Andhra Pradesh Urban Greening And Beautification Corporation Limited Tender
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Andhra Pradesh Urban Greening And Beautification Corporation Limited - APUGBCL Tender
Opening Date23 Jun 2020
Closing Date7 Jul 2020
Tender Amount₹ 16,05,417
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
339579Bid Award Id
ViewTender No
APUG-15021/8/2020-TEC-SEC-APUGBC/2020-2021/1(10)Tender Authority
Andhra Pradesh Urban Greening And Beautification Corporation Limited ViewPurchaser Address
-Website
http://http://urbangreening.ap.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Hedge / shrub planting:Digging the trench of size 0.45 mtrs. depth, refilling with red garden soil including cost of red garden soil and farmyard manure at 4:1 ratio, internal transportation of plants, planting etc., including the application of fertilizers and pesticides etc.,(@ 20 gms/pit/sqmt) complete for item of work, but excluding the cost of the fertilizers (@ 20 gms/pit/sqmt) and plant material etc., - unit 1 Sqmt of work. (*10 No./Sqm of plants & bag size shall be arrived based on the spacing as per the design.) (Red garden soil in this context it is defined as sandy loamy garden soil congenial for plant growth which shall be of light textured, crystalline, porous and friable, fertile, slightly acidic or neutral) .
440.66
221440
502.52
Maintenance of hedge/shrub planting: Trimming of hedges/shrubs (once in 15 days) watering (once in a day @ 5 Lts/per sqmt/per day shall be provide to maintain sub soil moisture continuously). Edge cutting 0.30mtr. away from the edges/shrub (once in a month) and application of fertilizers, insecticides, Fungicides ( once in a month @ 20 gms/pit/sqmt) etc., by manually excluding cost of water and fertilizers for one year
440.66
126237
2387.28
Bed preparation for Ground cover / Flower beds: Digging the trench of size 150 mm. depth, and Formation of 150 mm. (6") thick of soil mixture at 3:1:1 ratio red garden soil, farmyard manure and river sand, application of fertilizers (@ 20 gms/pit/sqmt) by making smooth surface as per design including cost of soil mixture, filling of the soil mixture and internal transportation etc., for complete item of work. (excluding cost of plant material, fertilizers and chemicals (@ 20 gms / pit/ sqmt))-unit 1 Sqmt of work. (*20 No./Sqm of plants & bag size shall be arrived based on the spacing as per the design.) (Red garden soil in this context it is defined as sandy loamy garden soil congenial for plant growth which shall be of light textured, crystalline, porous and friable, fertile, slightly acidic or neutral)
386
52947
137.17
Maintenance of groundcover/flower beds: Weeding, Trimming/pinching and keeping the ground cover in healthy condition (once in a fortnight). Watering to ground cover (one's in three day's @ 5 litres/per Sqmts shall be provide to maintain sub soil moisture continuously) by manually, excluding cost of water. for one year
386
49803
1075.2
Digging of 0.75x0.75x0.75 mtrs. pit, filling with soil mixture of red garden soil, farmyard manure at 4:1 ratio including internal transport, application of fertilizers and chemicals (@ 20 gms/pit/sqmt), internal transportation of plants, planting the plants etc., for complete item of work (excluding cost of plant material, fertilizers and chemicals (@ 20 gms / pit/ sqmt) (Red garden soil in this context it is defined as sandy loamy garden soil congenial for plant growth which shall be of light textured, crystalline, porous and friable, fertile, slightly acidic or neutral)
158
75765
479.53
Maintenance of Palms/Tree planting: Trimming (once in month), watering (once in three days @ 5 Lts/per plant shall be provide to maintain sub soil moisture continuously), formation of basins 0.30m . away from the edges (once in a month) and application of fertilizers, insecticides, Fungicides @ 20 gms/pit/sqmt) (once in quarterly) by manually, but excluding cost of water & fertilizers for month for one year
158
40134
2116.8
Supply & Delivery of topiary/trees/Palms/shrubs/lawn/ ground covers and specified plants as per directions of officer in charge at site including cost of plants and conveyance of all materials and labour charges etc., plants of bag size 7" x 8" of plant height not less than 1.0 feet,
8" x 10" of plant height not less than 3.0 feet,
13" x 13" of Tree/Palm height not less than 5 feet,
13" x 13" of plant (Hedges & Shrub) height not less than 2 feet,
15" x 16" of plant (Tree/Palm/Topiary) height not less than 5 feet, 18" x 18" plant (Tree/Palm/Topiary) height not less than 6 feet, bottom dia of the stem is 0.75'' and above, 21" x 21" and above plant (Tree/Palm/Topiary) height not less than 7 feet, bottom dia of the stem is 1'' and above.
Heights mentioned above are excluding bag height.
All the plants supplied shall be with sturdy stem, well formed crown, vigorously growing tip, healthy foliage without any infestation and the plants shall be supplied after proper hardening off. The rates inclusive of loading, transportation to the site, unloading & handling.
1
-
-
For Shade grass
600
45000
75
For Korean grass
600
108000
180
For Tecoma gaudichaudi (12'' x 13'')
189
13230
70
For Calliandra haematocephala (7'' x 8'')
81
2430
30
For Cestrum nocturnum (7'' x 8'')
425
9350
22
For Tabernaemontana divariecata (5'' x 6'')
405
6075
15
For Hibiscus hybrid (8'' x 10'')
263
13150
50
For Ixora hybrid (7'' x 8'')
215
4730
22
For Plumbago capensis (7'' x 8'')
405
8910
22
For Galphimia gracilis (7'' x 8'')
911
13665
15
For Ficus panda (7'' x 8'')
1350
29700
22
For Hamelia patens (7'' x 8'')
162
2916
18
For Wadlia trilobata (5'' x 6'')
1120
11200
10
For Lantana depressa (7'' x 8'')
1260
22680
18
For Lantana sellowiana (7'' x 8'')
500
9000
18
For Verbina peronial (5'' x 6'')
460
6900
15
For Nerium oleaander dwarf (7'' x 8'')
840
18480
22
For Hamelia patens dwarf (7'' x 8'')
880
14080
16
For Rhoeo discolor (4'' x 6'')
360
5400
15
For Dianella numorosa (7'' x 8'')
540
8640
16
For Asp aragus sprengerll (5'' x 6'')
720
28800
40
For Oheopogon taburans (7'' x 8'')
1040
29120
28
For Delonix regia (25" x 25")
9
-
-
For Cassia fistula (25" x 25")
12
-
-
For Peltophorum ferrugenium (25" x 25")
7
-
-
For Mimusops elengi (25" x 25")
3
-
-
For Plumeria alba (25" x 25")
8
-
-
For Spathodea campanulata (25" x 25")
3
-
-
For Jacaranda mimosofolia (25" x 25")
5
-
-
For Erythria indica (25" x 25")
6
-
-
For Terminally catappa (25" x 25")
6
-
-
For Bamboosa goldeana (25" x 25")
51
-
-
For Ficus benjamina (25" x 25")
21
-
-
For Caryota urens (25" x 25")
4
-
-
For Washingtonia filifera (25" x 25")
4
-
-
For Dypsis decary (25" x 25")
4
-
-
For Wodeytia bifurcata (25" x 25")
2
-
-
For Cycas revoluta (25" x 25")
7
-
-
For Phoenix roebelinll (25" x 25")
6
-
-
Loading and unloading of plants bag size (25"X25") at site of work and stacking for lead less upto 50 m and including labour charges, T&P etc.,and overheads & contractors profit complete for finished item of work (excluding cost of plant bag)
158
6729
4258.86
Transportation of bag plants form Gannavaram to Eluru
13.43
6043
450
Transportation of grass form Hyderabad to Eluru (The Amount will be paid as per the actuals)
1
35000
35000
Provision for drip irrigation (The Amount will be paid as per the actuals)
1
250000
250000
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements