East Coast Railway Tender

... More
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

East Coast Railway - ECOR Tender

Works
Civil Works Others
Electrical Works
Ireps
Opening Date27 Jan 2025
Closing Date19 Feb 2025
Tender Amount₹ 4,22,82,227.96 
Notes
Download

Costs

Summary

Execution Of Ohe Modification And Electrification Work In Connection With Provision Of One Additional Line With High

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Erection of TTC Structures 5.5m boom with TTK-1 & 2. 4

-

-

589760.68

... More
Erection of TTC Structures 8.00m boom with TTK-1 & 2. 5

-

-

327440.88

... More
Fabricated Steel Work other than mast

-

-

2162926.76

... More
Single bracket assembly(Including Double/Multiple bracket assemblies) for conventional OHE with SPS

-

-

3347585.93

... More
Single Bracket assembly(Including Double Bracket Assemblies) for Tramway type OHE with SPS 8

-

-

1123150.72

... More
Mounting arrangement of Span Wire 9

12

1290

15483.6

... More
Cadmium Copper Large Span Wire(130sq. Mm) 10

-

-

1208736

... More
Dropper wire(5mm) 11

1300

173

224926

... More
Small jumper wire(50sq.mm) 12

40

601

24074.4

... More
Large jumper wire(105sq.mm) 13

30

767

23013.9

... More
Large jumper wire(160sq.mm) 14

160

973

155716.8

... More
Assorted components required per Kilometer length of OHE 15

5.2

55759

289948.83

... More
Erection of OHE 16

-

-

225419.94

... More
Supply of Briddle Wire

0.7

-

81691.81

... More
Erection of contact wire along with supply of required components(Regulated with briddle wire)

-

-

31650.95

... More
Extra for supply & erection of additional fittings at a turnout, diamond crossing or overlap 19

-

-

46514.44

... More
Guy rod assembly including mast anchor/guy rod attachment

-

-

603584.86

... More
Regulating Equipment 3-pulley type with counter weight assembly, guide tube for Conventional OHE

-

-

2244315.85

... More
Regulating Equipment 3-pulley type with counter weight assembly, guide tube for Tramway type OHE 22

-

-

848839.98

... More
Termination of Double Conductor of OHE 23

-

-

258116.84

... More
Termination of Single Conductor of OHE 24

-

-

127800.39

... More
Termination of Tramway type OHE 25

-

-

83076.7

... More
Anticreep with Cadimum Copper Catenary Wire 26

-

-

86335.3

... More
Section Insulator Assembly for Conventional type/Tramway type OHE. 27

-

-

500487.21

... More
Erection of Section Insulator Assembly for Conventional type OHE. 28

-

-

41955.79

... More
Erection of Section Insulator Assembly for Tramway type OHE 29

-

-

7436.82

... More
Solid Core Cut-in-Insulator 30

-

-

43315.06

... More
Solid Core Suspension Insulator 31

-

-

40558.83

... More
25KV Single Pole Isolator Assembly 32

-

-

466621.8

... More
25kV Single Pole Isolator with Earth Contact Assembly

-

-

104201.27

... More
Earth Electrode 34

-

-

8999.86

... More
25KV Post Insulator 35

-

-

125317.92

... More
Aluminium Bus Bar 36

-

-

31246.8

... More
Connector & terminal 37

-

-

15275.02

... More
Erection of Structure Bond (a) Erection in NPB 38

220

49

10986.8

... More
Erection of Transverse/Special Bond (a) Erection in NPB 39

50

53

2668.5

... More
Erection of Longitudinal Bond(C-bond for cross over) (a) Erection in NPB 40

100

46

4635

... More
Number Plate Mast/ structure (a) Supply & erection 41

155

309

47908.95

... More
Sectioning Diagram Board (a) Supply & erection 42

3

9421

28264.29

... More
Electric Engine Stop Board (a) Supply & erection 43

6

761

4570.8

... More
Caution Board for 25KV traction (a) Supply & erection 44

50

482

24144

... More
Danger Board for 25KV traction (a) Supply & erection 45

10

387

3877.1

... More
Working Limit Board(Power Block) (a) Supply & erection

12

537

6444.48

... More
Preparation of Station Working Rules Diagram and working instructions (a) Erection in NPB 47

2

12218

24436.82

... More
Transfer of Equipment from one mast/support to another (a) Erection in PB 48

8

4769

38153.44

... More
Provision of additional bracket assembly on a mast or support (a) Erection in PB 49

14

1273

17830.12

... More
Splicing & extension of Anchored OHE 50

-

-

160844.32

... More
Adjustment of existing OHE and Tower Wagon checking 52

-

-

177252.17

... More
Dismantling of Cantilevers 53

-

-

159893.44

... More
Dismantling of Guy Rod Assembly 54

-

-

33714.82

... More
Dismantling of Regulating Equipment with counter weight assembly. 55

-

-

98316.64

... More
Dismantling of OHE. (a) Erection in PB 56

-

52342

183197.28

... More
Dismantling of Portal Boom (a) Erection in PB 57

25

14297

357447.5

... More
Dismantling of SPS. (a) Erection in PB 58

10.5

9423

98946.01

... More
Dismantling of SP/DP Isolator. (a) Erection in PB 59

7

3462

24239.88

... More
Dismantling of Section Insulator. (a) Erection in PB

5

5750

28750.35

... More
Dismantling of Anticreep. (a) Erection in PB 61

7

9678

67752.3

... More
Dismantling mast/structure/upright by cutting 62

-

-

295744.58

... More
Retrieval of mast/TTU from solid core foundation without damage or leaning of mast

-

-

256264.98

... More
Supply of Porcelain 9-T insulator 2

121

3219

389575.23

... More
Supply of Porcelain Stay insulator 3

288

2967

854527.68

... More
Supply of Porcelain Bracket insulator 4

288

2902

835983.36

... More
Fabricated & galvanized B-Series Steel Structures 5

40.7

109846

4470740.34

... More
Fabricated & galvanized Steel TTC (5.50m Boom) Structures 6

33.5

124997

4187412.9

... More
Fabricated & galvanized Steel TTC (8.0m Boom) Structures 7

21.4

119947

2566865.8

... More
Fabricated & Galvanized Steel Portal Structures

33.3

107321

3573789.3

... More
Galvanized Steel Flexible Traction Wire bonds with lugs duly crimped at both ends for 25KV ac Electric traction system(Effective length- 3 Metres)

200

1199

239894

... More
Supply of structure bond along with fasteners(GI nut & bolt & washer 16mmx50mmx38mm) made from MS flat steel with black painted & smooth edge(40mmx6mm) (length: 4mtr as per latest RDSO specification

100

858

85857

... More
Galvanized Steel Stranded wire Traction bonds with lugs duly crimped at both ends for 25KV ac Electric traction system as per latest RDSO specification(Effective length- 02.5 Mtrs ± 10mm)

50

1420

71021.5

... More
Galvanized Steel Stranded wire Traction bonds with lugs duly crimped at both ends for 25KV AC traction system(Effective length- 02 Meters ± 0.10mm)

100

1313

131310



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.