Andhra Pradesh Urban Greening And Beautification Corporation Limited Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Andhra Pradesh Urban Greening And Beautification Corporation Limited - APUGBCL Tender

Housekeeping Services
Opening Date18 Nov 2022
Closing Date2 Dec 2022
Tender Amount₹ 6,64,06,180 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Greening and Beautification of Hon ble Chief Minister Camp Office Road (1.225 KMs) and Abutting Buck;Boring for Cast-in-Situ piles Augering and boring of holes in site for Bored cast-in-situ R.C.C. Piles for building foundations in loamy, clayey soils like Black cotton soils and ordinary soils without under reams as per IS 2911 - 1980 as per approved designs including all operations, incidental, labour charges, hire charges of machinery, augur bore drill and shell equipment, etc, complete for all depths and for finished item of work for piles of following diameters.

1239

-

485911.02

... More
Greening and Beautification of Hon ble Chief Minister Camp Office Road (1.225 KMs) and Abutting Buck;Earth work excavation for foundations (Manual Means) of buildings, septic tank, sump, compound wall in ordinary soils and depositing on bank with an initial lead of 10m and depth up to 3m including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete for finished item of work excluding dewatering charges etc., as per SS 20 B(APSS 308)

554.6

-

150518.44

... More
Greening and Beautification of Hon ble Chief Minister Camp Office Road (1.225 KMs) and Abutting Buck;Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using 162.0 kgs of cement, coarse aggregate 40mm size hard , machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc., to site, and including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc., and overheads & contractors profit complete for finished item of work. (APSS No. 402)

160.13

-

715146.99

... More
Greening and Beautification of Hon ble Chief Minister Camp Office Road (1.225 KMs) and Abutting Buck;Supply and fixing of Precast C.C Saucer /Drain blocks smooth finish curved, (with Reinforced) of size 600 X 300 X 85 mm thick can be laid on existing CC Bed jointing with C.M(1:3) including cost and conveyance of all material with all Taxes & labour charges including transportation complete finished item of work as selected by the Engineer-in-charge from approved source/ factory which is laid on existing CC Bed in position to the required line, level and curvature jointed with cement mortar 1:3 (1 cement : 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5 mm), including making drainage opening wherever required and including cost and conveyance of all materials & labour charges including transportation from approved source, loading & unloading charges including contractor profit & overhead charges complete for finished item of work..

2450

-

1182909

... More
Greening and Beautification of Hon ble Chief Minister Camp Office Road (1.225 KMs) and Abutting Buck;Supply and fixing of Kadapa slab (rough) 50mm thick and size of 0.457x0.457m stone edging including excavating trench in ordinary soil, laying P.C.C (1:4:8) 100 mm thick and fixing the stone in alignment and refilling the excavated soil conveyance of all materials and labour charges including transportation complete for finished item of work

8000

-

1337760

... More
Greening and Beautification of Hon ble Chief Minister Camp Office Road (1.225 KMs) and Abutting Buck;Vibrated Plain Cement Concrete M 20 Nominal mix using Concrete MIXER, 20mm size hard granite machine crushed graded metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concrete , including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site including steel centring, shuttering, machine mixing, lift charges, laying concrete, vibrating, curing, overheads & contractors profit etc., complete for finished item of work (APSS No. 402 & 403)

235.68

-

1626769.42

... More
Greening and Beautification of Hon ble Chief Minister Camp Office Road (1.225 KMs) and Abutting Buck;Supply and placing of the V.R.C.C Nominal Mix Concrete M 20 grade corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete using CONCRETE MIXER with 20mm size HBG graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry and including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water, etc., to site and , centring using Steel scaffolding pipes , jack props , Waller?s , Foot plates , brackets , steel centring plates etc., including all operational, incidental and labour charges such as machine mixing, laying concrete, vibrator, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)

-

-

-

... More
Greening and Beautification of Hon ble Chief Minister Camp Office Road (1.225 KMs) and Abutting Buck;c) For Plinth Beam

111.51

-

1336654.76

... More
Greening and Beautification of Hon ble Chief Minister Camp Office Road (1.225 KMs) and Abutting Buck;Supply and placing of the V.R.C.C Nominal Mix Concrete M 20 grade corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete using CONCRETE MIXER with 20mm size HBG graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry and,including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and , centring using Casurina Ballies, Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates etc., including all operational, incidental and labour charges such as machine mixing, lifting of concrete manually, laying concrete, vibrator, curing , overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)

-

-

-

... More
Greening and Beautification of Hon ble Chief Minister Camp Office Road (1.225 KMs) and Abutting Buck;For piles Columns

87.97

-

774634.79

... More
Greening and Beautification of Hon ble Chief Minister Camp Office Road (1.225 KMs) and Abutting Buck;Providing High Yield Strength Deformed (HYSD) / Thermo Mechanically Treated (TMT) (Fe 500 / Fe 500D grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including overheads & contractors profit complete for finished item of work.( APSS No.126)

23673

-

2435714.97

... More
Greening and Beautification of Hon ble Chief Minister Camp Office Road (1.225 KMs) and Abutting Buck;Supply and fabrication of MS framed structure like Window Grills, Compound Wall Grills, Iron Doors, Windows, Gates, MS Frame for chain link mesh works, Roof Trusses by using square / rectangular MS hollow section as per IS 4923 & Angles as per SP:6(1) IS Hand book, including cost of welding rods, power charges, labour charges for cutting, placing, welding and erecting in position and fixing, cost & convenience of all materials including wastage to site and complete for finished item of work

98916.8

-

12276564.05

... More
Greening and Beautification of Hon ble Chief Minister Camp Office Road (1.225 KMs) and Abutting Buck;Supply and fabrication works like Window Grills, Compound Wall Grills, Iron Doors, Windows, Gates, Roof Trusses by using MS solid plate section as per IS 1730 including cost of welding rods, power charges, labour charges for cutting, placing, welding & erecting in position and fixing cost & convenience of all materials including wastage to site and complete for finished item of work.

232.85

-

33644.5

... More
Greening and Beautification of Hon ble Chief Minister Camp Office Road (1.225 KMs) and Abutting Buck;Painting to new iron work with one coat of Red oxide primer and two coats with synthetic enamel paint Grade-I VOC (Volatile Organic Compound) content less than 50 grams/litre over primer coat of red oxid, including cost and conveyance of all materials like Red oxide primer, Synthetic Enamel Paint to site, incidental, operational and all labour charges etc., and overheads & contractors profit complete for finished item of work in all floors. (SS No. 1201, 1212 & 1207).

4268.1

-

864076.85

... More
Greening and Beautification of Hon ble Chief Minister Camp Office Road (1.225 KMs) and Abutting Buck;Supply and Transportation of XLPE/PVC insulated & PVC sheathed armoured cables 4 C x 4 sq.mm of 1.1 KV grade with copper conductor as per IS 7098 Part-I -1988 etc including cost and conveyance of all materials ,overheads & contractors profit etc., Make: Torrent / Universal / Unicab / Havells / KEI/ Polycab/ Gloster/ Orbit/Paragon/RR Kabel/RPG/Rhino

2600

-

850746

... More
Greening and Beautification of Hon ble Chief Minister Camp Office Road (1.225 KMs) and Abutting Buck;Supply and Laying of U.G cables upto 50 Sq,mm including earth work excavation of trench 300x600mm and ,laying the cable on sand cushion of 150 mm thick ,covering the cable with Rough Kadapa slabs minimum of 40 mm thick and refilling the trench with the excavated soils[excl. rock] , including cost and conveyance of all materials ,overheads & contractors profit etc., complete for finished item of work

2600

-

445406

... More
Greening and Beautification of Hon ble Chief Minister Camp Office Road (1.225 KMs) and Abutting Buck;Supply, Transportation and Installation of Urban Decorative POLIS Bollard 15 Watt LED LAZER CUT bollard 150mm*150mm*600mm Height, 3 mm thick made of GI with abstract design, ingress protection IP65 and Impact resistance IK08, having lumen efficacy >110lm/W with system efficacy >750lumens, P.F>0.95, Electrical Class - I, CCT : 3000K, Cat.Ref: POLIS-15W-WW Body Colour Dark Grey, IP68 connectors for controllers and including as required complete as per the direction of Engineer-in-charge and including cost of all materials to site, incidental giving connections and all labour charges overheads & contractors profit etc., complete for finished item of work Makes: LIGHTMAN/BEGA/IGUZZINI.

745

-

8791000

... More
Greening and Beautification of Hon ble Chief Minister Camp Office Road (1.225 KMs) and Abutting Buck;Supply, transportation and Installation of 5Watt LED WURREN Spike, housing made of Die Cast Aluminium, ingress protection IP65 and Impact resistance IK08, having lumen efficacy >110lm/W with system efficacy >750lumens, P.F>0.95, Electrical Class - I, CCT : 3000K, Cat.Ref: WURREN-5W-WW Body Colour Dark Grey, IP68 connectors for controllers and including as required complete as per the direction of Engineer-in-charge and including cost of all materials to site, incidental giving connections and all labour charges overheads & contractors profit etc., complete for finished item of work Makes: LIGHTMAN/BEGA/IGUZZINI.

1360

-

3808000

... More
Greening and Beautification of Hon ble Chief Minister Camp Office Road (1.225 KMs) and Abutting Buck;Supply and Wiring with 1 run of 3 core 1.50 Sqmm XLPE/PVC insulated & PVC sheathed unarmoured control cables of 1.1 KV grade with copper conductor as per IS 7098 Part-I -1988 etc in the existing pipes for main supply as required complete as per the direction of Engineer-in-charge and including cost of all materials to site, incidental giving connections and all labour charges overheads & contractors profit etc., complete for finished item of work Make: Torrent / Universal / Unicab / Havells / KEI/Polycab/Gloster /orbit / Paragon/ RR Kabel/ RPG

5200

-

805064

... More
Greening and Beautification of Hon ble Chief Minister Camp Office Road (1.225 KMs) and Abutting Buck;Supply and transportation of ISI PVC conduit pipe 25 mm (1.60 -1.80)mm thickness outer dia medium grade with IS:9537 part 3 FRLS regid PVC pipe, and including cost of all materials to site, overheads & contractors profit etc., complete for finished item of work Makes : Precision/Universal& Marudhar/VIP / GoldMedal / Million plast / GM / Sudhakar /Polycab/Anchor/ Polyline/ Orbit/AKG/Beljin/Vasavi/DEC

5200

-

200871.32

... More
Greening and Beautification of Hon ble Chief Minister Camp Office Road (1.225 KMs) and Abutting Buck;Supply and fixing of 1 No. 6-32A SP MCB 10KA C/D Curve ISI mark as required complete as per the direction of Engineer-in-charge and including cost of all materials to site, incidental giving connections and all labour charges overheads & contractors profit etc., complete for finished item of work. Makes: V-Guard/Bonton /Finecab/ HPL / Million / FortuneArt /Sudhakar/Orbit/ Tamra/Anchor /Plaza/ Vihan/Spykaar/ Ollvin/Laser/Beljin/Rhino/ Standard/ Vimal

50

-

23683.5

... More
Greening and Beautification of Hon ble Chief Minister Camp Office Road (1.225 KMs) and Abutting Buck;Supply and fixing of suitable out door type feeder piller box made with 14 SWG CRCA sheet after 7 tank process including S & F 40-63A FP MCB, 6 Nos SP MCB's, din chanel, bus bars, 6 Sqmm 3 core copper cable for internal wiring, contactor, connectors and provision for energy meter etc., complete for finished item of work..FP MCB including cost and conveyance of all materials ,overheads & contractors profit etc., complete for finished item of work FP MCB make :Legrand / Schnieder / L&T

12

-

293658.36

... More
Greening and Beautification of Hon ble Chief Minister Camp Office Road (1.225 KMs) and Abutting Buck;Providing Independent earthing by excavating atrench to a depth f 2.10m in ordinary soils as specified 1.50 X 0.6 to a depth of 0.9m and 1.2 X 0.6 to a depth of 1.20m ,using 40 mm dia 'B' class GI Pipe of 2.5 m long with necessary accessories with 450mm x 50 mm thick hume pipe ring duly providing staggered holes including filling with 40 kg of hard coke and 20 kg salt providing with equal proportion of in layers etc. including cost and conveyance of all materials ,overheads & contractors profit etc., complete for finished item of work

12

-

50458.68

... More
Greening and Beautification of Hon ble Chief Minister Camp Office Road (1.225 KMs) and Abutting Buck;Bed preparation for Korean/Mexican: Dressing the surface to the desired shape, laying of 150 mm. (6?) thick fine red garden soil, covered with a thin layer of 10 mm thick sand, watering, rolling (compacting to 4" thickness by hand roller), including the cost of red garden soil, sand and labour charges etc., for complete bed preparation and laying and ramming of lawn mats / rolls in proper position on existing prepared bed by internal transportation from dumped place, including cost of labour for laying, ramming by hand roller / demesha, internal transportation and watering etc., complete for finished item of work excluding cost of grass, fertilizers and chemicals etc., for 1 Sqm (Red garden soil in this context it is defined as sandy loamy garden soil congenial for plant growth which shall be of light textured, crystalline, porous and friable, fertile, slightly acidic or neutral)

50

-

13836

... More
Greening and Beautification of Hon ble Chief Minister Camp Office Road (1.225 KMs) and Abutting Buck;Hedge / shrub planting: Digging the trench of size 0.3 mtrs. depth, refilling with red garden soil including cost of red garden soil and farmyard manure at 4:1 ratio, internal transportation of plants, planting etc., including the application of fertilizers and pesticides etc., (@ 20 gms/pit/sqmt) complete for item of work, but excluding the cost of the fertilizers (@ 20 gms/pit/sqmt) and plant material etc., - unit 1 Sqmt of work. (* 10 No./Sqm of plants & bag size shall be arrived based on the spacing 0.3 c/c as per the design.) (Red garden soil in this context it is defined as sandy loamy garden soil congenial for plant growth which shall be of light textured, crystalline, porous and friable, fertile, slightly acidic or neutral)

4668

-

1953044.52

... More
Greening and Beautification of Hon ble Chief Minister Camp Office Road (1.225 KMs) and Abutting Buck;Hedge / shrub planting:Digging the trench of size 0.45 mtrs. depth, refilling with red garden soil including cost of red garden soil and farmyard manure at 4:1 ratio, internal transportation of plants, planting etc., including the application of fertilizers and pesticides etc.,(@ 20 gms/pit/sqmt) complete for item of work, but excluding the cost of the fertilizers (@ 20 gms/pit/sqmt) and plant material etc., - unit 1 Sqmt of work. (* 10 No./Sqm of plants & bag size shall be arrived based on the spacing 0.3 c/c as per the design.) (Red garden soil in this context it is defined as sandy loamy garden soil congenial for plant growth which shall be of light textured, crystalline, porous and friable, fertile, slightly acidic or neutral).

2100

-

1386882

... More
Greening and Beautification of Hon ble Chief Minister Camp Office Road (1.225 KMs) and Abutting Buck;Bed preparation for Ground cover / Flower beds: Digging the trench of size 150 mm. depth, and Formation of 150 mm. (6") thick of soil mixture at 3:1:1 ratio red garden soil, farmyard manure and river sand, application of fertilizers (@ 20 gms/pit/sqmt) by making smooth surface as per design including cost of soil mixture, filling of the soil mixture and internal transportation etc., for complete item of work. (excluding cost of plant material, fertilizers and chemicals (@ 20 gms / pit/ sqmt))-unit 1 Sqmt of work. (* 25 No./Sqm of plants & bag size shall be arrived based on the spacing 0.2 c/c as per the design.) (Red garden soil in this context it is defined as sandy loamy garden soil congenial for plant growth which shall be of light textured, crystalline, porous and friable, fertile, slightly acidic or neutral)

6644

-

1757736.64

... More
Greening and Beautification of Hon ble Chief Minister Camp Office Road (1.225 KMs) and Abutting Buck;Digging of 1x1x1 mtrs. pit, filling with soil mixture of red garden soil, farmyard manure at 4:1 ratio including internal transport, application of fertilizers and chemicals (@ 20 gms/pit/sqmt), internal transportation of plants and planting the plants etc., for complete item of work (excluding cost of plant material, fertilizers and chemicals (@ 20 gms / pit/ sqmt)) (Red garden soil in this context it is defined as sandy loamy garden soil congenial for plant growth which shall be of light textured, crystalline, porous and friable, fertile, slightly acidic or neutral)

250

-

352232.5

... More
Greening and Beautification of Hon ble Chief Minister Camp Office Road (1.225 KMs) and Abutting Buck;Digging of 0.75x0.75x0.75 mtrs. pit, filling with soil mixture of red garden soil, farmyard manure at 4:1 ratio including internal transport, application of fertilizers and chemicals (@ 20 gms/pit/sqmt), internal transportation of plants, planting the plants etc., for complete item of work (excluding cost of plant material, fertilizers and chemicals (@ 20 gms / pit/ sqmt) (Red garden soil in this context it is defined as sandy loamy garden soil congenial for plant growth which shall be of light textured, crystalline, porous and friable, fertile, slightly acidic or neutral)

396

-

238795.92

... More
Greening and Beautification of Hon ble Chief Minister Camp Office Road (1.225 KMs) and Abutting Buck;Complete maintenance of the entire garden area i.e. lawn trees, shrubs, hedge, flower beds, foliages, creepers etc. including watering, weeding pruning, replacement of plants, gap filling, hoeing, mowing of lawn, grass cutting by lawn mover and brush cutter , removal of garden waste, applying insecticide, pesticide & fertilizers(whenever required) top dressing of lawn with good earth and menure and maintenance of other garden related works as directed by office-in-charge ( excluding cost of water, Manure, Fertilizer, Insecticide, Pesticide, lawn mover and brush cutter with fuel) Maintence for 24 months.

240

-

4621857.6

... More
Greening and Beautification of Hon ble Chief Minister Camp Office Road (1.225 KMs) and Abutting Buck;NA

-

-

-

... More
Greening and Beautification of Hon ble Chief Minister Camp Office Road (1.225 KMs) and Abutting Buck;Supply & Delivery of topiary/trees/Palms/shrubs/lawn/ ground covers and specified plants as per directions of officer in charge at site including cost of plants and conveyance of all materials and labour charges etc., plants of bag size 7" x 8" of plant height not less than 1.0 feet, 8" x 10" of plant height not less than 3.0 feet, 13" x 13" of Tree/Palm height not less than 5 feet, 13" x 13" of plant (Hedges & Shrub) height not less than 2 feet, 15" x 16" of plant (Tree/Palm/Topiary) height not less than 5 feet, 18" x 18" plant (Tree/Palm/Topiary) height not less than 6 feet, bottom dia of the stem is 0.75'' and above, 21" x 21" and above plant (Tree/Palm/Topiary) height not less than 7 feet, bottom dia of the stem is 1'' and above. Heights mentioned above are excluding bag height. All the plants supplied shall be with sturdy stem, well formed crown, vigorously growing tip, healthy foliage without any infestation and the plants shall be supplied after proper hardening off. the rates inclusive of cost of plants and labour charges for loading, handling & complete for finished item of work.

-

-

-

... More
Greening and Beautification of Hon ble Chief Minister Camp Office Road (1.225 KMs) and Abutting Buck;lawn

-

-

-

... More
Greening and Beautification of Hon ble Chief Minister Camp Office Road (1.225 KMs) and Abutting Buck;For Korean grass

50

-

9000

... More
Greening and Beautification of Hon ble Chief Minister Camp Office Road (1.225 KMs) and Abutting Buck;Shrub / Hedge planting in 0.30 m trench in slope of bund

-

-

-

... More
Greening and Beautification of Hon ble Chief Minister Camp Office Road (1.225 KMs) and Abutting Buck;Euphorbia milii

250

-

25000

... More
Greening and Beautification of Hon ble Chief Minister Camp Office Road (1.225 KMs) and Abutting Buck;Alamanda (Yellow )

16500

-

495000

... More
Greening and Beautification of Hon ble Chief Minister Camp Office Road (1.225 KMs) and Abutting Buck;Tabernaemontanavariegated

250

-

8750

... More
Greening and Beautification of Hon ble Chief Minister Camp Office Road (1.225 KMs) and Abutting Buck;Tecomaria capensis

1000

-

30000

... More
Greening and Beautification of Hon ble Chief Minister Camp Office Road (1.225 KMs) and Abutting Buck;Acalypha rosea red

1000

-

30000

... More
Greening and Beautification of Hon ble Chief Minister Camp Office Road (1.225 KMs) and Abutting Buck;salvia Red dwarf

9180

-

275400

... More
Greening and Beautification of Hon ble Chief Minister Camp Office Road (1.225 KMs) and Abutting Buck;salvia blue dwarf

18000

-

540000

... More
Greening and Beautification of Hon ble Chief Minister Camp Office Road (1.225 KMs) and Abutting Buck;Geranium

250

-

7500

... More
Greening and Beautification of Hon ble Chief Minister Camp Office Road (1.225 KMs) and Abutting Buck;Tabernaemontana DWARF

250

-

21250

... More
Greening and Beautification of Hon ble Chief Minister Camp Office Road (1.225 KMs) and Abutting Buck;Groundcover / flower beds in slope of bund

-

-

-

... More
Greening and Beautification of Hon ble Chief Minister Camp Office Road (1.225 KMs) and Abutting Buck;Lantana sellowiana

15000

-

450000

... More
Greening and Beautification of Hon ble Chief Minister Camp Office Road (1.225 KMs) and Abutting Buck;Alternanthera GREEN

63750

-

1912500

... More
Greening and Beautification of Hon ble Chief Minister Camp Office Road (1.225 KMs) and Abutting Buck;Alternanthera red

2500

-

75000

... More
Greening and Beautification of Hon ble Chief Minister Camp Office Road (1.225 KMs) and Abutting Buck;Alternanthera GOLD

2500

-

75000

... More
Greening and Beautification of Hon ble Chief Minister Camp Office Road (1.225 KMs) and Abutting Buck;Alternanthera Brown

2500

-

75000

... More
Greening and Beautification of Hon ble Chief Minister Camp Office Road (1.225 KMs) and Abutting Buck;Asystasia blue

625

-

18750

... More
Greening and Beautification of Hon ble Chief Minister Camp Office Road (1.225 KMs) and Abutting Buck;Clematis Sapphire (Indigo)

26725

-

801750

... More
Greening and Beautification of Hon ble Chief Minister Camp Office Road (1.225 KMs) and Abutting Buck;Lantana orange

52500

-

1575000

... More
Greening and Beautification of Hon ble Chief Minister Camp Office Road (1.225 KMs) and Abutting Buck;Unique Trees in slope of bund

-

-

-

... More
Greening and Beautification of Hon ble Chief Minister Camp Office Road (1.225 KMs) and Abutting Buck;Eugenia comanulata (Cone)

44

-

52800

... More
Greening and Beautification of Hon ble Chief Minister Camp Office Road (1.225 KMs) and Abutting Buck;Thuja (Cone)

44

-

39600

... More
Greening and Beautification of Hon ble Chief Minister Camp Office Road (1.225 KMs) and Abutting Buck;Juniperus (Cone) pot

44

-

79200

... More
Greening and Beautification of Hon ble Chief Minister Camp Office Road (1.225 KMs) and Abutting Buck;Ficus apollo (Cone)

44

-

35200

... More
Greening and Beautification of Hon ble Chief Minister Camp Office Road (1.225 KMs) and Abutting Buck;Malpighia coccigera (Cone)

44

-

110000

... More
Greening and Beautification of Hon ble Chief Minister Camp Office Road (1.225 KMs) and Abutting Buck;Ficus nuda (Cone)

44

-

132000

... More
Greening and Beautification of Hon ble Chief Minister Camp Office Road (1.225 KMs) and Abutting Buck;Podocorpus (Cone)

44

-

57200

... More
Greening and Beautification of Hon ble Chief Minister Camp Office Road (1.225 KMs) and Abutting Buck;Ficus ponda

44

-

30800

... More
Greening and Beautification of Hon ble Chief Minister Camp Office Road (1.225 KMs) and Abutting Buck;Buxus x 'Green (Cone)

44

-

44000

... More
Greening and Beautification of Hon ble Chief Minister Camp Office Road (1.225 KMs) and Abutting Buck;Shrub / Hedge planting in 0.45 m trench in 1.5 m wide central median

-

-

-

... More
Greening and Beautification of Hon ble Chief Minister Camp Office Road (1.225 KMs) and Abutting Buck;Ixora red dwarf

12000

-

1200000

... More
Greening and Beautification of Hon ble Chief Minister Camp Office Road (1.225 KMs) and Abutting Buck;Duranta gold

8000

-

640000

... More
Greening and Beautification of Hon ble Chief Minister Camp Office Road (1.225 KMs) and Abutting Buck;Plumbago auriculata

1000

-

40000

... More
Greening and Beautification of Hon ble Chief Minister Camp Office Road (1.225 KMs) and Abutting Buck;Unique Trees in 1.5 m wide central median

-

-

-

... More
Greening and Beautification of Hon ble Chief Minister Camp Office Road (1.225 KMs) and Abutting Buck;Terminalia mantaly variegata

250

-

3000000

... More
Greening and Beautification of Hon ble Chief Minister Camp Office Road (1.225 KMs) and Abutting Buck;Unloading of plants bag size (25"X25") at site of work and stacking for lead less upto 50 m and including labour charges, T&P etc.,and overheads & contractors profit complete for finished item of work (excluding cost of plant bag)

250

-

6654.45

... More
Greening and Beautification of Hon ble Chief Minister Camp Office Road (1.225 KMs) and Abutting Buck;Unloading of plants bag size (21"X21") at site of work and stacking for lead less upto 50 m and including labour charges, T&P etc.,and overheads & contractors profit complete for finished item of work (excluding cost of plant bag)

264

-

4222.18

... More
Greening and Beautification of Hon ble Chief Minister Camp Office Road (1.225 KMs) and Abutting Buck;Unloading of plants bag size (13"X13") at site of work and stacking for lead less upto 50 m and including labour charges, T&P etc.,and overheads & contractors profit complete for finished item of work (excluding cost of plant bag)

20632

-

33364.01

... More
Greening and Beautification of Hon ble Chief Minister Camp Office Road (1.225 KMs) and Abutting Buck;Unloading of plants bag size (7"X8") at site of work and stacking for lead less upto 50 m and including labour charges, T&P etc.,and overheads & contractors profit complete for finished item of work (excluding cost of plant bag)

213280

-

54173.12

... More
Greening and Beautification of Hon ble Chief Minister Camp Office Road (1.225 KMs) and Abutting Buck;Transportation of bag plants form Kadiyam to Tadepalle. (Actual payment will paid for the actual work done subjected to approval by the competent authority)

685.08

-

616572



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.