Andhra Pradesh Urban Greening And Beautification Corporation Limited Tender

... More
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Andhra Pradesh Urban Greening And Beautification Corporation Limited - APUGBCL Tender

Agriculture or Forestry Works
Opening Date18 Jul 2022
Closing Date1 Aug 2022
Tender Amount₹ 27,15,303 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Development of landscape (Softscape Hardscape) works in NGO Colony park (0.21 Acres),Gokul park (0.;Hedge / shrub planting: Digging the trench of size 0.3 mtrs. depth, refilling with red garden soil including cost of red garden soil and farmyard manure at 4:1 ratio, internal transportation of plants, planting etc., including the application of fertilizers and pesticides etc., (@ 20 gms/pit/sqmt) complete for item of work, but excluding the cost of the fertilizers (@ 20 gms/pit/sqmt) and plant material etc., - unit 1 Sqmt of work. (* 10 No./Sqm of plants & bag size shall be arrived based on the spacing as per the design.) (Red garden soil in this context it is defined as sandy loamy garden soil congenial for plant growth which shall be of light textured, crystalline, porous and friable, fertile, slightly acidic or neutral)

458.5

-

190075.76

... More
Development of landscape (Softscape Hardscape) works in NGO Colony park (0.21 Acres),Gokul park (0.;Maintenance of hedge/shrub planting: Trimming of hedges/shrubs (once in a month) it including all operational, incidental ,labour charges for complete of work.

5502

-

24263.82

... More
Development of landscape (Softscape Hardscape) works in NGO Colony park (0.21 Acres),Gokul park (0.;Maintenance of hedge/shrub planting: Edge cutting 0.30mtr. away from the edges/shrub (once in a month) and application of fertilizers, insecticides, Fungicides (once in a month @ 20 gms/pit/sqmt) etc., by manually excluding cost of fertilizers it including all operational, incidental ,labour charges, for complete of work.

5502

-

23832.46

... More
Development of landscape (Softscape Hardscape) works in NGO Colony park (0.21 Acres),Gokul park (0.;Maintenance of hedge/shrub planting: watering once in 2 days @ 5 Lts/per sqmt shall be provide to maintain sub soil moisture continuously by manually excluding cost of wateri ncluding all operational, incidental ,labour charges for complete of work..

5502

-

40439.7

... More
Development of landscape (Softscape Hardscape) works in NGO Colony park (0.21 Acres),Gokul park (0.;Bed preparation for Ground cover / Flower beds: Digging the trench of size 150 mm. depth, and Formation of 150 mm. (6") thick of soil mixture at 3:1:1 ratio red garden soil, farmyard manure and river sand, application of fertilizers (@ 20 gms/pit/sqmt) by making smooth surface as per design including cost of soil mixture, filling of the soil mixture and internal transportation etc., for complete item of work. (excluding cost of plant material, fertilizers and chemicals (@ 20 gms / pit/ sqmt))-unit 1 Sqmt of work. (* 22 No./Sqm of plants & bag size shall be arrived based on the spacing as per the design.) (Red garden soil in this context it is defined as sandy loamy garden soil congenial for plant growth which shall be of light textured, crystalline, porous and friable, fertile, slightly acidic or neutral)

158.5

-

39113.04

... More
Development of landscape (Softscape Hardscape) works in NGO Colony park (0.21 Acres),Gokul park (0.;Maintenance of groundcover/flower beds: Weeding, Trimming/pinching and keeping the ground cover in healthy condition (once in a 15 days) it including all operational, incidental ,labour charges for complete of work.

1902

-

13606.91

... More
Development of landscape (Softscape Hardscape) works in NGO Colony park (0.21 Acres),Gokul park (0.;Maintenance of groundcover/flower beds: Watering to ground cover (one's in three day's @ 5 litres/per Sqmts shall be provide to maintain sub soil moisture continuously) by manually, excluding cost of wateri ncluding all operational, incidental ,labour charges for complete of work..

1902

-

10251.78

... More
Development of landscape (Softscape Hardscape) works in NGO Colony park (0.21 Acres),Gokul park (0.;Digging of 0.6x0.6x0.6 mtrs. pit, filling with soil mixture of red garden soil, farmyard manure at 4:1 ratio including internal transport, application of fertilizers and chemicals (@ 20 gms/pit/sqmt), internal transportation of plants, planting the plants etc., for complete item of work (excluding cost of plant material, fertilizers and chemicals (@ 20 gms / pit/ sqmt)) (Red garden soil in this context it is defined as sandy loamy garden soil congenial for plant growth which shall be of light textured, crystalline, porous and friable, fertile, slightly acidic or neutral)

326

-

95247.42

... More
Development of landscape (Softscape Hardscape) works in NGO Colony park (0.21 Acres),Gokul park (0.;Maintenance of Palms/Tree planting: Trimming (once in month) and application of fertilizers, insecticides, Fungicides @ 20 gms/pit/sqmt) (once in quarterly) by manually excluding cost of fertilizers, it including all operational, incidental ,labour charges, for complete of work

3912

-

22235.81

... More
Development of landscape (Softscape Hardscape) works in NGO Colony park (0.21 Acres),Gokul park (0.;Maintenance of Palms/Tree planting: formation of basins 0.30m . away from the edges (once in a month) it including all operational, incidental ,labour charges for complete of work

3912

-

39871.1

... More
Development of landscape (Softscape Hardscape) works in NGO Colony park (0.21 Acres),Gokul park (0.;Maintenance of Palms/Tree planting: watering (once in three days @ 5 Lts/per plant shall be provide to maintain sub soil moisture continuously) by manually, but excluding cost of water including all operational, incidental ,labour charges for complete of work.

3912

-

34503.84

... More
Development of landscape (Softscape Hardscape) works in NGO Colony park (0.21 Acres),Gokul park (0.;Supply & Delivery of topiary/trees/Palms/shrubs/lawn/ ground covers and specified plants as per directions of officer in charge at site including cost of plants and conveyance of all materials and labour charges etc., plants of bag size 7" x 8" of plant height not less than 1.0 feet, 8" x 10" of plant height not less than 3.0 feet, 13" x 13" of Tree/Palm height not less than 5 feet, 13" x 13" of plant (Hedges & Shrub) height not less than 2 feet, 15" x 16" of plant (Tree/Palm/Topiary) height not less than 5 feet, 18" x 18" plant (Tree/Palm/Topiary) height not less than 6 feet, bottom dia of the stem is 0.75'' and above, 21" x 21" and above plant (Tree/Palm/Topiary) height not less than 7 feet, bottom dia of the stem is 1'' and above. Heights mentioned above are excluding bag height. All the plants supplied shall be with sturdy stem, well formed crown, vigorously growing tip, healthy foliage without any infestation and the plants shall be supplied after proper hardening off.

-

-

-

... More
Development of landscape (Softscape Hardscape) works in NGO Colony park (0.21 Acres),Gokul park (0.;Korean grass

150

-

27000

... More
Development of landscape (Softscape Hardscape) works in NGO Colony park (0.21 Acres),Gokul park (0.;Acalypha inferna ( Bag size 7" x 8" )

500

-

15000

... More
Development of landscape (Softscape Hardscape) works in NGO Colony park (0.21 Acres),Gokul park (0.;Golden durnta ( Bag size 7" x 8" )

925

-

27750

... More
Development of landscape (Softscape Hardscape) works in NGO Colony park (0.21 Acres),Gokul park (0.;canna indica varigated ( Bag size 7" x 8" )

3160

-

94800

... More
Development of landscape (Softscape Hardscape) works in NGO Colony park (0.21 Acres),Gokul park (0.;Allamanda cuthartica ( Bag size 4" x 6" )

726

-

14520

... More
Development of landscape (Softscape Hardscape) works in NGO Colony park (0.21 Acres),Gokul park (0.;Pandanus gold ( Bag size 4" x 6" )

2761

-

55220

... More
Development of landscape (Softscape Hardscape) works in NGO Colony park (0.21 Acres),Gokul park (0.;Pelophorum pterocarpum ( Bag size 21" x 21" )

198

-

148500

... More
Development of landscape (Softscape Hardscape) works in NGO Colony park (0.21 Acres),Gokul park (0.;Bauhnia blackena ( Bag size 21" x 21" )

91

-

68250

... More
Development of landscape (Softscape Hardscape) works in NGO Colony park (0.21 Acres),Gokul park (0.;Delonix regia ( Bag size 21" x 21" )

1

-

750

... More
Development of landscape (Softscape Hardscape) works in NGO Colony park (0.21 Acres),Gokul park (0.;Wodyetia bifurcata ( Bag size 21" x 21" )

36

-

27000

... More
Development of landscape (Softscape Hardscape) works in NGO Colony park (0.21 Acres),Gokul park (0.;Hardscape (Civil works)

-

-

-

... More
Development of landscape (Softscape Hardscape) works in NGO Colony park (0.21 Acres),Gokul park (0.;Earth work excavation for foundations (Manual Means) of buildings, septic tank, sump, compound wall in ordinary soils and depositing on bank with an initial lead of 10m and depth up to 3m including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete for finished item of work excluding dewatering charges etc., as per SS 20 B(APSS 308)

44.07

-

10716.5

... More
Development of landscape (Softscape Hardscape) works in NGO Colony park (0.21 Acres),Gokul park (0.;Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using 162.0 kgs of cement, coarse aggregate 40mm size hard , machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc., to site, and including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc., and overheads & contractors profit complete for finished item of work. (APSS No. 402)

12.07

-

46448.5

... More
Development of landscape (Softscape Hardscape) works in NGO Colony park (0.21 Acres),Gokul park (0.;Supply and fixing of C.C. Kerb not less than M30 strength of size 600 X 400 X 110 mm thick with bottom thickness of 110 mm up to height of 350 mm and top width of 50 mm thick chamfering with 45° at starts at 350 mm height to 400 mm height as selected by the Engineer-in-charge from approved source/ factory which is laid on existing CC Bed in position to the required line, level and curvature jointed with cement mortar 1:3 (1 cement : 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5 mm), including making drainage opening wherever required and including cost and conveyance of all materials & labour charges including transportation from approved source, loading & unloading charges including contractor profit & overhead charges complete for finished item of work.

245

-

112415.8

... More
Development of landscape (Softscape Hardscape) works in NGO Colony park (0.21 Acres),Gokul park (0.;Supply and fixing of Kadapa slab (rough) 50mm thick and size of 0.457x0.457m stone edging including excavating trench in ordinary soil, laying P.C.C (1:4:8) 100 mm thick and fixing the stone in alignment and refilling the excavated soil conveyance of all materials and labour charges including transportation complete for finished item of work

1514

-

231278.64

... More
Development of landscape (Softscape Hardscape) works in NGO Colony park (0.21 Acres),Gokul park (0.;Filling with carted gravel in pathways, trenches, sides of foundations and basement with initial lead in layers not exceeding 15cm thick, watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T&P etc., and overheads & contractors profit complete for finished item of work(APSS NO.309&310)

766.19

-

244927.96

... More
Development of landscape (Softscape Hardscape) works in NGO Colony park (0.21 Acres),Gokul park (0.;Supply & Fixing Sadarhalli granite stone with 5 line dressing Double Patti of 5' length seating benches with back rest and its width 16'' with 4" thick and 18" height with 4" thick and leg size 4'' width, including cost and conveyance of all materials like granite benche, cement, sand to work site loading ,un loading transport and all operational, incidental labour & lift charges,and overheads & contractors profit complete for finished item

31

-

465000

... More
Development of landscape (Softscape Hardscape) works in NGO Colony park (0.21 Acres),Gokul park (0.;Filling with dust in pathways with initial lead in layers not exceeding 15cm thick, watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T&P etc., and overheads & contractors profit complete for finished item of work(APSS NO.309&310)

15.9

-

9169.85

... More
Development of landscape (Softscape Hardscape) works in NGO Colony park (0.21 Acres),Gokul park (0.;Supply of precast concrete blocks for paving of M-30 grade and thickness not less than 50 mm for Non- traffic areas conforming to IS 15658:2006 in all shapes and designs as per the manufacturer's specification set over the 50 mm thick sand bed with hand roller compaction with joint neatly in homogeneous or heterogeneous pattern as the colour and pattern shall be as per the drawings furnished by the architect, including cost and conveyance of all materials like cement, sand, water, tiles, etc., to site including all operational, incidental, labour charges, laying tiles to required slope as directed by the Engineer- in-charge etc., and overheads & contractors profit complete for finished item of work

159

-

98824.86

... More
Development of landscape (Softscape Hardscape) works in NGO Colony park (0.21 Acres),Gokul park (0.;Flooring with Rough Shahabad / Tandur stone slabs of 40 mm thick set over base coat of cement mortar (1 : 8) 12 mm thick over CC bed already laid or RCC roof slab, including pointing with cement mortar 1:3 duly filling joints nearly, including cost of all materials like flooring stone, cement, sand, and water etc., complete, including labour charges for dressing of flooring stones etc., complete for finished item of work,. (APSS No.703 & 701)

45.01

-

29235.8

... More
Development of landscape (Softscape Hardscape) works in NGO Colony park (0.21 Acres),Gokul park (0.;Vibrated Plain Cement Concrete M 20 Nominal mix using Concrete MIXER, 20mm size hard granite machine crushed graded metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concrete , including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site including steel centring, shuttering, machine mixing, lift charges, laying concrete, vibrating, curing, overheads & contractors profit etc., complete for finished item of work (APSS No. 402 & 403)

0.9

-

5478.88

... More
Development of landscape (Softscape Hardscape) works in NGO Colony park (0.21 Acres),Gokul park (0.;Providing High Yield Strength Deformed (HYSD) / Thermo Mechanically Treated (TMT) (Fe 500 / Fe 500D grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including overheads & contractors profit complete for finished item of work.( APSS No.126)

72

-

6937.2

... More
Development of landscape (Softscape Hardscape) works in NGO Colony park (0.21 Acres),Gokul park (0.;Filling with carted coarse sand in play area, pathway, foundations bed and basement with initial lead in layers not exceeding 15cm thick, watering and ramming including cost and conveyance of water to work site and all operational, incidental ,labour charges, hire charges of T&P etc., and overheads & contractors profit complete for finished item of work(APSS NO.309&310)

48

-

33080.16

... More
Development of landscape (Softscape Hardscape) works in NGO Colony park (0.21 Acres),Gokul park (0.;Supply and Transportation of XLPE/PVC insulated & PVC sheathed armoured cables 4 C x 4 sq.mm of 1.1 KV grade with copper conductor as per IS 7098 Part-I -1988 etc including cost and conveyance of all materials ,overheads & contractors profit etc., Make: Torrent / Universal / Unicab / Havells / KEI/ Polycab/ Gloster/ Orbit/Paragon/RR Kabel/RPG/Rhino

150

-

43117.5

... More
Development of landscape (Softscape Hardscape) works in NGO Colony park (0.21 Acres),Gokul park (0.;Supply and Laying of U.G cables upto 50 Sq,mm including earth work excavation of trench 300x600mm and ,laying the cable on sand cushion of 150 mm thick ,covering the cable with Rough Kadapa slabs minimum of 40 mm thick and refilling the trench with the excavated soils[excl. rock] , including cost and conveyance of all materials ,overheads & contractors profit etc., complete for finished item of work

150

-

23226

... More
Development of landscape (Softscape Hardscape) works in NGO Colony park (0.21 Acres),Gokul park (0.;Supply and fabrication of street light poles made with medium quality MS Pipes of 88.90mm OD for 1670mm long, 60.3mm OD Pipes of 1670 mm long and 42.4 mm OD for 1670 mm long welded to each other for a total height of 5.0 m and providing 33.70 mm OD MS pipe of 1000 mm long for arm bracket for Luminaires fixing welded to main pole at suitable angle, suitable pole cap, base plate 300 x 300 x 10 mm and 4 Nos of 16 m dia 700 long 'J' bolts along with template including cost of welding rods, power charges, labour charges for cutting, placing, welding and erecting in position, cost & convenience of all materials including wastage to site, complete painting the total length of pipe with Painting to new iron work with one coat of Red oxide primer and two coats with synthetic enamel paint Grade-II VOC including cost of all materials ,labour charges etc for finished item of work.

12

-

52746.36

... More
Development of landscape (Softscape Hardscape) works in NGO Colony park (0.21 Acres),Gokul park (0.;Supply and fixing of 60 W LED Street light Luminaire for existing street light pole, Luminaire made of pressure diecast alluminium body with powder coated, having protective toughned glass, Supply Input voltage 120 - 270 V AC, P.F > 0.90, high power LED's having System efficacy > 100 lm/W and junction temprature < 70°C, with Ingrees protection IP66, Luminaire performance complies to IS 10322 (Part 5 / Sec-3), Driver surge protection 4KV, In house additional Surge protection 10 KV with optics distribution , THD<10% at 110 Volts AC, driver efficiency >90%, CCT: 3000K - 5700K, minimum CRI>70, etc., including as required complete as per the direction of Engineer-in-charge and including cost of all materials to site, incidental giving connections and all labour charges overheads & contractors profit etc., complete for finished item of work. a) Luminaire Make : Wipro(Skyline) / Philips (Greenline Extra) /GE- Venture / Crompton(Nexus / Hawk series) / Bajaj (Edge)/ Halonix (Modular/ Lumos-Super) / Havells (EnduraSeries)/Greenlites(HILux)/Capart (Premium)/Polycab/Keselec/ HPL(City Vision)/Jaquar (Premium) /Eveready /Surya (Pollux) / Fortune Art (Leaf) b) LED MAKE :PHILIPS LUMILEDS / CREE / NICHIA /OSRAM / SAMSUNG / LG.

12

-

74004.24

... More
Development of landscape (Softscape Hardscape) works in NGO Colony park (0.21 Acres),Gokul park (0.;Foundation and erection charges with special T&P, for 5 Mtrs. Long MS / GI Garden pole duly erecting on base plate duly providing 4 Nos foundation bolts with nuts with providing of 0.45Mtr x 0.45Mtrs x1.0 Mtr size pedestal with Vibrated Plain Cement Concrete M 20 Nominal mix with necessary steel (10kgs) reinforcement and curing for 7 days as directed by the field engineers during execution including excavation of Earth/BT all labour charges and cost and conveyance of materials etc including cost and conveyance of all materials ,overheads & contractors profit etc., complete for finished item of work

12

-

30309.48

... More
Development of landscape (Softscape Hardscape) works in NGO Colony park (0.21 Acres),Gokul park (0.;Supply and Wiring with 1 run of 3 core 1.50 Sqmm XLPE/PVC insulated & PVC sheathed unarmoured control cables of 1.1 KV grade with copper conductor as per IS 7098 Part-I -1988 etc in the existing pipes for main supply as required complete as per the direction of Engineer-in-charge and including cost of all materials to site, incidental giving connections and all labour charges overheads & contractors profit etc., complete for finished item of work Make: Torrent / Universal / Unicab / Havells / KEI/Polycab/Gloster /orbit / Paragon/ RR Kabel/ RPG

84

-

11447.52

... More
Development of landscape (Softscape Hardscape) works in NGO Colony park (0.21 Acres),Gokul park (0.;Supply of 4 core 6.0 Sqmm PVC insulated and sheathed FRLS copper round cable for voltage up to 1100V as per IS 694/1990. including cost and conveyance of all materials ,overheads & contractors profit etc., complete for finished item of work Makes: V-Guard/Bonton /Finecab/ HPL / GM / Million / Goldmedal /Fortune Art / /Sudhakar/Orbit/ Tamra/Anchor/Plaza/Vihan/Ollvin

40

-

13588.4

... More
Development of landscape (Softscape Hardscape) works in NGO Colony park (0.21 Acres),Gokul park (0.;Supply and fixing of 1 No. 6-32A SP MCB 10KA C/D Curve ISI mark as required complete as per the direction of Engineer-in-charge and including cost of all materials to site, incidental giving connections and all labour charges overheads & contractors profit etc., complete for finished item of work. Makes: V-Guard/Bonton /Finecab/ HPL / Million / FortuneArt /Sudhakar/Orbit/ Tamra/Anchor /Plaza/ Vihan/Spykaar/ Ollvin/Laser/Beljin/Rhino/ Standard/ Vimal

12

-

2849.52

... More
Development of landscape (Softscape Hardscape) works in NGO Colony park (0.21 Acres),Gokul park (0.;Supply and fixing of suitable out door type feeder piller box made with 14 SWG CRCA sheet after 7 tank process including S & F 40-63A FP MCB, 6 Nos SP MCB's, din chanel, bus bars, 6 Sqmm 3 core copper cable for internal wiring, contactor, connectors and provision for energy meter etc., complete for finished item of work..FP MCB including cost and conveyance of all materials ,overheads & contractors profit etc., complete for finished item of work FP MCB make :Legrand / Schnieder / L&T

1

-

22870.7

... More
Development of landscape (Softscape Hardscape) works in NGO Colony park (0.21 Acres),Gokul park (0.;Providing Independent earthing by excavating atrench to a depth f 2.10m in ordinary soils as specified 1.50 X 0.6 to a depth of 0.9m and 1.2 X 0.6 to a depth of 1.20m ,using 40 mm dia 'B' class GI Pipe of 2.5 m long with necessary accessories with 450mm x 50 mm thick hume pipe ring duly providing staggered holes including filling with 40 kg of hard coke and 20 kg salt providing with equal proportion of in layers etc. including cost and conveyance of all materials ,overheads & contractors profit etc., complete for finished item of work

1

-

3832.57

... More
Development of landscape (Softscape Hardscape) works in NGO Colony park (0.21 Acres),Gokul park (0.;Supply, Delivery, Installation and Commissioning of 1.5m x 2.2m size of FOUR SEATER SWING of Arihant/ Equivalent make including transportation, installation, commissioning, loading and unloading etc., for complete finished item of the work

-

-

-

... More
Development of landscape (Softscape Hardscape) works in NGO Colony park (0.21 Acres),Gokul park (0.;1.Swing leg pipe : 40NB hot dip galvanized swing leg pipe of length 2300mm conforming to IS 1239 with GI thickness up to 60µ.

-

-

-

... More
Development of landscape (Softscape Hardscape) works in NGO Colony park (0.21 Acres),Gokul park (0.;2. Top pipe : Four Seater swing top fixed to 50NB Galvanized pipe having C Class material of length 1490mm at the center and two junction box frame at the ends to attach leg pipes.

-

-

-

... More
Development of landscape (Softscape Hardscape) works in NGO Colony park (0.21 Acres),Gokul park (0.;3. Junction box : 225mmx103mm junction box made from 5mm thick GI plate to house the two swing leg pipes & top pipe.

-

-

-

... More
Development of landscape (Softscape Hardscape) works in NGO Colony park (0.21 Acres),Gokul park (0.;4. Seat frame: side frame consist of Rectangular tube having 50X25X4 mm thick. 20NB bend pipe used for seat frame support. 40NB bend is used for Entry Support structure.

-

-

-

... More
Development of landscape (Softscape Hardscape) works in NGO Colony park (0.21 Acres),Gokul park (0.;5. Bearing Assembly: Shaft for UCP 207 Bearing is self-lubricated made of SKF make shall be provided for smooth & trouble-free movement.

-

-

-

... More
Development of landscape (Softscape Hardscape) works in NGO Colony park (0.21 Acres),Gokul park (0.;6. Pipes:- All metal pipes should be used of Heavy Duty ('C' Class) of TATA/Jindal make only with Hot Dipped Galvanized Pipes conforming to IS 1239 (Part 1) with GI thickness not less than 60micron.

-

-

-

... More
Development of landscape (Softscape Hardscape) works in NGO Colony park (0.21 Acres),Gokul park (0.;7. Powder coating:- It shall be done with pure polyester raw material. Dry film thickness maintained within the range of 50-70 microns. It is tested for adhesion test (According to ASTM-D-3359) with the help of cross hatch cutter instruments.

-

-

-

... More
Development of landscape (Softscape Hardscape) works in NGO Colony park (0.21 Acres),Gokul park (0.;8. Nut and Bolts:- Galvanized/ S.S./Allen Bolt/Button Head Allen Bolt & Nuts / Nylon Lock Nuts are used with PVC Bolt Caps.

-

-

-

... More
Development of landscape (Softscape Hardscape) works in NGO Colony park (0.21 Acres),Gokul park (0.;9. All open ends of pipe been closed by GI caps for user safety against entrapment.

-

-

-

... More
Development of landscape (Softscape Hardscape) works in NGO Colony park (0.21 Acres),Gokul park (0.;10. Certificate: ISO9001:2015

-

-

-

... More
Development of landscape (Softscape Hardscape) works in NGO Colony park (0.21 Acres),Gokul park (0.;11. Color: Multicolor for optional or customized & As per RAL shade.

-

-

-

... More
Development of landscape (Softscape Hardscape) works in NGO Colony park (0.21 Acres),Gokul park (0.;12. Packaging: Safety 3 layer packaging like 1st EPE Foam 2nd HDPE Film and 3rd is Stretch wrap.

-

-

-

... More
Development of landscape (Softscape Hardscape) works in NGO Colony park (0.21 Acres),Gokul park (0.;Cost of the Equipment

1

-

48500

... More
Development of landscape (Softscape Hardscape) works in NGO Colony park (0.21 Acres),Gokul park (0.;Supply, delivery and commissioning of 4 No?s Seats made with FRP Fibre Seats and fitted both ends of 50 MM Dia Pipe length8 Ft with Bolts & Nuts and both fitted on Horizontal Pipe 3? length and 60 mm Dia?U? shape (rivers) with clamps with fibre Seats of Arihant / Equivalent make including transportation, installation, commissioning, loading and unloading in complete finished item of the work

-

-

-

... More
Development of landscape (Softscape Hardscape) works in NGO Colony park (0.21 Acres),Gokul park (0.;1. Centre Main Frame Structure:- 80NB hot dip galvanized pipes conforming to IS 1239.

-

-

-

... More
Development of landscape (Softscape Hardscape) works in NGO Colony park (0.21 Acres),Gokul park (0.;2. See saws:- 2 Nos of See saws made up of 80NB GI pipe conforming to IS 1239 with proper holdings.

-

-

-

... More
Development of landscape (Softscape Hardscape) works in NGO Colony park (0.21 Acres),Gokul park (0.;3. FRP Seats: - 4 nos. of FRP Seats

-

-

-

... More
Development of landscape (Softscape Hardscape) works in NGO Colony park (0.21 Acres),Gokul park (0.;4. FRP (FIBER REINFORCED PLASTIC):- All the Fiber Reinforced Plastics (FRP) materials are processed by the hand laid process which is considered to be the best of its type. International quality of Gel coats which is duly mixed with U.V stabilized pigment to give the required color to the product. Thickness of the FRP material should not less than 5 mm as per the product. The FRP material should be tested for abrasion resistance & UTS (ultimate tensile test).

-

-

-

... More
Development of landscape (Softscape Hardscape) works in NGO Colony park (0.21 Acres),Gokul park (0.;5. Pipes:- All metal pipes should be used of Heavy Duty ('C' Class) of TATA/Jindal make only with Hot Dipped Galvanized Pipes conforming to IS 1239 (Part 1) with GI thickness not less than 60micron.

-

-

-

... More
Development of landscape (Softscape Hardscape) works in NGO Colony park (0.21 Acres),Gokul park (0.;6. Powder coating:- It shall be done with pure polyester raw material. Dry film thickness maintained within the range of 50-70 microns. It is tested for adhesion test (According to ASTM-D-3359) with the help of cross hatch cutter instruments.

-

-

-

... More
Development of landscape (Softscape Hardscape) works in NGO Colony park (0.21 Acres),Gokul park (0.;7. Nut and Bolts:- Galvanized/ S.S./Allen Bolt/Button Head Allen Bolt & Nuts / Nylon Lock Nuts are used with PVC Bolt Caps.

-

-

-

... More
Development of landscape (Softscape Hardscape) works in NGO Colony park (0.21 Acres),Gokul park (0.;8.Bearing: Bearing is self-lubricated made of SKF/NTN/ NACHI make shall be provided for smooth & trouble free movement

-

-

-

... More
Development of landscape (Softscape Hardscape) works in NGO Colony park (0.21 Acres),Gokul park (0.;9. All open ends of pipes been closed by GI caps for user safety against entrapment.

-

-

-

... More
Development of landscape (Softscape Hardscape) works in NGO Colony park (0.21 Acres),Gokul park (0.;10. Certificate: ISO9001:2015

-

-

-

... More
Development of landscape (Softscape Hardscape) works in NGO Colony park (0.21 Acres),Gokul park (0.;11. Color: Multicolor for optional or customized & As per RAL shade.

-

-

-

... More
Development of landscape (Softscape Hardscape) works in NGO Colony park (0.21 Acres),Gokul park (0.;12. Packaging: Safety 3 layer packaging like 1st EPE Foam 2nd HDPE Film and 3rd is Stretch wrap.

-

-

-

... More
Development of landscape (Softscape Hardscape) works in NGO Colony park (0.21 Acres),Gokul park (0.;Cost of the Equipment

1

-

40480



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.