Dr Yashwant Singh Parmar University Of Horticulture And Forestry Tender
... More
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Dr Yashwant Singh Parmar University Of Horticulture And Forestry Tender
Civil And Construction
Civil Works Others
Opening Date23 Nov 2022
Closing Date7 Dec 2022
Tender Amount₹ 35,14,512
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
₹ 4,000
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
567716Bid Award Id
ViewTender No
07(02)/HU/EO/TN/2022-23Tender Authority
Dr Yashwant Singh Parmar University Of Horticulture And Forestry ViewPurchaser Address
-Website
http://https://www.drysrhu.edu.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Construction of compound wall for a length of 380Rmt and Retaining wall at (west side) of CRS, Petlu;Plain Cement Concrete (1:5:10) (cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using coarse aggregate 40mm size hard , machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, sales & other taxes on all materials and including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc.,and overheads & contractors profit complete for finished item of work.
30.53
-
131995
... More
Construction of compound wall for a length of 380Rmt and Retaining wall at (west side) of CRS, Petlu;Providing Thermo Mechanically Treated (TMT) (Fe 500 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc. ,and overheads & contractors
7.1
-
647753
... More
Construction of compound wall for a length of 380Rmt and Retaining wall at (west side) of CRS, Petlu;Footings: Supply and placing of the Nominal Mix Concrete M 20 corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete using 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and sales & other taxes on all materials , centering using Steel scaffolding pipes , jack props , wallers , Foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as , machine mixing, lifting of concrete manually, laying concrete, vibrating, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work
41.86
-
358841
... More
Construction of compound wall for a length of 380Rmt and Retaining wall at (west side) of CRS, Petlu;Pedastal: Supply and placing of the Nominal Mix Concrete M 20 corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete using 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and sales & other taxes on all materials , centering using Steel scaffolding pipes , jack props , wallers , Foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as , machine mixing, lifting of concrete manually, laying concrete, vibrating, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work
6.73
-
61049
... More
Construction of compound wall for a length of 380Rmt and Retaining wall at (west side) of CRS, Petlu;Column: Supply and placing of the Nominal Mix Concrete M 20 corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete using 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and sales & other taxes on all materials , centering using Steel scaffolding pipes , jack props , wallers , Foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as , machine mixing, lifting of concrete manually, laying concrete, vibrating, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work
18.26
-
194145
... More
Construction of compound wall for a length of 380Rmt and Retaining wall at (west side) of CRS, Petlu;Plinth Beam: Supply and placing of the Nominal Mix Concrete M 20 corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete using 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and sales & other taxes on all materials , centering using Steel scaffolding pipes , jack props , wallers , Foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as , machine mixing, lifting of concrete manually, laying concrete, vibrating, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work
24.9
-
272862
... More
Construction of compound wall for a length of 380Rmt and Retaining wall at (west side) of CRS, Petlu;Vibrated Plain Cement Concrete (1:3:6) nominal mix using 40mm size machine crushed hard granite metal and 20mm graded machine crushed hard granite metal (coarse aggregate) in (2:1) ratio from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc. to site, sales & other taxes on all materials, all charges for mixing, laying concrete in position, vibrating, curing, centering charges, overheads & contractors profit etc.,for finished item of work for retaining wall
18
-
102232
... More
Construction of compound wall for a length of 380Rmt and Retaining wall at (west side) of CRS, Petlu;Masonry work in CM(1:6) prop (Cement : Sand) in compound wall with fly ash cement solid blocks of size 290mm x 225mm x 140mm from approved source having minimum crushing strength of 50 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including sales & other taxes on all materials and such as labour charges, like mixing cement mortar, scaGFolding charges, constructing masonry, lift charges, curing, overheads and contrctor profit etc., complete for finished item of work.
126.37
-
782493
... More
Construction of compound wall for a length of 380Rmt and Retaining wall at (west side) of CRS, Petlu;Plastering 12mm thick single coat in CM(1:5) using screened sand including cost and conveyance of all materials like cement, sand, water etc., to site, including sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work.
1720.47
-
527341
... More
Construction of compound wall for a length of 380Rmt and Retaining wall at (west side) of CRS, Petlu;Providing 100mmx15 mm thick ornamental cement mortar band in cement mortar 1 : 4 (1cement: 4 sand) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, and overheads & contractors profit complete for finished item of work.
380
-
45140
... More
Construction of compound wall for a length of 380Rmt and Retaining wall at (west side) of CRS, Petlu;Painting to new walls with 2 coats of water proof cement paint of shade as approved by the Engineer-In-Charge over a base coat of aproved white cement base coat making 3 coats in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc., and overheads & contractors profit complete for finished item of work in all floors.
1695.97
-
265928
... More
Construction of compound wall for a length of 380Rmt and Retaining wall at (west side) of CRS, Petlu;Filling with useful available excavated earth (excluding rock) with a lead of 50 m in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cm thick, watering and ramming including cost and conveyance of water to work site and all operaitonal, incidental, labour charges, hire charges of T&P etc., and overheads & contractors profit complete for fnished item of work
143.98
-
4482
... More
Construction of compound wall for a length of 380Rmt and Retaining wall at (west side) of CRS, Petlu;Supply and fixing Mild steel grills including labour charges for cutting,fabrication and fixing to required sizes and shapes, placing in position as per approved designs and drawings, including cost and conveyance of Mild steel incl. all wastages and all incidental, operational, labour charges including sales and other taxes on all materials etc. ,and overheads & contractors profit complete for finished item of work.
215
-
24695
... More
Construction of compound wall for a length of 380Rmt and Retaining wall at (west side) of CRS, Petlu;Painting two coats with synthetic enamel paint Grade-II VOC (Volatile Organic Compound) content less than 50 grams/litre over primer coat of Zinc chromate yellow oxide to new iron work including cost and conveyance of all materials to site, sales & other taxes, incidental, operational and all labour charges etc., and overheads & contractors profit complete for finished item of work in all floors.
4.32
-
758
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements