Andhra Pradesh Urban Greening And Beautification Corporation Limited Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Andhra Pradesh Urban Greening And Beautification Corporation Limited - APUGBCL Tender

Agriculture or Forestry Works
Opening Date8 Apr 2022
Closing Date25 Apr 2022
Tender Amount₹ 1,23,86,957 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Maintenance of lawns: watering to the lawn once in 2 days @ 10 to 15 ltrs /per Sqmt basing on season and weather conditions (15 watering is required in a month to maintain sub-soil moisture continuously), excluding cost of water including all operational, incidental ,labour charges for complete of work..

7080

-

26019

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Hedge / shrub planting: Digging the trench of size 0.3 mtrs. depth, refilling with red garden soil including cost of red garden soil and farmyard manure at 4:1 ratio, internal transportation of plants, planting etc., including the application of fertilizers and pesticides etc., (@ 20 gms/pit/sqmt) complete for item of work, but excluding the cost of the fertilizers (@ 20 gms/pit/sqmt) and plant material etc., - unit 1 Sqmt of work. (* 11 No./Sqm of plants & bag size shall be arrived based on the spacing as per the design.) (Red garden soil in this context it is defined as sandy loamy garden soil congenial for plant growth which shall be of light

639

-

295575.84

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Hedge / shrub planting:Digging the trench of size 0.45 mtrs. depth, refilling with red garden soil including cost of red garden soil and farmyard manure at 4:1 ratio, internal transportation of plants, planting etc., including the application of fertilizers and pesticides etc.,(@ 20 gms/pit/sqmt) complete for item of work, but excluding the cost of the fertilizers (@ 20 gms/pit/sqmt) and plant material etc., - unit 1 Sqmt of work. (* 5 No./Sqm of plants & bag size shall be arrived based on the spacing as per the design.) (Red garden soil in this context it is defined as sandy loamy garden soil congenial for plant growth which shall be of light

371

-

251541.71

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Maintenance of hedge/shrub planting: Trimming of hedges/shrubs (once in a month) it including all operational, incidental ,labour charges for complete of work.

12120

-

53449.2

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Maintenance of hedge/shrub planting: Edge cutting 0.30mtr. away from the edges/shrub (once in a month) and application of fertilizers, insecticides, Fungicides (once in a month @ 20 gms/pit/sqmt) etc., by manually excluding cost of fertilizers it including all operational, incidental ,labour charges, for complete of work.

12120

-

52498.99

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Maintenance of hedge/shrub planting: watering once in 2 days @ 5 Lts/per sqmt shall be provide to maintain sub soil moisture continuously by manually excluding cost of wateri ncluding all operational, incidental ,labour charges for complete of work..

12120

-

89082

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Bed preparation for Ground cover / Flower beds: Digging the trench of size 150 mm. depth, and Formation of 150 mm. (6") thick of soil mixture at 3:1:1 ratio red garden soil, farmyard manure and river sand, application of fertilizers (@ 20 gms/pit/sqmt) by making smooth surface as per design including cost of soil mixture, filling of the soil mixture and internal transportation etc., for complete item of work. (excluding cost of plant material, fertilizers and chemicals (@ 20 gms / pit/ sqmt))-unit 1 Sqmt of work. (* 25 No./Sqm of plants & bag size shall be arrived based on the spacing as per the design.) (Red garden soil in this context it is defined as sandy loamy garden soil congenial for plant growth which shall be of light textured, crystalline, porous and friable, fertile, slightly acidic or neutral)

285.64

-

75971.67

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Maintenance of groundcover/flower beds: Weeding, Trimming/pinching and keeping the ground cover in healthy condition (once in a 15 days) it including all operational, incidental ,labour charges for complete of work.

3427.68

-

24521.62

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Maintenance of groundcover/flower beds: Watering to ground cover (one's in three day's @ 5 litres/per Sqmts shall be provide to maintain sub soil moisture continuously) by manually, excluding cost of wateri ncluding all operational, incidental ,labour charges for complete of work..

3427.68

-

18475.2

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Digging of 0.6x0.6x0.6 mtrs. pit, filling with soil mixture of red garden soil, farmyard manure at 4:1 ratio including internal transport, application of fertilizers and chemicals (@ 20 gms/pit/sqmt), internal transportation of plants, planting the plants etc., for complete item of work (excluding cost of plant material, fertilizers and chemicals (@ 20 gms / pit/ sqmt)) (Red garden soil in this context it is defined as sandy loamy garden soil congenial for plant growth which shall be of light textured, crystalline, porous and friable, fertile, slightly acidic or neutral)

145

-

47246.8

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Digging of 0.45x0.45x0.45 mtrs. pit, filling with soil mixture of red garden soil, farmyard manure at 4:1 ratio including internal transport, application of fertilizers and chemicals (@ 20 gms/pit/sqmt), internal transportation of plants, planting the plants etc., for complete item of work (excluding cost of plant material, fertilizers and chemicals (@ 20 gms / pit/ sqmt)) (Red garden soil in this context it is defined as sandy loamy garden soil congenial for plant growth which shall be of light textured, crystalline, porous and friable, fertile, slightly acidic or neutral)

14

-

2035.88

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Maintenance of Palms/Tree planting: Trimming (once in month) and application of fertilizers, insecticides, Fungicides @ 20 gms/pit/sqmt) (once in quarterly) by manually excluding cost of fertilizers, it including all operational, incidental ,labour charges, for complete of work

1908

-

10845.07

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Maintenance of Palms/Tree planting: formation of basins 0.30m . away from the edges (once in a month) it including all operational, incidental ,labour charges for complete of work

1908

-

19446.34

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Maintenance of Palms/Tree planting: watering (once in three days @ 5 Lts/per plant shall be provide to maintain sub soil moisture continuously) by manually, but excluding cost of water including all operational, incidental ,labour charges for complete of work.

1908

-

16828.56

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Supply & Delivery of topiary/trees/Palms/shrubs/lawn/ ground covers and specified plants as per directions of officer in charge at site including cost of plants and conveyance of all materials and labour charges etc., plants of bag size 7" x 8" of plant height not less than 1.0 feet, 8" x 10" of plant height not less than 3.0 feet, 13" x 13" of Tree/Palm height not less than 5 feet, 13" x 13" of plant (Hedges & Shrub) height not less than 2 feet, 15" x 16" of plant (Tree/Palm/Topiary) height not less than 5 feet, 18" x 18" plant (Tree/Palm/Topiary) height not less than 6 feet, bottom dia of the stem is 0.75'' and above, 21" x 21" and above plant (Tree/Palm/Topiary) height not less than 7 feet, bottom dia of the stem is 1'' and above. Heights mentioned above are excluding bag height. All the plants supplied shall be with sturdy stem, well formed crown, vigorously growing tip, healthy foliage without any infestation and the plants shall be supplied after proper hardening off.

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;lawn

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;For paspalum grass

150

-

11250

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;For Korean grass

440

-

79200

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Shrub / Hedge planting in 0.30 m trench

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Coleus cascade Red

2090

-

94050

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Allamanda cathartica

803

-

36135

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Ixora Red

2354

-

105930

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Duranta Golden speciosa

1782

-

80190

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Shrub / Hedge planting in 0.45 m trench

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Pyrostegia venesta

990

-

44550

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Murrya paniculata

620

-

27900

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Ficus panda

245

-

12250

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Groundcover / flower beds

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Wedelia Trilobota

756

-

18900

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Dianella variegata

225

-

6750

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Epipremnum aureum

143

-

4290

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Pandanaus gold

5400

-

162000

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Hymenocallis speciosa

118

-

3540

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Ipomea batata

250

-

7500

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Hymenocallis speciosa

250

-

7500

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Palms/Tree

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Bauhinia blakeana

29

-

11600

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Delonix regia

2

-

800

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Neolamarckia cadamba

11

-

4400

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Baringtonia acutungula

13

-

5200

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Mimusops elengi

7

-

2800

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Cordia sebestena

21

-

8400

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Millingtonia hortenensis

14

-

5600

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Peltophorum pterocarpum

11

-

4400

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Terminalia mantaly

21

-

8400

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Spathodia companulata

16

-

6400

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Roystenia regia

8

-

4000

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Hyophorbe indica

6

-

3600

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Hardscape (Civil works)

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Earth work excavation for foundations (Manual Means) of buildings, septic tank, sump, compound wall in ordinary soils and depositing on bank with an initial lead of 10m and depth up to 3m including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete for finished item of work excluding dewatering charges etc., as per SS 20 B(APSS 308)

468.8

-

118745.77

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using 162.0 kgs of cement, coarse aggregate 40mm size hard , machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc., to site, and including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc., and overheads & contractors profit complete for finished item of work. (APSS No. 402)

142.3

-

712247.08

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Supply and fixing of C.C. Kerb not less than M30 strength of size 600 X 375 X 100 mm thick with bottom thickness of 100 mm upto height of 300 mm and top width of 50 mm thick chamfering with 45° at starts at 300 mm height to 375 mm height as selected by the Engineer-in-charge from approved source/ factory which is laid on existing CC Bed in position to the required line, level and curvature jointed with cement mortar 1:3 (1 cement : 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5 mm), including making drainage opening wherever required and including cost and conveyance of all materials & labour charges including transportation from approved source, loading & unloading charges including contractor profit & overhead charges complete for finished item of work.

1033

-

528141.91

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Supply and fixing of Kadapa slab (rough) 50mm thick and size of 0.457x0.457m stone edging including excavating trench in ordinary soil, laying P.C.C (1:4:8) 100 mm thick and fixing the stone in alignment and refilling the excavated soil conveyance of all materials and labour charges including transportation complete for finished item of work

1020

-

174471

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Masonry work in CM(1:6) prop (Cement : Screened sand) in superstructure with fly ash cement / lime solid blocks of size 290mm x 225mm x 140mm from approved source having minimum crushing strength of 50 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site,and such as labour charges, like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, overheads and contractor profit etc., complete for finished item of work. (APSS No. 501 & 504).

70.91

-

461170.28

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Plastering 12mm thick single coat in CM(1:5) using screened sand including cost and conveyance of all materials like cement, sand, water etc., to site and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work.(SS 901,903 & 904)

106.2

-

37304.87

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Filling with carted gravel in pathways, trenches, sides of foundations and basement with initial lead in layers not exceeding 15cm thick, watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T&P etc., and overheads & contractors profit complete for finished item of work(APSS NO.309&310)

307.5

-

356862.98

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Supply & Fixing Sadarhalli granite stone with 5 line dressing Double Patti of 5' length seating benches with back rest and its width 16'' with 4" thick and 18" height with 4" thick and leg size 4'' width, including cost and conveyance of all materials like granite benche, cement, sand to work site loading ,un loading transport and all operational, incidental labour & lift charges,and overheads & contractors profit complete for finished item

13

-

195000

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Flooring with 16 to 18mm thick high polished / Flame Finished / leather finished granite stone slabs other than black and regular colours (i.e. of shades like paradise / bala flower / copper silk / laka red / lavender blue) with borders and design as per the pattern approved by the Engineer-in-Charge of length not less than 2.43 mts set over base coat of cement mortar (1:8) , 20mm thick using screened sand over CC bed already laid or RCC roof slab including neat grey cement slurry of honey like consistency spread @ 3.3 Kg per sqm and jointed neatly with white cement paste mixed with pigment of matching shade to full depth including cost and conveyance of all materials like cement , sand , water , granite slabs etc., to work site and all operational, incidental labour & lift charges, polishing charges and cost of base coat and overheads & contractors profit complete for finished item of work (S.S.701 & special)

122

-

462053.04

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Flooring with Rough Shahabad / Tandur stone slabs of 40 mm thick set over base coat of cement mortar (1 : 8) 12 mm thick over CC bed already laid or RCC roof slab, including pointing with cement mortar 1:3 duly filling joints nearly, including cost of all materials like flooring stone, cement, sand, and water etc., complete, including labour charges for dressing of flooring stones etc., complete for finished item of work,. (APSS No.703 & 701)

385

-

259221.93

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Supply and placing of the V.R.C.C Nominal Mix Concrete M 20 grade corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete using CONCRETE MIXER with 20mm size HBG graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry and including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water, etc., to site and , centring using Steel scaffolding pipes , jack props , Waller?s , Foot plates , brackets , steel centring plates etc., including all operational, incidental and labour charges such as machine mixing, laying concrete, vibrator, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;For Footings

18.01

-

172156.15

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;For Pedestals

12.38

-

125910.29

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;For Plinth Beam above the basement wall

28.06

-

342727.93

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Random Rubble stone masonry in CM (1:8) prop: (Cement: Screened sand) using hard granite stones carted from approved quarry including cost and conveyance of all materials like cement, screened sand, water,Rough stone Through stone, Coursed stones etc., from approved quarry, to site, including labour charges for cutting stones to required size and shape, mixing, of cement, mortar, construction, curing, charges for scaffolding etc., and overheads & contractors profit complete for finished item of work. (APSS No. 601 & 615)

76.82

-

378681.89

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Supply and placing of the V.R.C.C Nominal Mix Concrete M 20 grade corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete using CONCRETE MIXER with 20mm size HBG graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry and,including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and , centring using Casurina Ballies, Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates etc., including all operational, incidental and labour charges such as machine mixing, lifting of concrete manually, laying concrete, vibrator, curing , overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;For Columns

10.62

-

126609.73

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Providing High Yield Strength Deformed (HYSD) / Thermo Mechanically Treated (TMT) (Fe 500 / Fe 500D grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including overheads & contractors profit complete for finished item of work.( APSS No.126)

8354

-

730306.68

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Supply and fabrication of MS framed structure like Window Grills, Compound Wall Grills, Iron Doors, Windows, Gates, MS Frame for chain link mesh works, Roof Trusses by using square / rectangular MS hollow section as per IS 4923 & Angles as per SP:6(1) IS Hand book, including cost of welding rods, power charges, labour charges for cutting, placing, welding and erecting in position and fixing, cost & convenience of all materials including wastage to site and complete for finished item of work

10478.79

-

1141454.59

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Supply and fabrication works like Window Grills, Compound Wall Grills, Iron Doors, Windows, Gates, Roof Trusses by using MS solid plate section as per IS 1730 including cost of welding rods, power charges, labour charges for cutting, placing, welding & erecting in position and fixing cost & convenience of all materials including wastage to site and complete for finished item of work.

364.17

-

46031.09

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Painting to new iron work with one coat of Red oxide primer and two coats with synthetic enamel paint Grade-I VOC (Volatile Organic Compound) content less than 50 grams/litre over primer coat of red oxid, including cost and conveyance of all materials like Red oxide primer, Synthetic Enamel Paint to site, incidental, operational and all labour charges etc., and overheads & contractors profit complete for finished item of work in all floors. (SS No. 1201, 1212 & 1207).

486.82

-

90860.08

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Vibrated Plain Cement Concrete M 20 Nominal mix using Concrete MIXER, 20mm size hard granite machine crushed graded metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concrete , including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site including steel centring, shuttering, machine mixing, lift charges, laying concrete, vibrating, curing, overheads & contractors profit etc., complete for finished item of work (APSS No. 402 & 403)

34.55

-

250342.39

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Providing 0.30 m wide Coping with Polished black Kadapa slabs minimum of 25 mm to 30 mm thick in single piece as specified set over a base coat of CM (1:5) , 12mm thick using screened sand over already laid CC bed / RCC roof slab including neat cement slurry of honey like consistency spread @ 3.3 Kgs per Sqm and jointed with neat cement to full depth including cost and conveyance of all materials like cement, sand, water, flooring stones etc. complete including all labour charges like dressing of flooring stones to the required size, flat nosing the edges, mixing of cement mortar, laying, lift charges , cost of base coat, water charges etc., and overheads & contractors profit complete for finished item of work (APSS No.703 & 701)

122.65

-

108409.11

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Plastering 12mm thick in two coats using screened sand with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, ,, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer - in - charge etc., and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904)

585.17

-

277551.98

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Providing and applying PMCC / Deco orient base or Equivalent exterior Texture ( borders and design as per the pattern approved by the Engineer-in-Charge ) of average 2 to 3 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying putty/ texture paint filler by putty knife / muslin pad, air dry for 2 - 3 hrs for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges, scaffolding charges,

585.17

-

164064.11

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Supply & application of one coat water based cement primer of exterior grade II and two coats of acrylic exterior emulsion paint having VOC (Volatile Organic Compound) content less than 50 grams/litre for exterior walls including cost and conveyance of all materials to site,and all operational, incidental, labour charges etc., and overheads & contractors profit complete for finished item of work in all floors.

600.17

-

152899.31

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Filling with useful available excavated earth (excluding rock) with a lead of 50 m in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cm thick, watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T&P etc., and overheads & contractors profit complete for finished item of work (APSS NO.309&310)

20.16

-

732.01

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Supply and placing of the V.R.C.C Nominal Mix Concrete M 20 grade corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete using CONCRETE MIXER with 20mm size HBG graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry and,including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and , centring using Casurina Ballies, Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates etc., including all operational, incidental and labour charges such as machine mixing, lifting of concrete manually, laying concrete, vibrator, curing , overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)

3.48

-

41487.93

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Supply and placing of the V.R.C.C Nominal Mix Concrete M 20 grade corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete using CONCRETE MIXER with 20mm size HBG graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and , centring using Casurina Ballies , Bamboos , Wooden Reapers , Runners , Wood Posts , Wall Plates etc., including all operational, incidental and labour charges such as machine mixing, lifting of concrete manually, laying concrete, vibrator, , curing , overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)

2.53

-

26663.49

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Providing cladding to wall with High Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M) other than black and regular colours, length equal to flooring slabs set over base coat of CM(1:5) 12 mm thick using screened sand with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointing with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., and overheads & contractors profit complete for finished item of work.

49.86

-

189640.21

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Plastering 20mm thick in two coats using screened sand with base coat of 16mm thick in CM(1:6) and top coat of 4mm thick in CM(1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, ,, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work .(SS 901,903 & 904)

18

-

8828.1

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Providing Treads with 16 to 18mm thick high polished / Flame Finished / leather finished granite stone slabs other than black and regular colour granite with borders and design as per the pattern approved by the Engineer-in-Charge of length not less than 2.43 mts set over base coat of cement mortar (1:5) , 12mm thick using screened sand over CC bed already laid or RCC roof slab including neat grey cement slurry of honey like consistency spread @ 3.3 Kg per sqm and jointed neatly with white cement paste mixed with pigment of matching shade to full depth including cost and conveyance of all materials like cement , sand , water , granite slabs etc., to work site and all operational, incidental labour & lift charges, half rounding the edges of treads , polishing charges and cost of base coat and overheads & contractors profit complete for finished item of work for Treads (S.S.701 & special)

0.6

-

2864.98

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Providing Risers to steps walls with 16 to 18mm thick high polished / Flame Finished / leather finished granite stone slabs other than black and regular colour granite with length equal to flooring stone, set over base coat of CM(1:5) 12 mm thick using screened sand with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointing with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., and overheads & contractors profit complete for finished item of work. for Risers-0.15 m(APSS No.701 &707)

0.2

-

784.93

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Supply and laying of 3/8" turfted synthetic grass type (artificial) of 35mm pile height of fibre colour 4 field green + 4 olive green, root zone 4 jute+ 4 field green with covering of 14 stitches per 10 cm with double backing UV stable, 215 gram/sq.mt, coating with black SBR latex, duly fibres meet the most stingent environmental standards, including cost of material, transportation to the site, labor charges, etc., in complete item of work.

216

-

348840

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Supply, Delivery and Installation of Square shape Sadarahalli granite gazebo size of - 13?x13?x 11? design as per approved by the Engineer-in-Charge include, structure, ornamental works, flooring with granite and seating benches around gazebo etc, including cost and conveyance of all materials like cement, sand, water, stone etc., to work site and all operational, incidental labour & lift charges, for finished item of work but Excluding cost of civil works. Specifications of gazebo :- Square shape Sadarahalli granite gazebo size of 13?x13?x 11? as per design 8 no?s of pillars size of 8" x 8" x 108" fixing at equal distance and 7 no?s seating slabs 15" width 75 mm thick support with suitable stone grille between stone pillars and roof slab stone 20 mm thick rest on 4 numbers of MS 100 mm C channel with suitable SS Square pipe frame and to provide water proof treatment for roof slabs and flooring with 16 to 18mm thick high polished/ leather finished granite stone slabs with borders and design as per the pattern approved, incidental installation of hole Unit of gazebo as required complete as per the direction of Engineer-in-charge.

1

-

400000

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Filling with carted coarse sand in play area, pathway, foundations bed and basement with initial lead in layers not exceeding 15cm thick, watering and ramming including cost and conveyance of water to work site and all operational, incidental ,labour charges, hire charges of T&P etc., and overheads & contractors profit complete for finished item of work(APSS NO.309&310)

96

-

58864.32

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Supply and Transportation of XLPE/PVC insulated & PVC sheathed armoured cables 4 C x 4 sq.mm of 1.1 KV grade with copper conductor as per IS 7098 Part-I -1988 etc including cost and conveyance of all materials ,overheads & contractors profit etc., Make: Torrent / Universal / Unicab / Havells / KEI/ Polycab/ Gloster/ Orbit/Paragon/RR Kabel/RPG/Rhino

517

-

148609.56

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Supply and Laying of U.G cables upto 50 Sq,mm including earth work excavation of trench 300x600mm and ,laying the cable on sand cushion of 150 mm thick ,covering the cable with Rough Kadapa slabs minimum of 40 mm thick and refilling the trench with the excavated soils[excl. rock] , including cost and conveyance of all materials ,overheads & contractors profit etc., complete for finished item of work

517

-

80097.26

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Fabrication, Transportation and supply of hot-dip galvanized Octogonal Pole with BSEN - 10025 grade S 355 JO steel plate for shaft, IS 2062 for base plate with door opening arrangement, including the supply of suitable boards with bakelite sheet as per IS specification suitable to withstand the wind speed of 180 KMPH for 9 Mtrs heightPole having dimensions Bottom 155 mm,. Top 70mm with 3mm thick, base plate 260 x 260 x 16mm and 4 Nos of M24 x 750 long 'J' bolts along with template, including cost and conveyance of all materials ,overheads & contractors profit etc., complete for finished item of work Makes: Bajaj / Valmont/Laasma/Transrail/Utkarsh/ Skipper/Consoul

1

-

21246.01

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Fabrication, Transportation and supply of 1.0 Mtr Length Single Arm Bracket made with MS galvanized 40mm / 50mm dia Pipe. including cost and conveyance of all materials ,overheads & contractors profit etc., complete for finished item of work including cost and conveyance of all materials ,overheads & contractors profit etc., complete for finished item of work Makes: Bajaj / Valmont/Laasma /Transrail/Utkarsh/Skipper/Consoul

2

-

3249.39

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Supply and fabrication of street light poles made with medium quality MS Pipes of 88.90mm OD for 1670mm long, 60.3mm OD Pipes of 1670 mm long and 42.4 mm OD for 1670 mm long welded to each other for a total height of 5.0 m and providing 33.70 mm OD MS pipe of 1000 mm long for arm bracket for Luminaires fixing welded to main pole at suitable angle, suitable pole cap, base plate 300 x 300 x 10 mm and 4 Nos of 16 m dia 700 long 'J' bolts along with template including cost of welding rods, power charges, labour charges for cutting, placing, welding and erecting in position, cost & convenience of all materials including wastage to site, complete painting the total length of pipe with Painting to new iron work with one coat of Red oxide primer and two coats with synthetic enamel paint Grade-II VOC including cost of all materials ,labour charges etc for finished item of work.

35

-

154388.98

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Supply and fixing of 120 W LED Street light Luminaire for existing street light pole, Luminaire made of pressure diecast alluminium body with powder coated, having protective toughned glass, Supply Input voltage 120 - 270 V AC, P.F > 0.90, high power LED's having System efficacy > 100 lm/W and junction temprature < 70°C, with Ingrees protection IP66, Luminaire performance complies to IS 10322 (Part 5 / Sec-3), Driver surge protection 4KV, In house additional Surge protection 10 KV with optics distribution , THD<10% at 110 Volts AC, driver efficiency >90%, CCT: 3000K - 5700K, minimum CRI>70, etc., including as required complete as per the direction of Engineer-in-charge and including cost of all materials to site, incidental giving connections and all labour charges overheads & contractors profit etc., complete for finished item of work a) Luminaire Make : Wipro(Skyline) / Philips (Greenline Extra) /GE- Venture / Crompton(Nexus / Hawk series) / Bajaj (Edge)/ Halonix (Modular/ Lumos-Super) / Havells (EnduraSeries)/Greenlites(HILux)/Capart (Premium)/Polycab/Keselec/ HPL(City Vision)/Jaquar (Premium) /Eveready /Surya (Pollux) / Fortune Art (Leaf) b) LED MAKE :PHILIPS LUMILEDS / CREE / NICHIA /OSRAM / SAMSUNG / LG.

4

-

51645.97

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Supply and fixing of 60 W LED Street light Luminaire for existing street light pole, Luminaire made of pressure diecast alluminium body with powder coated, having protective toughned glass, Supply Input voltage 120 - 270 V AC, P.F > 0.90, high power LED's having System efficacy > 100 lm/W and junction temprature < 70°C, with Ingrees protection IP66, Luminaire performance complies to IS 10322 (Part 5 / Sec-3), Driver surge protection 4KV, In house additional Surge protection 10 KV with optics distribution , THD<10% at 110 Volts AC, driver efficiency >90%, CCT: 3000K - 5700K, minimum CRI>70, etc., including as required complete as per the direction of Engineer-in-charge and including cost of all materials to site, incidental giving connections and all labour charges overheads & contractors profit etc., complete for finished item of work. a) Luminaire Make : Wipro(Skyline) / Philips (Greenline Extra) /GE- Venture / Crompton(Nexus / Hawk series) / Bajaj (Edge)/ Halonix (Modular/ Lumos-Super) / Havells (EnduraSeries)/Greenlites(HILux)/Capart (Premium)/Polycab/Keselec/ HPL(City Vision)/Jaquar (Premium) /Eveready /Surya (Pollux) / Fortune Art (Leaf) b) LED MAKE :PHILIPS LUMILEDS / CREE / NICHIA /OSRAM / SAMSUNG / LG.

35

-

232398.06

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Supply and transportation of 100 W LED Flood light Luminaire made of pressure diecast aluminium housing with powder coated, having protective toughened glass, Supply Input voltage 120 - 270 V AC, P.F > 0.90, high power LED's System efficacy >100lm/W and junction temperature < 70°C, with Ingress protection IP66, Luminaire performance complies to IS 10322 (Part 5 / Sec-3), IK08, Driver surge protection 4KV, external Surge protection = 10KV with wide/ Narrow beam optics, THD<10% at 110 Volts AC, driver efficiency >90%, , CCT: 3000K - 5700K, minimum CRI>70,etc., including as required complete as per the direction of Engineer-in-charge and including cost of all materials to site, incidental giving connections and all labour charges overheads & contractors profit etc., complete for finished item of work a) LUMINAIRE MAKE : Wipro / Philips/ GE-Venture /Crompton/ Bajaj/Greenlites / Havells/Capart(Premium) /Halonix/ Polycab/Keselec/HPL/Jaquar/Eveready / Surya (Lumasmax / O Flood)/ FortuneArrt (Fin) b) LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA /OSRAM / SAMSUNG.

8

-

90330.74

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Foundation and erection charges with special T&P, for 9.00Mtrs / 10Mtrs long Octagonal / Conical pole duly erecting on base plate duly providing 4 Nos foundation bolts with nuts with providing of 0.60Mtr x 0.60Mtrs x 1.40 Mtr size M20 cc work vibrated concreting mixing with necessary steel (15kgs) reinforcement and curing for 7 days as directed by the field engineers during execution including excavation of Earth/BT all labour charges and including cost and conveyance of all materials ,overheads & contractors profit etc., complete.

1

-

8248.45

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Foundation and erection charges with special T&P, for 5 Mtrs. Long MS / GI Garden pole duly erecting on base plate duly providing 4 Nos foundation bolts with nuts with providing of 0.45Mtr x 0.45Mtrs x1.2 Mtr size pedestal with Vibrated Plain Cement Concrete M 20 Nominal mix with necessary steel (10kgs) reinforcement and curing for 7 days as directed by the field engineers during execution including excavation of Earth/BT all labour charges and cost and conveyance of materials etc including cost and conveyance of all materials ,overheads & contractors profit etc., complete for finished item of work

35

-

93913.2

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Supply and Wiring with 1 run of 3 core 1.50 Sqmm XLPE/PVC insulated & PVC sheathed unarmoured control cables of 1.1 KV grade with copper conductor as per IS 7098 Part-I -1988 etc in the existing pipes for main supply as required complete as per the direction of Engineer-in-charge and including cost of all materials to site, incidental giving connections and all labour charges overheads & contractors profit etc., complete for finished item of work Make: Torrent / Universal / Unicab / Havells / KEI/Polycab/Gloster /orbit / Paragon/ RR Kabel/ RPG

293

-

40082.4

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Supply of 4 core 6.0 Sqmm PVC insulated and sheathed FRLS copper round cable for voltage up to 1100V as per IS 694/1990. including cost and conveyance of all materials ,overheads & contractors profit etc., complete for finished item of work Makes: V-Guard/Bonton /Finecab/ HPL / GM / Million / Goldmedal /Fortune Art / /Sudhakar/Orbit/ Tamra/Anchor/Plaza/Vihan/Ollvin

50

-

16985.44

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Supply and fixing of 1 No. 6-32A SP MCB 10KA C/D Curve ISI mark as required complete as per the direction of Engineer-in-charge and including cost of all materials to site, incidental giving connections and all labour charges overheads & contractors profit etc., complete for finished item of work. Makes: V-Guard/Bonton /Finecab/ HPL / Million / FortuneArt /Sudhakar/Orbit/ Tamra/Anchor /Plaza/ Vihan/Spykaar/ Ollvin/Laser/Beljin/Rhino/ Standard/ Vimal

47

-

11160.4

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Supply of Automatic Street Light Control System with Optical Micro Sensor, Low volatage / High voltage trip and reset, operating voltage 150 - 280V AC per Phase, 50 HZ with suitable SMC enclousure of IP 54 protection, MCBs and contactor suitable to control the load of 5 KW of Three phase load with necessary clamping arrangements. Make: Swadeep Nature Switch / Light Mate /GL/Bajaj

1

-

18496.52

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Supply and fixing of suitable out door type feeder piller box made with 14 SWG CRCA sheet after 7 tank process including S & F 40-63A FP MCB, 6 Nos SP MCB's, din chanel, bus bars, 6 Sqmm 3 core copper cable for internal wiring, contactor, connectors and provision for energy meter etc., complete for finished item of work..FP MCB including cost and conveyance of all materials ,overheads & contractors profit etc., complete for finished item of work FP MCB make :Legrand / Schnieder / L&T

1

-

22870.7

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Providing Independent earthing by excavating atrench to a depth f 2.10m in ordinary soils as specified 1.50 X 0.6 to a depth of 0.9m and 1.2 X 0.6 to a depth of 1.20m ,using 40 mm dia 'B' class GI Pipe of 2.5 m long with necessary accessories with 450mm x 50 mm thick hume pipe ring duly providing staggered holes including filling with 40 kg of hard coke and 20 kg salt providing with equal proportion of in layers etc. including cost and conveyance of all materials ,overheads & contractors profit etc., complete for finished item of work

2

-

7767.15

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Supply, Delivery, Installation and Commissioning of 6.5m x 1.5m size of FOUR SEATER ARC SWING including transportation, installation, commissioning, loading and unloading etc., for complete finished item of the work.

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;1.Swing leg pipe : 40NB hot dip galvanized swing leg pipe of length 2300mm conforming to IS 1239 with GI thickness up to 60µ.

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;2. Top pipe : Four Seater swing top fixed to 50NB Galvanized pipe having C Class material of length 1490mm at the center and two junction box frame at the ends to attach leg pipes.

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;3. Junction box : 225mmx103mm junction box made from 5mm thick GI plate to house the two swing leg pipes & top pipe.

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;4. Seat frame: side frame consist of Rectangular tube having 50X25X4 mm thick. 20NB bend pipe used for seat frame support. 40NB bend is used for Entry Support structure.

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;5. Bearing Assembly: Shaft for UCP 207 Bearing is self-lubricated made of SKF make shall be provided for smooth & trouble-free movement.

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;6. Pipes:- All metal pipes should be used of Heavy Duty ('C' Class) of TATA/Jindal make only with Hot Dipped Galvanized Pipes conforming to IS 1239 (Part 1) with GI thickness not less than 60micron.

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;7. Powder coating:- It shall be done with pure polyester raw material. Dry film thickness maintained within the range of 50-70 microns. It is tested for adhesion test (According to ASTM-D-3359) with the help of cross hatch cutter instruments.

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;8. Nut and Bolts:- Galvanized/ S.S./Allen Bolt/Button Head Allen Bolt & Nuts / Nylon Lock Nuts are used with PVC Bolt Caps.

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;9. All open ends of pipe been closed by GI caps for user safety against entrapment.

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;10. Certificate: ISO9001:2015

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;11. Color: Multicolor for optional or customized & As per RAL shade.

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;12. Packaging: Safety 3 layer packaging like 1st EPE Foam 2nd HDPE Film and 3rd is Stretch wrap.

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Cost of the Equipment

1

-

48500

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Supply, Delivery, Installation and Commissioning of 6.5m x 1.5m size of FOUR SEATER ARC SWING of Arihant/ Equivalent make including transportation, installation, commissioning, loading and unloading etc., for complete finished item of the work.

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;1. Arc swimg frame: 6700mm long 80NB Pipe bent in Single Piece & welded together with a flange 5mm thick & ISA of 40x40x5mm to form a strong frame at bottom & middle. The 80NB pipe is hot dip galvanized pipe conforming to IS 1239 with GI thickness of 60µ. Height of the frame is 2700mm.

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;2. Top pipe : 50NB Top Pipe with two Arc Swing Flanges welded at both its ends. Pipe can withstanding torsional stress created due to swinging motion. These 50NB top pipe is hot dip galvanized pipe of length 2950mm conforming to IS 1239 with GI thickness of 60µ.

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;3. Seat assembly : a) Swing clamp assembly: Swing clamps made up of two parts are joined together with M6 Allen bolts along with S-Hook & a specially designed swing pin.The S-Hook is specially designed to house a bearing for smooth & noiseless swinging. The clamps are made from injection molded Nylon-6 plastic. b) Chain : Rubber dip molded swing chain of dia. 6mm & 1450mm Long. c) Hook: S-Hook of dia 8mm & 145x130 Triangular hook of Grade SS 304. d) Seat: Rubber Seat made by Natural Rubber with sufficient reinforcement.

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;4. Bearing: Bearing is self-lubricated made of SKF/ NTN/ NACHI make shall be provided for smooth & trouble-free movement.

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;5. Pins and Circlips: 12mm diameter pins shall be made from EN8 material & Circlip A10.

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;6. Pipes:- All metal pipes should be used of Heavy Duty ('C' Class) of TATA/Jindal make only with Hot Dipped Galvanized Pipes conforming to IS 1239 (Part 1) with GI thickness not less than 60micron.

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;7. Powder coating:- It shall be done with pure polyester raw material. Dry film thickness maintained within the range of 50-70 microns. It is tested for adhesion test (According to ASTM-D-3359) with the help of cross hatch cutter instruments.

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;8. Nut and Bolts:- Galvanized/ S.S./Allen Bolt/Button Head Allen Bolt & Nuts / Nylon Lock Nuts are used with PVC Bolt Caps.

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;9. All open ends of pipe been closed by GI caps for user safety against entrapment.

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;10. Certificate: ISO9001:2015

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;11. Color: Multicolor for optional or customized & As per RAL shade.

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;12. Packaging: Safety 3 layer packaging like 1st EPE Foam 2nd HDPE Film and 3rd is Stretch wrap.

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Cost of the Equipment

1

-

89877

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Supply, Delivery, Installation and Commissioning of Jungle Gym including transportation, installation, commissioning, loading and unloading etc., for complete finished item of the work.

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;1) Main frame Structure: Main pipe 42.5mm OD support pipe hinged over with 25mm outer dia pipes .

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;2. Pipes:- All metal pipes should be used of Heavy Duty ('C' Class) of TATA/Jindal make only with Hot Dipped Galvanized Pipes conforming to IS 1239 (Part 1) with GI thickness not less than 60micron.

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;3) Welding: Welding shall be done with robotic welded and Prior to finishing all welded joints should scalloped as necessary and welded to an approved MIG process should dressed of removing all sharp edges and burrs..

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;4. Powder coating:- It shall be done with pure polyester raw material. Dry film thickness maintained within the range of 50-70 microns. It is tested for adhesion test (According to ASTM-D-3359) with the help of cross hatch cutter instruments.

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;5. Colour: Multi colour for optional or customized & as per RAL shade.

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;6. All open ends of pipe been closed by GI caps for user safety against entrapment.

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;7. Certificate: ISO9001:2015

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;8. Packaging: Safety 3 layer packaging like 1st EPE Foam 2nd HDPE Film and 3rd is Stretch wrap.

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Cost of the Equipment

1

-

68000

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;supply, delivery and commissioning of FRP Triple Slide including transportation, installation, commissioning, loading and unloading in complete finished item of the work.

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Supporting Main Pipes for platform:- 80NB hot dip galvanized pipe of length 2400mm conforming to IS 1239 with GI thickness up to 60µ.

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;2. FRP Wave Slide:- Wave Slide chute is made up of FRP of lenght 10' and width 20''. The chute has its end such as it causes safe landing of the child. The landing portion is horizontal with respect to the ground. landing of the slide is supported by stand made up of 25NB pipe

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;3. Platform:-8ft L x 30 "W x5 ½ft H a. Material:- MS Plate with antiskid surface on top. b. Thickness:- Minimum thickness of 3 to 5 mm. c. Shape:- Rectangle. e. Vertical Pipes:- 80NB GI pipes should be used of Heavt Duty ('C' Class) of TATA/Jindal make only with Hot Dipped Galvanized Pipes conforming to IS 1239 (Part 1) with GI thickness not less than 60micron.

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;4. Ladder: - The ladder is made up of with required size and thickness of L angle/ cirular pipes with necessary supporting steps and suitable railing over the platform & for ladder as per the safety norms.

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;5. FRP (FIBER REINFORCED PLASTIC):- All the Fiber Reinforced Plastics (FRP) materials are processed by the hand laid process which is considered to be the best of its type. International quality of Gel coats which is duly mixed with U.V stabilized pigment to give the required color to the product. Thickness of the FRP material should not less than 5 mm as per the product. The FRP material should be tested for abrasion resistance & UTS (ultimate tensile test).

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;6. Pipes:- All metal pipes should be used of Heavy Duty ('C' Class) of TATA/Jindal make only with Hot Dipped Galvanized Pipes conforming to IS 1239 (Part 1) with GI thickness not less than 60micron.

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;7. Welding: Welding shall be done with robotic welded and Prior to finishing all welded joints should scalloped as necessary and welded to an approved MIG process should dressed of removing all sharp edges and burrs..

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;8. Powder coating:- It shall be done with pure polyester raw material. Dry film thickness maintained within the range of 50-70 microns. It is tested for adhesion test (According to ASTM-D-3359) with the help of cross hatch cutter instruments.

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;9. Nut and Bolts:- Galvanized/ S.S./Allen Bolt/Button Head Allen Bolt & Nuts / Nylon Lock Nuts are used with PVC Bolt Caps.

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;10 All open ends of pipes been closed by GI caps for user safety against entrapment.

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;11. Color: Multicolor for optional or customized & As per RAL shade.

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;12. Packaging: Safety 3 layer packaging like 1st EPE Foam 2nd HDPE Film and 3rd is Stretch wrap.

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Cost of the Equipment

1

-

121963

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Supply, delivery and commissioning of Butter Fly swing including transportation, installation, commissioning, loading and unloading in complete finished item of the work.

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;1. Structural frame: a) Main frame is made up of 80NB pipe. b) ?U? shaped frame is made up of 25NBpipe c) the handle frame is made up of 20Nb pipe d) Sitting place id made from 15NB pipe e) Both 80NB main frame pipes are joint with 25NB pipe.

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;2. Pipes:- All metal pipes should be used of Heavy Duty ('C' Class) of TATA/Jindal make only with Hot Dipped Galvanized Pipes conforming to IS 1239 (Part 1) with GI thickness not less than 60micron.

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;3. Bearing: Bearing is self-lubricated made of SKF/NTN/ NACHI make shall be provided for smooth & trouble free movement

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;4. Pins & Circlips: 12mm diameter pins shall be made from EN8 material & circlip A10

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;5. Powder coating:- It shall be done with pure polyester raw material. Dry film thickness maintained within the range of 50-70 microns. It is tested for adhesion test (According to ASTM-D-3359) with the help of cross hatch cutter instruments.

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;6. Nut and Bolts:- Galvanized/ S.S./Allen Bolt/Button Head Allen Bolt & Nuts / Nylon Lock Nuts are used with PVC Bolt Caps.

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;7. All open ends of pipes been closed by GI caps for user safety against entrapment.

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;8. Certificate: ISO9001:2015

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;9. Color: Multicolor for optional or customized & As per RAL shade.

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;10. Packaging: Safety 3 layer packaging like 1st EPE Foam 2nd HDPE Film and 3rd is Stretch wrap.

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Cost of the Equipment

1

-

66480

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Supply, delivery and commissioning of 4 No?s Seats made with FRP Fibre Seats and fitted both ends of 50 MM Dia Pipe length8 Ft with Bolts & Nuts and both fitted on Horizontal Pipe 3? length and 60 mm Dia?U? shape (rivers) with clamps with fibre Seats including transportation, installation, commissioning, loading and unloading in complete finished item of the work. Length : 2438 mm Width : 914 mm Height : 914 mm

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;1. Centre Main Frame Structure:- 80NB hot dip galvanized pipes conforming to IS 1239.

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;2. See saws:- 2 Nos of See saws made up of 80NB GI pipe conforming to IS 1239 with proper holdings.

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;3. FRP Seats: - 4 nos. of FRP Seats

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;4. FRP (FIBER REINFORCED PLASTIC):- All the Fiber Reinforced Plastics (FRP) materials are processed by the hand laid process which is considered to be the best of its type. International quality of Gel coats which is duly mixed with U.V stabilized pigment to give the required color to the product. Thickness of the FRP material should not less than 5 mm as per the product. The FRP material should be tested for abrasion resistance & UTS (ultimate tensile test).

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;5. Pipes:- All metal pipes should be used of Heavy Duty ('C' Class) of TATA/Jindal make only with Hot Dipped Galvanized Pipes conforming to IS 1239 (Part 1) with GI thickness not less than 60micron.

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;6. Powder coating:- It shall be done with pure polyester raw material. Dry film thickness maintained within the range of 50-70 microns. It is tested for adhesion test (According to ASTM-D-3359) with the help of cross hatch cutter instruments.

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;7. Nut and Bolts:- Galvanized/ S.S./Allen Bolt/Button Head Allen Bolt & Nuts / Nylon Lock Nuts are used with PVC Bolt Caps.

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;8.Bearing: Bearing is self-lubricated made of SKF/NTN/ NACHI make shall be provided for smooth & trouble free movement

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;9. All open ends of pipes been closed by GI caps for user safety against entrapment.

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;10. Certificate: ISO9001:2015

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;11. Color: Multicolor for optional or customized & As per RAL shade.

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;12. Packaging: Safety 3 layer packaging like 1st EPE Foam 2nd HDPE Film and 3rd is Stretch wrap.

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Cost of the Equipment

1

-

40480

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Supply, Delivery, Installation and Commissioning of 2.5m x 1.5m size of Rock cum net climber of Arihant/ Equivalent make including transportation, installation, commissioning, loading and unloading in complete finished item of the work.

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;1. Pad: Rock climber 7Ft. pad made from Fiber Reinforced Plastic (FRP) attached to the angular frame. The pad is provided with rock shaped part ergonomically spaced in zig-zag manner for climbing act.The rocks are bolted on same platform, with a gradient of 65 degree from the ground.

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;2. Supports: Bend angular frame made from 40NB Galvanized pipe conforming to IS 1239:1979 with base plates fixed on each end and grounded for strong foundation.It has Ø12 U-hook on one side for attaching rope.It has profile plate for top support. and has plate 130x50x5 for bottom support.

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;3.Top pipe: It is made from 40NB top pipe of 1190mm long with Dia. 12 U-Hooks fixed on one side.

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;4. Rope: Rope size conforming to standards EN11761:1998 for minimum grip requirement. It is size of Ø18 of nylon.Mesh size conforming to standards EN1176-1:1998& ASTM - F1487:07a for safety against entrapment of head & neck

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;5. Clamp: Its is made from nylon. nylon rope attached by specially designed nylon rope clamps used which has rope integrated inside which hold it tightly and avoids breaking

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;6. Bottom pipe: It is made from 40NB bottom pipe of 1190mm long with Dia. 12 U-Hooks fixed on one side.

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;7. Rock: It is made from Fiber Reinforced Plastic (FRP).

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;8. Pipes:- All metal pipes should be used of Heavy Duty ('C' Class) of TATA/Jindal make only with Hot Dipped Galvanized Pipes conforming to IS 1239 (Part 1) with GI thickness not less than 60micron.

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;9. FRP (FIBER REINFORCED PLASTIC): All the Fiber Reinforced Plastics (FRP) materials are processed by the hand laid process which is considered to be the best of its type. International quality of Gel coats which is duly mixed with U.V stabilized pigment to give the required color to the product. Thickness of the FRP material varies from 3 mm to 5 mm as per the product. The FRP material should be tested for abrasion resistance & UTS (ultimate tensile test).

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;10. Powder coating:- It shall be done with pure polyester raw material. Dry film thickness maintained within the range of 50-70 microns. It is tested for adhesion test (According to ASTM-D-3359) with the help of cross hatch cutter instruments.

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;11. Nut and Bolts:- Galvanized/ S.S./Allen Bolt/Button Head Allen Bolt & Nuts / Nylon Lock Nuts are used with PVC Bolt Caps.

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;12. All open ends of pipe been closed by GI caps for user safety against entrapment.

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;13. Certificate: ISO9001:2015

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;14. Color: Multicolor for optional or customized & As per RAL shade.

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;15. Packaging: Safety 3 layer packaging like 1st EPE Foam 2nd HDPE Film and 3rd is Stretch wrap.

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Cost of the Equipment

1

-

52323

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Two Unit Multi Activity Play Station (MAPS75)

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Supply, Delivery, Installation and Commissioning of Two Pillar Multiplay Station including transportation, installation, commissioning, loading and un loading etc., for complete finished item of the work.

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;1. Platform:- a. Material:-Checkered Plate with anti-skid surface on top.. b. Thickness:- Minimum thickness of 3-5 mm and side flanges of 6-8 mm thickness. c. Size:- 40 x 40inch. d. Others:- Ribbed structure on bottom side. e. Shape:- Square. f. Brazing Frame:- ISA 25x25x5mm or ISA40x40x5mm thick and ISF 40x5mm thick which is galvanized and then duly Powder Coated. g. Clamp:- Made by Nylon 6 material by Injection Molding Process which is UV stabilized and having better strength to give support to other parts. h. Vertical Pipes:- 80NB GI pipes should be used of Medium Duty ('C' Class) of TATA/Jindal make only with Hot Dipped Galvanized Pipes conforming to IS 1239 (Part 1) with GI thickness not less than 60micron.

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;2.Bridge 8ft Long:- a. Size:- Width 8ft x Length 2.6ft b. Material:- Anti- Skid Checkered Plate with a minimum thickness of 3-5mm. Ribs are provided at defined distance to improve strength as well as aesthetics of the bridge. c.Railling: Suitable Railing Made up 33OD Pipe.

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;3. FRP Wave Slide :- a. Size:- 10ft b. Material:- Wave Slide Chute is made up of FRP. The chute has its end such as it causes safe landing of the child. The landing portion is horizontal with respect to the ground. The landing of the slide is supported by stand made up of 25NB pipe and 5mm thick MS plate with GI plating.

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;4. FRP Straight Slidee :- a. Size:- 10ft b. Material:- Straight Slide Chute is made up of FRP. The chute has its end such as it causes safe landing of the child. The landing portion is horizontal with respect to the ground. The landing of the slide is supported by stand made up of 25NB pipe and 5mm thick MS plate with GI plating.

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;5. FRP Canopy Mushroom or Cone Or Square or Dog :- The canopy is made of FRP (Fiber Reinforced Plastic) with a minimum thickness of 2-3 mm.

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;6. Metallic Railing on Bridge - This pole of the fire men is made up out of 40NB GI pipe and is made for the purpose using it as a climber. It is attached to vertical deck pipes with the help of 20NB GI pipe & specially designed nylon clamps.

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;7. Two Seater Swing :-The chain is made from 8mm thick galvanized chain for climbing. The foundation frame is made from 25 NB GI pipe with Nylon Clamp. The chain is over-hanged with the help of M.S. flat 50x10 with Nylon Clamp GI plating. It also has steps made from 20 NB GI pipes welded to the chain for climbing.

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;8. FRP Characters Sunflower and Butterfly :- FRP Characters is made up of rotational molding process which consists of FRP mixed with UV stabilized food grade material for making it UV resistant.

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;9. FRP Rock Climber:-Central pad of ROCK Climber is made up of FRP (Fiber Reinforced Plastic). The rocks are mounted on platform and it has gradient from the ground. The ladder is supported by stand made up of 25NB G.I. pipe and 50x10mm thick flat from the bottom.

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;10. FRP Step Ladder :- a. Size:- 5 Ft- b. Material:- FRP (Fiber Reinforced Plastic) with a minimum thickness of 3-5mm. Ribs are provided at defined distance to improve strength as well as aesthetics of the bridge.. c. SuitableRailiing Made up 33OD GI Pipe

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;11. Cross Checkered Railing:- Railings are provided as barrier for safety purpose. Cross Checkered Railing is made up of LLDPE (Low- Density Polyethylene Plastic) in rotational molding process and has a support of 20 NB powder coated GI pipes. The railing is attached to the support pipe using an Injection Molded Nylon Clamps.

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;12. FRP (FIBER REINFORCED PLASTIC):- All the Fiber Reinforced Plastics (FRP) materials are processed by the hand laid process which is considered to be the best of its type. International quality of Gel coats which is duly mixed with U.V stabilized pigment to give the required color to the product. Thickness of the FRP material varies from 3 mm to 5 mm as per the product. The FRP material should be tested for abrasion resistance & UTS (ultimate tensile test).

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;13. LLDPE (LINEAR LOW DENSITY POLYETHYLENE):- The ROTO products are manufactured using material LLDPE (Linear Low Density Polyethylene) with UV stabilization of Food Grade Non Hazardous Plastic compiled to ROHS. Thickness of the ROTO products varies from 5 mm to 8 mm as per the product. The overall product obtain is a seamless to ensure perfect blend of uniform thickness & durability.

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;14. Pipes:- All metal pipes should be used of Heavy Duty ('C' Class) of TATA/Jindal make only with Hot Dipped Galvanized Pipes conforming to IS 1239 (Part 1) with GI thickness not less than 60micron.

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;15. Powder coating:- It shall be done with pure polyester raw material. Dry film thickness maintained within the range of 50-70 microns. It is tested for adhesion test (According to ASTM-D-3359) with the help of cross hatch cutter instruments.

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;16. Nut and Bolts:- Galvanized/ S.S./Allen Bolt/Button Head Allen Bolt & Nuts / Nylon Lock Nuts are used with PVC Bolt Caps.

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;17. All open ends of pipe been closed by GI / PVC caps for user safety against entrapment.

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;18. Certificate: ISO9001:2015

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;19. Color: Multicolor for optional or customized & As per RAL shade.

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;20. Packaging: Safety 3 layer packaging like 1st EPE Foam 2nd HDPE Film and 3rd is Stretch wrap.

-

-

-

... More
Development of landscape (Softscape Hardscape) works in Yerra Nageswara Rao Municipal corporation;Cost of the Equipment

1

-

476424



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.