Andhra Pradesh Urban Greening And Beautification Corporation Limited Tender
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Andhra Pradesh Urban Greening And Beautification Corporation Limited - APUGBCL Tender
Opening Date23 Jun 2020
Closing Date7 Jul 2020
Tender Amount₹ 17,44,292
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
339584Bid Award Id
ViewTender No
APUG-15021/8/2020-TEC-SEC-APUGBC/2020-2021/1(15)Tender Authority
Andhra Pradesh Urban Greening And Beautification Corporation Limited ViewPurchaser Address
-Website
http://http://urbangreening.ap.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Maintenance of hedge/shrub planting: Trimming of hedges/shrubs (once in 15 days) watering (once in a day @ 5 Lts/per sqmt/per day shall be provide to maintain sub soil moisture continuously). Edge cutting 0.30mtr. away from the edges/shrub (once in a month) and application of fertilizers, insecticides, Fungicides ( once in a month @ 20 gms/pit/sqmt) etc., by manually excluding cost of water and fertilizers for one year
1192
341476
2387.28
Bed preparation for Ground cover / Flower beds: Digging the trench of size 150 mm. depth, and Formation of 150 mm. (6") thick of soil mixture at 3:1:1 ratio red garden soil, farmyard manure and river sand, application of fertilizers (@ 20 gms/pit/sqmt) by making smooth surface as per design including cost of soil mixture, filling of the soil mixture and internal transportation etc., for complete item of work. (excluding cost of plant material, fertilizers and chemicals (@ 20 gms / pit/ sqmt))-unit 1 Sqmt of work. (*20 No./Sqm of plants & bag size shall be arrived based on the spacing as per the design.) (Red garden soil in this context it is defined as sandy loamy garden soil congenial for plant growth which shall be of light textured, crystalline, porous and friable, fertile, slightly acidic or neutral)
40
6392
159.81
Maintenance of groundcover/flower beds: Weeding, Trimming/pinching and keeping the ground cover in healthy condition (once in a fortnight). Watering to ground cover (one's in three day's @ 5 litres/per Sqmts shall be provide to maintain sub soil moisture continuously) by manually, excluding cost of water. for one year
40
5160
1075.2
Digging of 0.75x0.75x0.75 mtrs. pit, filling with soil mixture of red garden soil, farmyard manure at 4:1 ratio including internal transport, application of fertilizers and chemicals (@ 20 gms/pit/sqmt), internal transportation of plants, planting the plants etc., for complete item of work (excluding cost of plant material, fertilizers and chemicals (@ 20 gms / pit/ sqmt) (Red garden soil in this context it is defined as sandy loamy garden soil congenial for plant growth which shall be of light textured, crystalline, porous and friable, fertile, slightly acidic or neutral)
134
73307
547.07
Maintenance of Palms/Tree planting: Trimming (once in month), watering (once in three days @ 5 Lts/per plant shall be provide to maintain sub soil moisture continuously), formation of basins 0.30m . away from the edges (once in a month) and application of fertilizers, insecticides, Fungicides @ 20 gms/pit/sqmt) (once in quarterly) by manually, but excluding cost of water & fertilizers for month for one year
134
34038
2116.8
Supply & Delivery of topiary/trees/Palms/shrubs/lawn/ ground covers and specified plants as per directions of officer in charge at site including cost of plants and conveyance of all materials and labour charges etc., plants of bag size 7" x 8" of plant height not less than 1.0 feet,
8" x 10" of plant height not less than 3.0 feet,
13" x 13" of Tree/Palm height not less than 5 feet,
13" x 13" of plant (Hedges & Shrub) height not less than 2 feet,
15" x 16" of plant (Tree/Palm/Topiary) height not less than 5 feet, 18" x 18" plant (Tree/Palm/Topiary) height not less than 6 feet, bottom dia of the stem is 0.75'' and above, 21" x 21" and above plant (Tree/Palm/Topiary) height not less than 7 feet, bottom dia of the stem is 1'' and above.
Heights mentioned above are excluding bag height.
All the plants supplied shall be with sturdy stem, well formed crown, vigorously growing tip, healthy foliage without any infestation and the plants shall be supplied after proper hardening off. The rates inclusive of loading, transportation to the site, unloading & handling.
1
-
-
For paspalum grass
400
30000
75
For Acalypha hispida 5"x6"
440
6600
15
For Bahunia galpinii 8"x10"
490
24500
50
For Bauhinia acuminata a 7"x8"
590
29500
50
For Brugmansai suaveolenas white 8"x10"
230
11500
50
For Caesalpinia Pulcherimma orange 7"x8"
290
7250
25
For Caesalpania Pulcherimma goldcrest 7"x8"
560
14000
25
For Calliandra portoricensis white 7"x8"
320
11200
35
For Crinum amabile 13"x13"
250
50000
200
For Canna Variegated 7"x8"
230
6440
28
For Crinum asiaticum 8"x10"
570
28500
50
For Codaeium crispum 7"x8"
430
12900
30
For Euphorbia pulcherimma flamming 8"x10"
280
11200
40
For Ficus Starlight 7"x8"
350
17500
50
For Hibiscus sabdariffa 8"x10"
340
17000
50
For Hibiscus Lafrance assorted 7"x8"
410
14350
35
For Hymenocallis variegata 7"x8"
450
9900
22
For Ixora Coccinea new pink 7"x8"
430
12900
30
For lagesstroemia indica white 8"x10"
230
11500
50
For Leucophyllum frutescens 7"x8"
270
5940
22
For Lantan sellowiana white 7"x8"
370
6660
18
For Nerium oleander pink 7"x8"
220
4840
22
For Meyenia erecta 7"x8"
750
16500
22
For Pennisetum ruppeli green 8"x10"
390
19500
50
For Murraya paniculata 7"x8"
360
9000
25
For Plumbago capensis 7"x8"
250
5500
22
For Pisonia alba 7"x8"
370
12950
35
For Pandanus Baptistii variegated 7"x8"
150
4500
30
For Ravenia spectabilis 7"x8"
330
6600
20
For Ruellia brittonian katie white -per piece
240
2400
10
For Scheffiera arboricola variegated 7"x8"
310
13950
45
For Tecoma stans 8"x10"
250
10000
40
For Tecoma rosea 7"x8"
110
3850
35
For Taberna montana divaricata 5"x6"
500
7500
15
For Tecoma gaudichaudi 13"x13"
160
11200
70
For Arachis pintoi (5"x 6")
400
8000
20
Wedelia chinensis (5"x 6")
200
2000
10
For Rhoeo discolor per piece
200
3000
15
For Anthocephalus cadamba (25" x 25")
11
-
-
For Alstonia Scholaries (25" x 25")
12
-
-
For Bauhina variegata (25" x 25")
16
-
-
For Delonix regia (25" x 25")
18
-
-
For Melia azadirachta (25" x 25")
6
-
-
For Millngtonia hortensis (25" x 25")
9
-
-
For Peltophorum ferrugineum (25" x 25")
10
-
-
For plumeria alba (25" x 25")
11
-
-
For Pterospermum acerifolium (25" x 25")
8
-
-
For spathodea campanulata (25" x 25")
16
-
-
For syzygium cumini (25" x 25")
4
-
-
For Peltophorum ferrugineum (25" x 25")
7
-
-
For Terminalia cattapa (25" x 25")
6
-
-
Loading and unloading of plants bag size (25"X25") at site of work and stacking for lead less upto 50 m and including labour charges, T&P etc.,and overheads & contractors profit complete for finished item of work (excluding cost of plant bag)
134
5706
4258.86
Transportation of bag plants form Gannavaram to Anantapuram (Based on the bill submitted)
1
40000
40000
Transportation of bag plants form Hyderabad to Anantapuram (Based on the bill submitted)
1
20000
20000
Irrigation facilities - Actual payment will paid for the actual work done subjected to approval of the rates by the competent authority
1
200000
200000
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements