Andhra Pradesh Urban Greening And Beautification Corporation Limited Tender
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Andhra Pradesh Urban Greening And Beautification Corporation Limited - APUGBCL Tender
Coronavirus COVID 19
Opening Date6 Dec 2019
Closing Date13 Dec 2019
Tender Amount₹ 65,26,629
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
₹ 2,311
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
302030Bid Award Id
ViewTender No
APUG-15021/10/2019-PROJ-SEC-APUGBC/2019-20/6(6)Tender Authority
Andhra Pradesh Urban Greening And Beautification Corporation Limited ViewPurchaser Address
-Website
http://http://urbangreening.ap.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Maintenance of hedge/shrub planting: Trimming of hedges/shrubs (once in 15 days) watering (twice in a week @ 5 Lts/per sqmt/per day shall be provide to maintain sub soil moisture continuously). Edge cutting 0.30mtr. away from the edges/shrub (once in a month) and application of fertilizers, insecticides, Fungicides ( once in a month @ 20 gms/pit/sqmt) etc., by manually excluding cost of water and fertilizers for Two years
4800
-
2387.28
Alignment and fixing of planting point with 0.45 mtrs. length sticks including material cost, transport and overheads & contractors profit complete for finished item of work.
800
-
1.35
Earth work excavation for foundations (Manual Means) of buildings, septic tank, sump, compound wall in ordinary soils and depositing on bank with an initial lead of 10m and depth up to 3m including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete for finished item of work excluding dewatering charges etc., as per SS 20 B(APSS 308) For Digging of pits of size 0.90 M x 0.90 M x 0.90 M
583.2
-
260.54
Filling with Red soil (Red soil in this context it is defined as sandy loamy garden soil congenial for plant growth which shall be of light textured, crystalline, porous and friable, fertile, slightly acidic or neutral) in pits/trenches and including cost and conveyance of red soil to work site and it including all operational, incidental ,labour charges, required tools, overheads & contractors profit complete for finished item of work.
291.6
-
720
Cost and Conveyance of Farm Yard Manure or dry cow dung powder including loading, unloading, internal transport and application of the FYM into the pits/trenches and it including all operational, incidental ,labour charges, required tools, overheads & contractors profit complete for finished item of work. (0.056 cum Farm yard Manure for each pit.)
44.8
-
1955.54
Conveyance charges for internal transprot upto 100 mt with head load and application of the red soil and FYM into the pit and it including all operational, incidental ,labour charges, required tools, overheads & contractors profit complete for finished item of work.
336.4
-
81.8
Removing polythene bag, planting by keeping the ball of earth intact, fixing the plant by refilling with dug out of soil /supplied soli FYM mixer and ramming around the plant , it including all operational, incidental ,labour charges, required tools, overheads & contractors profit complete for finished item of work.
800
-
16.05
Circular weeding cum deep soil working to a dia of 1 m and to a depth of 10 cm around the plant and it including all operational, incidental ,labour charges, required tools, overheads & contractors profit complete for finished item of work. (once in 3 month)
6400
-
17.9
Watch and ward including watering, pruning, cleaning the area and application of fertilizers and chemicals as directed by site in-charge .
24
-
12000
Hire charges of tractor mounted water tanker for filling sump by 5000 ltrs capacity tanker @ 40 litres per plant per watering ( 40 waterings for 1 year) and it including all operational, incidental ,labour charges, required tools, overheads & contractors profit complete for finished item of work
973
-
595.27
Supply & Delivery of topiary/trees/Palms/shrubs/lawn/ ground covers and specified plants as per directions of officer in charge at site including cost of plants and conveyance of all materials and labour charges etc., plants of bag size 7" x 8" of plant height not less than 1.0 feet,
8" x 10" of plant height not less than 3.0 feet,
25" x 25" and above plant (Tree/Palm/Topiary) height not less than 7 feet, bottom dia of the stem is 1'' and above.
Heights mentioned above are excluding bag height.
All the plants supplied shall be with sturdy stem, well formed crown, vigorously growing tip, healthy foliage without any infestation and the plants shall be supplied after proper hardening off. The rates inclusive of loading, transportation to the site, unloading & handling.
-
-
-
Hedge /shrub plants in central median
-
-
-
For Bougainvillea plants varieties
24000
-
-
Tree planting in central median
-
-
-
For Mimusops elengi
400
-
-
For Sterculia foetida
400
-
-
Loading and unloading of plants bag at site of work and stacking for lead less upto 50 m and including labour charges, T&P etc.,and overheads & contractors profit complete for finished item of work (excluding cost of plant bag)
-
-
-
Tree planting in central median
800
-
4088.5
Hedge /shrub plants in central median
24000
-
72.07
Internal Transportation of bag plants to the planting points and including labour charges, T&P etc.,and overheads & contractors profit complete for finished item of work
-
-
-
Tree planting in central median
400
-
2290.48
Transportation of bag plants from Gannavaram to Pulivendula 24800 Nos
164
-
1223
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements