Andhra Pradesh Urban Greening And Beautification Corporation Limited Tender
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Andhra Pradesh Urban Greening And Beautification Corporation Limited - APUGBCL Tender
Agriculture or Forestry Works
Opening Date5 Jul 2022
Closing Date25 Jul 2022
Tender Amount₹ 22,62,259
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
526001Bid Award Id
ViewTender No
APUG-15021/5/2022-TECH-SEC-APUGBC/2022-23/2(7)Tender Authority
Andhra Pradesh Urban Greening And Beautification Corporation Limited ViewPurchaser Address
-Website
http://http://urbangreening.ap.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Development of Raising Avenue Plantation and Central median Plantation with 1 Year Maintenance at Na;Filling with Red soil (Red soil in this context it is defined as sandy loamy garden soil congenial for plant growth which shall be of light textured, crystalline, porous and friable, fertile, slightly acidic or neutral) in pits/trenches and including cost and conveyance of red soil to work site and it including all operational, incidental ,labour charges, required tools, overheads & contractors profit complete for finished item of work.
166.27
-
199524
Development of Raising Avenue Plantation and Central median Plantation with 1 Year Maintenance at Na;Cost and Conveyance of Farm Yard Manure or dry cow dung powder including loading, unloading, internal transport and application of the FYM into the pits/trenches and it including all operational, incidental, labour charges, required tools, overheads & contractors profit complete for finished item of work. (0.028 cum Farm yard Manure for each pit.)
24.53
-
37920.93
Development of Raising Avenue Plantation and Central median Plantation with 1 Year Maintenance at Na;Conveyance charges for internal transprot upto 100 mt with head load and application of the red soil and FYM into the pit and it including all operational, incidental, labour charges, required tools, overheads & contractors profit complete for finished item of work.
190.76
-
18205.66
Development of Raising Avenue Plantation and Central median Plantation with 1 Year Maintenance at Na;Internal transportation of tall plants from plants stacking place to planting pit, it including all operational, incidental ,labour charges, overheads & contractors profit complete for finished item of work.
876
-
2838.24
Development of Raising Avenue Plantation and Central median Plantation with 1 Year Maintenance at Na;Removing polythene bag, planting by keeping the ball of earth intact, fixing the plant by refilling with dug out of soil /supplied soli FYM mixer and ramming around the plant , it including all operational, incidental ,labour charges, required tools, overheads & contractors profit complete for finished item of work.
876
-
13613.04
Development of Raising Avenue Plantation and Central median Plantation with 1 Year Maintenance at Na;Hedge / shrub planting: Digging the trench of size 0.3 mtrs. depth, refilling with red garden soil including cost of red garden soil and farmyard manure at 4:1 ratio, internal transportation of plants, planting etc., including the application of fertilizers and pesticides etc., (@ 20 gms/pit/sqmt) complete for item of work, but excluding the cost of the fertilizers (@ 20 gms/pit/sqmt) and plant material etc., - unit 1 Sqmt of work. (* 5 No./Sqm of plants & bag size shall be arrived based on the spacing as per the design.) (Red garden soil in this context it is defined as sandy loamy garden soil congenial for plant growth which shall be of light textured, crystalline, porous and friable, fertile, slightly acidic or neutral)
870
-
416973.6
Development of Raising Avenue Plantation and Central median Plantation with 1 Year Maintenance at Na;Supply, deliveryand and fixing of HDPE Tree Guards confirming to ISI standards with following Technical specifications 1. The tree guard should be made of Virgin HDPE 2. Width ? 1200 mm 3. Height ? 1800 mm 4. Diameter ? 375 mm 5. Horizontal regular filament average thickness should not be less than 4 mm. 6. Vertical regular filament average thickness should not be less than 4 mm. 7. All joints average thicknesses should not be less than 6 mm 8. Regular mesh gap should not be more than 45mm x 55mm.. 9. Longitudinal additional extra thick filament (two bars) shall be placed at 4 places along the height of 1800mm with a filament average thickness should not be less than 5 mm. 10. Circumference additional extra thick filament (two bars) shall be placed at 5 places along the width of 1200mm with a filament average thickness should not be less than 5 mm.
696
-
176992.8
Development of Raising Avenue Plantation and Central median Plantation with 1 Year Maintenance at Na;11. Weight of the sheet (1200mmX1800mm) should not be less than 1.50 kgs excluding display board and cable ties. 12. Melt Flow Index (MFI) should be as per Raw Material data sheet submitted by the contractor. (+ 20% allowable) 13. Supply of 18 Nos cable ties (100 mm length). 14. Color ? Dark blue or Green variants 15. Suitable for outdoor use (Must be tested for presence of UV resistance material) 16. Display board of size 300mm x 150mm of plastic glow sheet blend of HDPP / tin plate/ACP with a suitable hole at each corner for tie up. The rates inclusive of loading, transportation to the site, unloading. complete for finished item of work.
-
-
-
Development of Raising Avenue Plantation and Central median Plantation with 1 Year Maintenance at Na;Maintenance of hedge/shrub planting: Trimming of hedges/shrubs (once in a month) it including all operational, incidental ,labour charges for complete of work.
10440
-
46040.4
Development of Raising Avenue Plantation and Central median Plantation with 1 Year Maintenance at Na;Maintenance of hedge/shrub planting: application of fertilizers, insecticides, Fungicides (once in a month @ 20 gms/pit/sqmt) etc., by manually excluding cost of fertilizers it including all operational, incidental, labour charges, for complete of work.
10440
-
8696.52
Development of Raising Avenue Plantation and Central median Plantation with 1 Year Maintenance at Na;Maintenance of hedge/shrub planting: watering once in 3 days @ 5 Lts/per sqmt shall be provide to maintain sub soil moisture continuously by manually excluding cost of wateri ncluding all operational, incidental ,labour charges for complete of work..
10440
-
51156
Development of Raising Avenue Plantation and Central median Plantation with 1 Year Maintenance at Na;Hire charges of tractor mounted water tanker for filling sump by 5000 ltrs capacity tanker (120 waterings for one year ie. once in a three days @ 5 litres per sqm/plant per each time) and it including all operational, incidental ,labour charges, required tools, overheads & contractors profit complete for finished item of work
201
-
138929.19
Development of Raising Avenue Plantation and Central median Plantation with 1 Year Maintenance at Na;Watering by pipe, weeding and soil working 1 Mt Dai around the plant, fertilizer application, pesticide application and watch and ward. and it including, labour charges, required tools, overheads & contractors profit complete for finished item of work
10512
-
130150.44
Development of Raising Avenue Plantation and Central median Plantation with 1 Year Maintenance at Na;Loading and unloading of plants bag size (18"X18") at site of work and stacking for lead less upto 50 m and including labour charges, T&P etc.,and overheads & contractors profit complete for finished item of work (excluding cost of plant bag)
876
-
15625.3
Development of Raising Avenue Plantation and Central median Plantation with 1 Year Maintenance at Na;Loading and unloading of plants bag size (8"X10") at site of work and stacking for lead less upto 50 m and including labour charges, T&P etc.,and overheads & contractors profit complete for finished item of work (excluding cost of plant bag)
4350
-
3091.54
Development of Raising Avenue Plantation and Central median Plantation with 1 Year Maintenance at Na;Transportation of bag plants from kadiyam to Narsapur .
48.06
-
33642
Development of Raising Avenue Plantation and Central median Plantation with 1 Year Maintenance at Na;Painting With Asian Apex exterior emulsion paint two coats over two coats of primary coat of Asian exterior emulsion paint and painting of clip art / vector art /3D bubble art with enamel paint over old plastered walls of Public/Govt. Institution?s compound walls, Medians and Islands including cost and conveyance of all materials and labor charges etc?complete including removing of posters and rubbing work for walls up to 10 feet height. overheads & contractors profit complete for finished item of work. as per (ANNEXURE TO THE CIRCULAR ROC NO. 1481/2017/M3, Dt. 13.06.2017)
2100
-
642054
Development of Raising Avenue Plantation and Central median Plantation with 1 Year Maintenance at Na;Supply & Delivery of trees / Palms / shrubs and specified plants as per directions of officer in charge at site, all the plants supplied shall be with sturdy stem, well formed crown, vigorously growing tip, healthy foliage without any infestation and the plants shall be supplied after proper hardening off. the rates inclusive of cost of plants and conveyance of all materials and labour charges loading, transportation to the site, unloading & handling complete for finished item of work.
-
-
-
Development of Raising Avenue Plantation and Central median Plantation with 1 Year Maintenance at Na;Neolamarckia cadamba Bag size 18"x18" Sapling height 5' - 6'
200
-
30000
Development of Raising Avenue Plantation and Central median Plantation with 1 Year Maintenance at Na;Sterculia foetida 18"x18" Sapling height 5' - 6'
100
-
16000
Development of Raising Avenue Plantation and Central median Plantation with 1 Year Maintenance at Na;Tabebuia rosea 18"x18" Sapling height 5' - 6'
96
-
14400
Development of Raising Avenue Plantation and Central median Plantation with 1 Year Maintenance at Na;Tabebuia avellanedae 18"x18" Sapling height 5' - 6'
24
-
3840
Development of Raising Avenue Plantation and Central median Plantation with 1 Year Maintenance at Na;Spathodea campanulata 18"x18" Sapling height 5'-6''
160
-
24000
Development of Raising Avenue Plantation and Central median Plantation with 1 Year Maintenance at Na;Cordia sebestena 18"x18" Sapling height 4' 6''-5'
40
-
7000
Development of Raising Avenue Plantation and Central median Plantation with 1 Year Maintenance at Na;Bauhinia blakeana 18"x18" Sapling height 4' - 5'
80
-
12800
Development of Raising Avenue Plantation and Central median Plantation with 1 Year Maintenance at Na;Hibiscus tiliaceus 18"x18" Sapling height 5'-6'
96
-
14400
Development of Raising Avenue Plantation and Central median Plantation with 1 Year Maintenance at Na;Washingtonia robusta 18"x18" Sapling height 6"-1'
40
-
17000
Development of Raising Avenue Plantation and Central median Plantation with 1 Year Maintenance at Na;Wodyetia bifurcata 18"x18" Sapling height 4' - 5'
40
-
14000
Development of Raising Avenue Plantation and Central median Plantation with 1 Year Maintenance at Na;Ixora chinensis 7"x8" Sapling height 1'.6''-2'
2250
-
31500
Development of Raising Avenue Plantation and Central median Plantation with 1 Year Maintenance at Na;Lantana sellowiana 7"x8" Sapling height 8"'-1'
900
-
10800
Development of Raising Avenue Plantation and Central median Plantation with 1 Year Maintenance at Na;Hymenocallis littoralis 7"x8" Sapling height 6"'-1'
1200
-
13200
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements