Andhra Pradesh Urban Greening And Beautification Corporation Limited Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Andhra Pradesh Urban Greening And Beautification Corporation Limited - APUGBCL Tender

Civil And Construction
Coronavirus COVID 19
Opening Date6 Dec 2019
Closing Date13 Dec 2019
Tender Amount₹ 57,42,866 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Hedge / shrub planting: Digging the trench of size 0.3 mtrs. depth, refilling with red garden soil including cost of red garden soil and farmyard manure at 4:1 ratio, internal transportation of plants, planting etc., including the application of fertilizers and pesticides etc., (@ 20 gms/pit/sqmt) complete for item of work, but excluding the cost of the fertilizers (@ 20 gms/pit/sqmt) and plant material etc., - unit 1 Sqmt of work. (*10 No./Sqm of plants & bag size shall be arrived based on the spacing as per the design.) (Red garden soil in this context it is defined as sandy loamy garden soil congenial for plant growth which shall be of light textured, crystalline, porous and friable, fertile, slightly acidic or neutral)

1120

-

447.45

... More
Maintenance of hedge/shrub planting: Trimming of hedges/shrubs (once in 15 days) watering (once in a day @ 5 Lts/per sqmt/per day shall be provide to maintain sub soil moisture continuously). Edge cutting 0.30mtr. away from the edges/shrub (once in a month) and application of fertilizers, insecticides, Fungicides ( once in a month @ 20 gms/pit/sqmt) etc., by manually excluding cost of water and fertilizers ( 2 years maintenance )

1120

-

2387.28

... More
Digging of 0.45x0.45x0.45 mtrs. pit, filling with soil mixture of red garden soil, farmyard manure at 4:1 ratio including internal transport, application of fertilizers and chemicals (@ 20 gms/pit/sqmt), internal transportation of plants, planting the plants etc., for complete item of work (excluding cost of plant material, fertilizers and chemicals (@ 20 gms / pit/ sqmt)) (Red garden soil in this context it is defined as sandy loamy garden soil congenial for plant growth which shall be of light textured, crystalline, porous and friable, fertile, slightly acidic or neutral)

200

-

134.03

... More
Digging of 0.6x0.6x0.6 mtrs. pit, filling with soil mixture of red garden soil, farmyard manure at 4:1 ratio including internal transport, application of fertilizers and chemicals (@ 20 gms/pit/sqmt), internal transportation of plants, planting the plants etc., for complete item of work (excluding cost of plant material, fertilizers and chemicals (@ 20 gms / pit/ sqmt)) (Red garden soil in this context it is defined as sandy loamy garden soil congenial for plant growth which shall be of light textured, crystalline, porous and friable, fertile, slightly acidic or neutral)

62

-

296.89

... More
Digging of 0.75x0.75x0.75 mtrs. pit, filling with soil mixture of red garden soil, farmyard manure at 4:1 ratio including internal transport, application of fertilizers and chemicals (@ 20 gms/pit/sqmt), internal transportation of plants, planting the plants etc., for complete item of work (excluding cost of plant material, fertilizers and chemicals (@ 20 gms / pit/ sqmt) (Red garden soil in this context it is defined as sandy loamy garden soil congenial for plant growth which shall be of light textured, crystalline, porous and friable, fertile, slightly acidic or neutral)

53

-

581.05

... More
Maintenance of Palms/Tree planting: Trimming (once in month), watering (once in three days @ 5 Lts/per plant shall be provide to maintain sub soil moisture continuously), formation of basins 0.30m . away from the edges (once in a month) and application of fertilizers, insecticides, Fungicides @ 20 gms/pit/sqmt) (once in quarterly) by manually, but excluding cost of water & fertilizers for month (2 years Maintenance)

315

-

2116.8

... More
Supply & Delivery of topiary/trees/Palms/shrubs/lawn/ ground covers and specified plants as per directions of officer in charge at site including cost of plants and conveyance of all materials and labour charges etc., plants of bag size 7" x 8" of plant height not less than 1.0 feet, 8" x 10" of plant height not less than 3.0 feet, 13" x 13" of Tree/Palm height not less than 5 feet, 13" x 13" of plant (Hedges & Shrub) height not less than 2 feet, 15" x 16" of plant (Tree/Palm/Topiary) height not less than 5 feet, 18" x 18" plant (Tree/Palm/Topiary) height not less than 6 feet, bottom dia of the stem is 0.75'' and above, 21" x 21" and above plant (Tree/Palm/Topiary) height not less than 7 feet, bottom dia of the stem is 1'' and above. Heights mentioned above are excluding bag height. All the plants supplied shall be with sturdy stem, well formed crown, vigorously growing tip, healthy foliage without any infestation and the plants shall be supplied after proper hardening off. The rates inclusive of loading, transportation to the site, unloading & handling.

1

-

-

... More
For paspalum grass

500

-

75

... More
For Korean grass

400

-

180

... More
Durantha

1600

-

40

... More
Bougainvillea

1600

-

40

... More
Plumbago

1600

-

40

... More
Tecomaria capensis

1600

-

40

... More
Ixora

1600

-

40

... More
Hamelia patens

1600

-

40

... More
Acalypha rosea red

1600

-

40

... More
Tabebuia rosea

10

-

450

... More
Spathodea campanulata

10

-

450

... More
Peltophorum pterocarpum

20

-

450

... More
Bauhinia blakeana

10

-

450

... More
Sterculia foetida

12

-

450

... More
Ficus religiosa

26

-

350

... More
Ficus panda

27

-

350

... More
For Miyawaki plantation

200

-

200

... More
Loading and unloading of plants bag at site of work and stacking for lead less upto 50 m and including labour charges, T&P etc.,and overheads & contractors profit complete for finished item of work (excluding cost of plant bag)

1

-

-

... More
Topiary/trees/Palms/shrubs/lawn/ ground covers

62

-

4088.5

... More
Topiary/trees/Palms/shrubs/lawn/ ground covers

53

-

2456.54

... More
Topiary/trees/Palms/shrubs/lawn/ ground covers

200

-

916.19

... More
Topiary/trees/Palms/shrubs/lawn/ ground covers

11200

-

72.07

... More
Transportation of bag plants

1

-

-

... More
Transportation of bag plants form Gannavaram to Pulivendula

56.72

-

1223

... More
Transportation of bag plants form Hyderabad to idupulapaya

13

-

1595

... More
Earth work excavation for foundations (Manual Means) of buildings, septic tank, sump, compound wall in ordinary soils and depositing on bank with an initial lead of 10m and depth up to 3m including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete for finished item of work excluding dewatering charges etc., as per SS 20 B(APSS 308)

233.62

-

208.43

... More
Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using 162.0 kgs of cement, coarse aggregate 40mm size hard , machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including sales & other taxes on all materials and including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc., and overheads & contractors profit complete for finished item of work. (APSS No. 402)

82.59

-

3699.69

... More
Supply and fixing of C.C. Kerb not less than M30 strength of size 450 X 450 X 110 mm thick with bottom thickness of 110 mm up to height of 380 mm and top width of 50 mm thick chamfering with 45° at starts at 380 mm height to 450 mm height as selected by the Engineer-in-charge from approved source/ factory which is laid on existing CC Bed in position to the required line, level and curvature jointed with cement mortar 1:3 (1 cement : 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5 mm), including making drainage opening wherever required and including cost and conveyance of all materials & labour charges including transportation from approved source, loading & unloading charges including contractor profit & overhead charges complete for finished item of work.

915

-

594.91

... More
Supply and fixing of Kadapa slab (rough) 50mm thick and size of 0.457x0.457m stone edging including excavating trench in ordinary soil, laying P.C.C (1:4:8) 100 mm thick and fixing the stone in alignment and refilling the excavated soil conveyance of all materials and labour charges including transportation complete for finished item of work

400

-

130.52

... More
Supply & Fixing Sadarhalli granite stone with 5 line dressing Double Patti of 5' length seating benches with back rest and its width 16'' with 4" thick and 18" height with 4" thick and leg size 4'' width, including cost and conveyance of all materials like granite benche, cement, sand to work site loading ,un loading transport and all operational, incidental labour & lift charges, and all other taxes on all materials, cost of base coat and overheads & contractors profit complete for finished item.

8

-

12500

... More
Filling with carted gravel in pathways, trenches, sides of foundations and basement with initial lead in layers not exceeding 15cm thick, watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T&P etc., and overheads & contractors profit complete for finished item of work(APSS NO.309&310)

393.74

-

278.32

... More
Flooring with Rough black Kadapa slabs minimum of 50 mm thick of size 0.457m x 0.457m set over base coat of cement mortar (1 : 8) 12 mm thick over CC bed already laid or RCC roof slab, including pointing with cement mortar 1:3 duly filling joints nearly, including cost of all materials like flooring stone, cement, sand, and water etc., complete, including labour charges for dressing of flooring stones etc., complete for finished item of work,. (APSS No.703 & 701)

249.9

-

562.31

... More
Flooring with 16 to 18mm thick high polished / Flame Finished / leather finished granite stone slabs other than black and regular colours (i.e. of shades like paradise / bala flower / copper silk / laka red / lavender blue) with borders and design as per the pattern approved by the Engineer-in-Charge of length not less than 2.43 mts set over base coat of cement mortar (1:8) , 20mm thick using screened sand over CC bed already laid or RCC roof slab including neat grey cement slurry of honey like consistency spread @ 3.3 Kg per sqm and jointed neatly with white cement paste mixed with pigment of matching shade to full depth including cost and conveyance of all materials like cement , sand , water , granite slabs etc., to work site and all operational, incidental labour & lift charges, polishing charges and all other taxes on all materials, cost of base coat and overheads & contractors profit complete for finished item of work (S.S.701 & special)

86

-

3626.59

... More
Filling with dust in pathways with initial lead in layers not exceeding 15cm thick, watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T&P etc., and overheads & contractors profit complete for finished item of work(APSS NO.309&310)

42

-

764.52

... More
Supply of precast concrete blocks for paving of M-30 grade and thickness not less than 50 mm for Non- traffic areas conforming to IS 15658:2006 in all shapes and designs as per the manufacturer's specification set over the 50 mm thick sand bed with hand roller compaction with joint neatly in homogeneous or heterogeneous pattern as the colour and pattern shall be as per the drawings furnished by the architect, including cost of all materials like cement, sand water and tiles etc., complete for finished item of work

420

-

587.76

... More
Supply and placing of the V.R.C.C Nominal Mix Concrete M 20 grade corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete using CONCRETE MIXER with 20mm size HBG graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry and including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water, etc., to site and sales & other taxes on all materials , centring using Steel scaffolding pipes , jack props , Waller’s , Foot plates , brackets , steel centring plates etc., including all operational, incidental and labour charges such as machine mixing, laying concrete, vibrator, , curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)

13.399999999999999

-

10274.22

... More
Providing High Yield Strength Deformed (HYSD) / Thermo Mechanically Treated (TMT) (Fe 500 / Fe 500D grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc. ,and overheads & contractors profit complete for finished item of work.( APSS No.126)

1219.1999999999998

-

57.52

... More
Masonry work in CM(1:6) prop (Cement : Screened sand) in superstructure with fly ash cement / lime solid blocks of size 290mm x 225mm x 140mm from approved source having minimum crushing strength of 50 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including sales & other taxes on all materials and such as labour charges, like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, overheads and contractor profit etc., complete for finished item of work. (APSS No. 501 & 504).

45.18

-

5781.85

... More
Plastering 12mm thick single coat in CM(1:5) using screened sand including cost and conveyance of all materials like cement, sand, water etc., to site, including sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work.(SS 901,903 & 904)

82

-

295.4

... More
Plastering 12mm thick in two coats using screened sand with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer - in - charge etc., and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904)

70.52

-

396.94

... More
Providing 0.45m wide Coping with Polished black Kadapa slabs minimum of 25 mm to 30 mm thick in single piece as specified set over a base coat of CM (1:5) , 12mm thick using screened sand over already laid CC bed / RCC roof slab including neat cement slurry of honey like consistency spread @ 3.3 Kgs per Sqm and jointed with neat cement to full depth including cost and conveyance of all materials like cement, sand, water, flooring stones etc. complete including sales & other taxes on all materials including all labour charges like dressing of flooring stones to the required size, flat nosing the edges, mixing of cement mortar, laying, lift charges , cost of base coat, water charges etc., and overheads & contractors profit complete for finished item of work (APSS No.703 & 701)

106.05000000000001

-

718.27

... More
Supply & application of one coat water based cement primer of exterior grade II and two coats of acrylic exterior emulsion paint having VOC (Volatile Organic Compound) content less than 50 grams/litre for exterior walls including cost and conveyance of all materials to site, sales & other taxes, incidental, operational and all labour charges etc., and overheads & contractors profit complete for finished item of work in all floors.

66.22

-

218.45

... More
Vibrated Plain Cement Concrete M 20 Nominal mix using Concrete MIXER, 20mm size hard granite machine crushed graded metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concrete , including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site including steel centring, shuttering, machine mixing, lift charges, laying concrete, vibrating, curing, overheads & contractors profit etc., complete for finished item of work (APSS No. 402 & 403)

3.9

-

5825.16

... More
Supply and fabrication of MS framed structure like Window Grills, Compound Wall Grills, Iron Doors, Windows, Gates, MS Frame for chain link mesh works, Roof Trusses by using square / rectangular MS hollow section as per IS 4923 & Angles as per SP:6(1) IS Hand book, including cost of welding rods, power charges, labour charges for cutting, placing, welding and erecting in position and fixing, cost & convenience of all materials including wastage to site with all taxes and duties etc complete for finished item of work

2223.36

-

88.68

... More
Painting to new iron work with one coat of Red oxide primer and two coats with synthetic enamel paint Grade-I VOC (Volatile Organic Compound) content less than 50 grams/litre over primer coat of red oxid, including cost and conveyance of all materials like Red oxide primer ,Synthetic Enamel Paint to site, sales & other taxes, incidental, operational and all labour charges etc., and overheads & contractors profit complete for finished item of work in all floors. (SS No. 1201, 1212 & 1207).

71.98

-

163.96

... More
Filling with carted coarse sand in with initial lead in layers not exceeding 15cm thick, watering and ramming including cost and conveyance of water to work site and all operational, incidental ,labour charges, hire charges of T&P etc., and overheads & contractors profit complete for finished item of work(APSS NO.309&310)

45.36

-

501.16

... More
Supply and placing of the V.R.C.C Nominal Mix Concrete M 20 grade corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete using CONCRETE MIXER with 20mm size HBG graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry and including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water, etc., to site and sales & other taxes on all materials , centring using Steel scaffolding pipes , jack props , Waller’s , Foot plates , brackets , steel centring plates etc., including all operational, incidental and labour charges such as machine mixing, laying concrete, vibrator, , curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)

3.6

-

8362.77

... More
Supply and fixing of cement bonded board 8 mm thick and laying as per the pattern approved by the Engineer-in-Charge on purlins, rafters, trusses, including cost and conveyance of all materials like approved cement bonded board, nails, labour charges, scaffolding, lift charges, overheads and contractors profit etc., complete for finished item of work in all floors. excluding the cost of purlins, rafters, trusses.

60

-

750.4

... More
Providing and laying of best tiled roofing with pressed clay (Mangalore tiles) size 225 x 150 x 20 mm thick and laying as per the pattern approved by the Engineer-in-Charge on roofs jointed with cement mortar 1:4 (1 cement : 4 coarse sand) mixed with 2% integral water proofing compound, laid over a bed of 20 mm thick cement mortar 1:4 (1 cement : 4 coarse sand) including Rabbit wire mesh (Chicken mesh) of not less than 30 gauge and jointed neatly with white cement paste to full depth mixed with pigment of matching shade at required place including cost and conveyance of all materials like cement, sand, water, tiles, Rabbit wire mesh, white cement, wastage etc., to site including cost of all labour charges for mixing of cement mortar, scaffolding, lift charges, laying tiles to required slope as directed by the Engineer- in-charge , curing etc., and overheads & contractors profit complete for finished item of work.

67.7

-

1570.12

... More
Random Rubble stone masonry in CM (1:8) prop: (Cement: Screened sand) using hard granite stones carted from approved quarry including cost and conveyance of all materials like cement, screened sand, water,Rough stone Through stone, Coursed stones etc., from approved quarry, to site, including labour charges for cutting stones to required size and shape, mixing, of cement, mortar, construction, curing, charges for scaffolding etc., and overheads & contractors profit complete for finished item of work. (APSS No. 601 & 615)

34.14

-

3141.64

... More
Filling with useful available excavated earth (excluding rock) with a lead of 50 m in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cm thick, watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T&P etc., and overheads & contractors profit complete for finished item of work (APSS NO.309&310)

44.77

-

29.88

... More
Flooring with Rough Shahabad / Tandur stone slabs of 40 mm thick set over base coat of cement mortar (1 : 8) 12 mm thick over CC bed already laid or RCC roof slab, including pointing with cement mortar 1:3 duly filling joints nearly, including cost of all materials like flooring stone, cement, sand, and water etc., complete, including labour charges for dressing of flooring stones etc., complete for finished item of work,. (APSS No.703 & 701)

44.89

-

562.31

... More
Providing Treads with 16 to 18mm thick high polished / Flame Finished / leather finished granite stone slabs other than black and regular colour granite with borders and design as per the pattern approved by the Engineer-in-Charge of length not less than 2.43 mts set over base coat of cement mortar (1:5) , 12mm thick using screened sand over CC bed already laid or RCC roof slab including neat grey cement slurry of honey like consistency spread @ 3.3 Kg per sqm and jointed neatly with white cement paste mixed with pigment of matching shade to full depth including cost and conveyance of all materials like cement , sand , water , granite slabs etc., to work site and all operational, incidental labour & lift charges, half rounding the edges of treads , polishing charges and all other taxes on all materials, cost of base coat and overheads & contractors profit complete for finished item of work for Treads (S.S.701 & special)

1.8

-

3687.3

... More
Providing Risers to steps walls with 16 to 18mm thick high polished / Flame Finished / leather finished granite stone slabs other than black and regular colour granite with length equal to flooring stone, set over base coat of CM(1:5) 12 mm thick using screened sand with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointing with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., and overheads & contractors profit complete for finished item of work. for Risers-0.15 m(APSS No.701 &707)

1.35

-

3754.43

... More
supply, delivery and commissioning of FRP Deluxe Wave Slide of 7 feet height, 10' length and 20'' width of Arihant / Equivalent make including transportation, installation, commissioning, IGST, loading and unloading in complete finished item of the work. 1. Arc swimg frame: 6000mm long 80NB Pipe bent in Single Piece & welded together with a flange 5mm thick & ISA of 40x40x5mm to form a strong frame at bottom & middle. The 80NB pipe is hot dip galvanized pipe conforming to IS 1239 with GI thickness of 60µ. Height of the frame is 2700mm. 2. Top pipe : 50NB Top Pipe with two Arc Swing Flanges welded at both its ends. Pipe can withstanding torsional stress created due to swinging motion. These 50NB top pipe is hot dip galvanized pipe of length 2950mm conforming to IS 1239 with GI thickness of 60µ.

1

-

65000

... More
3. Seat assembly : a) Swing clamp assembly: Swing clamps made up of two parts are joined together with M6 Allen bolts along with S-Hook & a specially designed swing pin.The S-Hook is specially designed to house a bearing for smooth & noiseless swinging. The clamps are made from injection molded Nylon-6 plastic. b) Chain : Rubber dip molded swing chain of dia. 6mm & 1450mm Long. c) Hook: S-Hook of dia 8mm & 145x130 Triangular hook of Grade SS 304. d) Seat: Rubber Seat made by Natural Rubber with sufficient reinforcement.

-

-

-

... More
4. Bearing: Bearing is self-lubricated made of SKF/ NTN/ NACHI make shall be provided for smooth & trouble-free movement. 5. Pins and Circlips: 12mm diameter pins shall be made from EN8 material & Circlip A10. 6. Pipes:- All metal pipes should be used of Heavy Duty ('C' Class) of TATA/Jindal make only with Hot Dipped Galvanized Pipes conforming to IS 1239 (Part 1) with GI thickness not less than 60micron.

-

-

-

... More
7. Powder coating:- It shall be done with pure polyester raw material. Dry film thickness maintained within the range of 50-70 microns. It is tested for adhesion test (According to ASTM-D-3359) with the help of cross hatch cutter instruments. 8. Nut and Bolts:- Galvanized/ S.S./Allen Bolt/Button Head Allen Bolt & Nuts / Nylon Lock Nuts are used with PVC Bolt Caps. 9. All open ends of pipe been closed by GI caps for user safety against entrapment.

-

-

-

... More
10. Certificate: ISO9001:2015 11. Color: Multicolor for optional or customized & As per RAL shade. 12. Packaging: Safety 3 layer packaging like 1st EPE Foam 2nd HDPE Film and 3rd is Stretch wrap.

-

-

-

... More
Supply, delivery and commissioning of 6.5m x 1.5m size of FOUR SEATER ARC SWING of Arihant / Equivalent make including transportation, installation, commissioning, IGST, loading and unloading in complete finished item of the work. 1. Arc swimg frame: 6000mm long 80NB Pipe bent in Single Piece & welded together with a flange 5mm thick & ISA of 40x40x5mm to form a strong frame at bottom & middle. The 80NB pipe is hot dip galvanized pipe conforming to IS 1239 with GI thickness of 60µ. Height of the frame is 2700mm. 2. Top pipe : 50NB Top Pipe with two Arc Swing Flanges welded at both its ends. Pipe can withstanding torsional stress created due to swinging motion. These 50NB top pipe is hot dip galvanized pipe of length 2950mm conforming to IS 1239 with GI thickness of 60µ.

1

-

69000

... More
3. Seat assembly : a) Swing clamp assembly: Swing clamps made up of two parts are joined together with M6 Allen bolts along with S-Hook & a specially designed swing pin.The S-Hook is specially designed to house a bearing for smooth & noiseless swinging. The clamps are made from injection molded Nylon-6 plastic. b) Chain : Rubber dip molded swing chain of dia. 6mm & 1450mm Long. c) Hook: S-Hook of dia 8mm & 145x130 Triangular hook of Grade SS 304. d) Seat: Rubber Seat made by Natural Rubber with sufficient reinforcement.

-

-

-

... More
4. Bearing: Bearing is self-lubricated made of SKF/ NTN/ NACHI make shall be provided for smooth & trouble-free movement. 5. Pins and Circlips: 12mm diameter pins shall be made from EN8 material & Circlip A10. 6. Pipes:- All metal pipes should be used of Heavy Duty ('C' Class) of TATA/Jindal make only with Hot Dipped Galvanized Pipes conforming to IS 1239 (Part 1) with GI thickness not less than 60micron.

-

-

-

... More
7. Powder coating:- It shall be done with pure polyester raw material. Dry film thickness maintained within the range of 50-70 microns. It is tested for adhesion test (According to ASTM-D-3359) with the help of cross hatch cutter instruments. 8. Nut and Bolts:- Galvanized/ S.S./Allen Bolt/Button Head Allen Bolt & Nuts / Nylon Lock Nuts are used with PVC Bolt Caps. 9. All open ends of pipe been closed by GI caps for user safety against entrapment.

-

-

-

... More
10. Certificate: ISO9001:2015 11. Color: Multicolor for optional or customized & As per RAL shade. 12. Packaging: Safety 3 layer packaging like 1st EPE Foam 2nd HDPE Film and 3rd is Stretch wrap.

-

-

-

... More
Supply, delivery and commissioning of Four seated See Saw of 8 feet length, 4' width and 1'6'' hieght of Arihant / Equivalent make including transportation, installation, commissioning, IGST, loading and unloading in complete finished item of the work. 1. Centre Main Frame Structure:- 80NB hot dip galvanized pipes conforming to IS 1239. 2. See saws:- 2 Nos of See saws made up of 80NB GI pipe conforming to IS 1239 with proper holdings. 3. FRP Seats: - 4 nos. of FRP Seats

1

-

36000

... More
4. FRP (FIBER REINFORCED PLASTIC):- All the Fiber Reinforced Plastics (FRP) materials are processed by the hand laid process which is considered to be the best of its type. International quality of Gel coats which is duly mixed with U.V stabilized pigment to give the required color to the product. Thickness of the FRP material should not less than 5 mm as per the product. The FRP material should be tested for abrasion resistance & UTS (ultimate tensile test). 5. Pipes:- All metal pipes should be used of Heavy Duty ('C' Class) of TATA/Jindal make only with Hot Dipped Galvanized Pipes conforming to IS 1239 (Part 1) with GI thickness not less than 60micron.

1

-

-

... More
6. Powder coating:- It shall be done with pure polyester raw material. Dry film thickness maintained within the range of 50-70 microns. It is tested for adhesion test (According to ASTM-D-3359) with the help of cross hatch cutter instruments. 7. Nut and Bolts:- Galvanized/ S.S./Allen Bolt/Button Head Allen Bolt & Nuts / Nylon Lock Nuts are used with PVC Bolt Caps. 8. All open ends of pipe been closed by GI caps for user safety against entrapment.

1

-

-

... More
9. Certificate: ISO9001:2015 10. Color: Multicolor for optional or customized & As per RAL shade. 11. Packaging: Safety 3 layer packaging like 1st EPE Foam 2nd HDPE Film and 3rd is Stretch wrap.

1

-

-

... More
Supply, delivery and commissioning of 6' length, 6' width and 8' height of SELF JULA with 4inch square box section made up of MS 'C' class of 6.00 mm thickness material of TATA/JINDAL make for main frame and for cross supports for jointing main frame and horizontal at top and 50mm dia of MS C Class of 4.50mm thickness pipes of TATA/JINDAL make for other supporting structures for hanging jhula with the help of specially designed ISI certified bearings and providing seats with suitable material with seating capacity of 6 to 8 persons at a time and two coats of Anti-Corrosive primer & two coats Auto-motive spray paint of approved make as a matt finishing as directed by the engineer in-charge including transportation, installation, commissioning, loading and un loading etc., complete with all bolts and nuts for finished item of the work excluding cost of civil works.

1

-

110000

... More
Supply, delivery and commissioning of 10' length, 8' width and 8' height of MULTIPLE SPECIAL SWINGS with 4inch square box section made up of MS 'C' class of 6.00 mm thickness material of TATA/JINDAL make for main frame and 6” C - channel fabricated as square box for crass bar and 50mm dia of MS C Class of 4.50mm thickness pipes of TATA/JINDAL make for hanging 3 nos of swings with the help of specially designed ISI certified bearings and providing seats with suitable material with seating capacity of 2 persons in each swing and two coats of Anti-Corrosive primer & two coats Auto-motive spray paint of approved make as a matt finishing as directed by the engineer in-charge including transportation, installation, commissioning, loading and un loading etc., complete for finished item of the work excluding cost of civil works.

1

-

105000

... More
Supply, delivery and commissioning of 5' length, 6' width and 6' height of BUTTER FLY with main pipes of 80mm NB and other 32mm NB pipes of MS C Class TATA/JINDAL make with the help of specially designed ISI certified bearings and providing seats with suitable material and two coats of Anti-Corrosive primer & two coats Auto-motive spray paint of approved make as a matt finishing as directed by the engineer in-charge including transportation, installation, commissioning, loading and un loading etc., complete for finished item of the work excluding cost of civil works.

1

-

27000

... More
provision for electrification facilities

1

-

200000

... More
provision for irrigation facilities

1

-

100000



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.