of work.

118.48

21458

1811.1

... More
Painting to new walls with Emulsion paint 2 coats over primary coat (total3 coats) and sales & other taxes on cost of all materials including cost and conveyance of all materials and all labour charges etc., complete for finished item of work.

798.5

164387

2058.7

... More
(Construction of Second floor)VRCC- M20 Nominal mix using 20mm size H.G m/c graded metal(coarsed aggregate) from approved quarry including cost and conveyance of all materials like cement,fine aggregate(sand),coarse aggregate,water etc., to site including cost of taxes on all materials and including steel centering,shuttering,machine mixing,laying concrete,vibrating,lift charges,curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work as per SS

-

-

-

... More
Columns

12.4

160807

12968.3

... More
Roof Beam

17.5

209725

11984.3

... More
Lintels

1.25

16348

13078.5

... More
Roof Slab 5" thick

368.25

519638

14111

... More
staicase slab 6 " thick

21.62

34785

16089.3

... More
kodangai

41.27

55624

1347.8

... More
Providing Hysd steel bar of different diameter including cost and conveyance of all materials and all labour charges for cutting,bending to required size and shapes placing in position with cover blocks and tying with binding wire,forming grills for reinforcement work as per approved designs and drawings and including all wastages such as overlaps couplings,welded joints,chairs,spacers etc.,complete for finished item of work in all floors

10

905966

90596.6

... More
Brick work with C.M(1:6) using 2nd class bricks from approved source including cost and conveyance of all materials like cement,sand,bricks,water etc.,to site including all taxes on all materials and such as labour charges like cement mortar mixing,scaffolding charges,construction of masonary,lift charges,curing etc.,complete for finished item of work.(For Super Structure)

33.99

300397

8837.8

... More
Brick work for partitiona walls with C.M(1:5) using 2nd class bricks from approved source including cost and conveyance of all materials like cement,sand,bricks,water etc.,to site including all taxes on all materials and such as labour charges like cement mortar mixing,scaffolding charges,construction of masonary,lift charges,curing etc.,complete for finished item of work.(for patition walls)

471.3

548530

11638.65

... More
second floor

103.23

126576

12261.6

... More
Door Frame section of 63.5x100 MM.The two Vertical members are to be joined together with the horizontal member using 8x75 MM long MS Star full thread screws to be used with reverse forward speed control hand drilling machine. The ready/assembled door frame is fixed to the wall using hold fast or bolt fasteners. A minimum of 4 No.s of screws to be provided for each vertical member & minimum 2no.s for horizontal member.

101.19

106345

1050.94

... More
Providing of 35mm thick Facotry made Prelaminated ABS (Acrolynitrile Butadyne Styrene) Door shutter moulded in different designs, consisting of all round Frame made out of water proof solid foam PVC bar of size 20x32mm, reinforced by 32x 32mm - 2nos. for vertical made out of LVL(Laminated Veneer Lumber), core material of 32 mm thick high density craft paper honey comb board, sandwiched on both sides with prelaminated ABS sheet thickness of 1.5mm . PVC edge banding of size 0.45mm on the vertical sides.for each shutter and ISI make S.S round lock complete for finished item of work.

28.88

230012

7964.4

... More
Providing and fixing 28 -30 MM thick solid Wood Polymer Composite(WPC) single extruded door shutter with 3MM top and bottom rigid layer with an overall density of 750kg/Cum. It will be fixed to the frame using 3 inch /4 inch hinges. A minimum of 4 hinges will be required for fixing the door with the frame

12.56

48661

3874.3

... More
S&F of UPVC Three track three panels sliding window with fly proof SS wire mesh (Two nos. glazed & one no. wire mesh panels) made of (small series) frame 92 x 44 mm & sash 32 x 60 mmboth having wall thickness of 1.9 ± 0.2 mm and single glazingbead of appropriate dimension (Area of window upto 1.75 sqm).

43.9

448893

10225.35

... More
Plastering 12 mm thick in CM (1:3) with sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including all taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting Grooves etc., complete for finished item of work.

268.33

118572

4418.9

... More
Plastering 20mm thick in CM (1:5) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including all taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting Grooves etc., complete for finished item of work as per SS

1212.58

526320

4340.5

... More
second floor

223.67

104378

4666.6

... More
Providing impervious coat to exposed RCC roof slab surface to required slopes with CM (1:3)prop.using screened and 20mm thick(avg) mixed with water proofing compound manufactured by reputed manufacturers as approved by Engineer incharge at 1 kg per 1 bag of cement,laid over roof slab including cost and conveyance of all materials like cement, sand, water etc., to site and all operational, incidental charges on materials and all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting Grooves etc., complete for finished item of work as per SS

349.35

203982

5838.9

... More
Flooring with Vitrified tiles including cost and conveyance of all materials like tiles,cement, sand, water etc., to site and all operational, incidental charges on materials and all labour charges for marble laying,jointing,polishing,mixing mortar, finishing etc., complete for finished item of work as per SS

227.06

347272

15294.3

... More
Flooring with Non skid ceramic size 300mmx300mm tiles including cost and conveyance of all materials like marble slabs,cement, sand, water etc., to site and all operational, incidental charges on materials and all labour charges for laying,jointing,mixing mortar, finishing etc., complete for finished item of work as per SS

81.61

86769

10632.1

... More
Providing dadooing to walls with glazed tiles including cost and conveyance of all materials like marble slabs,cement, sand, water etc., to site and all operational, incidental charges on materials and all labour charges for laying,jointing,mixing mortar, finishing etc., complete for finished item of work as per SS

177.26

169881

9583.7

... More
Painting to new wood work and flush shutters with lappam finish over primary coat and two coats with Synthetic enamel paint Grade-I VOC(Volatile Organic Compound) content less than 50grams/litre of approved shade including cost and conveyance of all materials and all labour charges etc., complete for finished item of work.

118.48

21458

1811.1

... More
Painting to new walls with Emulsion paint 2 coats over primary coat (total3 coats) and sales & other taxes on cost of all materials including cost and conveyance of all materials and all labour charges etc., complete for finished item of work.

798.5

164387

2058.7



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.