Andhra Pradesh Urban Greening And Beautification Corporation Limited Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Andhra Pradesh Urban Greening And Beautification Corporation Limited - APUGBCL Tender

Civil And Construction
Agriculture or Forestry Works
Opening Date27 Oct 2021
Closing Date5 Nov 2021
Tender Amount₹ 72,59,260 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Development of landscape(Softscape and Hardscape) works in Mandapadu 21st ward ( 0.54 Ac) at Gudivad;Hedge / shrub planting: Digging the trench of size 0.3 mtrs. depth, refilling with red garden soil including cost of red garden soil and farmyard manure at 4:1 ratio, internal transportation of plants, planting etc., including the application of fertilizers and pesticides etc., (@ 20 gms/pit/sqmt) complete for item of work, but excluding the cost of the fertilizers (@ 20 gms/pit/sqmt) and plant material etc., - unit 1 Sqmt of work. (*10 No./Sqm of plants & bag size shall be arrived based on the spacing as per the design.) (Red garden soil in this context it is defined as sandy loamy garden soil congenial for plant growth which shall be of light textured, crystalline, porous and friable, fertile, slightly acidic or neutral).

300

-

115650

... More
Development of landscape(Softscape and Hardscape) works in Mandapadu 21st ward ( 0.54 Ac) at Gudivad;Maintenance of hedge/shrub planting: Trimming of hedges/shrubs (once in 15 days) watering (once in a day @ 5 Lts/per sqmt/per day shall be provide to maintain sub soil moisture continuously). Edge cutting 0.30mtr. away from the edges/shrub (once in a month) and application of fertilizers, insecticides, Fungicides ( once in a month @ 20 gms/pit/sqmt) etc., by manually excluding cost of water and fertilizers for one year

300

-

94127.04

... More
Development of landscape(Softscape and Hardscape) works in Mandapadu 21st ward ( 0.54 Ac) at Gudivad;Bed preparation for Ground cover / Flower beds: Digging the trench of size 150 mm. depth, and Formation of 150 mm. (6") thick of soil mixture at 3:1:1 ratio red garden soil, farmyard manure and river sand, application of fertilizers (@ 20 gms/pit/sqmt) by making smooth surface as per design including cost of soil mixture, filling of the soil mixture and internal transportation etc., for complete item of work. (excluding cost of plant material, fertilizers and chemicals (@ 20 gms / pit/ sqmt))-unit 1 Sqmt of work. (*20 No./Sqm of plants & bag size shall be arrived based on the spacing as per the design.) (Red garden soil in this context it is defined as sandy loamy garden soil congenial for plant growth which shall be of light textured, crystalline, porous and friable, fertile, slightly acidic or neutral)

130

-

29676.4

... More
Development of landscape(Softscape and Hardscape) works in Mandapadu 21st ward ( 0.54 Ac) at Gudivad;Maintenance of groundcover/flower beds: Weeding, Trimming/pinching and keeping the ground cover in healthy condition (once in a fortnight). Watering to ground cover (one's in three day's @ 5 litres/per Sqmts shall be provide to maintain sub soil moisture continuously) by manually, excluding cost of water. (Observed Data) for one year

130

-

18370.56

... More
Development of landscape(Softscape and Hardscape) works in Mandapadu 21st ward ( 0.54 Ac) at Gudivad;Digging of 0.75x0.75x0.75 mtrs. pit, filling with soil mixture of red garden soil, farmyard manure at 4:1 ratio including internal transport, application of fertilizers and chemicals (@ 20 gms/pit/sqmt), internal transportation of plants, planting the plants etc., for complete item of work (excluding cost of plant material, fertilizers and chemicals (@ 20 gms / pit/ sqmt) (Red garden soil in this context it is defined as sandy loamy garden soil congenial for plant growth which shall be of light textured, crystalline, porous and friable, fertile, slightly acidic or neutral)

116

-

67413.4

... More
Development of landscape(Softscape and Hardscape) works in Mandapadu 21st ward ( 0.54 Ac) at Gudivad;Maintenance of Palms/Tree planting: Trimming (once in month), watering (once in three days @ 5 Lts/per plant shall be provide to maintain sub soil moisture continuously), formation of basins 0.30m . away from the edges (once in a month) and application of fertilizers, insecticides, Fungicides @ 20 gms/pit/sqmt) (once in quarterly) by manually, but excluding cost of water & fertilizers for month for one year

116

-

32272.13

... More
Development of landscape(Softscape and Hardscape) works in Mandapadu 21st ward ( 0.54 Ac) at Gudivad;For paspalum grass

100

-

7500

... More
Development of landscape(Softscape and Hardscape) works in Mandapadu 21st ward ( 0.54 Ac) at Gudivad;For Korean grass

240

-

43200

... More
Development of landscape(Softscape and Hardscape) works in Mandapadu 21st ward ( 0.54 Ac) at Gudivad;For Tabernaemontana variegated

375

-

11250

... More
Development of landscape(Softscape and Hardscape) works in Mandapadu 21st ward ( 0.54 Ac) at Gudivad;For Hamelia patens

375

-

6750

... More
Development of landscape(Softscape and Hardscape) works in Mandapadu 21st ward ( 0.54 Ac) at Gudivad;For Hibiscus rosasinensis

375

-

16875

... More
Development of landscape(Softscape and Hardscape) works in Mandapadu 21st ward ( 0.54 Ac) at Gudivad;For Clerodendrum inerme

375

-

7500

... More
Development of landscape(Softscape and Hardscape) works in Mandapadu 21st ward ( 0.54 Ac) at Gudivad;For Nerium oliender

375

-

8250

... More
Development of landscape(Softscape and Hardscape) works in Mandapadu 21st ward ( 0.54 Ac) at Gudivad;For Ophiopogon variegated

375

-

5625

... More
Development of landscape(Softscape and Hardscape) works in Mandapadu 21st ward ( 0.54 Ac) at Gudivad;For Canna indica

375

-

13125

... More
Development of landscape(Softscape and Hardscape) works in Mandapadu 21st ward ( 0.54 Ac) at Gudivad;For Golden duranta

375

-

6750

... More
Development of landscape(Softscape and Hardscape) works in Mandapadu 21st ward ( 0.54 Ac) at Gudivad;For Iresine herbstii

434

-

6510

... More
Development of landscape(Softscape and Hardscape) works in Mandapadu 21st ward ( 0.54 Ac) at Gudivad;For Rhoeo spathacea

434

-

6510

... More
Development of landscape(Softscape and Hardscape) works in Mandapadu 21st ward ( 0.54 Ac) at Gudivad;For Setcreasea purpurea

434

-

10850

... More
Development of landscape(Softscape and Hardscape) works in Mandapadu 21st ward ( 0.54 Ac) at Gudivad;For Ipomea tricolor

434

-

8680

... More
Development of landscape(Softscape and Hardscape) works in Mandapadu 21st ward ( 0.54 Ac) at Gudivad;For Wedelia trilobata

434

-

4340

... More
Development of landscape(Softscape and Hardscape) works in Mandapadu 21st ward ( 0.54 Ac) at Gudivad;For Hemigraphis colorata

434

-

6510

... More
Development of landscape(Softscape and Hardscape) works in Mandapadu 21st ward ( 0.54 Ac) at Gudivad;For Azadirachta indica

11

-

7150

... More
Development of landscape(Softscape and Hardscape) works in Mandapadu 21st ward ( 0.54 Ac) at Gudivad;For Delonix regia

11

-

7150

... More
Development of landscape(Softscape and Hardscape) works in Mandapadu 21st ward ( 0.54 Ac) at Gudivad;For Cassia fistula

11

-

7150

... More
Development of landscape(Softscape and Hardscape) works in Mandapadu 21st ward ( 0.54 Ac) at Gudivad;For Erythrina indica

11

-

7150

... More
Development of landscape(Softscape and Hardscape) works in Mandapadu 21st ward ( 0.54 Ac) at Gudivad;For Lagerstroemia speciosa

11

-

7150

... More
Development of landscape(Softscape and Hardscape) works in Mandapadu 21st ward ( 0.54 Ac) at Gudivad;For Anthocephalus cadamba

10

-

6500

... More
Development of landscape(Softscape and Hardscape) works in Mandapadu 21st ward ( 0.54 Ac) at Gudivad;For Peltophorem pterocarpum

10

-

6500

... More
Development of landscape(Softscape and Hardscape) works in Mandapadu 21st ward ( 0.54 Ac) at Gudivad;For Tebebuia species

30

-

19500

... More
Development of landscape(Softscape and Hardscape) works in Mandapadu 21st ward ( 0.54 Ac) at Gudivad;For Mimusops elengi

10

-

6500

... More
Development of landscape(Softscape and Hardscape) works in Mandapadu 21st ward ( 0.54 Ac) at Gudivad;Loading and unloading of plants bag size (25"X25") at site of work and stacking for lead less upto 50 m and including labour charges, T&P etc.,and overheads & contractors profit complete for finished item of work (excluding cost of plant bag)

115

-

5149.57

... More
Development of landscape(Softscape and Hardscape) works in Mandapadu 21st ward ( 0.54 Ac) at Gudivad;Providing casing embankment using gravel from approved area in layers of 25 cm with compaction including cost of all materials, machinery, labour, all operations such as materials transporting, spreading in layer of specified thickness, breaking clods, sectioning, compacting each layer without watering by Road roller 10 tonne etc.,complete with 36 km transportation and all lifts etc., include all incidental incomplete.

2140.2

-

1431558.38

... More
Development of landscape(Softscape and Hardscape) works in Mandapadu 21st ward ( 0.54 Ac) at Gudivad;Earth work excavation for foundations (Manual Means) of buildings, septic tank, sump, compound wall in ordinary soils and depositing on bank with an initial lead of 10m and depth up to 3m including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete for finished item of work excluding dewatering charges etc., as per SS 20 B(APSS 308)

139.4

-

31822.23

... More
Development of landscape(Softscape and Hardscape) works in Mandapadu 21st ward ( 0.54 Ac) at Gudivad;Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using 162.0 kgs of cement, coarse aggregate 40mm size hard , machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc., to site, and including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc., and overheads & contractors profit complete for finished item of work. (APSS No. 402)

56.95

-

257242.01

... More
Development of landscape(Softscape and Hardscape) works in Mandapadu 21st ward ( 0.54 Ac) at Gudivad;Supply and fixing of C.C. Kerb not less than M30 strength of size 600 X 375 X 100 mm thick with bottom thickness of 100 mm upto height of 300 mm and top width of 50 mm thick chamfering with 45° at starts at 300 mm height to 375 mm height as selected by the Engineer-in-charge from approved source/ factory which is laid on existing CC Bed in position to the required line, level and curvature jointed with cement mortar 1:3 (1 cement : 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5 mm), including making drainage opening wherever required and including cost and conveyance of all materials & labour charges including transportation from approved source, loading & unloading charges including contractor profit & overhead charges complete for finished item of work.

465

-

235076.1

... More
Development of landscape(Softscape and Hardscape) works in Mandapadu 21st ward ( 0.54 Ac) at Gudivad;Supply and fixing of Kadapa slab (rough) 50mm thick and size of 0.457x0.457m stone edging including excavating trench in ordinary soil, laying P.C.C (1:4:8) 100 mm thick and fixing the stone in alignment and refilling the excavated soil conveyance of all materials and labour charges including transportation complete for finished item of work

153

-

22315.05

... More
Development of landscape(Softscape and Hardscape) works in Mandapadu 21st ward ( 0.54 Ac) at Gudivad;Supply & Fixing Sadarhalli granite stone with 5 line dressing Double Patti of 5' length seating benches with back rest and its width 16'' with 4" thick and 18" height with 4" thick and leg size 4'' width, including cost and conveyance of all materials like granite benche, cement, sand to work site loading ,un loading transport and all operational, incidental labour & lift charges,and overheads & contractors profit complete for finished item

12

-

192000

... More
Development of landscape(Softscape and Hardscape) works in Mandapadu 21st ward ( 0.54 Ac) at Gudivad;Filling with carted gravel in pathways, trenches, sides of foundations and basement with initial lead in layers not exceeding 15cm thick, watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T&P etc., and overheads & contractors profit complete for finished item of work(APSS NO.309&310)

90.9

-

86924.94

... More
Development of landscape(Softscape and Hardscape) works in Mandapadu 21st ward ( 0.54 Ac) at Gudivad;Flooring with 16 to 18mm thick high polished / Flame Finished / leather finished granite stone slabs other than black and regular colours (i.e. of shades like paradise / bala flower / copper silk / laka red / lavender blue) with borders and design as per the pattern approved by the Engineer-in-Charge of length not less than 2.43 mts set over base coat of cement mortar (1:8) , 20mm thick using screened sand over CC bed already laid or RCC roof slab including neat grey cement slurry of honey like consistency spread @ 3.3 Kg per sqm and jointed neatly with white cement paste mixed with pigment of matching shade to full depth including cost and conveyance of all materials like cement , sand , water , granite slabs etc., to work site and all operational, incidental labour & lift charges, polishing charges and cost of base coat and overheads & contractors profit complete for finished item of work (S.S.701 & special)

112

-

414199.52

... More
Development of landscape(Softscape and Hardscape) works in Mandapadu 21st ward ( 0.54 Ac) at Gudivad;Filling with dust in pathways with initial lead in layers not exceeding 15cm thick, watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T&P etc., and overheads & contractors profit complete for finished item of work(APSS NO.309&310)

26

-

43990.44

... More
Development of landscape(Softscape and Hardscape) works in Mandapadu 21st ward ( 0.54 Ac) at Gudivad;Supply of precast concrete blocks for paving of M-35 grade and thickness not less than 60 mm for Light traffic areas conforming to IS 15658:2006 in all shapes and designs as per the manufacturer's specification set over the 50 mm thick sand bed with hand roller compaction with joint neatly in homogeneous or heterogeneous pattern as the colour and pattern shall be as per the drawings furnished by the architect, including cost and conveyance of all materials like cement, sand, water, tiles, etc., to site including all operational, incidental, labour charges, laying tiles to required slope as directed by the Engineer- in-charge etc., and overheads & contractors profit complete for finished item of work

260

-

170359.8

... More
Development of landscape(Softscape and Hardscape) works in Mandapadu 21st ward ( 0.54 Ac) at Gudivad;Flooring with Rough black Kadapa slabs minimum of 50 mm thick of size 0.457m x 0.457m set over base coat of cement mortar (1 : 8) 12 mm thick over CC bed already laid or RCC roof slab, including pointing with cement mortar 1:3 duly filling joints nearly, including cost of all materials like flooring stone, cement, sand, and water etc., complete, including labour charges for dressing of flooring stones etc., complete for finished item of work,. (APSS No.703 & 701)

20.4

-

12307.32

... More
Development of landscape(Softscape and Hardscape) works in Mandapadu 21st ward ( 0.54 Ac) at Gudivad;Masonry work in CM(1:6) prop (Cement : Screened sand) in superstructure with fly ash cement / lime solid blocks of size 290mm x 225mm x 140mm from approved source having minimum crushing strength of 50 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site,and such as labour charges, like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, overheads and contractor profit etc., complete for finished item of work. (APSS No. 501 & 504).

72.79

-

441858.59

... More
Development of landscape(Softscape and Hardscape) works in Mandapadu 21st ward ( 0.54 Ac) at Gudivad;Plastering 12mm thick single coat in CM(1:5) using screened sand including cost and conveyance of all materials like cement, sand, water etc., to site and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work.(SS 901,903 & 904)

88

-

28167.04

... More
Development of landscape(Softscape and Hardscape) works in Mandapadu 21st ward ( 0.54 Ac) at Gudivad;Providing 0.60 m wide Coping with Polished black Kadapa slabs minimum of 25 mm to 30 mm thick in single piece as specified set over a base coat of CM (1:5) , 12mm thick using screened sand over already laid CC bed / RCC roof slab including neat cement slurry of honey like consistency spread @ 3.3 Kgs per Sqm and jointed with neat cement to full depth including cost and conveyance of all materials like cement, sand, water, flooring stones etc. complete including all labour charges like dressing of flooring stones to the required size, flat nosing the edges, mixing of cement mortar, laying, lift charges , cost of base coat, water charges etc., and overheads & contractors profit complete for finished item of work (APSS No.703 & 701)

121.24

-

86909.68

... More
Development of landscape(Softscape and Hardscape) works in Mandapadu 21st ward ( 0.54 Ac) at Gudivad;Supply & application of one coat water based cement primer of exterior grade II and two coats of acrylic exterior emulsion paint having VOC (Volatile Organic Compound) content less than 50 grams/litre for exterior walls including cost and conveyance of all materials to site,and all operational, incidental, labour charges etc., and overheads & contractors profit complete for finished item of work in all floors.

455.45

-

106634.51

... More
Development of landscape(Softscape and Hardscape) works in Mandapadu 21st ward ( 0.54 Ac) at Gudivad;Boring for Cast-in-Situ piles Augering and boring of holes in site for Bored cast-in-situ R.C.C. Piles for building foundations in loamy, clayey soils like Black cotton soils and ordinary soils without under reams as per IS 2911 - 1980 as per approved designs including all operations, incidental, labour charges, hire charges of machinery, augur bore drill and shell equipment, etc, complete for all depths and for finished item of work for piles of following diameters.

274.67

-

90609.08

... More
Development of landscape(Softscape and Hardscape) works in Mandapadu 21st ward ( 0.54 Ac) at Gudivad;Under Reaming for Cast-in-Situ piles Under-reaming for Bored cast-in-situ R.C.C. Piles for building foundations in loamy, clayey soils like Black cotton soils and ordinary soils with Augering and boring equipment in site as per IS 2911 - 1980 as per approved designs including all operations, incidental, labour charges, hire charges of machinery, augur bore drill and shell equipment, etc, complete for all depths and for finished item of work for piles of following diameters.

69.67

-

24468.57

... More
Development of landscape(Softscape and Hardscape) works in Mandapadu 21st ward ( 0.54 Ac) at Gudivad;Supply and placing of the V.R.C.C Nominal Mix Concrete M 20 grade corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete using CONCRETE MIXER with 20mm size HBG graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry and,including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and , centring using Casurina Ballies, Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates etc., including all operational, incidental and labour charges such as machine mixing, lifting of concrete manually, laying concrete, vibrator, curing , overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)

20.66

-

169638.7

... More
Development of landscape(Softscape and Hardscape) works in Mandapadu 21st ward ( 0.54 Ac) at Gudivad;Supply and placing of the V.R.C.C Nominal Mix Concrete M 20 grade corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete using CONCRETE MIXER with 20mm size HBG graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry and including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water, etc., to site and , centring using Steel scaffolding pipes , jack props , Waller?s , Foot plates , brackets , steel centring plates etc., including all operational, incidental and labour charges such as machine mixing, laying concrete, vibrator, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)

14.14

-

158604.56

... More
Development of landscape(Softscape and Hardscape) works in Mandapadu 21st ward ( 0.54 Ac) at Gudivad;Supply and placing of the V.R.C.C Nominal Mix Concrete M 20 grade corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete using CONCRETE MIXER with 20mm size HBG graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry and,including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and , centring using Casurina Ballies, Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates etc., including all operational, incidental and labour charges such as machine mixing, lifting of concrete manually, laying concrete, vibrator, curing , overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)

2.22

-

24146.58

... More
Development of landscape(Softscape and Hardscape) works in Mandapadu 21st ward ( 0.54 Ac) at Gudivad;Supply and placing of the V.R.C.C Nominal Mix Concrete M 20 grade corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete using CONCRETE MIXER with 20mm size HBG graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and , centring using Casurina Ballies , Bamboos , Wooden Reapers , Runners , Wood Posts , Wall Plates etc., including all operational, incidental and labour charges such as machine mixing, lifting of concrete manually, laying concrete, vibrator, , curing , overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)

1.4

-

13592.94

... More
Development of landscape(Softscape and Hardscape) works in Mandapadu 21st ward ( 0.54 Ac) at Gudivad;Providing High Yield Strength Deformed (HYSD) / Thermo Mechanically Treated (TMT) (Fe 500 / Fe 500D grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including overheads & contractors profit complete for finished item of work.( APSS No.126)

3766.6

-

292325.83

... More
Development of landscape(Softscape and Hardscape) works in Mandapadu 21st ward ( 0.54 Ac) at Gudivad;Providing cladding to wall with High Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M) other than black and regular colours, length equal to flooring slabs set over base coat of CM(1:5) 12 mm thick using screened sand with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointing with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., and overheads & contractors profit complete for finished item of work.

44.22

-

164186.21

... More
Development of landscape(Softscape and Hardscape) works in Mandapadu 21st ward ( 0.54 Ac) at Gudivad;Supply and fabrication of MS framed structure like Window Grills, Compound Wall Grills, Iron Doors, Windows, Gates, MS Frame for chain link mesh works, Roof Trusses by using square / rectangular MS hollow section as per IS 4923 & Angles as per SP:6(1) IS Hand book, including cost of welding rods, power charges, labour charges for cutting, placing, welding and erecting in position and fixing, cost & convenience of all materials including wastage to site and complete for finished item of work

8075.27

-

781928.39

... More
Development of landscape(Softscape and Hardscape) works in Mandapadu 21st ward ( 0.54 Ac) at Gudivad;Supply and fabrication works like Window Grills, Compound Wall Grills, Iron Doors, Windows, Gates, Roof Trusses by using MS solid plate section as per IS 1730 including cost of welding rods, power charges, labour charges for cutting, placing, welding & erecting in position and fixing cost & convenience of all materials including wastage to site and complete for finished item of work.

256.76

-

27552.92

... More
Development of landscape(Softscape and Hardscape) works in Mandapadu 21st ward ( 0.54 Ac) at Gudivad;Painting to new iron work with one coat of Red oxide primer and two coats with synthetic enamel paint Grade-I VOC (Volatile Organic Compound) content less than 50 grams/litre over primer coat of red oxid, including cost and conveyance of all materials like Red oxide primer, Synthetic Enamel Paint to site, incidental, operational and all labour charges etc., and overheads & contractors profit complete for finished item of work in all floors. (SS No. 1201, 1212 & 1207).

366.53

-

63596.62

... More
Development of landscape(Softscape and Hardscape) works in Mandapadu 21st ward ( 0.54 Ac) at Gudivad;Vibrated Plain Cement Concrete M 20 Nominal mix using Concrete MIXER, 20mm size hard granite machine crushed graded metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concrete , including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site including steel centring, shuttering, machine mixing, lift charges, laying concrete, vibrating, curing, overheads & contractors profit etc., complete for finished item of work (APSS No. 402 & 403)

16.29

-

108388.45

... More
Development of landscape(Softscape and Hardscape) works in Mandapadu 21st ward ( 0.54 Ac) at Gudivad;Plastering 12mm thick in two coats using screened sand with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, ,, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer - in - charge etc., and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904)

405.25

-

174780.27

... More
Development of landscape(Softscape and Hardscape) works in Mandapadu 21st ward ( 0.54 Ac) at Gudivad;Providing and applying PMCC / Deco orient base or Equivalent exterior Texture ( borders and design as per the pattern approved by the Engineer-in-Charge ) of average 2 to 3 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying putty/ texture paint filler by putty knife / muslin pad, air dry for 2 - 3 hrs for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges, scaffolding charges, overheads and contractors profit etc., complete for finished item of work in all floors for external walls

405.25

-

107861.34

... More
Development of landscape(Softscape and Hardscape) works in Mandapadu 21st ward ( 0.54 Ac) at Gudivad;Filling with useful available excavated earth (excluding rock) with a lead of 50 m in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cm thick, watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T&P etc., and overheads & contractors profit complete for finished item of work (APSS NO.309&310)

10.92

-

3596.83

... More
Development of landscape(Softscape and Hardscape) works in Mandapadu 21st ward ( 0.54 Ac) at Gudivad;Plastering 20mm thick in two coats using screened sand with base coat of 16mm thick in CM(1:6) and top coat of 4mm thick in CM(1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, ,, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work .(SS 901,903 & 904)

11

-

4915.24

... More
Development of landscape(Softscape and Hardscape) works in Mandapadu 21st ward ( 0.54 Ac) at Gudivad;Providing Treads with 16 to 18mm thick high polished / Flame Finished / leather finished granite stone slabs other than black and regular colour granite with borders and design as per the pattern approved by the Engineer-in-Charge of length not less than 2.43 mts set over base coat of cement mortar (1:5) , 12mm thick using screened sand over CC bed already laid or RCC roof slab including neat grey cement slurry of honey like consistency spread @ 3.3 Kg per sqm and jointed neatly with white cement paste mixed with pigment of matching shade to full depth including cost and conveyance of all materials like cement , sand , water , granite slabs etc., to work site and all operational, incidental labour & lift charges, half rounding the edges of treads , polishing charges and cost of base coat and overheads & contractors profit complete for finished item of work for Treads (S.S.701 & special)

2.7

-

13693.97

... More
Development of landscape(Softscape and Hardscape) works in Mandapadu 21st ward ( 0.54 Ac) at Gudivad;Providing Risers to steps walls with 16 to 18mm thick high polished / Flame Finished / leather finished granite stone slabs other than black and regular colour granite with length equal to flooring stone, set over base coat of CM(1:5) 12 mm thick using screened sand with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointing with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., and overheads & contractors profit complete for finished item of work. for Risers-0.15 m(APSS No.701 &707)

1.2

-

4590.36

... More
Development of landscape(Softscape and Hardscape) works in Mandapadu 21st ward ( 0.54 Ac) at Gudivad;Supply and fixing of cement bonded board 8 mm thick and laying as per the pattern approved by the Engineer-in-Charge on purlins, rafters, trusses, including cost and conveyance of all materials like approved cement bonded board, nails, labour charges , overheads and contractors profit etc., complete for finished item of work in all floors. excluding the cost of purlins, rafters, trusses.

30

-

23307.3

... More
Development of landscape(Softscape and Hardscape) works in Mandapadu 21st ward ( 0.54 Ac) at Gudivad;Providing and laying of best tiled roofing with pressed clay (Mangalore tiles) size 225 x 150 x 20 mm thick and laying as per the pattern approved by the Engineer-in-Charge on roofs jointed with cement mortar 1:4 (1 cement : 4 coarse sand) mixed with 2% integral water proofing compound, laid over a bed of 20 mm thick cement mortar 1:4 (1 cement : 4 coarse sand) including Rabbit wire mesh (Chicken mesh) of not less than 30 gauge and jointed neatly with white cement paste to full depth mixed with pigment of matching shade at required place including cost and conveyance of all materials like cement, sand, water, tiles, Rabbit wire mesh, white cement, wastage etc., to site including cost of all labour charges for mixing of cement mortar, scaffolding, lift charges, laying tiles to required slope as directed by the Engineer- in-charge , curing etc., and overheads & contractors profit complete for finished item of work.

33.85

-

47961.05

... More
Development of landscape(Softscape and Hardscape) works in Mandapadu 21st ward ( 0.54 Ac) at Gudivad;Filling with carted coarse sand in play area, pathway, foundations bed and basement with initial lead in layers not exceeding 15cm thick, watering and ramming including cost and conveyance of water to work site and all operational, incidental ,labour charges, hire charges of T&P etc., and overheads & contractors profit complete for finished item of work(APSS NO.309&310)

64.5

-

73475.82

... More
Development of landscape(Softscape and Hardscape) works in Mandapadu 21st ward ( 0.54 Ac) at Gudivad;Supply, Delivery, Installation and Commissioning of Single Pillar Multiplay Station of Arihant/ Equivalent make including transportation, installation, commissioning, loading and unloading etc., for complete finished item of the work. Single Pillar Multiplay Station Equipment Size: L x W: 27 x 18 Feet i) FRP Double wave Slide ii) Mini Spiral Slide iii) Step Ladder iv) FRP Mushroom Canopy v) Hanging Bar

1

-

288000

... More
Development of landscape(Softscape and Hardscape) works in Mandapadu 21st ward ( 0.54 Ac) at Gudivad;Supply, Delivery, Installation and Commissioning of 6.5m x 1.5m size of FOUR SEATER ARC SWING of Arihant/ Equivalent make including transportation, installation, commissioning, loading and unloading etc., for complete finished item of the work.

1

-

89877

... More
Development of landscape(Softscape and Hardscape) works in Mandapadu 21st ward ( 0.54 Ac) at Gudivad;Supply, Delivery, Installation and Commissioning of Jungle GYM of Arihant/ Equivalent make including transportation, installation, commissioning, loading and unloading etc., for complete finished item of the work.

1

-

68000

... More
Development of landscape(Softscape and Hardscape) works in Mandapadu 21st ward ( 0.54 Ac) at Gudivad;Supply, Delivery, Installation and Commissioning of Deluxe Circular swing of Arihant/ Equivalent make including transportation, installation, commissioning, loading and unloading etc., for complete finished item of the work.

1

-

48500

... More
Development of landscape(Softscape and Hardscape) works in Mandapadu 21st ward ( 0.54 Ac) at Gudivad;Supply, Delivery, Installation and Commissioning of Butter Fly of Arihant/ Equivalent make including transportation, installation, commissioning, loading and unloading etc., for complete finished item of the work.

1

-

66480

... More
Development of landscape(Softscape and Hardscape) works in Mandapadu 21st ward ( 0.54 Ac) at Gudivad;Four Seater See Saw 4 No?s Seats made with FRP Fibre Seats and fitted both ends of 50 MM Dia Pipe length8 Ft with Bolts & Nuts and both fitted on Horizontal Pipe 3? length and 60 mm Dia?U? shape (rivers) with clamps with fibre Seats. L x W x H: 8ft x3ft x 3ft

1

-

40480



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.