To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Andhra Pradesh Urban Greening And Beautification Corporation Limited - APUGBCL Tender

Civil And Construction
Excavation
Opening Date9 Apr 2022
Closing Date25 Apr 2022
Tender Amount₹ 55,66,501 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Development of landcape ( Softscape and Hardscape) works in Gadalamma layout park(0.52 acres);Maintenance of lawns: watering to the lawn once in 2 days @ 10 to 15 ltrs /per Sqmt basing on season and weather conditions (15 watering is required in a month to maintain sub-soil moisture continuously), excluding cost of water including all operational, incidental ,labour charges for complete of work..

1920

-

7056

... More
Development of landcape ( Softscape and Hardscape) works in Gadalamma layout park(0.52 acres);Hedge / shrub planting: Digging the trench of size 0.3 mtrs. depth, refilling with red garden soil including cost of red garden soil and farmyard manure at 4:1 ratio, internal transportation of plants, planting etc., including the application of fertilizers and pesticides etc., (@ 20 gms/pit/sqmt) complete for item of work, but excluding the cost of the fertilizers (@ 20 gms/pit/sqmt) and plant material etc., - unit 1 Sqmt of work. (* 10 No./Sqm of plants & bag size shall be arrived based on the spacing as per the design.) (Red garden soil in this context it is defined as sandy loamy garden soil congenial for plant growth which shall be of light textured, crystalline, porous and friable, fertile, slightly acidic or neutral)

224

-

90964.16

... More
Development of landcape ( Softscape and Hardscape) works in Gadalamma layout park(0.52 acres);Hedge / shrub planting:Digging the trench of size 0.45 mtrs. depth, refilling with red garden soil including cost of red garden soil and farmyard manure at 4:1 ratio, internal transportation of plants, planting etc., including the application of fertilizers and pesticides etc.,(@ 20 gms/pit/sqmt) complete for item of work, but excluding the cost of the fertilizers (@ 20 gms/pit/sqmt) and plant material etc., - unit 1 Sqmt of work. (* 6 No./Sqm of plants & bag size shall be arrived based on the spacing as per the design.) (Red garden soil in this context it is defined as sandy loamy garden soil congenial for plant growth which shall be of light textured, crystalline, porous and friable, fertile, slightly acidic or neutral).

410

-

249070.9

... More
Development of landcape ( Softscape and Hardscape) works in Gadalamma layout park(0.52 acres);Maintenance of hedge/shrub planting: Trimming of hedges/shrubs (once in a month) it including all operational, incidental ,labour charges for complete of work.

7608

-

33551.28

... More
Development of landcape ( Softscape and Hardscape) works in Gadalamma layout park(0.52 acres);Maintenance of hedge/shrub planting: Edge cutting 0.30mtr. away from the edges/shrub (once in a month) and application of fertilizers, insecticides, Fungicides (once in a month @ 20 gms/pit/sqmt) etc., by manually excluding cost of fertilizers it including all operational, incidental ,labour charges, for complete of work.

7608

-

32954.81

... More
Development of landcape ( Softscape and Hardscape) works in Gadalamma layout park(0.52 acres);Maintenance of hedge/shrub planting: watering once in 2 days @ 5 Lts/per sqmt shall be provide to maintain sub soil moisture continuously by manually excluding cost of wateri ncluding all operational, incidental ,labour charges for complete of work..

7608

-

55918.8

... More
Development of landcape ( Softscape and Hardscape) works in Gadalamma layout park(0.52 acres);Bed preparation for Ground cover / Flower beds: Digging the trench of size 150 mm. depth, and Formation of 150 mm. (6") thick of soil mixture at 3:1:1 ratio red garden soil, farmyard manure and river sand, application of fertilizers (@ 20 gms/pit/sqmt) by making smooth surface as per design including cost of soil mixture, filling of the soil mixture and internal transportation etc., for complete item of work. (excluding cost of plant material, fertilizers and chemicals (@ 20 gms / pit/ sqmt))-unit 1 Sqmt of work. (* 22 No./Sqm of plants & bag size shall be arrived based on the spacing as per the design.) (Red garden soil in this context it is defined as sandy loamy garden soil congenial for plant growth which shall be of light textured, crystalline, porous and friable, fertile, slightly acidic or neutral)

116.01

-

27523.37

... More
Development of landcape ( Softscape and Hardscape) works in Gadalamma layout park(0.52 acres);Maintenance of groundcover/flower beds: Weeding, Trimming/pinching and keeping the ground cover in healthy condition (once in a 15 days) it including all operational, incidental ,labour charges for complete of work.

1392.12

-

9959.23

... More
Development of landcape ( Softscape and Hardscape) works in Gadalamma layout park(0.52 acres);Maintenance of groundcover/flower beds: Watering to ground cover (one's in three day's @ 5 litres/per Sqmts shall be provide to maintain sub soil moisture continuously) by manually, excluding cost of wateri ncluding all operational, incidental ,labour charges for complete of work..

1392.12

-

7503.53

... More
Development of landcape ( Softscape and Hardscape) works in Gadalamma layout park(0.52 acres);Digging of 0.6x0.6x0.6 mtrs. pit, filling with soil mixture of red garden soil, farmyard manure at 4:1 ratio including internal transport, application of fertilizers and chemicals (@ 20 gms/pit/sqmt), internal transportation of plants, planting the plants etc., for complete item of work (excluding cost of plant material, fertilizers and chemicals (@ 20 gms / pit/ sqmt)) (Red garden soil in this context it is defined as sandy loamy garden soil congenial for plant growth which shall be of light textured, crystalline, porous and friable, fertile, slightly acidic or neutral)

35

-

10093.3

... More
Development of landcape ( Softscape and Hardscape) works in Gadalamma layout park(0.52 acres);Digging of 0.45x0.45x0.45 mtrs. pit, filling with soil mixture of red garden soil, farmyard manure at 4:1 ratio including internal transport, application of fertilizers and chemicals (@ 20 gms/pit/sqmt), internal transportation of plants, planting the plants etc., for complete item of work (excluding cost of plant material, fertilizers and chemicals (@ 20 gms / pit/ sqmt)) (Red garden soil in this context it is defined as sandy loamy garden soil congenial for plant growth which shall be of light textured, crystalline, porous and friable, fertile, slightly acidic or neutral)

33

-

4289.67

... More
Development of landcape ( Softscape and Hardscape) works in Gadalamma layout park(0.52 acres);Maintenance of Palms/Tree planting: Trimming (once in month) and application of fertilizers, insecticides, Fungicides @ 20 gms/pit/sqmt) (once in quarterly) by manually excluding cost of fertilizers, it including all operational, incidental ,labour charges, for complete of work

816

-

4638.14

... More
Development of landcape ( Softscape and Hardscape) works in Gadalamma layout park(0.52 acres);Maintenance of Palms/Tree planting: formation of basins 0.30m . away from the edges (once in a month) it including all operational, incidental ,labour charges for complete of work

816

-

8316.67

... More
Development of landcape ( Softscape and Hardscape) works in Gadalamma layout park(0.52 acres);Maintenance of Palms/Tree planting: watering (once in three days @ 5 Lts/per plant shall be provide to maintain sub soil moisture continuously) by manually, but excluding cost of water including all operational, incidental ,labour charges for complete of work.

816

-

7197.12

... More
Development of landcape ( Softscape and Hardscape) works in Gadalamma layout park(0.52 acres);Supply & Delivery of topiary/trees/Palms/shrubs/lawn/ ground covers and specified plants as per directions of officer in charge at site including cost of plants and conveyance of all materials and labour charges etc., plants of bag size 7" x 8" of plant height not less than 1.0 feet, 8" x 10" of plant height not less than 3.0 feet, 13" x 13" of Tree/Palm height not less than 5 feet, 13" x 13" of plant (Hedges & Shrub) height not less than 2 feet, 15" x 16" of plant (Tree/Palm/Topiary) height not less than 5 feet, 18" x 18" plant (Tree/Palm/Topiary) height not less than 6 feet, bottom dia of the stem is 0.75'' and above, 21" x 21" and above plant (Tree/Palm/Topiary) height not less than 7 feet, bottom dia of the stem is 1'' and above. Heights mentioned above are excluding bag height. All the plants supplied shall be with sturdy stem, well formed crown, vigorously growing tip, healthy foliage without any infestation and the plants shall be supplied after proper hardening off.

-

-

-

... More
Development of landcape ( Softscape and Hardscape) works in Gadalamma layout park(0.52 acres);lawn

-

-

-

... More
Development of landcape ( Softscape and Hardscape) works in Gadalamma layout park(0.52 acres);For paspalum grass

60

-

4500

... More
Development of landcape ( Softscape and Hardscape) works in Gadalamma layout park(0.52 acres);For Korean grass

100

-

18000

... More
Development of landcape ( Softscape and Hardscape) works in Gadalamma layout park(0.52 acres);Shrub / Hedge planting in 0.45 m trench

-

-

-

... More
Development of landcape ( Softscape and Hardscape) works in Gadalamma layout park(0.52 acres);Heliconia

264

-

10560

... More
Development of landcape ( Softscape and Hardscape) works in Gadalamma layout park(0.52 acres);Coleus

180

-

7200

... More
Development of landcape ( Softscape and Hardscape) works in Gadalamma layout park(0.52 acres);Chrysothemis pulchella

180

-

7200

... More
Development of landcape ( Softscape and Hardscape) works in Gadalamma layout park(0.52 acres);Acalypha

192

-

7680

... More
Development of landcape ( Softscape and Hardscape) works in Gadalamma layout park(0.52 acres);Alpinia zurumbet variegata

540

-

21600

... More
Development of landcape ( Softscape and Hardscape) works in Gadalamma layout park(0.52 acres);Canna variegata

540

-

21600

... More
Development of landcape ( Softscape and Hardscape) works in Gadalamma layout park(0.52 acres);Ixora coccinea

564

-

22560

... More
Development of landcape ( Softscape and Hardscape) works in Gadalamma layout park(0.52 acres);Shrub / Hedge planting in 0.30 m trench

-

-

-

... More
Development of landcape ( Softscape and Hardscape) works in Gadalamma layout park(0.52 acres);Murraya hedge

144

-

4320

... More
Development of landcape ( Softscape and Hardscape) works in Gadalamma layout park(0.52 acres);Lantana hedge

144

-

4320

... More
Development of landcape ( Softscape and Hardscape) works in Gadalamma layout park(0.52 acres);Leucophyllum frutescens hedge

144

-

4320

... More
Development of landcape ( Softscape and Hardscape) works in Gadalamma layout park(0.52 acres);Photinia hedge

144

-

4320

... More
Development of landcape ( Softscape and Hardscape) works in Gadalamma layout park(0.52 acres);Duranta hedge

432

-

12960

... More
Development of landcape ( Softscape and Hardscape) works in Gadalamma layout park(0.52 acres);Bougainvillea hedge

432

-

12960

... More
Development of landcape ( Softscape and Hardscape) works in Gadalamma layout park(0.52 acres);Impatiens orange

400

-

12000

... More
Development of landcape ( Softscape and Hardscape) works in Gadalamma layout park(0.52 acres);Sterlizia regina

400

-

12000

... More
Development of landcape ( Softscape and Hardscape) works in Gadalamma layout park(0.52 acres);Groundcover / flower beds

-

-

-

... More
Development of landcape ( Softscape and Hardscape) works in Gadalamma layout park(0.52 acres);Epipremnum Neon

851

-

17020

... More
Development of landcape ( Softscape and Hardscape) works in Gadalamma layout park(0.52 acres);Ophiopogon japonicus

851

-

17020

... More
Development of landcape ( Softscape and Hardscape) works in Gadalamma layout park(0.52 acres);Pandanus Gold (variegated)

851

-

17020

... More
Development of landcape ( Softscape and Hardscape) works in Gadalamma layout park(0.52 acres);Palms/Tree

-

-

-

... More
Development of landcape ( Softscape and Hardscape) works in Gadalamma layout park(0.52 acres);Chamaerops humilis

1

-

700

... More
Development of landcape ( Softscape and Hardscape) works in Gadalamma layout park(0.52 acres);Livistonia rotundifolia

4

-

2800

... More
Development of landcape ( Softscape and Hardscape) works in Gadalamma layout park(0.52 acres);Wodyetia bifurcata

6

-

4200

... More
Development of landcape ( Softscape and Hardscape) works in Gadalamma layout park(0.52 acres);Delonix regia

4

-

2800

... More
Development of landcape ( Softscape and Hardscape) works in Gadalamma layout park(0.52 acres);Azadirachta indica

18

-

12600

... More
Development of landcape ( Softscape and Hardscape) works in Gadalamma layout park(0.52 acres);Ficus benjamina

2

-

1400

... More
Development of landcape ( Softscape and Hardscape) works in Gadalamma layout park(0.52 acres);Millingtonia hortensis

8

-

2800

... More
Development of landcape ( Softscape and Hardscape) works in Gadalamma layout park(0.52 acres);Mimusops elengi

6

-

2100

... More
Development of landcape ( Softscape and Hardscape) works in Gadalamma layout park(0.52 acres);Spathodea campanulata

8

-

2800

... More
Development of landcape ( Softscape and Hardscape) works in Gadalamma layout park(0.52 acres);Tabebuia rosea

6

-

2100

... More
Development of landcape ( Softscape and Hardscape) works in Gadalamma layout park(0.52 acres);Plumeria singaporensis

4

-

1400

... More
Development of landcape ( Softscape and Hardscape) works in Gadalamma layout park(0.52 acres);Butea monosperma

1

-

350

... More
Development of landcape ( Softscape and Hardscape) works in Gadalamma layout park(0.52 acres);Hardscape (Civil works)

-

-

-

... More
Development of landcape ( Softscape and Hardscape) works in Gadalamma layout park(0.52 acres);Earth work excavation for foundations (Manual Means) of buildings, septic tank, sump, compound wall in ordinary soils and depositing on bank with an initial lead of 10m and depth up to 3m including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete for finished item of work excluding dewatering charges etc., as per SS 20 B(APSS 308)

207.82

-

52640.81

... More
Development of landcape ( Softscape and Hardscape) works in Gadalamma layout park(0.52 acres);Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using 162.0 kgs of cement, coarse aggregate 40mm size hard , machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc., to site, and including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc., and overheads & contractors profit complete for finished item of work. (APSS No. 402)

105.71

-

402280.46

... More
Development of landcape ( Softscape and Hardscape) works in Gadalamma layout park(0.52 acres);Supply and fixing of C.C. Kerb not less than M30 strength of size 600 X 400 X 110 mm thick with bottom thickness of 110 mm up to height of 350 mm and top width of 50 mm thick chamfering with 45° at starts at 350 mm height to 400 mm height as selected by the Engineer-in-charge from approved source/ factory which is laid on existing CC Bed in position to the required line, level and curvature jointed with cement mortar 1:3 (1 cement : 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5 mm), including making drainage opening wherever required and including cost and conveyance of all materials & labour charges including transportation from approved source, loading & unloading charges including contractor profit & overhead charges complete for finished item of work..

72

-

46403.28

... More
Development of landcape ( Softscape and Hardscape) works in Gadalamma layout park(0.52 acres);Supply and fixing of Kadapa slab (rough) 50mm thick and size of 0.457x0.457m stone edging including excavating trench in ordinary soil, laying P.C.C (1:4:8) 100 mm thick and fixing the stone in alignment and refilling the excavated soil conveyance of all materials and labour charges including transportation complete for finished item of work

356

-

54485.8

... More
Development of landcape ( Softscape and Hardscape) works in Gadalamma layout park(0.52 acres);Masonry work in CM(1:6) prop (Cement : Screened sand) in superstructure with fly ash cement / lime solid blocks of size 290mm x 225mm x 140mm from approved source having minimum crushing strength of 50 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site,and such as labour charges, like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, overheads and contractor profit etc., complete for finished item of work. (APSS No. 501 & 504).

55.08

-

355602.54

... More
Development of landcape ( Softscape and Hardscape) works in Gadalamma layout park(0.52 acres);Plastering 12mm thick single coat in CM(1:5) using screened sand including cost and conveyance of all materials like cement, sand, water etc., to site and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work.(SS 901,903 & 904)

441

-

151770.15

... More
Development of landcape ( Softscape and Hardscape) works in Gadalamma layout park(0.52 acres);Filling with carted gravel in pathways, trenches, sides of foundations and basement with initial lead in layers not exceeding 15cm thick, watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T&P etc., and overheads & contractors profit complete for finished item of work(APSS NO.309&310)

27.75

-

12350.42

... More
Development of landcape ( Softscape and Hardscape) works in Gadalamma layout park(0.52 acres);Supply & Fixing Sadarhalli granite stone with 5 line dressing Double Patti of 5' length seating benches with back rest and its width 16'' with 4" thick and 18" height with 4" thick and leg size 4'' width, including cost and conveyance of all materials like granite benche, cement, sand to work site loading ,un loading transport and all operational, incidental labour & lift charges,and overheads & contractors profit complete for finished item

10

-

150000

... More
Development of landcape ( Softscape and Hardscape) works in Gadalamma layout park(0.52 acres);Flooring with 16 to 18mm thick high polished / Flame Finished / leather finished granite stone slabs other than black and regular colours (i.e. of shades like paradise / bala flower / copper silk / laka red / lavender blue) with borders and design as per the pattern approved by the Engineer-in-Charge of length not less than 2.43 mts set over base coat of cement mortar (1:8) , 20mm thick using screened sand over CC bed already laid or RCC roof slab including neat grey cement slurry of honey like consistency spread @ 3.3 Kg per sqm and jointed neatly with white cement paste mixed with pigment of matching shade to full depth including cost and conveyance of all materials like cement , sand , water , granite slabs etc., to work site and all operational, incidental labour & lift charges, polishing charges and cost of base coat and overheads & contractors profit complete for finished item of work (S.S.701 & special)

133

-

502451.39

... More
Development of landcape ( Softscape and Hardscape) works in Gadalamma layout park(0.52 acres);Flooring with Rough Shahabad / Tandur stone slabs of 40 mm thick set over base coat of cement mortar (1 : 8) 12 mm thick over CC bed already laid or RCC roof slab, including pointing with cement mortar 1:3 duly filling joints nearly, including cost of all materials like flooring stone, cement, sand, and water etc., complete, including labour charges for dressing of flooring stones etc., complete for finished item of work,. (APSS No.703 & 701)

170

-

113332.2

... More
Development of landcape ( Softscape and Hardscape) works in Gadalamma layout park(0.52 acres);Flooring with Rough black Kadapa slabs minimum of 50 mm thick of size 0.457m x 0.457m set over base coat of cement mortar (1 : 8) 12 mm thick over CC bed already laid or RCC roof slab, including pointing with cement mortar 1:3 duly filling joints nearly, including cost of all materials like flooring stone, cement, sand, and water etc., complete, including labour charges for dressing of flooring stones etc., complete for finished item of work,. (APSS No.703 & 701)

482

-

327639.5

... More
Development of landcape ( Softscape and Hardscape) works in Gadalamma layout park(0.52 acres);Providing casing embankment using gravel from approved area in layers of 25 cm with compaction including cost of all materials, machinery, labour, all operations such as materials transporting, spreading in layer of specified thickness, breaking clods, sectioning, compacting each layer without watering by Road roller 10 tonne etc.,complete with 17 km transportation with loading & unloading and complete for finished item of work.

675

-

309555

... More
Development of landcape ( Softscape and Hardscape) works in Gadalamma layout park(0.52 acres);Supply & application of one coat water based cement primer of exterior grade II and two coats of acrylic exterior emulsion paint having VOC (Volatile Organic Compound) content less than 50 grams/litre for exterior walls including cost and conveyance of all materials to site,and all operational, incidental, labour charges etc., and overheads & contractors profit complete for finished item of work in all floors.

127.8

-

32558.33

... More
Development of landcape ( Softscape and Hardscape) works in Gadalamma layout park(0.52 acres);Supply and placing of the V.R.C.C Nominal Mix Concrete M 20 grade corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete using CONCRETE MIXER with 20mm size HBG graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry and including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water, etc., to site and , centring using Steel scaffolding pipes , jack props , Waller?s , Foot plates , brackets , steel centring plates etc., including all operational, incidental and labour charges such as machine mixing, laying concrete, vibrator, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)

-

-

-

... More
Development of landcape ( Softscape and Hardscape) works in Gadalamma layout park(0.52 acres);For Footings

1.73

-

14461.38

... More
Development of landcape ( Softscape and Hardscape) works in Gadalamma layout park(0.52 acres);For Pedastal

1.58

-

14173.74

... More
Development of landcape ( Softscape and Hardscape) works in Gadalamma layout park(0.52 acres);Plinth beam

5.69

-

62671.77

... More
Development of landcape ( Softscape and Hardscape) works in Gadalamma layout park(0.52 acres);Providing High Yield Strength Deformed (HYSD) / Thermo Mechanically Treated (TMT) (Fe 500 / Fe 500D grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including overheads & contractors profit complete for finished item of work.( APSS No.126)

800.7

-

69997.19

... More
Development of landcape ( Softscape and Hardscape) works in Gadalamma layout park(0.52 acres);Providing 0.5 wide Coping with 16 to 18mm thick High Polished granite up to 8'-00 (2.43 M) other than black and regular colours with borders and design as per the pattern approved by the Engineer-in-Charge , set over base coat of cement mortar (1:5) , 12mm thick using screened sand over the stone ,Brick masonry or CC bed already laid , including neat grey cement slurry of honey like consistency spread 3.3 Kg per sqm and jointed neatly with white cement paste mixed with pigment of matching shade to full depth including cost and conveyance of all materials like cement , sand , water , granite slabs etc., to work site and all operational, incidental labour & lift charges, half rounding the edges of treads , polishing charges and cost of base coat and overheads & contractors profit complete for finished item of work for Coping (S.S.701 & special)

36

-

168098.4

... More
Development of landcape ( Softscape and Hardscape) works in Gadalamma layout park(0.52 acres);Random Rubble stone masonry in CM (1:8) prop: (Cement: Screened sand) using hard granite stones carted from approved quarry including cost and conveyance of all materials like cement, screened sand, water,Rough stone Through stone, Coursed stones etc., from approved quarry, to site, including labour charges for cutting stones to required size and shape, mixing, of cement, mortar, construction, curing, charges for scaffolding etc., and overheads & contractors profit complete for finished item of work. (APSS No. 601 & 615)

115.95

-

411961.07

... More
Development of landcape ( Softscape and Hardscape) works in Gadalamma layout park(0.52 acres);Filling with useful available excavated earth (excluding rock) with a lead of 50 m in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cm thick, watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T&P etc., and overheads & contractors profit complete for finished item of work (APSS NO.309&310)

86.86

-

3153.89

... More
Development of landcape ( Softscape and Hardscape) works in Gadalamma layout park(0.52 acres);Raised Pointing to RR Masonry in CM (1:3) including cost and conveyance of all materials at site excluding seigniorage charges on all materials and all operational, incidental labour charges, curing etc complete for finished item of work.

181.75

-

19400

... More
Development of landcape ( Softscape and Hardscape) works in Gadalamma layout park(0.52 acres);Providing 0.30 m wide Coping with Polished black Kadapa slabs minimum of 25 mm to 30 mm thick in single piece as specified set over a base coat of CM (1:5) , 12mm thick using screened sand over already laid CC bed / RCC roof slab including neat cement slurry of honey like consistency spread @ 3.3 Kgs per Sqm and jointed with neat cement to full depth including cost and conveyance of all materials like cement, sand, water, flooring stones etc. complete including all labour charges like dressing of flooring stones to the required size, flat nosing the edges, mixing of cement mortar, laying, lift charges , cost of base coat, water charges etc., and overheads & contractors profit complete for finished item of work (APSS No.703 & 701)

71.1

-

62440.02

... More
Development of landcape ( Softscape and Hardscape) works in Gadalamma layout park(0.52 acres);Providing Treads with 16 to 18mm thick high polished / Flame Finished / leather finished granite stone slabs other than black and regular colour granite with borders and design as per the pattern approved by the Engineer-in-Charge of length not less than 2.43 mts set over base coat of cement mortar (1:5) , 12mm thick using screened sand over CC bed already laid or RCC roof slab including neat grey cement slurry of honey like consistency spread @ 3.3 Kg per sqm and jointed neatly with white cement paste mixed with pigment of matching shade to full depth including cost and conveyance of all materials like cement , sand , water , granite slabs etc., to work site and all operational, incidental labour & lift charges, half rounding the edges of treads , polishing charges and cost of base coat and overheads & contractors profit complete for finished item of work for Treads (S.S.701 & special)

52.13

-

248621.52

... More
Development of landcape ( Softscape and Hardscape) works in Gadalamma layout park(0.52 acres);Providing Risers to steps walls with 16 to 18mm thick high polished / Flame Finished / leather finished granite stone slabs other than black and regular colour granite with length equal to flooring stone, set over base coat of CM(1:5) 12 mm thick using screened sand with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointing with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., and overheads & contractors profit complete for finished item of work. for Risers-0.15 m(APSS No.701 &707)

25.13

-

98482.71

... More
Development of landcape ( Softscape and Hardscape) works in Gadalamma layout park(0.52 acres);Providing cladding to wall with High Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M) other than black and regular colours, length equal to flooring slabs set over base coat of CM(1:5) 12 mm thick using screened sand with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointing with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., and overheads & contractors profit complete for finished item of work.

9

-

34179.84

... More
Development of landcape ( Softscape and Hardscape) works in Gadalamma layout park(0.52 acres);Providing 0.30 m wide Coping with 16 to 18mm thick High Polished granite up to 8'-00 (2.43 M) other than black and regular colours with borders and design as per the pattern approved by the Engineer-in-Charge , set over base coat of cement mortar (1:5) , 12mm thick using screened sand over the stone ,Brick masonry or CC bed already laid , including neat grey cement slurry of honey like consistency spread @ 3.3 Kg per sqm and jointed neatly with white cement paste mixed with pigment of matching shade to full depth including cost and conveyance of all materials like cement , sand , water , granite slabs etc., to work site and all operational, incidental labour & lift charges, and cost of base coat and overheads & contractors profit complete for finished item of work for Coping (S.S.701 & special)

3.15

-

12116.16

... More
Development of landcape ( Softscape and Hardscape) works in Gadalamma layout park(0.52 acres);Supply and fabrication of MS framed structure like Window Grills, Compound Wall Grills, Iron Doors, Windows, Gates, MS Frame for chain link mesh works, Roof Trusses by using square / rectangular MS hollow section as per IS 4923 & Angles as per SP:6(1) IS Hand book, including cost of welding rods, power charges, labour charges for cutting, placing, welding and erecting in position and fixing, cost & convenience of all materials including wastage to site and complete for finished item of work

1342.24

-

146210.2

... More
Development of landcape ( Softscape and Hardscape) works in Gadalamma layout park(0.52 acres);Supply and fabrication works like Window Grills, Compound Wall Grills, Iron Doors, Windows, Gates, Roof Trusses by using MS solid plate section as per IS 1730 including cost of welding rods, power charges, labour charges for cutting, placing, welding & erecting in position and fixing cost & convenience of all materials including wastage to site and complete for finished item of work.

12.54

-

1585.06

... More
Development of landcape ( Softscape and Hardscape) works in Gadalamma layout park(0.52 acres);Painting to new iron work with one coat of Red oxide primer and two coats with synthetic enamel paint Grade-II VOC (Volatile Organic Compound) content less than 50 grams/litre over primer coat of red oxid, including cost and conveyance of all materials like Red oxide primer ,Synthetic Enamel Paint to site, sales & other taxes, incidental, operational and all labour charges etc., and overheads & contractors profit complete for finished item of work in all floors. (SS No. 1201, 1212 & 1207).

34.92

-

6517.47

... More
Development of landcape ( Softscape and Hardscape) works in Gadalamma layout park(0.52 acres);Supply and fixing of cement bonded board 8 mm thick and laying as per the pattern approved by the Engineer-in-Charge on purlins, rafters, trusses, including cost and conveyance of all materials like approved cement bonded board, nails, labour charges , overheads and contractors profit etc., complete for finished item of work in all floors. excluding the cost of purlins, rafters, trusses.

30

-

24736.5

... More
Development of landcape ( Softscape and Hardscape) works in Gadalamma layout park(0.52 acres);Providing and laying of best tiled roofing with pressed clay (Mangalore tiles) size 225 x 150 x 20 mm thick and laying as per the pattern approved by the Engineer-in-Charge on roofs jointed with cement mortar 1:4 (1 cement : 4 coarse sand) mixed with 2% integral water proofing compound, laid over a bed of 20 mm thick cement mortar 1:4 (1 cement : 4 coarse sand) including Rabbit wire mesh (Chicken mesh) of not less than 30 gauge and jointed neatly with white cement paste to full depth mixed with pigment of matching shade at required place including cost and conveyance of all materials like cement, sand, water, tiles, Rabbit wire mesh, white cement, wastage etc., to site including cost of all labour charges for mixing of cement mortar, scaffolding, lift charges, laying tiles to required slope as directed by the Engineer- in-charge , curing etc., and overheads & contractors profit complete for finished item of work.

33.85

-

49082.16

... More
Development of landcape ( Softscape and Hardscape) works in Gadalamma layout park(0.52 acres);Supply and Transportation of XLPE/PVC insulated & PVC sheathed armoured cables 4 C x 4 sq.mm of 1.1 KV grade with copper conductor as per IS 7098 Part-I -1988 etc including cost and conveyance of all materials ,overheads & contractors profit etc., Make: Torrent / Universal / Unicab / Havells / KEI/ Polycab/ Gloster/ Orbit/Paragon/RR Kabel/RPG/Rhino

500

-

143725

... More
Development of landcape ( Softscape and Hardscape) works in Gadalamma layout park(0.52 acres);Supply and Laying of U.G cables upto 50 Sq,mm including earth work excavation of trench 300x600mm and ,laying the cable on sand cushion of 150 mm thick ,covering the cable with Rough Kadapa slabs minimum of 40 mm thick and refilling the trench with the excavated soils[excl. rock] , including cost and conveyance of all materials ,overheads & contractors profit etc., complete for finished item of work

500

-

76715

... More
Development of landcape ( Softscape and Hardscape) works in Gadalamma layout park(0.52 acres);Fabrication, Transportation and supply of hot-dip galvanized Octogonal Pole with BSEN - 10025 grade S 355 JO steel plate for shaft, IS 2062 for base plate with door opening arrangement, including the supply of suitable boards with bakelite sheet as per IS specification suitable to withstand the wind speed of 180 KMPH for 9 Mtrs heightPole having dimensions Bottom 155 mm,. Top 70mm with 3mm thick, base plate 260 x 260 x 16mm and 4 Nos of M24 x 750 long 'J' bolts along with template, including cost and conveyance of all materials ,overheads & contractors profit etc., complete for finished item of work Makes: Bajaj / Valmont/Laasma/Transrail/Utkarsh/ Skipper/Consoul

2

-

42492.02

... More
Development of landcape ( Softscape and Hardscape) works in Gadalamma layout park(0.52 acres);Fabrication, Transportation and supply of 1.0 Mtr Length Single Arm Bracket made with MS galvanized 40mm / 50mm dia Pipe. including cost and conveyance of all materials ,overheads & contractors profit etc., complete for finished item of work including cost and conveyance of all materials ,overheads & contractors profit etc., complete for finished item of work Makes: Bajaj / Valmont/Laasma /Transrail/Utkarsh/Skipper/Consoul

8

-

12997.52

... More
Development of landcape ( Softscape and Hardscape) works in Gadalamma layout park(0.52 acres);Foundation and erection charges with special T&P, for 9.00Mtrs / 10Mtrs long Octagonal / Conical pole duly erecting on base plate duly providing 4 Nos foundation bolts with nuts with providing of 0.60Mtr x 0.60Mtrs x 1.40 Mtr size M20 cc work vibrated concreting mixing with necessary steel (15kgs) reinforcement and curing for 7 days as directed by the field engineers during execution including excavation of Earth/BT all labour charges and including cost and conveyance of all materials ,overheads & contractors profit etc., complete.

2

-

16496.9

... More
Development of landcape ( Softscape and Hardscape) works in Gadalamma layout park(0.52 acres);Supply and fixing of 120 W LED Street light Luminaire for street light pole, Luminaire made of pressure diecast alluminium body with powder coated, having protective toughned glass, Supply Input voltage 120 - 270 V AC, P.F > 0.90, high power LED's having System efficacy > 100 lm/W and junction temprature < 70°C, with Ingrees protection IP66, Luminaire performance complies to IS 10322 (Part 5 / Sec-3), Driver surge protection 4KV, In house additional Surge protection 10 KV with optics distribution , THD<10% at 110 Volts AC, driver efficiency >90%, CCT: 3000K - 5700K, minimum CRI>70, etc., including as required complete as per the direction of Engineer-in-charge and including cost of all materials to site, incidental giving connections and all labour charges overheads & contractors profit etc., complete for finished item of work a) Luminaire Make : Wipro(Skyline) / Philips (Greenline Extra) /GE- Venture / Crompton(Nexus / Hawk series) / Bajaj (Edge)/ Halonix (Modular/ Lumos-Super) / Havells (EnduraSeries)/Greenlites(HILux)/Capart (Premium)/Polycab/Keselec/ HPL(City Vision)/Jaquar (Premium) /Eveready /Surya (Pollux) / Fortune Art (Leaf) b) LED MAKE :PHILIPS LUMILEDS / CREE / NICHIA /OSRAM / SAMSUNG / LG.

12

-

154937.88

... More
Development of landcape ( Softscape and Hardscape) works in Gadalamma layout park(0.52 acres);Supply and fabrication of street light poles made with medium quality MS Pipes of 88.90mm OD for 1670mm long, 60.3mm OD Pipes of 1670 mm long and 42.4 mm OD for 1670 mm long welded to each other for a total height of 5.0 m and providing 33.70 mm OD MS pipe of 1000 mm long for arm bracket for Luminaires fixing welded to main pole at suitable angle, suitable pole cap, base plate 300 x 300 x 10 mm and 4 Nos of 16 m dia 700 long 'J' bolts along with template including cost of welding rods, power charges, labour charges for cutting, placing, welding and erecting in position, cost & convenience of all materials including wastage to site, complete painting the total length of pipe with Painting to new iron work with one coat of Red oxide primer and two coats with synthetic enamel paint Grade-II VOC including cost of all materials ,labour charges etc for finished item of work.

15

-

66166.65

... More
Development of landcape ( Softscape and Hardscape) works in Gadalamma layout park(0.52 acres);Supply and fixing of 60 W LED Street light Luminaire for existing street light pole, Luminaire made of pressure diecast alluminium body with powder coated, having protective toughned glass, Supply Input voltage 120 - 270 V AC, P.F > 0.90, high power LED's having System efficacy > 100 lm/W and junction temprature < 70°C, with Ingrees protection IP66, Luminaire performance complies to IS 10322 (Part 5 / Sec-3), Driver surge protection 4KV, In house additional Surge protection 10 KV with optics distribution , THD<10% at 110 Volts AC, driver efficiency >90%, CCT: 3000K - 5700K, minimum CRI>70, etc., including as required complete as per the direction of Engineer-in-charge and including cost of all materials to site, incidental giving connections and all labour charges overheads & contractors profit etc., complete for finished item of work. a) Luminaire Make : Wipro(Skyline) / Philips (Greenline Extra) /GE- Venture / Crompton(Nexus / Hawk series) / Bajaj (Edge)/ Halonix (Modular/ Lumos-Super) / Havells (EnduraSeries)/Greenlites(HILux)/Capart (Premium)/Polycab/Keselec/ HPL(City Vision)/Jaquar (Premium) /Eveready /Surya (Pollux) / Fortune Art (Leaf) b) LED MAKE :PHILIPS LUMILEDS / CREE / NICHIA /OSRAM / SAMSUNG / LG.

15

-

99599.1

... More
Development of landcape ( Softscape and Hardscape) works in Gadalamma layout park(0.52 acres);Foundation and erection charges with special T&P, for 5 Mtrs. Long MS / GI Garden pole duly erecting on base plate duly providing 4 Nos foundation bolts with nuts with providing of 0.45Mtr x 0.45Mtrs x1.0 Mtr size pedestal with Vibrated Plain Cement Concrete M 20 Nominal mix with necessary steel (10kgs) reinforcement and curing for 7 days as directed by the field engineers during execution including excavation of Earth/BT all labour charges and cost and conveyance of materials etc including cost and conveyance of all materials ,overheads & contractors profit etc., complete for finished item of work

15

-

36649.35

... More
Development of landcape ( Softscape and Hardscape) works in Gadalamma layout park(0.52 acres);Supply of 3 core 4.0 Sqmm PVC insulated and sheathed FRLS copper round cable for voltage up to 1100V as per IS 694/1990. including cost and conveyance of all materials ,overheads & contractors profit etc., complete for finished item of work Makes: Finolex / RR kabel / Havells /KEI/Polycab/ Gloster/Goldmedal/GM

249

-

19519.11

... More
Development of landcape ( Softscape and Hardscape) works in Gadalamma layout park(0.52 acres);Supply of 4 core 6.0 Sqmm PVC insulated and sheathed FRLS copper round cable for voltage up to 1100V as per IS 694/1990. including cost and conveyance of all materials ,overheads & contractors profit etc., complete for finished item of work Makes: V-Guard/Bonton /Finecab/ HPL / GM / Million / Goldmedal /Fortune Art / /Sudhakar/Orbit/ Tamra/Anchor/Plaza/Vihan/Ollvin

50

-

16985.5

... More
Development of landcape ( Softscape and Hardscape) works in Gadalamma layout park(0.52 acres);Supply and fixing of 1 No. 6-32A SP MCB 10KA C/D Curve ISI mark as required complete as per the direction of Engineer-in-charge and including cost of all materials to site, incidental giving connections and all labour charges overheads & contractors profit etc., complete for finished item of work. Makes: V-Guard/Bonton /Finecab/ HPL / Million / FortuneArt /Sudhakar/Orbit/ Tamra/Anchor /Plaza/ Vihan/Spykaar/ Ollvin/Laser/Beljin/Rhino/ Standard/ Vimal

27

-

6411.42

... More
Development of landcape ( Softscape and Hardscape) works in Gadalamma layout park(0.52 acres);Supply and fixing of suitable out door type feeder piller box made with 14 SWG CRCA sheet after 7 tank process including S & F 40-63A FP MCB, 6 Nos SP MCB's, din chanel, bus bars, 6 Sqmm 3 core copper cable for internal wiring, contactor, connectors and provision for energy meter etc., complete for finished item of work..FP MCB including cost and conveyance of all materials ,overheads & contractors profit etc., complete for finished item of work FP MCB make :Legrand / Schnieder / L&T

2

-

45741.4

... More
Development of landcape ( Softscape and Hardscape) works in Gadalamma layout park(0.52 acres);Providing Independent earthing by excavating atrench to a depth f 2.10m in ordinary soils as specified 1.50 X 0.6 to a depth of 0.9m and 1.2 X 0.6 to a depth of 1.20m ,using 40 mm dia 'B' class GI Pipe of 2.5 m long with necessary accessories with 450mm x 50 mm thick hume pipe ring duly providing staggered holes including filling with 40 kg of hard coke and 20 kg salt providing with equal proportion of in layers etc. including cost and conveyance of all materials ,overheads & contractors profit etc., complete for finished item of work

1

-

3883.58



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.