To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Andhra Pradesh Urban Greening And Beautification Corporation Limited - APUGBCL Tender

Agriculture or Forestry Works
Opening Date9 Apr 2022
Closing Date25 Apr 2022
Tender Amount₹ 56,87,049 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Maintenance of lawns: watering to the lawn once in 2 days @ 10 to 15 ltrs /per Sqmt basing on season and weather conditions (15 watering is required in a month to maintain sub-soil moisture continuously), excluding cost of water including all operational, incidental ,labour charges for complete of work..

8040

-

29547

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Hedge / shrub planting: Digging the trench of size 0.3 mtrs. depth, refilling with red garden soil including cost of red garden soil and farmyard manure at 4:1 ratio, internal transportation of plants, planting etc., including the application of fertilizers and pesticides etc., (@ 20 gms/pit/sqmt) complete for item of work, but excluding the cost of the fertilizers (@ 20 gms/pit/sqmt) and plant material etc., - unit 1 Sqmt of work. (* 11 No./Sqm of plants & bag size shall be arrived based on the spacing as per the design.) (Red garden soil in this context it is defined as sandy loamy garden soil congenial for plant growth which shall be of light textured, crystalline, porous and friable, fertile, slightly acidic or neutral)

397

-

162642.96

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Hedge / shrub planting:Digging the trench of size 0.45 mtrs. depth, refilling with red garden soil including cost of red garden soil and farmyard manure at 4:1 ratio, internal transportation of plants, planting etc., including the application of fertilizers and pesticides etc.,(@ 20 gms/pit/sqmt) complete for item of work, but excluding the cost of the fertilizers (@ 20 gms/pit/sqmt) and plant material etc., - unit 1 Sqmt of work. (* 5 No./Sqm of plants & bag size shall be arrived based on the spacing as per the design.) (Red garden soil in this context it is defined as sandy loamy garden soil congenial for plant growth which shall be of light textured, crystalline, porous and friable, fertile, slightly acidic or neutral).

254

-

152067.26

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Maintenance of hedge/shrub planting: Trimming of hedges/shrubs (once in a month) it including all operational, incidental ,labour charges for complete of work.

7812

-

34450.92

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Maintenance of hedge/shrub planting: Edge cutting 0.30mtr. away from the edges/shrub (once in a month) and application of fertilizers, insecticides, Fungicides (once in a month @ 20 gms/pit/sqmt) etc., by manually excluding cost of fertilizers it including all operational, incidental ,labour charges, for complete of work.

7812

-

33838.46

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Maintenance of hedge/shrub planting: watering once in 2 days @ 5 Lts/per sqmt shall be provide to maintain sub soil moisture continuously by manually excluding cost of wateri ncluding all operational, incidental ,labour charges for complete of work..

7812

-

57418.2

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Bed preparation for Ground cover / Flower beds: Digging the trench of size 150 mm. depth, and Formation of 150 mm. (6") thick of soil mixture at 3:1:1 ratio red garden soil, farmyard manure and river sand, application of fertilizers (@ 20 gms/pit/sqmt) by making smooth surface as per design including cost of soil mixture, filling of the soil mixture and internal transportation etc., for complete item of work. (excluding cost of plant material, fertilizers and chemicals (@ 20 gms / pit/ sqmt))-unit 1 Sqmt of work. (* 25 No./Sqm of plants & bag size shall be arrived based on the spacing as per the design.) (Red garden soil in this context it is defined as sandy loamy garden soil congenial for plant growth which shall be of light textured, crystalline, porous and friable, fertile, slightly acidic or neutral)

40

-

9813.6

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Maintenance of groundcover/flower beds: Weeding, Trimming/pinching and keeping the ground cover in healthy condition (once in a 15 days) it including all operational, incidental ,labour charges for complete of work.

480

-

3433.92

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Maintenance of groundcover/flower beds: Watering to ground cover (one's in three day's @ 5 litres/per Sqmts shall be provide to maintain sub soil moisture continuously) by manually, excluding cost of wateri ncluding all operational, incidental ,labour charges for complete of work..

480

-

2587.2

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Digging of 0.6x0.6x0.6 mtrs. pit, filling with soil mixture of red garden soil, farmyard manure at 4:1 ratio including internal transport, application of fertilizers and chemicals (@ 20 gms/pit/sqmt), internal transportation of plants, planting the plants etc., for complete item of work (excluding cost of plant material, fertilizers and chemicals (@ 20 gms / pit/ sqmt)) (Red garden soil in this context it is defined as sandy loamy garden soil congenial for plant growth which shall be of light textured, crystalline, porous and friable, fertile, slightly acidic or neutral)

116

-

33452.08

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Digging of 0.45x0.45x0.45 mtrs. pit, filling with soil mixture of red garden soil, farmyard manure at 4:1 ratio including internal transport, application of fertilizers and chemicals (@ 20 gms/pit/sqmt), internal transportation of plants, planting the plants etc., for complete item of work (excluding cost of plant material, fertilizers and chemicals (@ 20 gms / pit/ sqmt)) (Red garden soil in this context it is defined as sandy loamy garden soil congenial for plant growth which shall be of light textured, crystalline, porous and friable, fertile, slightly acidic or neutral)

32

-

4159.68

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Maintenance of Palms/Tree planting: Trimming (once in month) and application of fertilizers, insecticides, Fungicides @ 20 gms/pit/sqmt) (once in quarterly) by manually excluding cost of fertilizers, it including all operational, incidental ,labour charges, for complete of work

1776

-

10094.78

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Maintenance of Palms/Tree planting: formation of basins 0.30m . away from the edges (once in a month) it including all operational, incidental ,labour charges for complete of work

1776

-

18100.99

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Maintenance of Palms/Tree planting: watering (once in three days @ 5 Lts/per plant shall be provide to maintain sub soil moisture continuously) by manually, but excluding cost of water including all operational, incidental ,labour charges for complete of work.

1776

-

15664.32

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Supply & Delivery of topiary/trees/Palms/shrubs/lawn/ ground covers and specified plants as per directions of officer in charge at site including cost of plants and conveyance of all materials and labour charges etc., plants of bag size 7" x 8" of plant height not less than 1.0 feet, 8" x 10" of plant height not less than 3.0 feet, 13" x 13" of Tree/Palm height not less than 5 feet, 13" x 13" of plant (Hedges & Shrub) height not less than 2 feet, 15" x 16" of plant (Tree/Palm/Topiary) height not less than 5 feet, 18" x 18" plant (Tree/Palm/Topiary) height not less than 6 feet, bottom dia of the stem is 0.75'' and above, 21" x 21" and above plant (Tree/Palm/Topiary) height not less than 7 feet, bottom dia of the stem is 1'' and above. Heights mentioned above are excluding bag height. All the plants supplied shall be with sturdy stem, well formed crown, vigorously growing tip, healthy foliage without any infestation and the plants shall be supplied after proper hardening off.

-

-

-

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;lawn

-

-

-

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;For paspalum grass

420

-

31500

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;For Korean grass

250

-

45000

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Shrub / Hedge planting in 0.30 m trench

-

-

-

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Coleus cascade Red

1914

-

76560

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Allamanda cathartica

594

-

23760

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Ficus panda

616

-

24640

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Ixora Red

627

-

25080

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Bougainvillea thima

176

-

7040

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Pisonia alba

352

-

14080

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Ficus benjamina starlight variegata

88

-

3520

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Shrub / Hedge planting in 0.45 m trench

-

-

-

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Pyrostegia venesta

645

-

25800

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Murrya paniculata

625

-

25000

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Groundcover / flower beds

-

-

-

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Wedelia Trilobota

400

-

8000

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Dianella variegata

600

-

12000

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Palms/Tree

-

-

-

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Bauhinia blakeana

6

-

4200

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Plumeria acutifolia

4

-

2800

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Neolamarckia cadamba

4

-

2800

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Baringtonia acutungula

6

-

4200

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Azadrachta indica

16

-

11200

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Cordia sebestena

25

-

17500

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Lagerstroemia speciosa

4

-

2800

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Millingtonia hortenensis

8

-

5600

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Albizia lebbeck

1

-

700

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Cassia fistula

10

-

7000

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Salyx babylonica

2

-

1400

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Lagerstoemia speciosa

8

-

5600

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Terminalia arjuna

7

-

4900

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Peltophorum pterocarpum

10

-

7000

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Pongamia pinnata

5

-

3500

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Butia capitata

3

-

1050

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Latania lontaroides red

8

-

2800

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Veitchia merrillii

21

-

7350

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Hardscape (Civil works)

-

-

-

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Earth work excavation for foundations (Manual Means) of buildings, septic tank, sump, compound wall in ordinary soils and depositing on bank with an initial lead of 10m and depth up to 3m including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete for finished item of work excluding dewatering charges etc., as per SS 20 B(APSS 308)

133.5

-

-

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using 162.0 kgs of cement, coarse aggregate 40mm size hard , machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc., to site, and including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc., and overheads & contractors profit complete for finished item of work. (APSS No. 402)

47.65

-

-

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Supply and fixing of C.C. Kerb not less than M30 strength of size 600 X 400 X 110 mm thick with bottom thickness of 110 mm up to height of 350 mm and top width of 50 mm thick chamfering with 45° at starts at 350 mm height to 400 mm height as selected by the Engineer-in-charge from approved source/ factory which is laid on existing CC Bed in position to the required line, level and curvature jointed with cement mortar 1:3 (1 cement : 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5 mm), including making drainage opening wherever required and including cost and conveyance of all materials & labour charges including transportation from approved source, loading & unloading charges including contractor profit & overhead charges complete for finished item of work..

400

-

33815.55

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Supply and fixing of Kadapa slab (rough) 50mm thick and size of 0.457x0.457m stone edging including excavating trench in ordinary soil, laying P.C.C (1:4:8) 100 mm thick and fixing the stone in alignment and refilling the excavated soil conveyance of all materials and labour charges including transportation complete for finished item of work

123

-

181332.55

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Masonry work in CM(1:6) prop (Cement : Screened sand) in superstructure with fly ash cement / lime solid blocks of size 290mm x 225mm x 140mm from approved source having minimum crushing strength of 50 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site,and such as labour charges, like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, overheads and contractor profit etc., complete for finished item of work. (APSS No. 501 & 504).

29.59

-

257796

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Plastering 12mm thick single coat in CM(1:5) using screened sand including cost and conveyance of all materials like cement, sand, water etc., to site and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work.(SS 901,903 & 904)

818.13

-

18825.15

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Filling with carted gravel in pathways, trenches, sides of foundations and basement with initial lead in layers not exceeding 15cm thick, watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T&P etc., and overheads & contractors profit complete for finished item of work(APSS NO.309&310)

239.33

-

191036.29

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Supply & Fixing Sadarhalli granite stone with 5 line dressing Double Patti of 5' length seating benches with back rest and its width 16'' with 4" thick and 18" height with 4" thick and leg size 4'' width, including cost and conveyance of all materials like granite benche, cement, sand to work site loading ,un loading transport and all operational, incidental labour & lift charges,and overheads & contractors profit complete for finished item

9

-

281559.44

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Filling with dust in pathways with initial lead in layers not exceeding 15cm thick, watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T&P etc., and overheads & contractors profit complete for finished item of work(APSS NO.309&310)

17

-

106516.21

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Supply of precast concrete blocks for paving of M-35 grade and thickness not less than 60 mm for Light traffic areas conforming to IS 15658:2006 in all shapes and designs as per the manufacturer's specification set over the 50 mm thick sand bed with hand roller compaction with joint neatly in homogeneous or heterogeneous pattern as the colour and pattern shall be as per the drawings furnished by the architect, including cost and conveyance of all materials like cement, sand, water, tiles, etc., to site including all operational, incidental, labour charges, laying tiles to required slope as directed by the Engineer- in-charge etc., and overheads & contractors profit complete for finished item of work

170

-

135000

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Flooring with Rough Shahabad / Tandur stone slabs of 40 mm thick set over base coat of cement mortar (1 : 8) 12 mm thick over CC bed already laid or RCC roof slab, including pointing with cement mortar 1:3 duly filling joints nearly, including cost of all materials like flooring stone, cement, sand, and water etc., complete, including labour charges for dressing of flooring stones etc., complete for finished item of work,. (APSS No.703 & 701)

226

-

9565.56

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Supply & application of one coat water based cement primer of exterior grade II and two coats of acrylic exterior emulsion paint having VOC (Volatile Organic Compound) content less than 50 grams/litre for exterior walls including cost and conveyance of all materials to site,and all operational, incidental, labour charges etc., and overheads & contractors profit complete for finished item of work in all floors.

754.53

-

114428.7

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Supply and placing of the V.R.C.C Nominal Mix Concrete M 20 grade corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete using CONCRETE MIXER with 20mm size HBG graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry and including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water, etc., to site and , centring using Steel scaffolding pipes , jack props , Waller?s , Foot plates , brackets , steel centring plates etc., including all operational, incidental and labour charges such as machine mixing, laying concrete, vibrator, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)

-

-

150665.16

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;For Footings

2.59

-

192224.06

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;For Pedestals

2.59

-

-

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;For Plinth Beam

1.71

-

21650.28

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;For Columns

7.15

-

23234.16

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;For Beam

0.74

-

18834.57

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Providing High Yield Strength Deformed (HYSD) / Thermo Mechanically Treated (TMT) (Fe 500 / Fe 500D grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including overheads & contractors profit complete for finished item of work.( APSS No.126)

1531.7

-

76662.8

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Plastering 12mm thick single coat in CM(1:5) using screened sand including cost and conveyance of all materials like cement, sand, water etc., to site and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work.(SS 901,903 & 904) for superstructure

15.4

-

6911

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Providing and applying PMCC / Deco orient base or Equivalent exterior Texture ( borders and design as per the pattern approved by the Engineer-in-Charge ) of average 2 to 3 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying putty/ texture paint filler by putty knife / muslin pad, air dry for 2 - 3 hrs for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges, scaffolding charges, overheads and contractors profit etc., complete for finished item of work in all floors for external walls

15.4

-

133901.21

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Providing cladding to wall with High Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M) other than black and regular colours, length equal to flooring slabs set over base coat of CM(1:5) 12 mm thick using screened sand with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointing with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., and overheads & contractors profit complete for finished item of work.

20.7

-

5504.11

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Supply and fabrication of MS framed structure like Window Grills, Compound Wall Grills, Iron Doors, Windows, Gates, MS Frame for chain link mesh works, Roof Trusses by using square / rectangular MS hollow section as per IS 4923 & Angles as per SP:6(1) IS Hand book, including cost of welding rods, power charges, labour charges for cutting, placing, welding and erecting in position and fixing, cost & convenience of all materials including wastage to site and complete for finished item of work

5302.66

-

4317.7

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Painting to new iron work with one coat of Red oxide primer and two coats with synthetic enamel paint Grade-I VOC (Volatile Organic Compound) content less than 50 grams/litre over primer coat of red oxid, including cost and conveyance of all materials like Red oxide primer, Synthetic Enamel Paint to site, incidental, operational and all labour charges etc., and overheads & contractors profit complete for finished item of work in all floors. (SS No. 1201, 1212 & 1207).

357.33

-

78613.63

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Supply and fabrication of MS framed structure like Window Grills, Compound Wall Grills, Iron Doors, Windows, Gates, MS Frame for chain link mesh works ,Roof Trusses by using MS Flats as per SP:6(1) IS Hand book , including cost of welding rods, power charges, labour charges for cutting, placing, welding and erecting in position and fixing, cost & convenience of all materials to site and complete for finished item of work

3099.54

-

577618.75

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Vibrated Plain Cement Concrete M 20 Nominal mix using Concrete MIXER, 20mm size hard granite machine crushed graded metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concrete , including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site including steel centring, shuttering, machine mixing, lift charges, laying concrete, vibrating, curing, overheads & contractors profit etc., complete for finished item of work (APSS No. 402 & 403)

14.89

-

66692.07

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Providing 0.30 m wide Coping with Polished black Kadapa slabs minimum of 25 mm to 30 mm thick in single piece as specified set over a base coat of CM (1:5) , 12mm thick using screened sand over already laid CC bed / RCC roof slab including neat cement slurry of honey like consistency spread @ 3.3 Kgs per Sqm and jointed with neat cement to full depth including cost and conveyance of all materials like cement, sand, water, flooring stones etc. complete including all labour charges like dressing of flooring stones to the required size, flat nosing the edges, mixing of cement mortar, laying, lift charges , cost of base coat, water charges etc., and overheads & contractors profit complete for finished item of work (APSS No.703 & 701)

10.29

-

391781.86

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Providing 0.50 m wide Coping with Polished black Kadapa slabs minimum of 25 mm to 30 mm thick in single piece as specified set over a base coat of CM (1:5) , 12mm thick using screened sand over already laid CC bed / RCC roof slab including neat cement slurry of honey like consistency spread @ 3.3 Kgs per Sqm and jointed with neat cement to full depth including cost and conveyance of all materials like cement, sand, water, flooring stones etc. complete including all labour charges like dressing of flooring stones to the required size, flat nosing the edges, mixing of cement mortar, laying, lift charges , cost of base coat, water charges etc., and overheads & contractors profit complete for finished item of work (APSS No.703 & 701)

13

-

90025.83

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Filling with useful available excavated earth (excluding rock) with a lead of 50 m in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cm thick, watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T&P etc., and overheads & contractors profit complete for finished item of work (APSS NO.309&310)

16.23

-

9036.68

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Plastering 12mm thick in two coats using screened sand with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, ,, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer - in - charge etc., and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904)

28.8

-

10257

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Flooring with polished Shahabad / Tandur stone slabs of 15mm to 18mm thick set over a base coat of CM (1:8) , 12mm thick using screened sand over already laid CC bed / RCC roof slab including neat cement slurry of honey like consistency spread @ 3.3 Kgs per Sqm and jointed with neat cement to full depth including cost and conveyance of all materials like cement, sand, water, flooring stones etc. complete including all labour charges like dressing of flooring stones to the required size, mixing of cement mortar, laying, lift charges , cost of base coat, water charges etc., and overheads & contractors profit complete for finished item of work. (APSS No.703 & 701)

32

-

589.31

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Providing polished Shahabad / Tandur stone slabs of 15mm to 18mm thick in single piece as specified set over a base coat of CM (1:5) , 12mm thick using screened sand over already laid CC bed / RCC roof slab including neat cement slurry of honey like consistency spread @ 3.3 Kgs per Sqm and jointed with neat cement to full depth including cost and conveyance of all materials like cement, sand, water, flooring stones etc. complete including all labour charges like dressing of flooring stones to the required size, flat nosing the edges, mixing of cement mortar, laying, lift charges , cost of base coat, water charges etc., and overheads & contractors profit complete for finished item of work for treads and risers. (APSS No.703 & 701)

0.6

-

13455.07

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Providing polished Shahabad / Tandur stone slabs of 15mm to 18mm thick in single piece as specified set over a base coat of CM (1:5) , 12mm thick using screened sand over already laid CC bed / RCC roof slab including neat cement slurry of honey like consistency spread @ 3.3 Kgs per Sqm and jointed with neat cement to full depth including cost and conveyance of all materials like cement, sand, water, flooring stones etc. complete including all labour charges like dressing of flooring stones to the required size, flat nosing the edges, mixing of cement mortar, laying, lift charges , cost of base coat, water charges etc., and overheads & contractors profit complete for finished item of work for treads and risers. (APSS No.703 & 701)

0.45

-

20952.62

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Random Rubble stone masonry in CM (1:8) prop: (Cement: Screened sand) using hard granite stones carted from approved quarry including cost and conveyance of all materials like cement, screened sand, water,Rough stone Through stone, Coursed stones etc., from approved quarry, to site, including labour charges for cutting stones to required size and shape, mixing, of cement, mortar, construction, curing, charges for scaffolding etc., and overheads & contractors profit complete for finished item of work. (APSS No. 601 & 615)

2.7

-

529.93

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Providing 0.30 m wide Coping with 16 to 18mm thick High Polished granite up to 8'-00 (2.43 M) other than black and regular colours with borders and design as per the pattern approved by the Engineer-in-Charge , set over base coat of cement mortar (1:5) , 12mm thick using screened sand over the stone ,Brick masonry or CC bed already laid , including neat grey cement slurry of honey like consistency spread @ 3.3 Kg per sqm and jointed neatly with white cement paste mixed with pigment of matching shade to full depth including cost and conveyance of all materials like cement , sand , water , granite slabs etc., to work site and all operational, incidental labour & lift charges, and cost of base coat and overheads & contractors profit complete for finished item of work for Coping (S.S.701 & special)

3.15

-

321.98

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Supply and fixing of cement bonded board 8 mm thick and laying as per the pattern approved by the Engineer-in-Charge on purlins, rafters, trusses, including cost and conveyance of all materials like approved cement bonded board, nails, labour charges , overheads and contractors profit etc., complete for finished item of work in all floors. excluding the cost of purlins, rafters, trusses.

30

-

9592.88

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Providing and laying of best tiled roofing with pressed clay (Mangalore tiles) size 225 x 150 x 20 mm thick and laying as per the pattern approved by the Engineer-in-Charge on roofs jointed with cement mortar 1:4 (1 cement : 4 coarse sand) mixed with 2% integral water proofing compound, laid over a bed of 20 mm thick cement mortar 1:4 (1 cement : 4 coarse sand) including Rabbit wire mesh (Chicken mesh) of not less than 30 gauge and jointed neatly with white cement paste to full depth mixed with pigment of matching shade at required place including cost and conveyance of all materials like cement, sand, water, tiles, Rabbit wire mesh, white cement, wastage etc., to site including cost of all labour charges for mixing of cement mortar, scaffolding, lift charges, laying tiles to required slope as directed by the Engineer- in-charge , curing etc., and overheads & contractors profit complete for finished item of work.

33.85

-

12116.16

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Supply and Transportation of XLPE/PVC insulated & PVC sheathed armoured cables 4 C x 4 sq.mm of 1.1 KV grade with copper conductor as per IS 7098 Part-I -1988 etc including cost and conveyance of all materials ,overheads & contractors profit etc., Make: Torrent / Universal / Unicab / Havells / KEI/ Polycab/ Gloster/ Orbit/Paragon/RR Kabel/RPG/Rhino

450

-

24736.5

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Supply and Laying of U.G cables upto 50 Sq,mm including earth work excavation of trench 300x600mm and ,laying the cable on sand cushion of 150 mm thick ,covering the cable with Rough Kadapa slabs minimum of 40 mm thick and refilling the trench with the excavated soils[excl. rock] , including cost and conveyance of all materials ,overheads & contractors profit etc., complete for finished item of work

450

-

49908.1

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Fabrication, Transportation and supply of hot-dip galvanized Octogonal Pole with BSEN - 10025 grade S 355 JO steel plate for shaft, IS 2062 for base plate with door opening arrangement, including the supply of suitable boards with bakelite sheet as per IS specification suitable to withstand the wind speed of 180 KMPH for 9 Mtrs heightPole having dimensions Bottom 155 mm,. Top 70mm with 3mm thick, base plate 260 x 260 x 16mm and 4 Nos of M24 x 750 long 'J' bolts along with template, including cost and conveyance of all materials ,overheads & contractors profit etc., complete for finished item of work Makes: Bajaj / Valmont/Laasma/Transrail/Utkarsh/ Skipper/Consoul

1

-

129352.5

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Fabrication, Transportation and supply of 1.0 Mtr Length Single Arm Bracket made with MS galvanized 40mm / 50mm dia Pipe. including cost and conveyance of all materials ,overheads & contractors profit etc., complete for finished item of work including cost and conveyance of all materials ,overheads & contractors profit etc., complete for finished item of work Makes: Bajaj / Valmont/Laasma /Transrail/Utkarsh/Skipper/Consoul

4

-

69043.5

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Foundation and erection charges with special T&P, for 9.00Mtrs / 10Mtrs long Octagonal / Conical pole duly erecting on base plate duly providing 4 Nos foundation bolts with nuts with providing of 0.60Mtr x 0.60Mtrs x 1.40 Mtr size M20 cc work vibrated concreting mixing with necessary steel (15kgs) reinforcement and curing for 7 days as directed by the field engineers during execution including excavation of Earth/BT all labour charges and including cost and conveyance of all materials ,overheads & contractors profit etc., complete.

1

-

21246.01

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Supply and fixing of 120 W LED Street light Luminaire for street light pole, Luminaire made of pressure diecast alluminium body with powder coated, having protective toughned glass, Supply Input voltage 120 - 270 V AC, P.F > 0.90, high power LED's having System efficacy > 100 lm/W and junction temprature < 70°C, with Ingrees protection IP66, Luminaire performance complies to IS 10322 (Part 5 / Sec-3), Driver surge protection 4KV, In house additional Surge protection 10 KV with optics distribution , THD<10% at 110 Volts AC, driver efficiency >90%, CCT: 3000K - 5700K, minimum CRI>70, etc., including as required complete as per the direction of Engineer-in-charge and including cost of all materials to site, incidental giving connections and all labour charges overheads & contractors profit etc., complete for finished item of work a) Luminaire Make : Wipro(Skyline) / Philips (Greenline Extra) /GE- Venture / Crompton(Nexus / Hawk series) / Bajaj (Edge)/ Halonix (Modular/ Lumos-Super) / Havells (EnduraSeries)/Greenlites(HILux)/Capart (Premium)/Polycab/Keselec/ HPL(City Vision)/Jaquar (Premium) /Eveready /Surya (Pollux) / Fortune Art (Leaf) b) LED MAKE :PHILIPS LUMILEDS / CREE / NICHIA /OSRAM / SAMSUNG / LG.

4

-

6498.76

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Supply and fabrication of street light poles made with medium quality MS Pipes of 88.90mm OD for 1670mm long, 60.3mm OD Pipes of 1670 mm long and 42.4 mm OD for 1670 mm long welded to each other for a total height of 5.0 m and providing 33.70 mm OD MS pipe of 1000 mm long for arm bracket for Luminaires fixing welded to main pole at suitable angle, suitable pole cap, base plate 300 x 300 x 10 mm and 4 Nos of 16 m dia 700 long 'J' bolts along with template including cost of welding rods, power charges, labour charges for cutting, placing, welding and erecting in position, cost & convenience of all materials including wastage to site, complete painting the total length of pipe with Painting to new iron work with one coat of Red oxide primer and two coats with synthetic enamel paint Grade-II VOC including cost of all materials ,labour charges etc for finished item of work.

25

-

8248.45

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Supply and fixing of 60 W LED Street light Luminaire for street light pole, Luminaire made of pressure diecast alluminium body with powder coated, having protective toughned glass, Supply Input voltage 120 - 270 V AC, P.F > 0.90, high power LED's having System efficacy > 100 lm/W and junction temprature < 70°C, with Ingrees protection IP66, Luminaire performance complies to IS 10322 (Part 5 / Sec-3), Driver surge protection 4KV, In house additional Surge protection 10 KV with optics distribution , THD<10% at 110 Volts AC, driver efficiency >90%, CCT: 3000K - 5700K, minimum CRI>70, etc., including as required complete as per the direction of Engineer-in-charge and including cost of all materials to site, incidental giving connections and all labour charges overheads & contractors profit etc., complete for finished item of work. a) Luminaire Make : Wipro(Skyline) / Philips (Greenline Extra) /GE- Venture / Crompton(Nexus / Hawk series) / Bajaj (Edge)/ Halonix (Modular/ Lumos-Super) / Havells (EnduraSeries)/Greenlites(HILux)/Capart (Premium)/Polycab/Keselec/ HPL(City Vision)/Jaquar (Premium) /Eveready /Surya (Pollux) / Fortune Art (Leaf) b) LED MAKE :PHILIPS LUMILEDS / CREE / NICHIA /OSRAM / SAMSUNG / LG.

25

-

51645.96

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Foundation and erection charges with special T&P, for 5 Mtrs. Long MS / GI Garden pole duly erecting on base plate duly providing 4 Nos foundation bolts with nuts with providing of 0.45Mtr x 0.45Mtrs x1.0 Mtr size pedestal with Vibrated Plain Cement Concrete M 20 Nominal mix with necessary steel (10kgs) reinforcement and curing for 7 days as directed by the field engineers during execution including excavation of Earth/BT all labour charges and cost and conveyance of materials etc including cost and conveyance of all materials ,overheads & contractors profit etc., complete for finished item of work

25

-

110277.75

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Supply of 3 core 4.0 Sqmm PVC insulated and sheathed FRLS copper round cable for voltage up to 1100V as per IS 694/1990. including cost and conveyance of all materials ,overheads & contractors profit etc., complete for finished item of work Makes: Finolex / RR kabel / Havells /KEI/Polycab/ Gloster/Goldmedal/GM

248

-

165998.5

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Supply of 4 core 6.0 Sqmm PVC insulated and sheathed FRLS copper round cable for voltage up to 1100V as per IS 694/1990. including cost and conveyance of all materials ,overheads & contractors profit etc., complete for finished item of work Makes: V-Guard/Bonton /Finecab/ HPL / GM / Million / Goldmedal /Fortune Art / /Sudhakar/Orbit/ Tamra/Anchor/Plaza/Vihan/Ollvin

50

-

61082.25

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Supply and fixing of 1 No. 6-32A SP MCB 10KA C/D Curve ISI mark as required complete as per the direction of Engineer-in-charge and including cost of all materials to site, incidental giving connections and all labour charges overheads & contractors profit etc., complete for finished item of work. Makes: V-Guard/Bonton /Finecab/ HPL / Million / FortuneArt /Sudhakar/Orbit/ Tamra/Anchor /Plaza/ Vihan/Spykaar/ Ollvin/Laser/Beljin/Rhino/ Standard/ Vimal

35

-

19440.72

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Supply and fixing of suitable out door type feeder piller box made with 14 SWG CRCA sheet after 7 tank process including S & F 40-63A FP MCB, 6 Nos SP MCB's, din chanel, bus bars, 6 Sqmm 3 core copper cable for internal wiring, contactor, connectors and provision for energy meter etc., complete for finished item of work..FP MCB including cost and conveyance of all materials ,overheads & contractors profit etc., complete for finished item of work FP MCB make :Legrand / Schnieder / L&T

1

-

16985.5

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Providing Independent earthing by excavating atrench to a depth f 2.10m in ordinary soils as specified 1.50 X 0.6 to a depth of 0.9m and 1.2 X 0.6 to a depth of 1.20m ,using 40 mm dia 'B' class GI Pipe of 2.5 m long with necessary accessories with 450mm x 50 mm thick hume pipe ring duly providing staggered holes including filling with 40 kg of hard coke and 20 kg salt providing with equal proportion of in layers etc. including cost and conveyance of all materials ,overheads & contractors profit etc., complete for finished item of work

1

-

8311.1

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Filling with carted coarse sand in play area, pathway, foundations bed and basement with initial lead in layers not exceeding 15cm thick, watering and ramming including cost and conveyance of water to work site and all operational, incidental ,labour charges, hire charges of T&P etc., and overheads & contractors profit complete for finished item of work(APSS NO.309&310)

65.25

-

22870.7

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Supply, Delivery, Installation and Commissioning of 1.5m x 2.2m size of FOUR SEATER SWING of Arihant/ Equivalent make including transportation, installation, commissioning, loading and unloading etc., for complete finished item of the work.

-

-

3883.58

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;1.Swing leg pipe : 40NB hot dip galvanized swing leg pipe of length 2300mm conforming to IS 1239 with GI thickness up to 60µ.

-

-

37822.82

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;2. Top pipe : Four Seater swing top fixed to 50NB Galvanized pipe having C Class material of length 1490mm at the center and two junction box frame at the ends to attach leg pipes.

-

-

-

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;3. Junction box : 225mmx103mm junction box made from 5mm thick GI plate to house the two swing leg pipes & top pipe.

-

-

-

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;4. Seat frame: side frame consist of Rectangular tube having 50X25X4 mm thick. 20NB bend pipe used for seat frame support. 40NB bend is used for Entry Support structure.

-

-

-

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;5. Bearing Assembly: Shaft for UCP 207 Bearing is self-lubricated made of SKF make shall be provided for smooth & trouble-free movement.

-

-

-

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;6. Pipes:- All metal pipes should be used of Heavy Duty ('C' Class) of TATA/Jindal make only with Hot Dipped Galvanized Pipes conforming to IS 1239 (Part 1) with GI thickness not less than 60micron.

-

-

-

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;7. Powder coating:- It shall be done with pure polyester raw material. Dry film thickness maintained within the range of 50-70 microns. It is tested for adhesion test (According to ASTM-D-3359) with the help of cross hatch cutter instruments.

-

-

-

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;8. Nut and Bolts:- Galvanized/ S.S./Allen Bolt/Button Head Allen Bolt & Nuts / Nylon Lock Nuts are used with PVC Bolt Caps.

-

-

-

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;9. All open ends of pipe been closed by GI caps for user safety against entrapment.

-

-

-

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;10. Certificate: ISO9001:2015

-

-

-

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;11. Color: Multicolor for optional or customized & As per RAL shade.

-

-

-

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;12. Packaging: Safety 3 layer packaging like 1st EPE Foam 2nd HDPE Film and 3rd is Stretch wrap.

-

-

-

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Cost of the Equipment

1

-

-

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Supply, Delivery, Installation and Commissioning of 6.5m x 1.5m size of FOUR SEATER ARC SWING of Arihant/ Equivalent make including transportation, installation, commissioning, loading and unloading etc., for complete finished item of the work.

-

-

-

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;1. Arc swimg frame: 6000mm long 80NB Pipe bent in Single Piece & welded together with a flange 5mm thick & ISA of 40x40x5mm to form a strong frame at bottom & middle. The 80NB pipe is hot dip galvanized pipe conforming to IS 1239 with GI thickness of 60µ. Height of the frame is 2700mm.

-

-

48500

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;2. Top pipe : 50NB Top Pipe with two Arc Swing Flanges welded at both its ends. Pipe can withstanding torsional stress created due to swinging motion. These 50NB top pipe is hot dip galvanized pipe of length 2950mm conforming to IS 1239 with GI thickness of 60µ.

-

-

-

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;3. Seat assembly : a) Swing clamp assembly: Swing clamps made up of two parts are joined together with M6 Allen bolts along with S-Hook & a specially designed swing pin.The S-Hook is specially designed to house a bearing for smooth & noiseless swinging. The clamps are made from injection molded Nylon-6 plastic. b) Chain : Rubber dip molded swing chain of dia. 6mm & 1450mm Long. c) Hook: S-Hook of dia 8mm & 145x130 Triangular hook of Grade SS 304. d) Seat: Rubber Seat made by Natural Rubber with sufficient reinforcement.

-

-

-

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;4. Bearing: Bearing is self-lubricated made of SKF/ NTN/ NACHI make shall be provided for smooth & trouble-free movement.

-

-

-

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;5. Pins and Circlips: 12mm diameter pins shall be made from EN8 material & Circlip A10.

-

-

-

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;6. Pipes:- All metal pipes should be used of Heavy Duty ('C' Class) of TATA/Jindal make only with Hot Dipped Galvanized Pipes conforming to IS 1239 (Part 1) with GI thickness not less than 60micron.

-

-

-

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;7. Powder coating:- It shall be done with pure polyester raw material. Dry film thickness maintained within the range of 50-70 microns. It is tested for adhesion test (According to ASTM-D-3359) with the help of cross hatch cutter instruments.

-

-

-

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;8. Nut and Bolts:- Galvanized/ S.S./Allen Bolt/Button Head Allen Bolt & Nuts / Nylon Lock Nuts are used with PVC Bolt Caps.

-

-

-

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;9. All open ends of pipe been closed by GI caps for user safety against entrapment.

-

-

-

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;10. Certificate: ISO9001:2015

-

-

-

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;11. Color: Multicolor for optional or customized & As per RAL shade.

-

-

-

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;12. Packaging: Safety 3 layer packaging like 1st EPE Foam 2nd HDPE Film and 3rd is Stretch wrap.

-

-

-

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Cost of the Equipment

1

-

-

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Supply, Delivery, Installation and Commissioning of Jungle Gym of Arihant/ Equivalent make including transportation, installation, commissioning, loading and unloading etc., for complete finished item of the work.

-

-

-

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;1) Main frame Structure: Main pipe 42.5mm OD support pipe hinged over with 25mm outer dia pipes .

-

-

89877

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;2. Pipes:- All metal pipes should be used of Heavy Duty ('C' Class) of TATA/Jindal make only with Hot Dipped Galvanized Pipes conforming to IS 1239 (Part 1) with GI thickness not less than 60micron.

-

-

-

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;3) Welding: Welding shall be done with robotic welded and Prior to finishing all welded joints should scalloped as necessary and welded to an approved MIG process should dressed of removing all sharp edges and burrs..

-

-

-

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;4. Powder coating:- It shall be done with pure polyester raw material. Dry film thickness maintained within the range of 50-70 microns. It is tested for adhesion test (According to ASTM-D-3359) with the help of cross hatch cutter instruments.

-

-

-

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;5. Nut and Bolts:- Galvanized/ S.S./Allen Bolt/Button Head Allen Bolt & Nuts / Nylon Lock Nuts are used with PVC Bolt Caps.

-

-

-

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;6. All open ends of pipe been closed by GI caps for user safety against entrapment.

-

-

-

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;7. Certificate: ISO9001:2015

-

-

-

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;8. Color: Multicolor for optional or customized & As per RAL shade.

-

-

-

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;9. Packaging: Safety 3 layer packaging like 1st EPE Foam 2nd HDPE Film and 3rd is Stretch wrap.

-

-

-

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Cost of the Equipment

1

-

-

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;supply, delivery and commissioning of FRP Triple Slide of Arihant / Equivalent make including transportation, installation, commissioning, loading and unloading in complete finished item of the work.

-

-

-

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;1) 3 in 1 Slide:- 3 numbers of Slide Platform is made up of Fiber Reinforced Plastic (FRP) combined in 1 model. Centre Support pipe made from 80NB Galvanized pipe. Steps and step railings consists of 20NB hot dip galvanized pipe bended to form frame to form a 3 in 1 slide joining together to GI Pipe with SS 304 graded nonrusting nut-bolts, made from Nylon Grade-6 plastic.

-

-

68000

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;2. Platform:- a. Material:-Fiber Reinforced Plastic (FRP) with anti-skid surface on top. b. Brazing Frame:- ISA 25x25x5mm or ISA40x40x5mm thick and ISF 40x5mm thick which is galvanized and then duly Powder Coated. c. Vertical Pipes:- 80NB GI pipes should be used of Heavt Duty ('C' Class) of TATA/Jindal make only with Hot Dipped Galvanized Pipes conforming to IS 1239 (Part 1) with GI thickness not less than 60micron.

-

-

-

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;3. Ladder: - The ladder is made up of with required size and thickness of L angle/ cirular pipes with necessary supporting steps and suitable railing over the platform & for ladder as per the safety norms.

-

-

-

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;4. FRP (FIBER REINFORCED PLASTIC):- All the Fiber Reinforced Plastics (FRP) materials are processed by the hand laid process which is considered to be the best of its type. International quality of Gel coats which is duly mixed with U.V stabilized pigment to give the required color to the product. Thickness of the FRP material should not less than 5 mm as per the product. The FRP material should be tested for abrasion resistance & UTS (ultimate tensile test).

-

-

-

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;5. Pipes:- All metal pipes should be used of Heavy Duty ('C' Class) of TATA/Jindal make only with Hot Dipped Galvanized Pipes conforming to IS 1239 (Part 1) with GI thickness not less than 60micron.

-

-

-

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;6. Welding: Welding shall be done with robotic welded and Prior to finishing all welded joints should scalloped as necessary and welded to an approved MIG process should dressed of removing all sharp edges and burrs..

-

-

-

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;7. Powder coating:- It shall be done with pure polyester raw material. Dry film thickness maintained within the range of 50-70 microns. It is tested for adhesion test (According to ASTM-D-3359) with the help of cross hatch cutter instruments.

-

-

-

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;8. Nut and Bolts:- Galvanized/ S.S./Allen Bolt/Button Head Allen Bolt & Nuts / Nylon Lock Nuts are used with PVC Bolt Caps.

-

-

-

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;9. All open ends of pipes been closed by GI caps for user safety against entrapment.

-

-

-

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;10. Certificate: ISO9001:2015

-

-

-

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;11. Color: Multicolor for optional or customized & As per RAL shade.

-

-

-

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;12. Packaging: Safety 3 layer packaging like 1st EPE Foam 2nd HDPE Film and 3rd is Stretch wrap.

-

-

-

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Cost of the Equipment

1

-

-

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Supply, delivery and commissioning of Butter Fly swing of Arihant / Equivalent make including transportation, installation, commissioning, loading and unloading in complete finished item of the work.

-

-

-

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;1. Structural frame: a) Main frame is made up of 80NB pipe. b) ?U? shaped frame is made up of 25NBpipe c) the handle frame is made up of 20Nb pipe d) Sitting place id made from 15NB pipe e) Both 80NB main frame pipes are joint with 25NB pipe.

-

-

121963

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;2. Pipes:- All metal pipes should be used of Heavy Duty ('C' Class) of TATA/Jindal make only with Hot Dipped Galvanized Pipes conforming to IS 1239 (Part 1) with GI thickness not less than 60micron.

-

-

-

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;3. Bearing: Bearing is self-lubricated made of SKF/NTN/ NACHI make shall be provided for smooth & trouble free movement

-

-

-

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;4. Pins & Circlips: 12mm diameter pins shall be made from EN8 material & circlip A10

-

-

-

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;5. Powder coating:- It shall be done with pure polyester raw material. Dry film thickness maintained within the range of 50-70 microns. It is tested for adhesion test (According to ASTM-D-3359) with the help of cross hatch cutter instruments.

-

-

-

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;6. Nut and Bolts:- Galvanized/ S.S./Allen Bolt/Button Head Allen Bolt & Nuts / Nylon Lock Nuts are used with PVC Bolt Caps.

-

-

-

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;7. All open ends of pipes been closed by GI caps for user safety against entrapment.

-

-

-

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;8. Certificate: ISO9001:2015

-

-

-

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;9. Color: Multicolor for optional or customized & As per RAL shade.

-

-

-

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;10. Packaging: Safety 3 layer packaging like 1st EPE Foam 2nd HDPE Film and 3rd is Stretch wrap.

-

-

-

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Cost of the Equipment

1

-

-

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Supply, delivery and commissioning of 4 No?s Seats made with FRP Fibre Seats and fitted both ends of 50 MM Dia Pipe length8 Ft with Bolts & Nuts and both fitted on Horizontal Pipe 3? length and 60 mm Dia?U? shape (rivers) with clamps with fibre Seats of Arihant / Equivalent make including transportation, installation, commissioning, loading and unloading in complete finished item of the work. Length : 2438 mm Width : 914 mm Height : 914 mm

-

-

-

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;1. Centre Main Frame Structure:- 80NB hot dip galvanized pipes conforming to IS 1239.

-

-

66480

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;2. See saws:- 2 Nos of See saws made up of 80NB GI pipe conforming to IS 1239 with proper holdings.

-

-

-

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;3. FRP Seats: - 4 nos. of FRP Seats

-

-

-

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;4. FRP (FIBER REINFORCED PLASTIC):- All the Fiber Reinforced Plastics (FRP) materials are processed by the hand laid process which is considered to be the best of its type. International quality of Gel coats which is duly mixed with U.V stabilized pigment to give the required color to the product. Thickness of the FRP material should not less than 5 mm as per the product. The FRP material should be tested for abrasion resistance & UTS (ultimate tensile test).

-

-

-

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;5. Pipes:- All metal pipes should be used of Heavy Duty ('C' Class) of TATA/Jindal make only with Hot Dipped Galvanized Pipes conforming to IS 1239 (Part 1) with GI thickness not less than 60micron.

-

-

-

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;6. Powder coating:- It shall be done with pure polyester raw material. Dry film thickness maintained within the range of 50-70 microns. It is tested for adhesion test (According to ASTM-D-3359) with the help of cross hatch cutter instruments.

-

-

-

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;7. Nut and Bolts:- Galvanized/ S.S./Allen Bolt/Button Head Allen Bolt & Nuts / Nylon Lock Nuts are used with PVC Bolt Caps.

-

-

-

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;8.Bearing: Bearing is self-lubricated made of SKF/NTN/ NACHI make shall be provided for smooth & trouble free movement

-

-

-

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;9. All open ends of pipes been closed by GI caps for user safety against entrapment.

-

-

-

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;10. Certificate: ISO9001:2015

-

-

-

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;11. Color: Multicolor for optional or customized & As per RAL shade.

-

-

-

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;12. Packaging: Safety 3 layer packaging like 1st EPE Foam 2nd HDPE Film and 3rd is Stretch wrap.

-

-

-

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Cost of the Equipment

1

-

-

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Supply, Delivery, Installation and Commissioning of 2.5m x 1.5m size of Rock cum net climber of Arihant/ Equivalent make including transportation, installation, commissioning, loading and unloading in complete finished item of the work.

-

-

-

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;1. Pad: Rock climber 7Ft. pad made from Fiber Reinforced Plastic (FRP) attached to the angular frame. The pad is provided with rock shaped part ergonomically spaced in zig-zag manner for climbing act.The rocks are bolted on same platform, with a gradient of 65 degree from the ground.

-

-

40480

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;2. Supports: Bend angular frame made from 40NB Galvanized pipe conforming to IS 1239:1979 with base plates fixed on each end and grounded for strong foundation.It has Ø12 U-hook on one side for attaching rope.It has profile plate for top support. and has plate 130x50x5 for bottom support.

-

-

-

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;3.Top pipe: It is made from 40NB top pipe of 1190mm long with Dia. 12 U-Hooks fixed on one side.

-

-

-

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;4. Rope: Rope size conforming to standards EN11761:1998 for minimum grip requirement. It is size of Ø18 of nylon.Mesh size conforming to standards EN1176-1:1998& ASTM - F1487:07a for safety against entrapment of head & neck

-

-

-

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;5. Clamp: Its is made from nylon. nylon rope attached by specially designed nylon rope clamps used which has rope integrated inside which hold it tightly and avoids breaking

-

-

-

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;6. Bottom pipe: It is made from 40NB bottom pipe of 1190mm long with Dia. 12 U-Hooks fixed on one side.

-

-

-

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;7. Rock: It is made from Fiber Reinforced Plastic (FRP).

-

-

-

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;8. Pipes:- All metal pipes should be used of Heavy Duty ('C' Class) of TATA/Jindal make only with Hot Dipped Galvanized Pipes conforming to IS 1239 (Part 1) with GI thickness not less than 60micron.

-

-

-

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;9. FRP (FIBER REINFORCED PLASTIC): All the Fiber Reinforced Plastics (FRP) materials are processed by the hand laid process which is considered to be the best of its type. International quality of Gel coats which is duly mixed with U.V stabilized pigment to give the required color to the product. Thickness of the FRP material varies from 3 mm to 5 mm as per the product. The FRP material should be tested for abrasion resistance & UTS (ultimate tensile test).

-

-

-

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;10. Powder coating:- It shall be done with pure polyester raw material. Dry film thickness maintained within the range of 50-70 microns. It is tested for adhesion test (According to ASTM-D-3359) with the help of cross hatch cutter instruments.

-

-

-

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;11. Nut and Bolts:- Galvanized/ S.S./Allen Bolt/Button Head Allen Bolt & Nuts / Nylon Lock Nuts are used with PVC Bolt Caps.

-

-

-

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;12. All open ends of pipe been closed by GI caps for user safety against entrapment.

-

-

-

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;13. Certificate: ISO9001:2015

-

-

-

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;14. Color: Multicolor for optional or customized & As per RAL shade.

-

-

-

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;15. Packaging: Safety 3 layer packaging like 1st EPE Foam 2nd HDPE Film and 3rd is Stretch wrap.

-

-

-

... More
Development of landscape (softsacpe Hardscape) works in AWA vambey house colony park (1.1 Acres) in;Cost of the Equipment

1

-

52323



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.