Bharat Sanchar Nigam Limited Tender
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Bharat Sanchar Nigam Limited - BSNL Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date29 Nov 2024
Closing Date9 Dec 2024
Tender Amount₹ 8,82,027
Costs
EMD
₹ 17,650Document Cost
₹ 590Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_BSNL_217044_1Bid Award Id
ViewTender No
NIT No.28/CD/TPT/2024-25Tender Authority
Bharat Sanchar Nigam Limited ViewPurchaser Address
-Website
http://https://www.bsnl.co.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
-
-
-
... More
1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
1
-
-
... More
1:5:10 (1 cement : 5 coarse sand (zone-III) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources)
0.4
-
-
... More
Centering and shuttering including strutting, propping etc. and removal of form work for :
-
-
-
... More
Foundations, footings, bases for columns
8
-
-
... More
Labour charges for marking the centre points at different levels on the tower and assistance for checking the verticality of tower and labour charges for tightening of nuts and bolts of all tower components like angles, flats, pipes and all dia tower bolts including cable ladder and climbing ladder etc., including arranging ropes, pullies, glouses, helmets for the labour engaged for the tower tightening work.The department at no cost responsible for the accidents, damages etc., if any occured during the execution of work. The work should be carried out as per the direction of the Engineer -in- charge. The agency shall take necessary insurance for workmen compensation and all risks coverage.
-
-
-
... More
40 M GBT (Weight upto 10.00 MT)
9
-
-
... More
60 M GBT. (Weight about 20.00 MT)
3
-
-
... More
Labour charges for making tower members (Vertical ladder components such as safety rings, vertical flats and plat form railings etc.,) in good condition including cost of dismembering and making good at any height of Ground Based Tower and necessry alterations using welding machine / drilling machine etc., complete and fixing in same position with bolt & nuts as per the directions of the Engineer-in-charge. (Rate includes transportation of welding machine / drilling machine to site).
-
-
-
... More
For 40 M GBT
9
-
-
... More
60 M GBT. (Weight about 20.00 MT)
3
-
-
... More
Removing of UHF antenna upto 3.00 M dia. at various heights upto 60 M tower including dehoisting (bringing down) from tower upto ground level and stacking of the same upto a lead of 50 M as per the directions of the Engineer-in-charge. The department at no cost responsible for the accidents, damages etc., if any occured during the execution of work. The agency shall take necessary insurance for workmen compensation and all risks coverage. (Rate includes arranging ropes, pullies, glouses, helmets for the labour engaged for the tower).
2
-
-
... More
Structural steel work riveted, bolted or welded in build up sections, trusses and framed work, including cutting, hoisting, fixing in position with galvanized steel sections consisting of angles, flats, plates fabricated as per approved drawings in gratings, frames, raillings, cable trays, ladders, space frames and similar locations. The galvanizing shall be as per IS 4759 with average mass of zinc coating of 610 gm/Sqm (approximately 85 micron). The steel sections shall be of M.S grade 'A' as per IS 2062. Cost of galvanization is inclusive. The payment shall be made as per the standard structura steel tables for the bare steel sectional weights. All compete as directed by the Engineer -in-charge.
400
-
-
... More
Supplying and fixing of galvanised high tension grip bolts and nuts of grade 5.6 and of required size minimum mass of galvanised coating not less than 610 gms per sqm on bolts and nuts and other fasteners etc., (Galvanisation shall be hot dipped as per IS : 1759 standard / Zinc galvanising should be conform to IS :13229-1991 or IS 209-1992.)
290
-
-
... More
Note- The Department at no cost will be responsible for any accidents, damages etc if any occurred during Execution of the work . The Agency shall take all necessary safety measures, insurance for workmen Compensation and all risk coverage.
-
-
-
... More
CONTRACTOR
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements