Andhra Pradesh Urban Greening And Beautification Corporation Limited Tender
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Andhra Pradesh Urban Greening And Beautification Corporation Limited - APUGBCL Tender
Opening Date23 Jun 2020
Closing Date7 Jul 2020
Tender Amount₹ 15,32,677
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
339586Bid Award Id
ViewTender No
APUG-15021/8/2020-TEC-SEC-APUGBC/2020-2021/1(17)Tender Authority
Andhra Pradesh Urban Greening And Beautification Corporation Limited ViewPurchaser Address
-Website
http://http://urbangreening.ap.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Maintenance of hedge/shrub planting: Trimming of hedges/shrubs (once in 15 days) watering (once in a day @ 5 Lts/per sqmt/per day shall be provide to maintain sub soil moisture continuously). Edge cutting 0.30mtr. away from the edges/shrub (once in a month) and application of fertilizers, insecticides, Fungicides ( once in a month @ 20 gms/pit/sqmt) etc., by manually excluding cost of water and fertilizers for one year
691
197953
2387.28
Bed preparation for Ground cover / Flower beds: Digging the trench of size 150 mm. depth, and Formation of 150 mm. (6") thick of soil mixture at 3:1:1 ratio red garden soil, farmyard manure and river sand, application of fertilizers (@ 20 gms/pit/sqmt) by making smooth surface as per design including cost of soil mixture, filling of the soil mixture and internal transportation etc., for complete item of work. (excluding cost of plant material, fertilizers and chemicals (@ 20 gms / pit/ sqmt))-unit 1 Sqmt of work. (*30 No./Sqm of plants & bag size shall be arrived based on the spacing as per the design.) (Red garden soil in this context it is defined as sandy loamy garden soil congenial for plant growth which shall be of light textured, crystalline, porous and friable, fertile, slightly acidic or neutral)
100
17827
178.27
Maintenance of groundcover/flower beds: Weeding, Trimming/pinching and keeping the ground cover in healthy condition (once in a fortnight). Watering to ground cover (one's in three day's @ 5 litres/per Sqmts shall be provide to maintain sub soil moisture continuously) by manually, excluding cost of water. for one year
100
12902
1075.2
Digging of 0.75x0.75x0.75 mtrs. pit, filling with soil mixture of red garden soil, farmyard manure at 4:1 ratio including internal transport, application of fertilizers and chemicals (@ 20 gms/pit/sqmt), internal transportation of plants, planting the plants etc., for complete item of work (excluding cost of plant material, fertilizers and chemicals (@ 20 gms / pit/ sqmt) (Red garden soil in this context it is defined as sandy loamy garden soil congenial for plant growth which shall be of light textured, crystalline, porous and friable, fertile, slightly acidic or neutral)
100
63720
637.2
Maintenance of Palms/Tree planting: Trimming (once in month), watering (once in three days @ 5 Lts/per plant shall be provide to maintain sub soil moisture continuously), formation of basins 0.30m . away from the edges (once in a month) and application of fertilizers, insecticides, Fungicides @ 20 gms/pit/sqmt) (once in quarterly) by manually, but excluding cost of water & fertilizers for month for one year
100
25401
2116.8
Supply & Delivery of topiary/trees/Palms/shrubs/lawn/ ground covers and specified plants as per directions of officer in charge at site including cost of plants and conveyance of all materials and labour charges etc., plants of bag size 7" x 8" of plant height not less than 1.0 feet,
8" x 10" of plant height not less than 3.0 feet,
13" x 13" of Tree/Palm height not less than 5 feet,
13" x 13" of plant (Hedges & Shrub) height not less than 2 feet,
15" x 16" of plant (Tree/Palm/Topiary) height not less than 5 feet, 18" x 18" plant (Tree/Palm/Topiary) height not less than 6 feet, bottom dia of the stem is 0.75'' and above, 21" x 21" and above plant (Tree/Palm/Topiary) height not less than 7 feet, bottom dia of the stem is 1'' and above.
Heights mentioned above are excluding bag height.
All the plants supplied shall be with sturdy stem, well formed crown, vigorously growing tip, healthy foliage without any infestation and the plants shall be supplied after proper hardening off. The rates inclusive of loading, transportation to the site, unloading & handling.
1
-
-
For paspalum grass
740
55500
75
For Acalypha hispida 5"x6"
190
2850
15
For Bahunia galpinii 7"x8"
360
16200
45
For Bahunia acuminata 7"x8"
120
6000
50
For Brugmansai suaveolenas white 7"x8"
100
4500
45
For Caesalpinia Pulcherimma orange 7"x8"
330
8250
25
For Caesalpinia Pulcherimma goldcrest 8"x10"
100
4500
45
For Calliandra portoricensis white 7"x8"
130
4550
35
For Crinum amabile 13"x13"
310
62000
200
For Canna Variegated 7"x8"
350
9800
28
For Canna Variegated 7"x8"
130
3640
28
For Crinum asiaticum 7"x8"
240
10800
45
For Codaeium crispum 7"x8"
260
7800
30
For Euphorbia pulcherimma flamming 8"x10"
70
2800
40
For Ficus Starlight 7"x8"
210
10500
50
For Hibiscus sabdariffa 8"x10"
190
9500
50
For Hibiscus Lafrance assorted 7"x8"
150
5250
35
For Hymenocallis variegata 7"x8"
250
5500
22
For Ixora coccinea new pink 7"x8"
70
2100
30
For lagesstroemia indica white 7"x8"
90
4050
45
For Leucophyllum frutescenes 7"x8"
100
2200
22
For Lantana sellowiana white 7"x8"
80
1440
18
For Nerium oleander pink 7"x8"
170
3740
22
For Meyenia erecta 7"x8"
30
660
22
For Pennisetum ruppelii green 7"x8"
250
11250
45
For Murrya Paniculata 7"x8"
90
2250
25
For Plumbago capensis 7"x8"
510
11220
22
For Pisonia alba 7"x8"
70
2450
35
For Pandanus baptistii variegated 7"x8"
210
6300
30
For Ravenia spectabilis 7"x8"
160
3200
20
For Ruellia brittoniana katie white -per piece
220
2200
10
For Scheffiera arboricola variegated 7"x8"
480
21600
45
For Tecoma stans 8"x10"
210
8400
40
For Tecoma rosea 7"x8"
140
4900
35
For Taberba montana divaricata 5"x6"
300
4500
15
For Tecoma gaudichaudi 113"x13"
240
16800
70
For Wedelia Trilobata 25"x25"
3000
30000
10
For Anthocephalus cadamba 25"x25"
10
-
-
For Delonix regia 25"x25"
8
-
-
For Melia azadirachta 25"x25"
5
-
-
For Millingtonia hortensis 25"x25"
8
-
-
For Pterospermum acerfolium 25"x25"
9
-
-
For Pterocarpus indicus 25"x25"
6
-
-
For Peltophorum pterocarpum 25"x25"
7
-
-
For Lagestroemia thorelli 25"x25"
10
-
-
For plumeria alba 25"x25"
6
-
-
For samanea saman 25"x25"
6
-
-
For Spathodea campanulata 25"x25"
7
-
-
For Syzygium cumini 25"x25"
5
-
-
For Terminalia catappa 25"x25"
13
-
-
Loading and unloading of plants bag size (25"X25") at site of work and stacking for lead less upto 50 m and including labour charges, T&P etc.,and overheads & contractors profit complete for finished item of work (excluding cost of plant bag)
100
4088
4088.5
Transportation of bag plants form Gannavaram to Hindupur (Based on the bill submitted)
1
15000
15000
Transportation of bag plants form Hyderabad to Hindupur (Based on the bill submitted)
1
5000
5000
Irrigation facilities - Actual payment will paid for the actual work done subjected to approval of the rates by the competent authority
1
130000
130000
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements