Andhra University Tender
... More
The Andhra University has issued a formal invitation for competitive bids for Providing Weather Proof Treatment And Expansion Joint Treatment To The Department To Ece College Of Engineering (a) Andhra University Visakhapatnam. 3rd Call. in Visakhapatnam, Andhra Pradesh, with an estimated contract value of Rs. 8,79,869. The bid opening date for this tender is 12-01-2022 and the last date for bid submission is 27-01-2022. Interested bidders for Andhra University tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Andhra University Tender
Paints and Enamels
Opening Date12 Jan 2022
Closing Date27 Jan 2022
Tender Amount₹ 8,79,869 This is an estimated amount, exact amount may vary.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
₹ 1,000
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
470078Bid Award Id
ViewTender No
UE/E-PTN(6)/AU/VSP/2021-22Tender Authority
Andhra University ViewPurchaser Address
-Website
http://https://www.andhrauniversity.edu.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Providing weather proof treatment and expansion joint treatment to the department to ECE college of;Dismantling of PCC and clearing the same etc complete as directed.
27
-
44012
... More
Providing weather proof treatment and expansion joint treatment to the department to ECE college of;Cement Concrete (1:11/2:3) mix (cement: fine aggregate: Coarse aggregate) using 20 and 12 mm size from approved quarry HBG metal machine crushed mixing water proof compound at 1 Kg. per 1 bag of cement including cost and conveyance of all material and labour charges vibrating the concrete with mechanical vibrator, curing etc complete as directed for First floor slab.
45
-
295454
... More
Providing weather proof treatment and expansion joint treatment to the department to ECE college of;Supplying , fitting and placing HYSD / TMT bar reinforcement in VRCC works complete as per drawings and technical specifications for bars below 36mm dia including over laps and wastage, where they are not welded including cost and conveyance of steel , binding wire etc., lifting charges of steel , placing in position, tying with binding wire , all tools etc., complete for finished item of work in second floor.
2440
-
161650
... More
Providing weather proof treatment and expansion joint treatment to the department to ECE college of;Supplying and fixing of plan GI sheet fixing with necessary screws including cost and conveyance of all materials and all labour charges etc complete as directed.
80
-
69078
... More
Providing weather proof treatment and expansion joint treatment to the department to ECE college of;Plastering 20 mm thick in CM (1:3) for patch works after removing of old damaged plastering including cost and conveyance of all materials like cement, sand (screened), water etc., to site, including seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing etc., complete for finished item of work(APSS No. 901 & 903) in first floor
60
-
26210
... More
Providing weather proof treatment and expansion joint treatment to the department to ECE college of;Making groves of 2 to 3 mm thick for expansion joints including dig surface cleaning removal of dust etc complete as directed.
95
-
8311
... More
Providing weather proof treatment and expansion joint treatment to the department to ECE college of;Plastering 12mm thick in CM(1:5) for even surfaces including cost and conveyance of all materials like cement, sand (screened), water etc., to site, including seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing etc., complete for finished item of work(APSS No. 901 & 903) for first floor.
20
-
7716
... More
Providing weather proof treatment and expansion joint treatment to the department to ECE college of;Fly ash brick masonry with 290x225x140mm thick for walls in superstructure with CM (1:6) prop. (cement : sand) using fly ash cement solid blocks from approved source having minimum crushing strength of 50 Kg/Sqcm. Using flyash 80 kg cement 15 kgs gypsum 5 kg and stone dust including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including seigniorage charges, sales & other taxes on all materials and all operational, incidental and labour charges such as mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, etc., complete for finished item of work (APSS No. 501 & 504).in Second floor
0.7
-
5507
... More
Providing weather proof treatment and expansion joint treatment to the department to ECE college of;Brick masonry 230x100x65 mm thick for panel walls in superstructure with CM (1:6) prop. (cement : sand) using fly ash cement solid blocks from approved source having minimum crushing strength of 50 Kg/Sqcm. Using flyash 80 kg cement 15 kgs gypsum 5 kg and stone dust including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including seigniorage charges, sales & other taxes on all materials and all operational, incidental and labour charges such as mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, etc., complete for finished item of work (APSS No. 501 & 504) (APSS No. 501 & 504).in Second floor
2.95
-
25552
... More
Providing weather proof treatment and expansion joint treatment to the department to ECE college of;Brick masonry 230x100x65 mm thick for panel walls in superstructure with CM (1:6) prop. (cement : sand using fly ash cement solid blocks from approved source having minimum crushing strength of 50 Kg/Sqcm. Using flyash 80 kg cement 15 kgs gypsum 5 kg and stone dust including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including seigniorage charges, sales & other taxes on all materials and all operational, incidental and labour charges such as mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, etc., complete for finished item of work (APSS No. 501 & 504).in first floor
0.9
-
7137
... More
Providing weather proof treatment and expansion joint treatment to the department to ECE college of;Reinforced Cement Concrete nominal mix (1:11/2:3)as per Table 9 of IS 456 using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering as per the approved shuttering plan, machine mixing, laying concrete, vibrating, lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) For 40mm thick shelf planks. in second floor.
19
-
6594
... More
Providing weather proof treatment and expansion joint treatment to the department to ECE college of;Reinforced Cement Concrete nominal mix (1:11/2:3) as per Table 9 of IS 456 using 20 mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering as per the approved shuttering plan, machine mixing, laying concrete, vibrating, lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403) For 40 mm thick shelf planks. in first floor
7
-
2335
... More
Providing weather proof treatment and expansion joint treatment to the department to ECE college of;Supplying , fitting and placing HYSD / TMT bar reinforcement in VRCC works complete as per drawings and technical specifications for bars below 36 mm dia including over laps and wastage, where they are not welded including cost and conveyance of steel , binding wire etc., lifting charges of steel , placing in position, tying with binding wire , all tools etc., complete for finished item of work in first floor.
48
-
3100
... More
Providing weather proof treatment and expansion joint treatment to the department to ECE college of;Plastering 12 mm thick in CM (1:3) to RCC surfaces mixing with water proof compound at 1 Kg per 1bag of cement including cost and conveyance of all materials like cement, sand (screened), water etc., to site, including seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed etc., complete for finished item of work(APSS No. 901 & 903)
890
-
347436
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements