Dr Yashwant Singh Parmar University Of Horticulture And Forestry Tender

... More
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Dr Yashwant Singh Parmar University Of Horticulture And Forestry Tender

Civil And Construction
Water Storage And Supply
Opening Date14 Dec 2022
Closing Date28 Dec 2022
Tender Amount₹ 3,34,756 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of pump house at HRS, Chintapalli, Alluri Sitharama Raju District;Earth work excavation for footings of pump house in ordinary soils and depositing on bank with an initial lead of 10m and depth up to 3m including all operational,incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete for finished item of work excluding dewatering charges etc.,

8.64

-

2345

... More
Construction of pump house at HRS, Chintapalli, Alluri Sitharama Raju District;Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) below footings and plinth beam using coarse aggregate 40mm size hard, machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including sales & other taxes on all materials and including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc., and overheads & contractors profit complete for finished item of work.

1.36

-

7382

... More
Construction of pump house at HRS, Chintapalli, Alluri Sitharama Raju District;Plain Cement Concrete (1:5:10) (cement: fine aggregate: Coarse aggregate) and under flooring bed using coarse aggregate 40mm size hard , machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, sales & other taxes on all materials and including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc.,and overheads & contractors profit complete for finished item of work.

0.75

-

3954

... More
Construction of pump house at HRS, Chintapalli, Alluri Sitharama Raju District;Providing Thermo Mechanically Treated (TMT) (Fe 500 grade as per IS 1786-1979) of diGFerent diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc. ,and overheads & contractors profit complete for finished item of work.

300

-

28362

... More
Construction of pump house at HRS, Chintapalli, Alluri Sitharama Raju District;Footings: Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and sales & other taxes on all materials , centering using Steel scaGFolding pipes , jack props , wallers , Foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, vibrating, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work

1.73

-

19984

... More
Construction of pump house at HRS, Chintapalli, Alluri Sitharama Raju District;Pedastals: Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and sales & other taxes on all materials , centering using Steel scaGFolding pipes , jack props , wallers , Foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, vibrating, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work

0.22

-

2676

... More
Construction of pump house at HRS, Chintapalli, Alluri Sitharama Raju District;Plinth Beam: Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and sales & other taxes on all materials , centering using Steel scaGFolding pipes , jack props , wallers , Foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, vibrating, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work

0.76

-

10797

... More
Construction of pump house at HRS, Chintapalli, Alluri Sitharama Raju District;Column: Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and sales & other taxes on all materials , centering using Steel scaGFolding pipes , jack props , wallers , Foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, vibrating, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work

0.63

-

9325

... More
Construction of pump house at HRS, Chintapalli, Alluri Sitharama Raju District;Lintels: Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and sales & other taxes on all materials , centering using Steel scaGFolding pipes , jack props , wallers , Foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, vibrating, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work

0.18

-

2663

... More
Construction of pump house at HRS, Chintapalli, Alluri Sitharama Raju District;sun-shades : Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and including sales & other taxes on all materials , centering using Casurina Ballies , Bamboos , Wooden Reapers , Runners , Wood Posts , Wall Plates etc., for 60cm wide sun-shades 7.5cm thick at fixed end and 5cm thick at free end with an average thickness of 6.25cm including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, curing, overheads & contractors profit complete etc., but excluding cost of steel and its fabrication charges for finished item of work

3

-

2017

... More
Construction of pump house at HRS, Chintapalli, Alluri Sitharama Raju District;Up to Basement Level: Masonry work in CM(1:6) prop (Cement : Sand) in superstructure with fly ash cement / lime solid blocks of size 290mm x 200mm x 140mm from approved source having minimum crushing strength of 50 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including sales & other taxes on all materials and such as labour charges, like mixing cement mortar, scaGFolding charges, constructing masonry, lift charges, curing, overheads and contrctor profit etc., complete for finished item of work.

1.32

-

9146

... More
Construction of pump house at HRS, Chintapalli, Alluri Sitharama Raju District;Ground Floor: Masonry work in CM(1:6) prop (Cement : Sand) in superstructure with fly ash cement / lime solid blocks of size 290mm x 200mm x 140mm from approved source having minimum crushing strength of 50 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including sales & other taxes on all materials and such as labour charges, like mixing cement mortar, scaGFolding charges, constructing masonry, lift charges, curing, overheads and contrctor profit etc., complete for finished item of work.

6.49

-

48789

... More
Construction of pump house at HRS, Chintapalli, Alluri Sitharama Raju District;Baement Level: Plastering 12mm thick single coat in CM(1:5) using screened sand including cost and conveyance of all materials like cement, sand, water etc., to site, including sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work.

60

-

23142

... More
Construction of pump house at HRS, Chintapalli, Alluri Sitharama Raju District;Ground Floor: Plastering 12mm thick single coat in CM(1:5) using screened sand including cost and conveyance of all materials like cement, sand, water etc., to site, including sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work.

95

-

37901

... More
Construction of pump house at HRS, Chintapalli, Alluri Sitharama Raju District;White washing two coats with white cement to give an even shade after thouroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials , labour charges and incidental such as scaGFolding , lift charges etc., and overheads & contractors profit complete for finished item of work in all floors.

155

-

7673

... More
Construction of pump house at HRS, Chintapalli, Alluri Sitharama Raju District;Granolithic Concrete flooring 50 mm thick with (1:1:2), using 6mm to 12 mm size hard granite machine crushed metal and screened sand laid over CC bed already laid or RCC roof slab, in alternate panels of size not exceeding 1.50 m x 1.50 m, using glass strips and finishing the top surface to required smoothness and slopes and thread lining including cost of all materials like cement, metal sand and water and overheads & contractors profit complete for finished item of work.

7.47

-

8548

... More
Construction of pump house at HRS, Chintapalli, Alluri Sitharama Raju District;Supply, Fabrication and fixing of Truss & Purlins using GI pipes including cost of welding rods, power charges, including labour charges for fixing to required sizes and shapes, placing in position as per approved designs and drawings, including cost and conveyance of all materials incl. all wastages and all incidental, operational, labour charges including sales and other taxes on all materials etc. ,and overheads & contractors profit complete for finished item of work

160.58

-

25596

... More
Construction of pump house at HRS, Chintapalli, Alluri Sitharama Raju District;Roofing with 0.5mm thick galvanized / pre painted G.I. profiled sheets fixed to the purlins with 14 size self drilling screws with neoprene washer. Side laps are stitched with self tapping / drilling screws. End laps are to be sealed with 25x3 mm Butyl tape. The sheets are provided with anti capillary groveincluding all labour charges, overheads and contractor profit complete for finished item of work

21.6

-

20516

... More
Construction of pump house at HRS, Chintapalli, Alluri Sitharama Raju District;Supply and fixing jallies ( cement concrete ) of 50mm thick as per the design approved by the Engineer-in-Charge including cost and conveyance of materials to site and labour charges etc., overheads & contractors profit complete for finished item of work.

2.88

-

2535

... More
Construction of pump house at HRS, Chintapalli, Alluri Sitharama Raju District;Filling with carted gravel in trenches,sides of foundations and basement with initial lead in layers not exceeding 15cm thick,watering and ramming including cost and conveyance of water to work site and all peraitonal,incidental, labour charges,hire charges of T&P etc., and overheads & contractors profit complete for fnished item of work.

4.48

-

2304

... More
Construction of pump house at HRS, Chintapalli, Alluri Sitharama Raju District;Filling with useful available excavated earth (excluding rock) with a lead of 50 m in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cm thick, watering and ramming including cost and conveyance of water to work site and all operaitonal, incidental, labour charges, hire charges of T&P etc., and overheads & contractors profit complete for fnished item of work.

5.83

-

226

... More
Construction of pump house at HRS, Chintapalli, Alluri Sitharama Raju District;54.00mm OD: Supply and fixing of Ashirvad/ Ajay/ Astral Flowguard or equivalent CPVC Pipes and Fittings SDR 13.5 to meet the requirement of ASTM-D 2846 and are produced in CTS (Copper Tube Sizes 1/2" to 2") for hot and cold water (IS 15778:2007) including cost and conveyance of all materials to site, labour charges for fixing, overheads & contractors profit complete for finished item of work at all floor levels.

45

-

24796

... More
Construction of pump house at HRS, Chintapalli, Alluri Sitharama Raju District;Supplying and fixing Gunmetal Gate ( GM peet ) valve 54mm as per IS-778 Class - I , Indian make heavy type including cost and conveyance of all materials , labour charges , overheads & contractors profit complete for finished item of work.

2

-

8006

... More
Construction of pump house at HRS, Chintapalli, Alluri Sitharama Raju District;Construction of brick masonry support for CPVC pipe of size 304.80mm x 228.60mm x 228.60 mm in CM (1:8) prop including plastering and finishing with 12mm thick in CM (1:5) including cost and conveyance of all materials and all labour charges, overheads & contractors profit complete for finished item of work for all floors.

5

-

467

... More
Construction of pump house at HRS, Chintapalli, Alluri Sitharama Raju District;Providing and fixing factory made solid Wood Polymer Composite (WPC) single extruded Door Frame section of size with encapsulation of 8mm rigid layer on all the six surfaces. The door frame will have a rebat of 32mm. Door frame section of 45 × 90 mm. The two vertical members are to be joined together with the horizontal member using 8, 75 mm long MS star full thread screws to be used with reverse forward speed control hand drilling machine. The ready/assembled door frame is fixed to the wall using hold fast or bolt fasteneers. A minimum of 4 No.s of screws to be provided for each vertical member & minimum 2no.s for horizontal member etc., complete as per manufacture specification and direction of Engineer-incharge including conveyance of all materials, labour charges for fixing, overheads & contractors profit complete for finished item of work.

6.2

-

5459

... More
Construction of pump house at HRS, Chintapalli, Alluri Sitharama Raju District;Providing & fixing 28-30 mm thick solid Wood Polymer Composite (WPC) single extruded door shutter with 3MM top and bottom rigid layer with an overall density of 750kg/Cum. It will be fixed to the frame using 3 inch /4 inch hinges. A minimum of 4 hinges will be required for fixing the door with the frame etc., complete as per direction of Engineer ?in-Charge, manufacture specification and drawing including ISI marked Aluminium fixtures 3 Nos. butt hinges (IS:205) of 150mm long, 1 No. aldrop (IS:2681) 250 mm long, 1 No. tower bolt (IS:204) of 150 mm x 10mm dia, 2 Nos. 125mm long handles (IS:208),1 No. Rubber / Nylon door stop bushes including labour charges for fixing the shutter to frame etc., including overheads & contractors profit complete for finished item of work

2

-

10100



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.