Andhra Pradesh Urban Greening And Beautification Corporation Limited Tender
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Andhra Pradesh Urban Greening And Beautification Corporation Limited - APUGBCL Tender
Opening Date23 Jun 2020
Closing Date7 Jul 2020
Tender Amount₹ 25,16,537
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
339580Bid Award Id
ViewTender No
APUG-15021/8/2020-TEC-SEC-APUGBC/2020-2021/1(11)Tender Authority
Andhra Pradesh Urban Greening And Beautification Corporation Limited ViewPurchaser Address
-Website
http://http://urbangreening.ap.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Hedge / shrub planting: Digging the trench of size 0.3 mtrs. depth, refilling with red garden soil including cost of red garden soil and farmyard manure at 4:1 ratio, internal transportation of plants, planting etc., including the application of fertilizers and pesticides etc., (@ 20 gms/pit/sqmt) complete for item of work, but excluding the cost of the fertilizers (@ 20 gms/pit/sqmt) and plant material etc., - unit 1 Sqmt of work. (*10 No./Sqm of plants & bag size shall be arrived based on the spacing as per the design.) (Red garden soil in this context it is defined as sandy loamy garden soil congenial for plant growth which shall be of light textured, crystalline, porous and friable, fertile, slightly acidic or neutral).
1738.82
680035
391.09
Maintenance of hedge/shrub planting: Trimming of hedges/shrubs (once in 15 days) watering (once in a day @ 5 Lts/per sqmt/per day shall be provide to maintain sub soil moisture continuously). Edge cutting 0.30mtr. away from the edges/shrub (once in a month) and application of fertilizers, insecticides, Fungicides ( once in a month @ 20 gms/pit/sqmt) etc., by manually excluding cost of water and fertilizers for one year
1738.82
498126
2387.28
Bed preparation for Ground cover / Flower beds: Digging the trench of size 150 mm. depth, and Formation of 150 mm. (6") thick of soil mixture at 3:1:1 ratio red garden soil, farmyard manure and river sand, application of fertilizers (@ 20 gms/pit/sqmt) by making smooth surface as per design including cost of soil mixture, filling of the soil mixture and internal transportation etc., for complete item of work. (excluding cost of plant material, fertilizers and chemicals (@ 20 gms / pit/ sqmt))-unit 1 Sqmt of work. (*20 No./Sqm of plants & bag size shall be arrived based on the spacing as per the design.) (Red garden soil in this context it is defined as sandy loamy garden soil congenial for plant growth which shall be of light textured, crystalline, porous and friable, fertile, slightly acidic or neutral)
492.94
67616
137.17
Maintenance of groundcover/flower beds: Weeding, Trimming/pinching and keeping the ground cover in healthy condition (once in a fortnight). Watering to ground cover (one's in three day's @ 5 litres/per Sqmts shall be provide to maintain sub soil moisture continuously) by manually, excluding cost of water. for one year
492.94
63601
1075.2
Digging of 0.75x0.75x0.75 mtrs. pit, filling with soil mixture of red garden soil, farmyard manure at 4:1 ratio including internal transport, application of fertilizers and chemicals (@ 20 gms/pit/sqmt), internal transportation of plants, planting the plants etc., for complete item of work (excluding cost of plant material, fertilizers and chemicals (@ 20 gms / pit/ sqmt) (Red garden soil in this context it is defined as sandy loamy garden soil congenial for plant growth which shall be of light textured, crystalline, porous and friable, fertile, slightly acidic or neutral)
50
29319
586.39
Maintenance of Palms/Tree planting: Trimming (once in month), watering (once in three days @ 5 Lts/per plant shall be provide to maintain sub soil moisture continuously), formation of basins 0.30m . away from the edges (once in a month) and application of fertilizers, insecticides, Fungicides @ 20 gms/pit/sqmt) (once in quarterly) by manually, but excluding cost of water & fertilizers for month for one year
50
12700
2116.8
Supply & Delivery of topiary/trees/Palms/shrubs/lawn/ ground covers and specified plants as per directions of officer in charge at site including cost of plants and conveyance of all materials and labour charges etc., plants of bag size 7" x 8" of plant height not less than 1.0 feet,
8" x 10" of plant height not less than 3.0 feet,
13" x 13" of Tree/Palm height not less than 5 feet,
13" x 13" of plant (Hedges & Shrub) height not less than 2 feet,
15" x 16" of plant (Tree/Palm/Topiary) height not less than 5 feet, 18" x 18" plant (Tree/Palm/Topiary) height not less than 6 feet, bottom dia of the stem is 0.75'' and above, 21" x 21" and above plant (Tree/Palm/Topiary) height not less than 7 feet, bottom dia of the stem is 1'' and above.
Heights mentioned above are excluding bag height.
All the plants supplied shall be with sturdy stem, well formed crown, vigorously growing tip, healthy foliage without any infestation and the plants shall be supplied after proper hardening off. The rates inclusive of loading, transportation to the site, unloading & handling.
1
-
-
For Shade grass
600
45000
75
For Korean grass
400
72000
180
Plumbago capensis (7'' x 8")
1875
41250
22
Acalypha red (7'' x 8")
815
14670
18
Techomaria capensis (12" x 13")
456
31920
70
Heliconia (7'' x 8")
1133
45320
40
Galphiia gracilis (7'' x 8")
828
12420
15
Murraya paniculata (7'' x 8")
1367
34175
25
Tecoma capensis (7'' x 8")
2330
51260
22
Chrysothemis pulchella (7'' x 8")
1800
54000
30
Ixora hybrid (7'' x 8")
840
18480
22
Golden durnata (5'' x 6")
3005
24040
8
Acalypha Inferna (7'' x 8")
300
6000
20
Hymenocallis littoralis (7'' x 8")
1080
19440
18
Pennistum white (7'' x 8")
420
7560
18
Alpinia red ginger (7'' x 8")
1140
34200
30
Wedelia trilobata (5'' x 6")
380
3800
10
Dianella numorosa (4" x 6'')
83
1328
16
Rhoeo spathacea (5'' x 6")
520
4680
9
Lantana depressa (7'' x 8")
1400
25200
18
Lantana sellowiana (7'' x 8'')
1200
21600
18
Portucla (5'' x 6")
900
13500
15
Nerium oleander dwarf (7'' x 8")
200
3000
15
Hamelia patens dwarf (7'' x 8")
500
8000
16
Syngonium podophylum (4'' x 6'')
1120
16800
15
Opheopogon taburnas (4'' x 6'')
1317
19755
15
Dianella (4'' x 6'')
500
7500
15
Pandanus (7'' x 8'')
605
10890
18
Lantana sellowiana (7'' x 8'')
320
4800
15
Wedelia trilobata (7'' x 8")
414
6210
15
Rhoeo spathacea (7'' x 8")
400
6000
15
Codia sebestena (25" x 25")
4
-
-
Terminilia catappa (25" x 25")
5
-
-
Lagerstromia speciosa (25" x 25")
3
-
-
Azadirachta indica (25" x 25")
1
-
-
Peltophorum pterocarpum (25" x 25")
2
-
-
Mangifera indica (25" x 25")
1
-
-
Mimusops elengi (25" x 25")
11
-
-
Roystonea regia (25" x 25")
2
-
-
Cycus Revoluta (25" x 25")
5
-
-
Terminilia Mentally (25" x 25")
12
-
-
Bauhinia blakeana (25" x 25")
4
-
-
Loading and unloading of plants bag size (25"X25") at site of work and stacking for lead less upto 50 m and including labour charges, T&P etc.,and overheads & contractors profit complete for finished item of work (excluding cost of plant bag)
50
2129
4258.86
L.S Provision for transportation of bag plants form Gannavaram to Guntur (The Amount will be paid as per the actuals)
1
8000
8000
Transportation of bag plants form Hyderabad to Guntur (The Amount will be paid as per the actuals)
1
15000
15000
Provision for drip irrigation (The Amount will be paid as per the actuals)
1
150000
150000
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements