Andhra University Tender

... More
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Andhra University Tender

Opening Date1 Dec 2020
Closing Date8 Dec 2020
Tender Amount₹ 5,86,578 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Electrificationof first floor over the exixting ground floor of girls hostels in north campus, A.U;Ceiling fan 56? sweep ?Crompton? High Speed chocolate brown complete with blades, down rod etc, with double ball bearings etc.

66

-

171600

... More
Electrificationof first floor over the exixting ground floor of girls hostels in north campus, A.U;Ceiling fan regulator modular electronics with 5 steps fixed on modular plate.

66

-

31020

... More
Electrificationof first floor over the exixting ground floor of girls hostels in north campus, A.U;Exhaust fan 12? sweep Crompton with blades to be fixed in ventilator or wall with necessary masionary work.

8

-

28000

... More
Electrificationof first floor over the exixting ground floor of girls hostels in north campus, A.U;Socket out let 2 pin/3pin 5 Amps 3Nos with 3 Nos switches fixed on modular plate of required size.

2

-

1300

... More
Electrificationof first floor over the exixting ground floor of girls hostels in north campus, A.U;Socket out let 3pin 5/15 amps controlled by separate 15 Amps switch fixed on modular plate of required size.

4

-

1800

... More
Electrificationof first floor over the exixting ground floor of girls hostels in north campus, A.U;ICTPN switch fuse 125Amps 415V with HRC fuses to be fixed on the iron channels. (L&T/ABB/SIEMENS)

1

-

9500

... More
Electrificationof first floor over the exixting ground floor of girls hostels in north campus, A.U;Bus bar chamber 3 phase 100A with 4 Nos. alluminimum bus bars fixing on the iron channels.

1

-

6000

... More
Electrificationof first floor over the exixting ground floor of girls hostels in north campus, A.U;MCB DB double door TPN 4 way with TPN 100Amps isolator as Incomer and 12 Nos. 15- 30A SP MCBs as outgoing. (Standard/Asian/Legrand)

2

-

14000

... More
Electrificationof first floor over the exixting ground floor of girls hostels in north campus, A.U;MCB DB DD SPN 12 way with 40 ADP Isolator and 10 Nos 5-15Amps SP MCBs

2

-

10000

... More
Electrificationof first floor over the exixting ground floor of girls hostels in north campus, A.U;Earth pipe of GI pipe 40mm dia 3 Mts, long with 6x600x600mm GI plate, Chemical powder etc, connected with 25x3mm GI flat as per IS standards.

4

-

16800

... More
Electrificationof first floor over the exixting ground floor of girls hostels in north campus, A.U;Run of GI flat 25x3 and connection to main switch and distribution boards.

100

-

11000

... More
Electrificationof first floor over the exixting ground floor of girls hostels in north campus, A.U;Ceiling fan hook with 12mm M.S. Rod. (Not anchior fastened hooks)

-

-

15840

... More
Electrificationof first floor over the exixting ground floor of girls hostels in north campus, A.U;M.S. Fan rod

-

-

5610

... More
Electrificationof first floor over the exixting ground floor of girls hostels in north campus, A.U;Light, calling bell and exhaust fan points with 2 Nos.1 sq.mm copper wires.

-

-

96000

... More
Electrificationof first floor over the exixting ground floor of girls hostels in north campus, A.U;Ceiling fan points with 3 Nos. 1 sq.mm copper wires including earth.

-

-

40920

... More
Electrificationof first floor over the exixting ground floor of girls hostels in north campus, A.U;Socket out let points including providing of3 pin 5A socket out let and switch with 3 Nos. 1 sq.mm copper wires.

-

-

29700

... More
Electrificationof first floor over the exixting ground floor of girls hostels in north campus, A.U;Connection to 3 pin 15Amps socket and computer sockets with 2 Nos. 2.5 sq.mm and 1 No. 1 sq.mm copper wires connected from DB.

-

-

10380

... More
Electrificationof first floor over the exixting ground floor of girls hostels in north campus, A.U;Connection to Geysers with 2 Nos. 4 sq.mm and 1 no. 2.5 sqmm copper wires connected from the existing nearest DB.

-

-

9080

... More
Electrificationof first floor over the exixting ground floor of girls hostels in north campus, A.U;Supply, laying, terminations and connecting with required size of lugs of XLPE insulated sheathed armoured underground cable 3 ½Core 50 Sqmm 3 feet below the ground including excavation of ground, protection bricks etc and providing of GI pipe at terminations , at road crossings and road crossing should be finished with concreting or cementing etc from LT pole to main swicth. UNIVERSAL/HAVELLS

-

-

13000

... More
Electrificationof first floor over the exixting ground floor of girls hostels in north campus, A.U;Run of 4 Nos.16 sq.mm and 1 No. 4 sq.mm copper wires.

-

-

32400

... More
Electrificationof first floor over the exixting ground floor of girls hostels in north campus, A.U;Run of 2 Nos.10 sq.mm and 1 No. 4 sq.mm copper wires.

-

-

22500



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.