Andhra Pradesh Urban Greening And Beautification Corporation Limited Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Andhra Pradesh Urban Greening And Beautification Corporation Limited - APUGBCL Tender

Agriculture or Forestry Works
Opening Date11 Jul 2022
Closing Date27 Jul 2022
Tender Amount₹ 27,00,070 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Development of Raising Avenue Plantation and Central median Plantation with 1 Year Maintenance at Na;Filling with Red soil (Red soil in this context it is defined as sandy loamy garden soil congenial for plant growth which shall be of light textured, crystalline, porous and friable, fertile, slightly acidic or neutral) in pits/trenches and including cost and conveyance of red soil to work site and it including all operational, incidental ,labour charges, required tools, overheads & contractors profit complete for finished item of work.

333.82

-

363863.8

... More
Development of Raising Avenue Plantation and Central median Plantation with 1 Year Maintenance at Na;Cost and Conveyance of Farm Yard Manure or dry cow dung powder including loading, unloading, internal transport and application of the FYM into the pits/trenches and it including all operational, incidental, labour charges, required tools, overheads & contractors profit complete for finished item of work. (0.028 cum Farm yard Manure for each pit.)

47.04

-

72719.14

... More
Development of Raising Avenue Plantation and Central median Plantation with 1 Year Maintenance at Na;Conveyance charges for internal transprot upto 100 mt with head load and application of the red soil and FYM into the pit and it including all operational, incidental, labour charges, required tools, overheads & contractors profit complete for finished item of work.

380.86

-

36349.28

... More
Development of Raising Avenue Plantation and Central median Plantation with 1 Year Maintenance at Na;Internal transportation of tall plants from plants stacking place to planting pit, it including all operational, incidental ,labour charges, overheads & contractors profit complete for finished item of work.

1680

-

5443.2

... More
Development of Raising Avenue Plantation and Central median Plantation with 1 Year Maintenance at Na;Removing polythene bag, planting by keeping the ball of earth intact, fixing the plant by refilling with dug out of soil /supplied soli FYM mixer and ramming around the plant , it including all operational, incidental ,labour charges, required tools, overheads & contractors profit complete for finished item of work.

1680

-

26107.2

... More
Development of Raising Avenue Plantation and Central median Plantation with 1 Year Maintenance at Na;Hedge / shrub planting: Digging the trench of size 0.3 mtrs. depth, refilling with red garden soil including cost of red garden soil and farmyard manure at 4:1 ratio, internal transportation of plants, planting etc., including the application of fertilizers and pesticides etc., (@ 20 gms/pit/sqmt) complete for item of work, but excluding the cost of the fertilizers (@ 20 gms/pit/sqmt) and plant material etc., - unit 1 Sqmt of work. (* 5 No./Sqm of plants & bag size shall be arrived based on the spacing as per the design.) (Red garden soil in this context it is defined as sandy loamy garden soil congenial for plant growth which shall be of light textured, crystalline, porous and friable, fertile, slightly acidic or neutral)

750

-

341287.5

... More
Development of Raising Avenue Plantation and Central median Plantation with 1 Year Maintenance at Na;Maintenance of hedge/shrub planting: Trimming of hedges/shrubs (once in a month) it including all operational, incidental ,labour charges for complete of work.

9000

-

39690

... More
Development of Raising Avenue Plantation and Central median Plantation with 1 Year Maintenance at Na;Maintenance of hedge/shrub planting: application of fertilizers, insecticides, Fungicides (once in a month @ 20 gms/pit/sqmt) etc., by manually excluding cost of fertilizers it including all operational, incidental, labour charges, for complete of work.

9000

-

7497

... More
Development of Raising Avenue Plantation and Central median Plantation with 1 Year Maintenance at Na;Maintenance of hedge/shrub planting: watering once in 3 days @ 5 Lts/per sqmt shall be provide to maintain sub soil moisture continuously by manually (Watering by pipe) excluding cost of wateri ncluding all operational, incidental, labour charges for complete of work..

9000

-

44100

... More
Development of Raising Avenue Plantation and Central median Plantation with 1 Year Maintenance at Na;Hire charges of tractor mounted water tanker for filling sump by 5000 ltrs capacity tanker (120 waterings for one year ie. once in a three days @ 5 litres per sqm/plant per each time) and it including all operational, incidental ,labour charges, required tools, overheads & contractors profit complete for finished item of work

292

-

201827.48

... More
Development of Raising Avenue Plantation and Central median Plantation with 1 Year Maintenance at Na;Watering by pipe, weeding and soil working 1 Mt Dai around the plant, fertilizer application, pesticide application and watch and ward. and it including, labour charges, required tools, overheads & contractors profit complete for finished item of work

20160

-

249603.58

... More
Development of Raising Avenue Plantation and Central median Plantation with 1 Year Maintenance at Na;Loading and unloading of plants bag size (18"X18") at site of work and stacking for lead less upto 50 m and including labour charges, T&P etc.,and overheads & contractors profit complete for finished item of work (excluding cost of plant bag)

1680

-

29966.33

... More
Development of Raising Avenue Plantation and Central median Plantation with 1 Year Maintenance at Na;Loading and unloading of plants bag size (8"X10") at site of work and stacking for lead less upto 50 m and including labour charges, T&P etc.,and overheads & contractors profit complete for finished item of work (excluding cost of plant bag)

3750

-

2665.13

... More
Development of Raising Avenue Plantation and Central median Plantation with 1 Year Maintenance at Na;Transportation of bag plants from kadiyam to Narasaraopet (Actual payment will paid for the actual work done subjected to approval of the rates by the competent authority)

73.8

-

66420

... More
Development of Raising Avenue Plantation and Central median Plantation with 1 Year Maintenance at Na;Dypsis decaryi 

100

-

27500

... More
Development of Raising Avenue Plantation and Central median Plantation with 1 Year Maintenance at Na;Hymenocallis littoralis 

1875

-

20625

... More
Development of Raising Avenue Plantation and Central median Plantation with 1 Year Maintenance at Na;Washingtonia robusta

100

-

42500

... More
Development of Raising Avenue Plantation and Central median Plantation with 1 Year Maintenance at Na;Plumbago auriculata

1875

-

30000

... More
Development of Raising Avenue Plantation and Central median Plantation with 1 Year Maintenance at Na;Peltophorum pterocarpum

400

-

64000

... More
Development of Raising Avenue Plantation and Central median Plantation with 1 Year Maintenance at Na;Swietenia mahagoni

80

-

11600

... More
Development of Raising Avenue Plantation and Central median Plantation with 1 Year Maintenance at Na;Spathodea campanulata

400

-

60000

... More
Development of Raising Avenue Plantation and Central median Plantation with 1 Year Maintenance at Na;Hibiscus tiliaceus

200

-

30000

... More
Development of Raising Avenue Plantation and Central median Plantation with 1 Year Maintenance at Na;Millingtonia hortensis

140

-

21000

... More
Development of Raising Avenue Plantation and Central median Plantation with 1 Year Maintenance at Na;Tabebuia avellanedae

100

-

16000

... More
Development of Raising Avenue Plantation and Central median Plantation with 1 Year Maintenance at Na;Delonix regia

40

-

6000

... More
Development of Raising Avenue Plantation and Central median Plantation with 1 Year Maintenance at Na;Mimusops elengi 

20

-

3500

... More
Development of Raising Avenue Plantation and Central median Plantation with 1 Year Maintenance at Na;Bauhinia blakeana

100

-

16000

... More
Development of Raising Avenue Plantation and Central median Plantation with 1 Year Maintenance at Na;Supply, deliveryand and fixing of HDPE Tree Guards confirming to ISI standards with following Technical specifications 1. The tree guard should be made of Virgin HDPE 2. Width ? 1200 mm 3. Height ? 1800 mm 4. Diameter ? 375 mm 5. Horizontal regular filament average thickness should not be less than 4 mm. 6. Vertical regular filament average thickness should not be less than 4 mm. 7. All joints average thicknesses should not be less than 6 mm 8. Regular mesh gap should not be more than 45mm x 55mm.. 9. Longitudinal additional extra thick filament (two bars) shall be placed at 4 places along the height of 1800mm with a filament average thickness should not be less than 5 mm. 10. Circumference additional extra thick filament (two bars) shall be placed at 5 places along the width of 1200mm with a filament average thickness should not be less than 5 mm.

1480

-

376364

... More
Development of Raising Avenue Plantation and Central median Plantation with 1 Year Maintenance at Na;Painting With Asian Apex exterior emulsion paint two coats over two coats of primary coat of Asian exterior emulsion paint and painting of clip art / vector art /3D bubble art with enamel paint over old plastered walls of Public/Govt. Institution?s compound walls, Medians and Islands including cost and conveyance of all materials and labor charges etc?complete including removing of posters and rubbing work for walls up to 10 feet height. overheads & contractors profit complete for finished item of work. as per (ANNEXURE TO THE CIRCULAR ROC NO. 1481/2017/M3, Dt. 13.06.2017)

800

-

244592



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.