Department Of Local Administration Tender
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Department Of Local Administration Tender
Civil And Construction
Road Construction
Eprocure
Opening Date25 Jan 2024
Closing Date7 Feb 2024
Tender Amount₹ 15,78,925
Costs
EMD
₹ 31,579Document Cost
₹ 525Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_DLA_14902_1Bid Award Id
ViewTender No
02/DB/YM/etender/2023-2024/6Tender Authority
Department Of Local Administration ViewPurchaser Address
-Website
http://http://www.dla.go.th/en/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
16.15.1 Supplying at site : RCC standards post / cum 536.61 struts/ rails/ pales of mix 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 12.5 mm nominal size) with wooden plugs or 6mm bar nibs, wherever required - (cost of earth works in excavation , concrete works to be paid separately)
11
-
-
16.16 Supplying and fixing turn buckles and
straining bolts for barbed wire fencing
900
-
-
16.17.1 Fencing with R.C.C post placed at required distance, embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on
both sides and end post one side nly,provided with horizontal lines and two diagonals of barbed wire 9.38kg per 100 metres (minimum) between the two posts fitted and fixed with G.I.staples on wooden plugs or G.I.binding wire tied to 6mm bar nibs fixed while casting the post (cost of R.C.C. posts ,struts, earth work and concrete to be paid for separately) -
Payment to be made per metre cost of total
length of barbed wire used - with
G.I.barbed wire length
2050
-
-
10.2: Structural steel work riveted , bolted or welded in built up sections , trusses and
framed work , including cutting, hoisting ,
fixing in position and applying a priming
coat of approved steel primer all complete
180
-
-
2.8.1 Earthwork in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not
exceeding 1.5m in width or 10 sqm on plan),
including dressing of sides and ramming of
bottoms, lift upto 1.5m, including getting
out the excavated soil and disposal of
surplus excavated soil as directed , within
a lead of 50m - all kinds of soil
93
-
-
2.27 Supplying and filling in plinth with river sand under floors, including watering
,ramming consolidating and dressing
complete
17
-
-
4.1.10: Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering.- All work upto plinth level -1:5:10 (1 cement:5coarse sand : 10 graded stone aggregate 40mm
nominal size)
17
-
-
4.1.3: Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering.- All work upto plinth level -1:2:4 (1 cement:2coarse sand : 4 graded stone aggregate 20mm nominal size)
45
-
-
4.3.1: Centering shuttering including struttings, propping etc. and removal of form work for foundations, footings , bases for columns.- Using steel sheet with M.S.frames
150
-
-
13.1.1: 12mm cement plaster of mix :Cement mortar 1:4 (1 cement : 4 fine sand)
75
-
-