To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Andhra University Tender
Opening Date16 Nov 2021
Closing Date23 Nov 2021
Tender Amount₹ 6,14,020
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
₹ 1,000
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
455032Bid Award Id
ViewTender No
UE/E-PTN(4)/AU/VSP/2021-22Tender Authority
Andhra University ViewPurchaser Address
-Website
http://https://www.andhrauniversity.edu.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
electrification of second floor over the existing first floor of girls hostel in north campus, AU;Ceiling fan regulator modular electronics with 5 steps fixed on modular plate.
60
-
28200
electrification of second floor over the existing first floor of girls hostel in north campus, AU;Exhaust fan 12? sweep Crompton with blades to be fixed in ventilator or wall with necessary masionary work.
8
-
28000
electrification of second floor over the existing first floor of girls hostel in north campus, AU;Socket out let 2 pin/3pin 5 Amps 3Nos with 3 Nos switches fixed on modular plate of required size.
2
-
1300
electrification of second floor over the existing first floor of girls hostel in north campus, AU;Socket out let 3pin 5/15 amps controlled by separate 15 Amps switch fixed on modular plate of required size.
10
-
4500
electrification of second floor over the existing first floor of girls hostel in north campus, AU;ICTPN switch fuse 125Amps 415V with HRC fuses to be fixed on the iron channels. (L&T/ABB/SIEMENS)
1
-
9500
electrification of second floor over the existing first floor of girls hostel in north campus, AU;Bus bar chamber 3 phase 100A with 4 Nos. alluminimum bus bars fixing on the iron channels.
1
-
6000
electrification of second floor over the existing first floor of girls hostel in north campus, AU;MCB DB double door TPN 4 way with TPN 100Amps isolator as Incomer and 12 Nos. 15- 30A SP MCBs as outgoing. (Standard/Asian/Legrand)
2
-
14000
electrification of second floor over the existing first floor of girls hostel in north campus, AU;MCB DB DD SPN 12 way with 40 ADP Isolator and 10 Nos 5-15Amps SP MCBs
2
-
10000
electrification of second floor over the existing first floor of girls hostel in north campus, AU;Earth pipe of GI pipe 40mm dia 3 Mts, long with 6x600x600mm GI plate, Chemical powder etc, connected with 25x3mm GI flat as per IS standards.
4
-
16800
electrification of second floor over the existing first floor of girls hostel in north campus, AU;Run of GI flat 25x3 and connection to main switch and distribution boards.
100
-
11000
electrification of second floor over the existing first floor of girls hostel in north campus, AU;Ceiling fan hook with 12mm M.S. Rod. (Not anchior fastened hooks)
60
-
14400
electrification of second floor over the existing first floor of girls hostel in north campus, AU;M.S. Fan rod
60
-
5100
electrification of second floor over the existing first floor of girls hostel in north campus, AU;Light, calling bell and exhaust fan points with 2 Nos.1 sq.mm copper wires.
145
-
87000
electrification of second floor over the existing first floor of girls hostel in north campus, AU;Ceiling fan points with 3 Nos. 1 sq.mm copper wires including earth.
60
-
37200
electrification of second floor over the existing first floor of girls hostel in north campus, AU;Socket out let points including providing of 3 pin 5A socket out let and switch with 3 Nos. 1 sq.mm copper wires
60
-
27000
electrification of second floor over the existing first floor of girls hostel in north campus, AU;Connection to 3 pin 15Amps socket and computer sockets with 2 Nos. 2.5 sq.mm and 1 No. 1 sq.mm copper wires connected from DB.
8
-
13840
electrification of second floor over the existing first floor of girls hostel in north campus, AU;Connection to Geysers with 2 Nos. 4 sq.mm and 1 no. 2.5 sqmm copper wires connected from the existing nearest DB.
4
-
9080
electrification of second floor over the existing first floor of girls hostel in north campus, AU;Supply, laying, terminations and connecting with required size of lugs of XLPE insulated sheathed armoured underground cable 3 ½Core 50 Sqmm 3 feet below the ground including excavation of ground, protection bricks etc and providing of GI pipe at terminations , at road crossings and road crossing should be finished with concreting or cementing etc from LT pole to main swicth. UNIVERSAL/HAVELLS
20
-
13000
electrification of second floor over the existing first floor of girls hostel in north campus, AU;Run of 4 Nos.16 sq.mm and 1 No. 4 sq.mm copper wires.
40
-
32400
electrification of second floor over the existing first floor of girls hostel in north campus, AU;Run of 2 Nos.10 sq.mm and 1 No. 4 sq.mm copper wires.
60
-
22500