Bharat Sanchar Nigam Limited Tender

... More
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Bharat Sanchar Nigam Limited - BSNL Tender

Works
Civil And Construction
Eprocure
Opening Date26 May 2025
Closing Date11 Jun 2025
Tender Amount₹ 13,99,664 
Notes
Download

Costs

Summary

Construction Of 40 M Gbt Foundation, Including Dg And Odbts Plinths, Erection Of Tower In Bsnl Compound At Anandapuram, Visakhapatnam (by Dismantling Existing 40 M Gbt Including Foundations At Saripalli)

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Construction of 40 m GBT Foundation, including DG and ODBTS Plinths, Erection of Tower in BSNL Compound at ANANDAPURAM, VISAKHAPATNAM (by Dismantling existing 40 M GBT including Foundations at SARIPALLI)
Construction of 40 m GBT Foundation, including DG and ODBTS Plinths, Erection of Tower in BSNL Compound at ANANDAPURAM, VISAKHAPATNAM (by Dismantling existing 40 M GBT including Foundations at SARIPALLI)
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
All kinds of soil.

10

196

-

... More
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.

200

196

-

... More
Extra for every additional lift of 1.5 m or part thereof in excavation /banking excavated or stacked materials.

-

-

-

... More
All kinds of soil.

100

196

-

... More
Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete.

6

196

-

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :

-

-

-

... More
1:2:4 (1 cement : 2 coarse sand(zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)

6

196

-

... More
1:3:6 (1 Cement : 3 coarse sand(zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources).

16

196

-

... More
1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources).

3

196

-

... More
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :

-

-

-

... More
1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)

15.5

196

-

... More
Centering and shuttering including strutting, propping etc. and removal of form for :

-

-

-

... More
Foundations, footings, bases of columns, etc. for mass concrete

30

196

-

... More
Lintels, beams, plinth beams, girders, bressumers and cantilevers

20

196

-

... More
Columns, Pillars, Piers, Abutments, Posts and Struts

20

196

-

... More
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.

-

-

-

... More
Thermo-Mechanically Treated bars of grade Fe-500D or more.

2000

196

-

... More
Smooth finishing of the exposed surface of R.C.C. work with 6 mm thick cement mortar 1:3 (1 Cement : 3 fine sand).

45

196

-

... More
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.

200

196

-

... More
Finishing walls with Acrylic Smooth exterior paint of required shade :

-

-

-

... More
New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 0.90 litre/10 sqm)

40

196

-

... More
Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge.

-

-

-

... More
Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)

1

196

-

... More
Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge.

16

196

-

... More
Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved.

17

196

-

... More
Making 150 mm nominal diameter bore holesat various locationsof Proposed building/structures in all types of soils using suitable approved method of boring bymanual augering up to 3.0 mts depth , Drilling in soil and performing standard penetration test (2.5 mts & 3.0 mts and collecting disturbed sample (1 mTS) , Iinclusive of reporting charges etc ., complete as directed by Engineer in charge.

1

196

-

... More
Labour charges for orienting and fixing assembly of 8 nos -36mm dia anchor bolts in each of the 4 legs/pedestals of tower with the help of template, base plate and other base arrangemnets. A total of 32 numbers anchor bolts shall be oriented and fixed for each tower as per drawings of Genetic requirements No. GR TWR - 11/01 Dec. 2004. Rate includes cost of necessary scaffolding arrangement etc all complete as directed by the Engineer-in-charge

1

196

-

... More
Labour for hoisting, fixing and erection of 40 mtrs height Ground based structural steel Tower as per approved Generic requirements No. GR TWR - 11/01 Dec. 2004 along with amendments with all its necessary components viz climbing ladder, platforms with railing and fixing with bolts, nuts, plain and spring washers. Cost includes necessary welding and alternation of any mismatching holes to the members wherever required complete in all respect as per drection of the Engineer in-charge ( Note:- Rate includes cost of all operations involved in hoisting and erection of tower including hire and labour charges of tools, plants and machinerires, all insurnace, safety privison, acceptance testing etc., all complete and nothing extra will be paid) Tower material( Weight about 10 MT) ( Rs 10,000/- will be with held for acceptance of AT and will be released after completion of AT)

1

196

-

... More
Applying priming coat with one coat of BISON HB Zinc Phosphate primer or equivalent of approved brand and manufacture for 40m tower ( weight about 10.00 MT)

1

196

-

... More
Applying priming coat with one coat of Etch primer ( BISON wash primer or equivalent) approved brand and manaufacture for 40m tower (weight about 10.00 MT)

1

196

-

... More
Painting with High glass synthetic enamel paint of approved brand and manufacture to give an even shade for 40m tower (Weight about 10.00 MT)

-

-

-

... More
a)Two or more coats on new work.

1

196

-

... More
Structural steel work reveted, bolted or welded in build up sections, trusses and framed work, including cutting hoisting, fixing in position with glavanized steel sections consisting of Angles, flats, plates, nuts and bolts of all sizes fabricated as per approved drawings in gratings, frames and similar locations. The galavanising shall be as per IS: 4759 with avaerage mass of zinc coating of 610gm/sqm (Approximately 85 micron). The steel sections shall be of M.S. grade 'A' as per IS: 2062. Cost of galvanization is inclusive. The payment shall be made as per the standard structural steel tables for the bare steel sectional weights. etc., all complete as directed by the Engineer- in- Charge.

575

196

-

... More
Painting two or more coats with high gloss syntetic enamel paint of approved brand and colour over one coat of Eitch primer (BISON wash primer or equivelent) and second cot of BISON HB Zinc phosphate primer or equivalent of approved brand and colour to give an even shade to additional steel section/ members/ builtup assembly such as Horizontal gantry, posts etc.

125

196

-

... More
Providing and fixing GI pipe of any size with ISI mark including transportation, cutting, hoisting, erection in position for Antena Mount etc., complete at all height as directed by the Engineer-in-charge.

150

196

-

... More
Providing at site 32 Nos of high tensile steel Anchor bolts 36 mm dia 900 mm long with 150 mm thread lengh and 200 mm length galvanisation including threading portion with necessary 80x80x6 mm plate welded at 6 cm above from untreaded end including Nut along with lock nut and a square washer of 80 x80x6 mm for each Anchor bolt as per TEC Drg No 08 Dated24.01.2024 and as per directions of Engineer in charge

275

196

-

... More
Credit for taking away unserviceable Galvanised steel recovered from tower Dismantling and dismembering etc., as per the directions of the Engineer -in-charge.

250

196

-

... More
Demolishing OD BTS and DG Plinths of size upto 3.45 m x 2.75 m x 0.60 m ( including upto 0.45m depth below the ground level) of CC/RCC/Brick/RR masonry by manual or mechanical means and disposal of unserviceable material/rubbish and stacking the serviceable material at the site all complete as directed by the Engineer - in - charge etc., complete

2

196

-

... More
Dismantling of 40 M four legged angular tower at SARIPALLI consisting the Components viz, angular legs, bracings,plates ,pipes, cable tray, horizonal gantry of about 8 M length, climbing ladder, safety rings, platforms with railing, bolts,nuts, plain and spring washers including marking & stacking of the material as per the dispatch list at site or at the time of handing over at BSNL Stores complete as per the directions of the Engineer - in - charge. (Note: Rate includes cost of all operations involved in hoisting and dismantling of tower including hire and labour charges of tools, plants and machineries all insurance, safety provision & insurance to the labour etc., all complete and nothing extra will be paid).

1

196

-

... More
Dismantling of lightening conductor, aviation lamp fittings,Antennae fixtures etc., complete as per the directions of Engineer-in-charge. (Stacking and packing the same to avoid damage during transportation)

8

196

-

... More
Credit for taking away unserviceable steel reinforcement recovered from tower during dismantling of tower stems, tie beams, OD BTS and DG Plinths as per the directions of the Engineer -in-charge.

1200

196

-

... More
Dismembering the wire mesh cage of OD BTS along with GI sheet roofing and stacking the serviceable material & disposing the unserviceable material including loading and unloading charges etc., complete as directed by the Engineer - in - charge.

1

196

-

... More
Sorting of tower material at site required for erection of 40 mtrs GB tower in orderely manner as per bill of materials/ erection drawings No. GR TWR - 11/01 Dec. 2004 along with amendments from a lot of material of one tower and listing out the missing material, if any complete as directed by the Engineer-in-charge. (Payment under this item shall be made only once for a tower material) Note : Payment under this item shall not be made if payment is made under the item of Segretation of Tower material.

1

196

-

... More
Mechanical transportation of tower members comprising MS angles , flats , plates, pipes nuts and bolts etc of varying sizes and lengths from specified place to work site. The entire lot of tower members shal be transported in a single lot . The Job includes cost of collection of all members with required lead, loading and unloading and depositing the tower members at the desired location complete as per directions of Engineer -in-charge. (Nothing extra shall be paid over and above the rate on any account).

-

-

-

... More
a)With in the lead of 20.00km

1

196

-

... More
b)Extra over above item for transportation beyond the lead of 20.00km

10

196

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.