Andhra Pradesh Urban Greening And Beautification Corporation Limited Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Andhra Pradesh Urban Greening And Beautification Corporation Limited - APUGBCL Tender

Agriculture or Forestry Works
Opening Date27 Oct 2021
Closing Date5 Nov 2021
Tender Amount₹ 1,68,96,041 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Development of Landscape (Hardscape) works in Sardar Vallabai patel canal view Park (1.70 Acres) Kad;Supply and fixing of C.C. Kerb not less than M30 strength of size 450 X 450 X 110 mm thick with bottom thickness of 110 mm up to height of 380 mm and top width of 50 mm thick chamfering with 45° at starts at 380 mm height to 450 mm height as selected by the Engineer-in-charge from approved source/ factory which is laid on existing CC Bed in position to the required line, level and curvature jointed with cement mortar 1:3 (1 cement : 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5 mm), including making drainage opening wherever required and including cost and conveyance of all materials & labour charges including transportation from approved source, loading & unloading charges including contractor profit & overhead charges complete for finished item of work.

342

-

217105.02

... More
Development of Landscape (Hardscape) works in Sardar Vallabai patel canal view Park (1.70 Acres) Kad;Supply and fixing of Kadapa slab (rough) 50mm thick and size of 0.457x0.457m stone edging including excavating trench in ordinary soil, laying P.C.C (1:4:8) 100 mm thick and fixing the stone in alignment and refilling the excavated soil conveyance of all materials and labour charges including transportation complete for finished item of work

350

-

48758.5

... More
Development of Landscape (Hardscape) works in Sardar Vallabai patel canal view Park (1.70 Acres) Kad;Masonry work in CM(1:6) prop (Cement : Screened sand) in superstructure with fly ash cement / lime solid blocks of size 290mm x 225mm x 140mm from approved source having minimum crushing strength of 50 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site,and such as labour charges, like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, overheads and contractor profit etc., complete for finished item of work. (APSS No. 501 & 504).

196.18

-

1210497.3

... More
Development of Landscape (Hardscape) works in Sardar Vallabai patel canal view Park (1.70 Acres) Kad;Plastering 12mm thick single coat in CM(1:5) using screened sand including cost and conveyance of all materials like cement, sand, water etc., to site and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work.(SS 901,903 & 904) for basement

1855.5

-

610997.6

... More
Development of Landscape (Hardscape) works in Sardar Vallabai patel canal view Park (1.70 Acres) Kad;Plastering 12mm thick single coat in CM(1:5) using screened sand including cost and conveyance of all materials like cement, sand, water etc., to site and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work.(SS 901,903 & 904) for superstructure

18

-

6151.5

... More
Development of Landscape (Hardscape) works in Sardar Vallabai patel canal view Park (1.70 Acres) Kad;Supply & application of one coat water based cement primer of exterior grade II and two coats of acrylic exterior emulsion paint having VOC (Volatile Organic Compound) content less than 50 grams/litre for exterior walls including cost and conveyance of all materials to site,and all operational, incidental, labour charges etc., and overheads & contractors profit complete for finished item of work in all floors.

2774.21

-

672440.76

... More
Development of Landscape (Hardscape) works in Sardar Vallabai patel canal view Park (1.70 Acres) Kad;Filling with carted gravel in pathways, trenches, sides of foundations and basement with initial lead in layers not exceeding 15cm thick, watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T&P etc., and overheads & contractors profit complete for finished item of work(APSS NO.309&310)

360.25

-

238651.22

... More
Development of Landscape (Hardscape) works in Sardar Vallabai patel canal view Park (1.70 Acres) Kad;Supply & Fixing Sadarhalli granite stone with 5 line dressing Double Patti of 5' length seating benches with back rest and its width 16'' with 4" thick and 18" height with 4" thick and leg size 4'' width, including cost and conveyance of all materials like granite benche, cement, sand to work site loading ,un loading transport and all operational, incidental labour & lift charges,and overheads & contractors profit complete for finished item

15

-

225000

... More
Development of Landscape (Hardscape) works in Sardar Vallabai patel canal view Park (1.70 Acres) Kad;Flooring with 16 to 18mm thick high polished / Flame Finished / leather finished granite stone slabs other than black and regular colours (i.e. of shades like paradise / bala flower / copper silk / laka red / lavender blue) with borders and design as per the pattern approved by the Engineer-in-Charge of length not less than 2.43 mts set over base coat of cement mortar (1:8) , 20mm thick using screened sand over CC bed already laid or RCC roof slab including neat grey cement slurry of honey like consistency spread @ 3.3 Kg per sqm and jointed neatly with white cement paste mixed with pigment of matching shade to full depth including cost and conveyance of all materials like cement , sand , water , granite slabs etc., to work site and all operational, incidental labour & lift charges, polishing charges and cost of base coat and overheads & contractors profit complete for finished item of work (S.S.701 & special)

356.5

-

1329114

... More
Development of Landscape (Hardscape) works in Sardar Vallabai patel canal view Park (1.70 Acres) Kad;Flooring with Rough Shahabad / Tandur stone slabs of 40 mm thick set over base coat of cement mortar (1 : 8) 12 mm thick over CC bed already laid or RCC roof slab, including pointing with cement mortar 1:3 duly filling joints nearly, including cost of all materials like flooring stone, cement, sand, and water etc., complete, including labour charges for dressing of flooring stones etc., complete for finished item of work,. (APSS No.703 & 701)

134

-

84974.64

... More
Development of Landscape (Hardscape) works in Sardar Vallabai patel canal view Park (1.70 Acres) Kad;Supply of precast concrete blocks for paving of M-35 grade and thickness not less than 60 mm for Light traffic areas conforming to IS 15658:2006 in all shapes and designs as per the manufacturer's specification set over the 50 mm thick sand bed with hand roller compaction with joint neatly in homogeneous or heterogeneous pattern as the colour and pattern shall be as per the drawings furnished by the architect, including cost and conveyance of all materials like cement, sand, water, tiles, etc., to site including all operational, incidental, labour charges, laying tiles to required slope as directed by the Engineer- in-charge etc., and overheads & contractors profit complete for finished item of work

373

-

240517.86

... More
Development of Landscape (Hardscape) works in Sardar Vallabai patel canal view Park (1.70 Acres) Kad;Flooring with (latoth) leather finish Tandur stone slabs of 18 to 22 mm thickset over a base coat of CM (1:8) , 12mm thick using screened sand over already laid CC bed / RCC roof slab including neat cement slurry of honey like consistency spread @ 3.3 Kgs per Sqm and jointed with neat cement to full depth including cost and conveyance of all materials like cement, sand, water, flooring stones etc. complete including all labour charges like dressing of flooring stones to the required size, mixing of cement mortar, laying, lift charges , cost of base coat, water charges etc., and overheads & contractors profit complete for finished item of work. (APSS No.703 & 701)

263.25

-

271405.49

... More
Development of Landscape (Hardscape) works in Sardar Vallabai patel canal view Park (1.70 Acres) Kad;Flooring with Rough black Kadapa slabs minimum of 50 mm thick of size 0.457m x 0.457m set over base coat of cement mortar (1 : 8) 12 mm thick over CC bed already laid or RCC roof slab, including pointing with cement mortar 1:3 duly filling joints nearly, including cost of all materials like flooring stone, cement, sand, and water etc., complete, including labour charges for dressing of flooring stones etc., complete for finished item of work,. (APSS No.703 & 701)

20

-

12384.4

... More
Development of Landscape (Hardscape) works in Sardar Vallabai patel canal view Park (1.70 Acres) Kad;Providing casing embankment using gravel from approved area in layers of 25 cm with compaction including cost of all materials, machinery, labour, all operations such as materials transporting, spreading in layer of specified thickness, breaking clods, sectioning, compacting each layer without watering by Road roller 10 tonne etc.,complete with 13 km transportation and all lifts etc., include all incidental incomplete.

3719

-

1357211.86

... More
Development of Landscape (Hardscape) works in Sardar Vallabai patel canal view Park (1.70 Acres) Kad;Supply and placing of the V.R.C.C Nominal Mix Concrete M 20 grade corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete using CONCRETE MIXER with 20mm size HBG graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry and including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water, etc., to site and , centring using Steel scaffolding pipes , jack props , Waller?s , Foot plates , brackets , steel centring plates etc., including all operational, incidental and labour charges such as machine mixing, laying concrete, vibrator, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) for footings

25.82

-

216131.73

... More
Development of Landscape (Hardscape) works in Sardar Vallabai patel canal view Park (1.70 Acres) Kad;Supply and placing of the V.R.C.C Nominal Mix Concrete M 20 grade corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete using CONCRETE MIXER with 20mm size HBG graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry and including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water, etc., to site and , centring using Steel scaffolding pipes , jack props , Waller?s , Foot plates , brackets , steel centring plates etc., including all operational, incidental and labour charges such as machine mixing, laying concrete, vibrator, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) for pedestals

19.83

-

177397

... More
Development of Landscape (Hardscape) works in Sardar Vallabai patel canal view Park (1.70 Acres) Kad;Supply and placing of the V.R.C.C Nominal Mix Concrete M 20 grade corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete using CONCRETE MIXER with 20mm size HBG graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry and including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water, etc., to site and , centring using Steel scaffolding pipes , jack props , Waller?s , Foot plates , brackets , steel centring plates etc., including all operational, incidental and labour charges such as machine mixing, laying concrete, vibrator, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) for plinth beam

36.99

-

402699.77

... More
Development of Landscape (Hardscape) works in Sardar Vallabai patel canal view Park (1.70 Acres) Kad;Supply and placing of the V.R.C.C Nominal Mix Concrete M 20 grade corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete using CONCRETE MIXER with 20mm size HBG graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry and,including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and , centring using Casurina Ballies, Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates etc., including all operational, incidental and labour charges such as machine mixing, lifting of concrete manually, laying concrete, vibrator, curing , overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) for columns

18.66

-

197557.15

... More
Development of Landscape (Hardscape) works in Sardar Vallabai patel canal view Park (1.70 Acres) Kad;Providing High Yield Strength Deformed (HYSD) / Thermo Mechanically Treated (TMT) (Fe 500 / Fe 500D grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including overheads & contractors profit complete for finished item of work.( APSS No.126)

15793.95

-

1234928.95

... More
Development of Landscape (Hardscape) works in Sardar Vallabai patel canal view Park (1.70 Acres) Kad;Providing and applying PMCC / Deco orient base or Equivalent exterior Texture ( borders and design as per the pattern approved by the Engineer-in-Charge ) of average 2 to 3 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying putty/ texture paint filler by putty knife / muslin pad, air dry for 2 - 3 hrs for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges, scaffolding charges, overheads and contractors profit etc., complete for finished item of work in all floors for external walls

645.55

-

175466.95

... More
Development of Landscape (Hardscape) works in Sardar Vallabai patel canal view Park (1.70 Acres) Kad;Supply and fabrication of MS framed structure like Window Grills, Compound Wall Grills, Iron Doors, Windows, Gates, MS Frame for chain link mesh works, Roof Trusses by using square / rectangular MS hollow section as per IS 4923 & Angles as per SP:6(1) IS Hand book, including cost of welding rods, power charges, labour charges for cutting, placing, welding and erecting in position and fixing, cost & convenience of all materials including wastage to site and complete for finished item of work

16679.27

-

1638905.07

... More
Development of Landscape (Hardscape) works in Sardar Vallabai patel canal view Park (1.70 Acres) Kad;Painting to new iron work with one coat of Red oxide primer and two coats with synthetic enamel paint Grade-I VOC (Volatile Organic Compound) content less than 50 grams/litre over primer coat of red oxid, including cost and conveyance of all materials like Red oxide primer, Synthetic Enamel Paint to site, incidental, operational and all labour charges etc., and overheads & contractors profit complete for finished item of work in all floors. (SS No. 1201, 1212 & 1207).

743.84

-

133169.68

... More
Development of Landscape (Hardscape) works in Sardar Vallabai patel canal view Park (1.70 Acres) Kad;Vibrated Plain Cement Concrete (1:3:6) nominal mix using 220 kg of cement and 20mm graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., and including all charges for Concrete Mixer, machine mixing, laying concrete in position, vibrating, curing, overheads & contractors profit etc., for finished item of work (APSS No. 402)

31.12

-

171212.68

... More
Development of Landscape (Hardscape) works in Sardar Vallabai patel canal view Park (1.70 Acres) Kad;Random Rubble stone masonry in CM (1:8) prop: (Cement: Screened sand) using hard granite stones carted from approved quarry including cost and conveyance of all materials like cement, screened sand, water,Rough stone Through stone, Coursed stones etc., from approved quarry, to site, including labour charges for cutting stones to required size and shape, mixing, of cement, mortar, construction, curing, charges for scaffolding etc., and overheads & contractors profit complete for finished item of work. (APSS No. 601 & 615)

184.7

-

728366.17

... More
Development of Landscape (Hardscape) works in Sardar Vallabai patel canal view Park (1.70 Acres) Kad;Supply and fabrication of MS framed structure like Window Grills, Compound Wall Grills, Iron Doors, Windows, Gates, MS Frame for chain link mesh works ,Roof Trusses by using MS Flats as per SP:6(1) IS Hand book , including cost of welding rods, power charges, labour charges for cutting, placing, welding and erecting in position and fixing, cost & convenience of all materials to site and complete for finished item of work

368.8

-

36669.78

... More
Development of Landscape (Hardscape) works in Sardar Vallabai patel canal view Park (1.70 Acres) Kad;Supply and fabrication works like Window Grills, Compound Wall Grills, Iron Doors, Windows, Gates, Roof Trusses by using MS solid plate section as per IS 1730 including cost of welding rods, power charges, labour charges for cutting, placing, welding & erecting in position and fixing cost & convenience of all materials including wastage to site and complete for finished item of work.

380.24

-

41347.3

... More
Development of Landscape (Hardscape) works in Sardar Vallabai patel canal view Park (1.70 Acres) Kad;Supplying and fixing G.I. Chain link fabric fencing of required width in mesh size 50x50 mm opening of 4 mm dia GI wire including strengthening with 2 mm dia wire or nuts, bolts and washers/welding in the MS angle frame/ RCC fencing posts as required complete as per the direction of Engineer-in-charge and including cost of all materials to site, incidental operational and all labour charges overheads & contractors profit etc., complete for finished item of work

656.82

-

490874.43

... More
Development of Landscape (Hardscape) works in Sardar Vallabai patel canal view Park (1.70 Acres) Kad;Supplying and fixing galvanised steel barbed wire (IS : 278-1962 Type I) weighing 9.38 Kg per 100 metres (min.), Straining and fixing to any type of standard, rails, straining bolts, including securing with and provision of galvanised mild steel wire, staples or steel pins, etc., as directed (Posts and struts of wood, concrete, steel, etc.) and straining bolts shall be paid for separately).

800

-

10320

... More
Development of Landscape (Hardscape) works in Sardar Vallabai patel canal view Park (1.70 Acres) Kad;Filling with useful available excavated earth (excluding rock) with a lead of 50 m in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cm thick, watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T&P etc., and overheads & contractors profit complete for finished item of work (APSS NO.309&310)

103

-

35340.33

... More
Development of Landscape (Hardscape) works in Sardar Vallabai patel canal view Park (1.70 Acres) Kad;Supply and placing of the V.R.C.C Nominal Mix Concrete M 20 grade corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete using CONCRETE MIXER with 20mm size HBG graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry and,including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and , centring using Casurina Ballies, Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates etc., including all operational, incidental and labour charges such as machine mixing, lifting of concrete manually, laying concrete, vibrator, curing , overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) for lintel beam

0.11

-

1154.53

... More
Development of Landscape (Hardscape) works in Sardar Vallabai patel canal view Park (1.70 Acres) Kad;Supply and placing of the V.R.C.C Nominal Mix Concrete M 20 grade corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete using CONCRETE MIXER with 20mm size HBG graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry and,including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and , centring using Casurina Ballies, Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates etc., including all operational, incidental and labour charges such as machine mixing, lifting of concrete manually, laying concrete, vibrator, curing , overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) for beam

10.84

-

101056.23

... More
Development of Landscape (Hardscape) works in Sardar Vallabai patel canal view Park (1.70 Acres) Kad;Supply and placing of the V.R.C.C Nominal Mix Concrete M 20 grade corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete using CONCRETE MIXER with 20mm size HBG graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry and,including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and , centring using Casurina Ballies, Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates etc., including all operational, incidental and labour charges such as machine mixing, lifting of concrete manually, laying concrete, vibrator, curing , overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) for slab 150mm thick

186.95

-

238342.56

... More
Development of Landscape (Hardscape) works in Sardar Vallabai patel canal view Park (1.70 Acres) Kad;Reinforced Cement Concrete Nominal Mix M 20 grade corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete using CONCRETE MIXER with using 12mm size hard granite machine crushed graded metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concrete including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site including steel centring, shuttering, labour charges such as ,Concrete machine mixing, laying concrete, lift charges, curing etc., and overheads & contractors profit complete for finished item of work (APSS No. 402 & 403) for platforms and shelves. 25 mm thick

7.2

-

1734.12

... More
Development of Landscape (Hardscape) works in Sardar Vallabai patel canal view Park (1.70 Acres) Kad;Brick masonry for panel walls in superstructure with CM (1:8) prop: (Cement : Screened sand) using common burnt clay bricks of class as per Table- I of IS:1077-1992, Non- Modular or traditional size 23 x 11 x 7 cms from approved source having minimum crushing strength of 40 Kg/Sqcm. including cost and conveyance of all materials like cement, screened sand, bricks, water etc., to site, including sales & other taxes on all materials and such as labour charges, like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, etc., and overheads & contractors profit complete for finished item of work. (APSS No. 501 & 504).

25.93

-

165934.37

... More
Development of Landscape (Hardscape) works in Sardar Vallabai patel canal view Park (1.70 Acres) Kad;Plastering 12mm thick in two coats using screened sand with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer - in - charge etc., and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904) for superstructure

57.42

-

26277.69

... More
Development of Landscape (Hardscape) works in Sardar Vallabai patel canal view Park (1.70 Acres) Kad;Plastering 12mm thick in two coats using screened sand with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, ,, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer - in - charge etc., and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904) for basement

604.84

-

269256.62

... More
Development of Landscape (Hardscape) works in Sardar Vallabai patel canal view Park (1.70 Acres) Kad;Plastering 20mm thick in two coats using screened sand with base coat of 16mm thick in CM(1:6) and top coat of 4mm thick in CM(1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work .(SS 901,903 & 904) for superstructure

136.54

-

64441.42

... More
Development of Landscape (Hardscape) works in Sardar Vallabai patel canal view Park (1.70 Acres) Kad;Plastering 20mm thick in two coats using screened sand with base coat of 16mm thick in CM(1:6) and top coat of 4mm thick in CM(1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work .(SS 901,903 & 904)

16.5

-

7581.59

... More
Development of Landscape (Hardscape) works in Sardar Vallabai patel canal view Park (1.70 Acres) Kad;Ornamental ceiling plastering 12mm thick single coat in CM (1:5) using screened sand including cost and conveyance of all materials like cement, sand, water etc., to site, including sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work.(SS 901,903 & 904)

218.63

-

77543.69

... More
Development of Landscape (Hardscape) works in Sardar Vallabai patel canal view Park (1.70 Acres) Kad;Supply & application of one coat water based cement primer of interior grade I and two coats of acrylic emulsion paint having VOC (Volatile Organic Compound) content less than 50 grams/litre for internal walls including cost and conveyance of all materials to site, and all operational, incidental, labour charges etc., and overheads & contractors profit complete for finished item of work in all floors.

106.42

-

18865.07

... More
Development of Landscape (Hardscape) works in Sardar Vallabai patel canal view Park (1.70 Acres) Kad;Supply and fixing doors as per drawings with medium teak wood frame of section 100mm x 65mm and ISI marked flush door shutter of 30mm thick single shutter with bond wood solid block board type Core having cross bands and face veneers, hot pressed bonded with water proof phenol formaldehyde synthetic resin factory made conforming to IS 2202-1991 (Part-I) both sides commercial ply with internal lipping on all sides including cost and conveyance to site of medium teak wood door frame, flush shutter, including suply and fixing 6 Nos. MS Z hold fasts of size 300mm x 40mm x 5mm including ISI marked MS powder coated fixtures 3 Nos. butt hinges (IS:205) of 150mm long, 1 No. aldrop (IS:2681) 250 mm long, 1 No. tower bolt (IS:204) of 150 mm x 10mm dia, 2 Nos. 125mm long handles (IS:208),1 No. rubber bush including supplying and fixing 1.20mm thick PVC sheet to full height of the shutter inside including llabour charges for fixing the frame in position, fixing the shutter to the frame etc., including overheads & contractors profit complete for finished item of work as per APSS 1001 & 1002. (The vertical frame of door shall be embedded in flooring for depth of not less than 10mm) ( 900 mm x 2100mm )

1.89

-

7488.07

... More
Development of Landscape (Hardscape) works in Sardar Vallabai patel canal view Park (1.70 Acres) Kad;Providing and fixing of Window with Two Sliding Shutters and with Grill Outer Frame Size 90 mm x 50 mm have a rebate of 15mm x 5 mm to fit grill made of 10mm MS Sq Rods for horizontal bars welded at a regular pitch of 150mm to 12mm x 6 mm MS flat. made of Galvanized Steel (Base Steel as per IS 513, D quality, galvanized as per IS 277 with Zinc of 120 GSM), using factory made section powder coated with Pure polyester powder upto 50-60 microns thick with total coated thickness of 0.58 mm for Outer Frame and 0.58 mm thickness for Sliding Shutter Section, the Outer Frame for Two Tracks with Grill provision size of 90 mm x 50 mm and the Window Shutter section of 0.58 mm x 36 mm and the outer Frame with two integrated guide tracks of 12mm width and 24mm deep for provision to slide the Shutter / sash frame and facilitates with a water drain outlet component made of PVC and the shutter frame fitted with 5mm thick plain float glass of reputed make and fixed with EPDM weathering seal resistant accessories and handle made of Alumimium 1 No. per each shutter and cut to length miter joined with corner brackets including installation of window system at site using anchor fasteners, Silicon sealant applied at the Outer frame corners inclusive of conveyance of all materials accessories, labour charges, and erection at site with complete finished item of work.

2.4

-

15398.02

... More
Development of Landscape (Hardscape) works in Sardar Vallabai patel canal view Park (1.70 Acres) Kad;Vibrated Plain Cement Concrete M 20 Nominal mix using Concrete MIXER, 20mm size hard granite machine crushed graded metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concrete , including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site including steel centring, shuttering, machine mixing, lift charges, laying concrete, vibrating, curing, overheads & contractors profit etc., complete for finished item of work (APSS No. 402 & 403)

35.55

-

220504.56

... More
Development of Landscape (Hardscape) works in Sardar Vallabai patel canal view Park (1.70 Acres) Kad;Providing 0.30 m wide Coping with Polished black Kadapa slabs minimum of 25 mm to 30 mm thick in single piece as specified set over a base coat of CM (1:5) , 12mm thick using screened sand over already laid CC bed / RCC roof slab including neat cement slurry of honey like consistency spread @ 3.3 Kgs per Sqm and jointed with neat cement to full depth including cost and conveyance of all materials like cement, sand, water, flooring stones etc. complete including all labour charges like dressing of flooring stones to the required size, flat nosing the edges, mixing of cement mortar, laying, lift charges , cost of base coat, water charges etc., and overheads & contractors profit complete for finished item of work (APSS No.703 & 701)

144.15

-

120678.06

... More
Development of Landscape (Hardscape) works in Sardar Vallabai patel canal view Park (1.70 Acres) Kad;Providing Treads with 16 to 18mm thick high polished / Flame Finished / leather finished granite stone slabs other than black and regular colour granite with borders and design as per the pattern approved by the Engineer-in-Charge of length not less than 2.43 mts set over base coat of cement mortar (1:5) , 12mm thick using screened sand over CC bed already laid or RCC roof slab including neat grey cement slurry of honey like consistency spread @ 3.3 Kg per sqm and jointed neatly with white cement paste mixed with pigment of matching shade to full depth including cost and conveyance of all materials like cement , sand , water , granite slabs etc., to work site and all operational, incidental labour & lift charges, half rounding the edges of treads , polishing charges and cost of base coat and overheads & contractors profit complete for finished item of work for Treads (S.S.701 & special)

25.8

-

120203.49

... More
Development of Landscape (Hardscape) works in Sardar Vallabai patel canal view Park (1.70 Acres) Kad;Providing Risers to steps walls with 16 to 18mm thick high polished / Flame Finished / leather finished granite stone slabs other than black and regular colour granite with length equal to flooring stone, set over base coat of CM(1:5) 12 mm thick using screened sand with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointing with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., and overheads & contractors profit complete for finished item of work. for Risers-0.15 m(APSS No.701 &707)

12.9

-

49785.23

... More
Development of Landscape (Hardscape) works in Sardar Vallabai patel canal view Park (1.70 Acres) Kad;Supply and placing of the V.R.C.C Nominal Mix Concrete M 20 grade corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete using CONCRETE MIXER with 20mm size HBG graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry and using mixed with integral cement water proofing powder confirming to IS: 2645-2003 manufactured by reputed manufacturers as approved by Engineer-in-charge at 0.5 Kg per one bag of cement , and including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water, etc., to site and , centring using Steel scaffolding pipes , jack props , Waller?s , Foot plates , brackets , steel centring plates etc., including all operational, incidental and labour charges such as machine mixing, laying concrete, vibrator, , curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) for base slab

0.83

-

7176.98

... More
Development of Landscape (Hardscape) works in Sardar Vallabai patel canal view Park (1.70 Acres) Kad;Supply and placing of the V.R.C.C Nominal Mix Concrete M 20 grade corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete using CONCRETE MIXER with 20mm size HBG graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry and using mixed with integral cement water proofing powder confirming to IS: 2645-2003 manufactured by reputed manufacturers as approved by Engineer-in-charge at 0.5 Kg per one bag of cement and including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and , centring using Casurina Ballies, Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates etc., including all operational, incidental and labour charges such as machine mixing, lifting of concrete manually, laying concrete, vibrator, , curing , overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) for RCC side wall 200mm thick

17.55

-

47393.07

... More
Development of Landscape (Hardscape) works in Sardar Vallabai patel canal view Park (1.70 Acres) Kad;Providing cladding to wall with High Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M) other than black and regular colours, length equal to flooring slabs set over base coat of CM(1:5) 12 mm thick using screened sand with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointing with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., and overheads & contractors profit complete for finished item of work.

50.65

-

189677.67

... More
Development of Landscape (Hardscape) works in Sardar Vallabai patel canal view Park (1.70 Acres) Kad;Reinforced Brick Masonry for partition walls (11.0 cm thick) in CM (1:4) prop. (Cement : Screened sand) using common burnt clay bricks of class as per Table- I of IS:1077-1992, Non- Modular or traditional size 23 x 11 x 7 cms from approved source having minimum crushing strength of 40 Kg/Sq.cm and placing 2 Nos. of 6mm M.S plain rods in every third layer with free ends of the reinforcement pegged into mortar joints of main brick walls where applicable including cost and conveyance of all materials like cement, steel, sand, bricks, water etc., to site, ,, all operational, incidental charges such as labour charges for mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, etc., and overheads & contractors profit but excluding cost of steel and its fabrication charges complete for finished item of work. (APSS No. of 501 & 509)

28.85

-

24712.04

... More
Development of Landscape (Hardscape) works in Sardar Vallabai patel canal view Park (1.70 Acres) Kad;Providing impervious coat to exposed RCC roof slab surfaces of sump , sump side wall, sump bottom slab, in side of septic tank , in sunken slabs etc. to required slopes with CM (1:3) prop. using screened sand 12mm thick mixed with integral cement water proofing liquid confirming to IS: 2645-2003 manufactured by reputed manufacturers as approved by Engineer-in-charge at 1 Kg per one bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm where ever necessary including cost and conveyance of all materials like cement, sand, water proofing compound, water etc., to site, , and operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing including rounding off junctions of wall and slab etc., and overheads & contractors profit complete for finished item of work. (APSS No. 901 & 903).

138.7

-

47358.64

... More
Development of Landscape (Hardscape) works in Sardar Vallabai patel canal view Park (1.70 Acres) Kad;Flooring with non-skid full body ceramic floor tiles of size 300mm x 300mm and thickness between 7 - 8mm 1st quality conforming to IS: 13711, IS: 13712, IS: 13630(Part 1 to 15) of any colour and finish in all shades and designs as approved by Engineer-in-charge, set over base coat of cement mortar (1:8), 12mm thick using screened sand over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3 Kgs per Sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, screened sand , water and tiles etc., and overheads & contractors profit complete for finished item of work. (APSS No.701 & 707)

4

-

3766.32

... More
Development of Landscape (Hardscape) works in Sardar Vallabai patel canal view Park (1.70 Acres) Kad;Providing dadooing to walls with glazed full body ceramic tiles of any size and thickness between 5 to 7mm 1st quality conforming to IS: 13711, IS: 13712, IS: 13630(Parts 1 to 15) of any colour and finish in all shades and designs with borders as approved by Engineer-in-Charge set over base coat of CM(1:5) 12 mm thick using screened sand with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointing with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., and overheads & contractors profit complete for finished item of work.

28.44

-

19381.86

... More
Development of Landscape (Hardscape) works in Sardar Vallabai patel canal view Park (1.70 Acres) Kad;Providing 0.30 m wide Coping with 16 to 18mm thick High Polished granite up to 8'-00 (2.43 M) other than black and regular colours with borders and design as per the pattern approved by the Engineer-in-Charge , set over base coat of cement mortar (1:5) , 12mm thick using screened sand over the stone ,Brick masonry or CC bed already laid , including neat grey cement slurry of honey like consistency spread @ 3.3 Kg per sqm and jointed neatly with white cement paste mixed with pigment of matching shade to full depth including cost and conveyance of all materials like cement , sand , water , granite slabs etc., to work site and all operational, incidental labour & lift charges, and cost of base coat and overheads & contractors profit complete for finished item of work for Coping (S.S.701 & special)

29.4

-

111452.17

... More
Development of Landscape (Hardscape) works in Sardar Vallabai patel canal view Park (1.70 Acres) Kad;Supply and fixing of toilet door shutter with frame made of M.S. door frame of 5mmX48mmX48mm (L angel) as allround frame the frame is coated with one coat of red oxide and two coats of enamel of approved color. For shutter and the shutter is made with 16mm Bison Lam shutter with allround ?U? Lipping of PPS section of 12mmX18mmX12mmX0.60mm, along hardware of 200m long and 12mm dia aluminum aldrop( ISI make)2 Nos, 2Nos of 125m m handle, 3 Nos of RT patte hinges IS 304gr SS 2mmX12mmX180mm long with a pole receiver of 10mmDia X 40mm by welded on 3mmX40mm SS 304, plate it works as receiver for RT Patee hinges it is welded to M.S. angle . M.S. angle will be fixed to wall of self expandable screws and caps. including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site with templates for casement sizing overheads and contractors profit etc., complete for finished item of work (750mm x 2100mm )

3.15

-

11559.74

... More
Development of Landscape (Hardscape) works in Sardar Vallabai patel canal view Park (1.70 Acres) Kad;Providing, supplying & fixing of Single fixed Louvers Ventilator made made of prepainted steel (Base steel as per IS 513 of 0.80 mm thick galvanized as per IS 277 with Zinc of 120 GSM), finish painted with a polyester paint of 60-65 microns thick and section for outer frame of 80 x 45 mm, centre mullion of 80 x 60 mm, section for shutter of 52 x 25 mm x 0.6 mm thick, outer frame and mullions to have rebate for glazed shutter with a provision for guard bars/grills and the sections cut to length metre joined with corner bracket, centre mullion fixed with mullion cap, 1 No. of High grade nylon latch handle, window stopper, 2 nos. of with MS Powder coated /SS ball bearing butt Hinges provided per shutter and windows fitted with 4 mm thick plain float glass with rubber gaskets including fixing the frames in concrete/masonry wall by means of self expanding screws, Including 10 mm Square guard bars with 6? (152.4mm) pitch etc., complete for finished item of work. including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site, overheads and contractor profit etc., complete for finished item of work

0.72

-

3106.05

... More
Development of Landscape (Hardscape) works in Sardar Vallabai patel canal view Park (1.70 Acres) Kad;Supplying and fixing European Water Closet of 1st quality conforming to IS:2556-Part-2-1973 of white glazed with 'S' trap,supplying and fixing best Indian make plastic seat and lid for European water closets with rubber or plastic Buffers as per IS 2548-1996 and 10 litres capacity single flush PVC low level cistern with internal components and fixed using required size of nails and screws, angle stop cock 12.70mm dia. first quality Indian make heavy duty, 12mm PVC connections with brass union nuts CP coated including cost and conveyance of all materials to site, overheads & contractors profit etc., complete for finished item of work for all floors.

2

-

10052.66

... More
Development of Landscape (Hardscape) works in Sardar Vallabai patel canal view Park (1.70 Acres) Kad;Supplying and fixing Indian make Flat Back Wash Hand Basin 1st quality conforming to IS:2556-Part-4:1972 of size 550mm x 400mm with 32 mm nominal size C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 and fitted with 15 mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make heavy duty complete with standard CI brackets including wooden blocks ,1 No.12.70mm PVC connection with brass union nuts CP coated , angle stop cock 12.70mm dia. first quality Indian make heavy duty, 31.75mm dia. PVC flexible waste pipe 914.4mm length of 1st quality including cost and conveyance of all materials to site, labour charges , overheads & contractors profit for finished item of work

2

-

4862.16

... More
Development of Landscape (Hardscape) works in Sardar Vallabai patel canal view Park (1.70 Acres) Kad;supply and laying of poly sheet of 125 microns including cost & convenience of all materials to site and complete for finished item of work

200

-

3465.26

... More
Development of Landscape (Hardscape) works in Sardar Vallabai patel canal view Park (1.70 Acres) Kad;Filling with carted coarse sand in play area, pathway, foundations bed and basement with initial lead in layers not exceeding 15cm thick, watering and ramming including cost and conveyance of water to work site and all operational, incidental ,labour charges, hire charges of T&P etc., and overheads & contractors profit complete for finished item of work(APSS NO.309&310)

141.3

-

103861.15

... More
Development of Landscape (Hardscape) works in Sardar Vallabai patel canal view Park (1.70 Acres) Kad;Providing rubble / boulder and sand filling behind abutment and return walls in layers including cost of all materials, machinery, labour, watering, ramming etc., complete with initial lead upto 50 m and initial lift upto 3 m. including cost of all materials, labour, Rubble / Boulder, finishing sand, etc., complete for finished item of work,

45

-

67912.68

... More
Development of Landscape (Hardscape) works in Sardar Vallabai patel canal view Park (1.70 Acres) Kad;Supply, Delivery, Installation and Commissioning of 1.5m x 2.2m size of FOUR SEATER SWING of Arihant/ Equivalent make including transportation, installation, commissioning, loading and unloading etc., for complete finished item of the work.

2

-

97000

... More
Development of Landscape (Hardscape) works in Sardar Vallabai patel canal view Park (1.70 Acres) Kad;Supply, Delivery, Installation and Commissioning of 6.5m x 1.5m size of FOUR SEATER ARC SWING of Arihant/ Equivalent make including transportation, installation, commissioning, loading and unloading etc., for complete finished item of the work.

2

-

179754

... More
Development of Landscape (Hardscape) works in Sardar Vallabai patel canal view Park (1.70 Acres) Kad;Supply, Delivery, Installation and Commissioning of Jungle Gym of Arihant/ Equivalent make including transportation, installation, commissioning, loading and unloading etc., for complete finished item of the work.

1

-

68000

... More
Development of Landscape (Hardscape) works in Sardar Vallabai patel canal view Park (1.70 Acres) Kad;supply, delivery and commissioning of FRP Triple Slide of Arihant / Equivalent make including transportation, installation, commissioning, loading and unloading in complete finished item of the work.

1

-

121963

... More
Development of Landscape (Hardscape) works in Sardar Vallabai patel canal view Park (1.70 Acres) Kad;Supply, delivery and commissioning of Butter Fly swing of Arihant / Equivalent make including transportation, installation, commissioning, loading and unloading in complete finished item of the work.

1

-

66480

... More
Development of Landscape (Hardscape) works in Sardar Vallabai patel canal view Park (1.70 Acres) Kad;Supply, delivery and commissioning of 4 No?s Seats made with FRP Fibre Seats and fitted both ends of 50 MM Dia Pipe length8 Ft with Bolts & Nuts and both fitted on Horizontal Pipe 3? length and 60 mm Dia?U? shape (rivers) with clamps with fibre Seats of Arihant / Equivalent make including transportation, installation, commissioning, loading and unloading in complete finished item of the work. Length : 2438 mm Width : 914 mm Height : 914 mm

2

-

80960

... More
Development of Landscape (Hardscape) works in Sardar Vallabai patel canal view Park (1.70 Acres) Kad;Supply, Delivery, Installation and Commissioning of 2.5m x 1.5m size of Rock cum net climber of Arihant/ Equivalent make including transportation, installation, commissioning, loading and unloading in complete finished item of the work.

1

-

52323

... More
Development of Landscape (Hardscape) works in Sardar Vallabai patel canal view Park (1.70 Acres) Kad;SKY WALKER SIZE (L x W x H): 1700X830X1650 mm (± 10% tolerance allowable)

1

-

82500

... More
Development of Landscape (Hardscape) works in Sardar Vallabai patel canal view Park (1.70 Acres) Kad;THAI CHI SPINNER 4 WHEEL SIZE (L x W x H): 1230X520X1500 mm (± 10% tolerance allowable)

1

-

48250

... More
Development of Landscape (Hardscape) works in Sardar Vallabai patel canal view Park (1.70 Acres) Kad;DOUBLE AIR WALKER SIZE (L x W x H): 2115X390X1420 mm (± 10% tolerance allowable)

1

-

69900

... More
Development of Landscape (Hardscape) works in Sardar Vallabai patel canal view Park (1.70 Acres) Kad;SEATED PULLER DOUBLE SIZE (L x W x H): 1740x740x1850 mm (± 10% tolerance allowable)

1

-

78250

... More
Development of Landscape (Hardscape) works in Sardar Vallabai patel canal view Park (1.70 Acres) Kad;CHEST PRESS DOUBLE SIZE (L x W x H): 1600X710X2150 mm (± 10% tolerance allowable)

1

-

82650

... More
Development of Landscape (Hardscape) works in Sardar Vallabai patel canal view Park (1.70 Acres) Kad;HORSE RIDER SIZE (L x W x H): 1000X695X1000 mm (± 10% tolerance allowable)

1

-

41250

... More
Development of Landscape (Hardscape) works in Sardar Vallabai patel canal view Park (1.70 Acres) Kad;STANDING TRIPPLE TWISTER SIZE (L x W x H): 1570X1570X1350 mm (± 10% tolerance allowable)

1

-

56500

... More
Development of Landscape (Hardscape) works in Sardar Vallabai patel canal view Park (1.70 Acres) Kad;DOUBLE SIT UP BOARD / EQUIVALENT SIZE (L x W x H): 1700X1300X900 mm (± 10% tolerance allowable)

1

-

67560

... More
Development of Landscape (Hardscape) works in Sardar Vallabai patel canal view Park (1.70 Acres) Kad;ROWER / EQUIVALENT SIZE (L x W x H): 1200X1000X800 mm (± 10% tolerance allowable)

1

-

49750

... More
Development of Landscape (Hardscape) works in Sardar Vallabai patel canal view Park (1.70 Acres) Kad;ELLIPTICAL CROSS TRAINER / EQUIVALENT SIZE (L x W x H): 1200X500X1500 mm (± 10% tolerance allowable)

1

-

67125



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.