Andhra Pradesh Township And Infrastructure Development Corporation Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Andhra Pradesh Township And Infrastructure Development Corporation - APTIDCO Tender

Civil And Construction
Civil Works Others
Opening Date16 Mar 2022
Closing Date4 Apr 2022
Tender Amount₹ 30,51,12,963 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Get the Best Price For TMT
Starting from
₹53,500/MT*
Andhra Pradesh

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Physical Infrastructure for Package RT Package 1;Carting away the surplus excavated material i.e.Earth and Rubble from the site to a suitable distance of about 5.00 Km including loading, unloading , conveyance charges and dumping the carted material at the contractors cost, labour charges, all leads & lifts and other incidental and operational charges etc., complete.

115.34

-

24405.94

... More
Physical Infrastructure for Package RT Package 1;Construction of 904m (3'-0") Dia. Solid block Masonry INSPECTION CHAMBER as per IS.4111, Part-I-1986 with CM(1:6)Prop. Fly-Ash blocks of 225mm thick from approved source having a minium crushing strength of 50 Kg/Sq.Cm.including plastering with CM(1:3)Prop., 1/2" thick both inside and outside and fitted with 20" Dia. RCC Manhole Covers and Frames including excavating pits upto a depth of 1524mm (5'-0") in all sorts of soils (excluding rock) and laying CC(1:4:8) Prop. 150mm thick using 40mm HBG metal and PCC(1:2:4)Prop. benching and channel 100mm thick as per standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site of work, seignorage on all materials and all operational, incidental, labour charges like mixing cement mortar, construcing masonry, lift charges, curing etc., complete for finished item of work as per standard specification.

13

-

138763.69

... More
Physical Infrastructure for Package RT Package 1;Labour charges for fixing 80 mm Dia Kinetic Air Valves with isolating Sluice valves, Double Air valves/ Air Cushion valve excluding cost of jointing materials such as bolts, nuts and rubber insertions etc., complete.

1

-

432.65

... More
Physical Infrastructure for Package RT Package 1;Labour charges for fixing 50 mm Dia Kinetic Air Valves with isolating Sluice valves, Double Air valves/ Air Cushion valve excluding cost of jointing materials such as bolts, nuts and rubber insertions etc., complete.

2

-

738.06

... More
Physical Infrastructure for Package RT Package 1;Manufacture, supply and delivery of Single Chamber DI 80mm Air Valve with Body and cover in Ductile Iron of grade SG 400/12 or equivalent grade as per I.S.3896-part2-1985 and subsequent revisions. All internal parts such as float, shell etc., all cover bolts, of stainless steel, and Gaskets and seals of EPDM food grade quality.S Epoxy powder coating (EP-P) inside and outside colour blue. Drilled as per IS:1538.

1

-

27557.32

... More
Physical Infrastructure for Package RT Package 1;Manufacture, supply and delivery of Single Chamber DI 50mm Air Valve with Body and cover in Ductile Iron of grade SG 400/12 or equivalent grade as per I.S.3896-part2-1985 and subsequent revisions. All internal parts such as float, shell etc., all cover bolts, of stainless steel, and Gaskets and seals of EPDM food grade quality.S Epoxy powder coating (EP-P) inside and outside colour blue. Drilled as per IS:1538.

2

-

32150.2

... More
Physical Infrastructure for Package RT Package 1;Labour charges for jointing D.I. Pipes and Valves with Double flanged ends including cost of jointing materials such as bolts, nuts rubber insertion, white lead including filling with water with lead upto 500 Mts. and testing to required pressure including cost and conveyance of all materials etc.,complete for 200mm Dia. Sluice Valve..

6

-

6934.02

... More
Physical Infrastructure for Package RT Package 1;Labour charges for jointing D.I. Pipes and Valves with Double flanged ends including cost of jointing materials such as bolts, nuts rubber insertion, white lead including filling with water with lead upto 500 Mts. and testing to required pressure including cost and conveyance of all materials etc.,complete for 150mm Dia. SLUICE Valve.

4

-

3253.28

... More
Physical Infrastructure for Package RT Package 1;Labour charges for jointing D.I. Pipes and Valves with Double flanged ends including cost of jointing materials such as bolts, nuts rubber insertion, white lead including filling with water with lead upto 500 Mts. and testing to required pressure including cost and conveyance of all materials etc.,complete for 150mm Dia. SLUICE Valve.

6

-

3295.98

... More
Physical Infrastructure for Package RT Package 1;Labour charges for jointing D.I. Pipes and Valves with Double flanged ends including cost of jointing materials such as bolts, nuts rubber insertion, white lead including filling with water with lead upto 500 Mts. and testing to required pressure including cost and conveyance of all materials etc.,complete for 100mm Dia. Sluice Valve.

3

-

625.41

... More
Physical Infrastructure for Package RT Package 1;Labour charges for jointing D.I. Pipes and Valves with Double flanged ends including cost of jointing materials such as bolts, nuts rubber insertion, white lead including filling with water with lead upto 500 Mts. and testing to required pressure including cost and conveyance of all materials etc.,complete for 100mm Dia. Sluice Valve.

6

-

1250.82

... More
Physical Infrastructure for Package RT Package 1;Lowering and keeping in position of 350 mm Dia. Sluice valve including conveyance of all materials to work site and nuts and bolts,rubber packing and shallock and all other charges etc., complete as per the direction of the department for finihsed item of work .

2

-

4284.42

... More
Physical Infrastructure for Package RT Package 1;Lowering and keeping in position of 300 mm Dia. Sluice valve including conveyance of all materials to work site and nuts and bolts,rubber packing and shallock and all other charges etc., complete as per the direction of the department for finihsed item of work .

2

-

2536.96

... More
Physical Infrastructure for Package RT Package 1;Lowering and keeping in position of 200 mm Dia. Sluice Valve including conveyance of all materials to work site, nuts and bolts, rubber packing and white lead and all other charges etc., complete as per the direction of the department for finihsed item of work .

3

-

1880.88

... More
Physical Infrastructure for Package RT Package 1;Lowering and keeping in position of 80 mm Dia. Sluice valve including conveyance of all materials to work site and nuts and bolts,rubber packing and shallock and all other charges etc., complete as per the direction of the department for finihsed item of work .

1

-

168.86

... More
Physical Infrastructure for Package RT Package 1;Supply and delivery of tamper proof D.I., Flanged Single Chamber Air Valves of 80 mm Dia. with body and cover made of Ductile Iron Grade GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS-1865, IS-3896-2 with food grade epoxy powder coating (EP-P) (Min:250 Micron) inside and outside of color blue RAL 5005. All internal parts such as float, shell, cove bolts etc., made of austenitic alloy steel of SS AISI 304/316 and DN-50 float of and other components with ABS/PTFE/ EPDM/NBR and generally conforming to DIN/BIS/AWWA standards (or) combination flange drilling as per IS-1538 and including cost and conveyance of all materials to work site, loading, unloading transportation charges Complete as directed by the departmental authorities. (PN 1.0 (mpa)

1

-

11836.5

... More
Physical Infrastructure for Package RT Package 1;Supply and delivery of tamper proof D.I., Flanged Single Chamber Air Valves of 50mm Dia. with body and cover made of Ductile Iron Grade GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS-1865, IS-3896-2 with food grade epoxy powder coating (EP-P) (Min:250 Micron) inside and outside of color blue RAL 5005. All internal parts such as float, shell, cove bolts etc., made of austenitic alloy steel of SS AISI 304/316 and DN-50 float of and other components with ABS/PTFE/ EPDM/NBR and generally conforming to DIN/BIS/AWWA standards (or) combination flange drilling as per IS-1538 and including cost and conveyance of all materials to work site, loading, unloading transportation charges Complete as directed by the departmental authorities. (PN 1.0 (mpa)

2

-

18297.6

... More
Physical Infrastructure for Package RT Package 1;Manufacture, Supply and delivery of 350mm DI D/F Gate Valves (Soft Seated) Resilient seated soft sealing gate valves (ScourValves ) with body bonnet of ductile cast iron of grade GGG40/SG- 400/15 or GGG-50/SG-500/7 or equivalent grade as per I.S.3896-part2-1985 and subsequent revisions, wedge fully rubber lined with EPDM food grade quality and seals of NBR and the valves should be of vacuum tight and 100% leak proof with face to face dimensions as per BS5163-89/IS14846-2000/DIN 3202 F 4. All the valves should be with Electrostatic powder coating both inside and outside pocket less body passage. Drilled as per IS:1538. DI. D/F Sluice valves of PN.16 clas- 300mm dia ScourValves

1

-

117774.7

... More
Physical Infrastructure for Package RT Package 1;Manufacture, Supply and delivery of 300mm DI D/F Gate Valves (Soft Seated) Resilient seated soft sealing gate valves (ScourValves with body bonnet of ductile cast iron of grade GGG40/SG- 400/15 or GGG-50/SG-500/7 or equivalent grade as per I.S.3896-part2-1985 and subsequent revisions, wedge fully rubber lined with EPDM food grade quality and seals of NBR and the valves should be of vacuum tight and 100% leak proof with face to face dimensions as per BS5163-89/IS14846-2000/DIN 3202 F 4. All the valves should be with Electrostatic powder coating both inside and outside pocket less body passage. Drilled as per IS:1538. DI. D/F Sluice valves of PN.16 clas- 300mm diaScourValves

1

-

84658.2

... More
Physical Infrastructure for Package RT Package 1;Manufacture, Supply and delivery of 200mm DI D/F Gate Valves (Soft Seated) Resilient seated soft sealing gate valves (ScourValves) with body bonnet of ductile cast iron of grade GGG40/SG- 400/15 or GGG-50/SG-500/7 or equivalent grade as per I.S.3896-part2-1985 and subsequent revisions, wedge fully rubber lined with EPDM food grade quality and seals of NBR and the valves should be of vacuum tight and 100% leak proof with face to face dimensions as per BS5163-89/IS14846-2000/DIN 3202 F 4. All the valves should be with Electrostatic powder coating both inside and outside pocket less body passage. Drilled as per IS:1538. DI. D/F Sluice valves of PN.1.6 (Mpa) 200mm dia ScourValves

1

-

35758.9

... More
Physical Infrastructure for Package RT Package 1;Manufacture, Supply and delivery of 350mm DI D/F Gate Valves (Soft Seated) Resilient seated soft sealing gate valves (Sluice valves) with body bonnet of ductile cast iron of grade GGG40/SG- 400/15 or GGG-50/SG-500/7 or equivalent grade as per I.S.3896-part2-1985 and subsequent revisions, wedge fully rubber lined with EPDM food grade quality and seals of NBR and the valves should be of vacuum tight and 100% leak proof with face to face dimensions as per BS5163-89/IS14846-2000/DIN 3202 F 4. All the valves should be with Electrostatic powder coating both inside and outside pocket less body passage. Drilled as per IS:1538. DI. D/F Sluice valves of PN.1.6 (Mpa)- 350mm dia Sluice Valves

1

-

117774.7

... More
Physical Infrastructure for Package RT Package 1;Manufacture, Supply and delivery of 300mm DI D/F Gate Valves (Soft Seated) Resilient seated soft sealing gate valves (Sluice valves) with body bonnet of ductile cast iron of grade GGG40/SG- 400/15 or GGG-50/SG-500/7 or equivalent grade as per I.S.3896-part2-1985 and subsequent revisions, wedge fully rubber lined with EPDM food grade quality and seals of NBR and the valves should be of vacuum tight and 100% leak proof with face to face dimensions as per BS5163-89/IS14846-2000/DIN 3202 F 4. All the valves should be with Electrostatic powder coating both inside and outside pocket less body passage. Drilled as per IS:1538. DI. D/F Sluice valves of PN.1.6 (Mpa)- 300mm dia Sluice Valves

1

-

84658.2

... More
Physical Infrastructure for Package RT Package 1;Manufacture, Supply and delivery of 200mm DI D/F Gate Valves (Soft Seated) Resilient seated soft sealing gate valves (Sluice valves) with body bonnet of ductile cast iron of grade GGG40/SG- 400/15 or GGG-50/SG-500/7 or equivalent grade as per I.S.3896-part2-1985 and subsequent revisions, wedge fully rubber lined with EPDM food grade quality and seals of NBR and the valves should be of vacuum tight and 100% leak proof with face to face dimensions as per BS5163-89/IS14846-2000/DIN 3202 F 4. All the valves should be with Electrostatic powder coating both inside and outside pocket less body passage. Drilled as per IS:1538. DI. D/F Sluice valves of PN.1.6 (Mpa)- 200mm dia Sluice Valves

2

-

71517.8

... More
Physical Infrastructure for Package RT Package 1;Painting with epoxy paint for MS Pipes in two coats over a epoxy primer as directed by the Departmental Authorities.etc,cpmplete including cost and conveyance of all materials,labour charges and all operational charges as directed by the Departmental Authorities.

481.05

-

124846.39

... More
Physical Infrastructure for Package RT Package 1;Lowering 350 mm dia MS pipes into ready made trenches or keeping in position on ready built pedestals or supports and laying them true to alignment and gradient and perfect lining by jacking and joinitng with three run arc welding and inlining and outcoating of field welded joints with wire mesh and cement mortar as per the above specification inclusive of cost of all jointing materials, labour charges and other incidental and operational charges etc., complete as directed by departmental Authorities.

20

-

16513.8

... More
Physical Infrastructure for Package RT Package 1;Lowering 300 mm dia MS pipes into ready made trenches or keeping in position on ready built pedestals or supports and laying them true to alignment and gradient and perfect lining by jacking and joinitng with three run arc welding and inlining and outcoating of field welded joints with wire mesh and cement mortar as per the above specification inclusive of cost of all jointing materials, labour charges and other incidental and operational charges etc., complete as directed by departmental Authorities.

80

-

56618.4

... More
Physical Infrastructure for Package RT Package 1;Lowering 200mm dia MS pipes into ready made trenches or keeping in position on ready built pedestals or supports and laying them true to alignment and gradient and perfect lining by jacking and joinitng with three run arc welding and inlining and outcoating of field welded joints with wire mesh and cement mortar as per the above specification inclusive of cost of all jointing materials, labour charges and other incidental and operational charges etc., complete as directed by departmental Authorities.

30

-

14154.6

... More
Physical Infrastructure for Package RT Package 1;Manufacturing and supply of 350 mm Dia MS pipes using MS plate of 10 mm thick manufactured with electric - resistance welding (ERW) or submerged arc welding (SAW) process longitudinally or spirally welded from MS plates confirming to IS:2062, Grade-`A'/ 'B' in suitable lengths to suit the site conditions as directed by the departmental officers including fabrication charges etc.,

2141.6

-

197087.49

... More
Physical Infrastructure for Package RT Package 1;Manufacturing and supply of 300 mm Dia MS pipes using MS plate of 10 mm thick manufactured with electric - resistance welding (ERW) or submerged arc welding (SAW) process longitudinally or spirally welded from MS plates confirming to IS:2062, Grade-`A'/ 'B' in suitable lengths to suit the site conditions as directed by the departmental officers including fabrication charges etc.,

6112.8

-

562549.68

... More
Physical Infrastructure for Package RT Package 1;Manufacturing and supply of 200 mm Dia MS pipes using MS plate of 10 mm thick manufactured with electric - resistance welding (ERW) or submerged arc welding (SAW) process longitudinally or spirally welded from MS plates confirming to IS:2062, Grade-`A'/ 'B' in suitable lengths to suit the site conditions as directed by the departmental officers including fabrication charges etc.,

1552.8

-

142901.31

... More
Physical Infrastructure for Package RT Package 1;Jointing C.I., D.I. pipes and fittings with rubber gasket (push-on-joint), including the cost of the gasket but including all sundries filling with water, with a water lead up to 500m and testing to required pressure, etc. complete (PHE-JCIR-4) as directed by the Departmental Authorities.

44

-

23682.12

... More
Physical Infrastructure for Package RT Package 1;Jointing C.I., D.I. pipes and fittings with rubber gasket (push-on-joint), including the cost of the gasket but including all sundries filling with water, with a water lead up to 500m and testing to required pressure, etc. complete (PHE-JCIR-4) as directed by the Departmental Authorities.

136

-

59835.92

... More
Physical Infrastructure for Package RT Package 1;Jointing C.I., D.I. pipes and fittings with rubber gasket (push-on-joint), including the cost of the gasket but including all sundries filling with water, with a water lead up to 500m and testing to required pressure, etc. complete (PHE-JCIR-4) as directed by the Departmental Authorities.

55

-

16798.65

... More
Physical Infrastructure for Package RT Package 1;PHE-LCIS-1: Lowering C.I. / D.I. Pipes (all classes) and specials (fittings) with s/s ends carefully into trenches and laying them true to alignment and gradient including all sundries but excluding cost and conveyance of pipes from source of supply (Ref to specifications. BIS No.3114/1994) as directed by the Departmental Authorities.(350 mm Dia D.I K7)

240

-

70744.8

... More
Physical Infrastructure for Package RT Package 1;PHE-LCIS-1: Lowering C.I. / D.I. Pipes (all classes) and specials (fittings) with s/s ends carefully into trenches and laying them true to alignment and gradient including all sundries but excluding cost and conveyance of pipes from source of supply (Ref to specifications. BIS No.3114/1994) as directed by the Departmental Authorities.(300 mm Dia D.I K7)

750

-

176265

... More
Physical Infrastructure for Package RT Package 1;PHE-LCIS-1: Lowering C.I. / D.I. Pipes (all classes) and specials (fittings) with s/s ends carefully into trenches and laying them true to alignment and gradient including all sundries but excluding cost and conveyance of pipes from source of supply (Ref to specifications. BIS No.3114/1994) as directed by the Departmental Authorities.( 200 mm Dia K7)

300

-

40347

... More
Physical Infrastructure for Package RT Package 1;Centrifugally cast (Spun) 350 MM DIA Ductile Iron pressure pipes for water, gas and sewage with Socket Spigot ends conforming to IS.: 8329/2000 in standard working lengths of 4, 5, 5.5 & 6 meter for classification K9 & K7 suitable for push-on-joint (rubber gasket jointing) with cement mortar lining inside the pipes with outside zinc coating. Rates are ex-factory, including transportation,.

240

-

1189466.4

... More
Physical Infrastructure for Package RT Package 1;Centrifugally cast (Spun) 300 MM DIA Ductile Iron pressure pipes for water, gas and sewage with Socket Spigot ends conforming to IS.: 8329/2000 in standard working lengths of 4, 5, 5.5 & 6 meter for classification K9 & K7 suitable for push-on-joint (rubber gasket jointing) with cement mortar lining inside the pipes with outside zinc coating. Rates are ex-factory, including transportation,.

750

-

2925135

... More
Physical Infrastructure for Package RT Package 1;Centrifugally cast (Spun) 200 MM DIA Ductile Iron pressure pipes for water, gas and sewage with Socket Spigot ends conforming to IS.: 8329/2000 in standard working lengths of 4, 5, 5.5 & 6 meter for classification K9 & K7 suitable for push-on-joint (rubber gasket jointing) with cement mortar lining inside the pipes with outside zinc coating. Rates are ex-factory, including transportation,.

300

-

674190

... More
Physical Infrastructure for Package RT Package 1;Supply and filling with gravel brought from approved quarry including cost and conveyance, watering, tamping including all labour charges

256.32

-

138143.66

... More
Physical Infrastructure for Package RT Package 1;Bailing out water by using oil Engine Driven pumpset inlcuding cost and conveyance , hire charges , crew charges etc complete as directed by the Departmental Authorities.

40

-

2064

... More
Physical Infrastructure for Package RT Package 1;PHE-BHLW-26; Barricading, hoarding, lighting and watching etc., for water supply and sewerage works for trenches of depths upto 6?-0? (2 Meter) below G.L as directed by the Departmental Authorities.

516

-

103979.16

... More
Physical Infrastructure for Package RT Package 1;Cutting sheet rock including stocking of excavated material for Pipe line trenches as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material, dressing of sides and bottom as per Technical Specification 304 and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying water lines including divertion of traffic including all incidental and operational charges etc., complete

128.16

-

565600.84

... More
Physical Infrastructure for Package RT Package 1;Earthwork excavation in hard rock with blasting for Pipe line trenches as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material, dressing of sides and bottom as per Technical Specification 304 and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying water lines including divertion of traffic including all incidental and operational charges etc., complete

128.16

-

137049.18

... More
Physical Infrastructure for Package RT Package 1;: Earthwork excavation in all kinds of soil for Pipe line trenches as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material, dressing of sides and bottom as per Technical Specification 304 MORTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water lines including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for Pipe Linesans.

128.16

-

55838.03

... More
Physical Infrastructure for Package RT Package 1;Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH as directed by the Departmentalal Authorities

897.12

-

107367.32

... More
Physical Infrastructure for Package RT Package 1;Cutting open cement concrete road surface including depositing of excavated materials for trench work including labour charges and all incidental and operational charges etc., complete. SSR Sl.No.25b (PH SSR).

60.12

-

190435.51

... More
Physical Infrastructure for Package RT Package 1;Providing High Yield Strenth Deformed STEEL bars/TMT (Fe.500 Grade as per IS1786- 1985 and as amended upto date) of different of diameters including labour charges for straightening, cutting, bending to required size, shapes, placing in position with cover blocks of approved materials and size and tying firmly with M.S.Binding wire of 20 SWG forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of steel bars, including all wastage, such as over laps, welding joints, chairs, space bars and all operational, incidental, labour charges, including sales and other taxes on all materials etc., complete for finished item of work (payment will be made on the basis of wieght of fabrication deformed bars only) (No re-rolled steel shall be allowed) complete for (8mm to 40mm).

2.88

-

244734.34

... More
Physical Infrastructure for Package RT Package 1;VRCC. M20 grade Nominal Mix Concrete corresponding to IS-456 using WEIGH BATCHER with 20mm and 12.50mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work.,for culvert Slab.& Bed Blocks

72

-

518474.16

... More
Physical Infrastructure for Package RT Package 1;P.C.C. work of mix M15 Prop. (1:2.5:5) 20 mm Graded hard broken granite machine crushed graded metal incluidng cost and conveyance of all materials and water to work site and all labour charges, and all operational charges incidental machine mixing charges, laying, curing etc., complete as directed by the Departmental authorities for Drain walls (1:2.5:5)

216

-

1870771.68

... More
Physical Infrastructure for Package RT Package 1;P.C.C. work of mix M15 Prop.(1:2.5:5) 20 mm Graded hard broken granite machine crushed graded metal incluidng cost and conveyance of all materials and water to work site and all labour charges, and all operational charges incidental machine mixing charges, laying, curing etc., complete as directed by the Departmental authorities for Drain bed.

88

-

537900.88

... More
Physical Infrastructure for Package RT Package 1;Laying PCC work of mix (1:4:8) Prop.using 40mm gauge hard broken granite machine crushed metal including cost and conveyance of all materials and water to worksite and all operational, incidental, labour charges, machine mixing, laying, levelling, tamping, curing,etc., complete as directed by the Departmental authorities for Levelling course for Drains.

88

-

434830

... More
Physical Infrastructure for Package RT Package 1;Filling with Sand for Foundations with initial lead in layers not exceeding 15 Cm. thick consolidating each deposited layer by watering and ramming including cost and conveyance of all materials and water to work site and all operational, incidental charges and all labour charges, hire charges of T&P etc., complete for finished item of work and as directed by the Departmental Authorities.

132

-

93782.48

... More
Physical Infrastructure for Package RT Package 1;Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH as directed by the Departmentalal Authorities

792

-

94786.56

... More
Physical Infrastructure for Package RT Package 1;Providing Mild Steel Round bars ( Dowel bars) including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position of approved materials and size as per approved designs and drawings including cost and conveyance of steel bars, all wastage, and all incidental, Operational labour charges such as cutting, bending,placing in position,etc., complete and as directed by the Departmental authorities for CC pavement.

1.28

-

103631.42

... More
Physical Infrastructure for Package RT Package 1;Construction of un-reinforced, dowel jointed at expansion and construction joint only, Design Mix M30 Grade cement concrete pavement, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity using concrete mixcer , laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle vibrator and finished in continuous operation including Cost and conveyance of all materials, all hire and operational charges of T&P etc., provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days as per design & drawing and Technical Specification Clause 1501 MORD excluding cost of Mild steel round bars(dowel bars) as directed by the Departmental Authorities for Main Roads.

280

-

2002753.2

... More
Physical Infrastructure for Package RT Package 1;Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with Vibratory Roller 80-100 kN weight to achieve the desired density including Cost and conveyance of all materials, all hire and operational charges of T&P etc., lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD / MORTH. as directed by the Departmental Authorities.

300

-

705246

... More
Physical Infrastructure for Package RT Package 1;Construction of granular sub-base by providing well graded material for grading-III spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with Vibratory Roller to achieve the desired density, complete as per Technical Specification Clause 401 MORD / MORTH.(CBR Value Minimum 30) including Cost and conveyance of all materials, all hire and operational charges of T&P etc., complete for finished item of work as directed by the Departmental Authorities

240

-

363962.4

... More
Physical Infrastructure for Package RT Package 1;Forming embankment with 70% of Gravel and 30% of Sand by mechanical means with all leads and lifts including pre-watering of soil at borrow area, removal of top soil, excavation of soils at borrowed area, conveyance of soil, depositing the soils on the embankment, spreading soils, breaking clods, sectioning and consolidation with Vibratory Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H, including Cost and conveyance of all materials, all hire and operational charges of T&P etc., complete for finished item of work as per MoRT&H specification 305 (4th revision) - with a lead beyond 1000m as directed by the Departmental Authorities for Side Berms

450

-

234688.5

... More
Physical Infrastructure for Package RT Package 1;Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH as directed by the Departmentalal Authorities

240

-

28723.2

... More
Physical Infrastructure for Package RT Package 1;Providing High Yield Strenth Deformed (HYSD)/Thermo Mechanically Treated (TMT) Steel bars ( Fe.500 grade as per IS1786 and as amended upto date) of different of diameters for RCC works, including labour charges for srraightening,cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-spacing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of steel bars, all wastage, such as over laps, couplings, chairs, spacer bars, binding wire,cover blocks and all incidental, Operational labour charges such as cutting, bending,placing in position, tying etc., complete for finished item of work as directed by the Departmental authorities

42.26

-

3591136.47

... More
Physical Infrastructure for Package RT Package 1;Providing weep holes with 75 mm dia . Of required length with PVC pipe of make (Sudhakar/nandi/prince) conforming to IS 49851:2000 of 4.00 kg/sq cm pressure and bell mouth finishing at inlet including cost , all taxes and all labour charges for conveyance to site cutting into required sizes , placing in position maintaing slopes as diorected by engineer in charge etc.. inncluding metal spall backing x 30 cms size in rear complete for weep holes in all respects as per the specification and dirtection of engineer in charge for retaining walls. (RM)

200

-

17042

... More
Physical Infrastructure for Package RT Package 1;VRCC. M20 grade design mix concrete corresponding to IS-456 using WEIGH BATCHER with 20mm and 12.50mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete as directed by the Departmental Authorities but excluding cost of steel and its fabrication charges for finished item of workt.,for RCC WALLS

327.63

-

4347728.73

... More
Physical Infrastructure for Package RT Package 1;VRCC. M20 grade design mix concrete corresponding to IS-456 using WEIGH BATCHER with 20mm and 12.50mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete as directed by the Departmental Authorities. but excluding cost of steel and its fabrication charges for finished item of workt.,for RAFT

141.88

-

1075108.47

... More
Physical Infrastructure for Package RT Package 1;Laying PCC work of mix (1:4:8) Prop.using 40mm gauge hard broken granite machine crushed metal including cost and conveyance of all materials and water to worksite and all operational, incidental, labour charges, machine mixing, laying, levelling, tamping, curing,etc., complete as directed by the Departmental authorities for Levelling course for PUMP HOUSE

65.75

-

324887.19

... More
Physical Infrastructure for Package RT Package 1;Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH as directed by the Departmentalal Authorities

328.75

-

39344.8

... More
Physical Infrastructure for Package RT Package 1;Filling with Gravel: Collection, spreading and filling with Gravel from approved source with a lead upto 8 KM with initial lead in layers not exceeding 15 Cm. thick consolidating each deposited layer by watering and ramming including cost and conveyance all materials and water to work site and all operational charges, incidental charges and all labour charges, hire charges of T&P etc., complete for finished item of work for irrespective of thickness.

17826.61

-

7981686.66

... More
Physical Infrastructure for Package RT Package 1;Carting of Excavated Hard Soil (not useful) by lories/Trippers with a lead of 1 Kms from site including Loading and Unloading etc. Complete as directed by the Departmentalal Authorities

35445.73

-

1194521.09

... More
Physical Infrastructure for Package RT Package 1;Carting of Excavated Hard rock (not useful) by lories/Trippers with a lead of 1 Kms from site including Loading and Unloading etc. Complete as directed by the Departmentalal Authorities

15191.03

-

493708.38

... More
Physical Infrastructure for Package RT Package 1;Excavation of Hard rock (blasting prohibited)-Upto 3 m depth including cost and conveyance of all material and labour charges etc..complete as directed by the Departmentalal Authorities

15191.03

-

10515684.65

... More
Physical Infrastructure for Package RT Package 1;Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH as directed by the Departmentalal Authorities

35445.73

-

4242144.94

... More
Physical Infrastructure for Package RT Package 1;Filling with Sand for Foundations with initial lead in layers not exceeding 15 Cm. thick consolidating each deposited layer by watering and ramming including cost and conveyance of all materials and water to work site and all operational, incidental charges and all labour charges, hire charges of T&P etc., complete for finished item of work and as directed by the Departmental Authorities.

520.88

-

370071.35

... More
Physical Infrastructure for Package RT Package 1;Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH as directed by the Departmentalal Authorities

4191

-

501578.88

... More
Physical Infrastructure for Package RT Package 1;Construction of 904m (3'-0") Dia. Solid block Masonry INSPECTION CHAMBER as per IS.4111, Part-I-1986 with CM(1:6)Prop. Fly-Ash blocks of 225mm thick from approved source having a minium crushing strength of 50 Kg/Sq.Cm.including plastering with CM(1:3)Prop., 1/2" thick both inside and outside and fitted with 20" Dia. RCC Manhole Covers and Frames including excavating pits upto a depth of 1524mm (5'-0") in all sorts of soils (excluding rock) and laying CC(1:4:8) Prop. 150mm thick using 40mm HBG metal and PCC(1:2:4)Prop. benching and channel 100mm thick as per standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site of work, seignorage on all materials and all operational, incidental, labour charges like mixing cement mortar, construcing masonry, lift charges, curing etc., complete for finished item of work as per standard specification.

50

-

533706.5

... More
Physical Infrastructure for Package RT Package 1;Construction of 904.0 m (3'-0")Dia. Solid block Masonry INSPECTION CHAMBER as per IS.4111, Part-I-1986 with CM(1:6)Prop. Fly-Ash blocks of 225mm thick from approved source having a minium crushing strength of 10 N/Sq. mm. Including plastering with CM(1:3)Prop. 1/2" thick both inside and outside and fitted with 20" Dia. RCC Manhole Covers and Frames including excavating pits upto a depth of 904.00 mm (3'-0") in all sorts of soils (excluding rock) and laying CC(1:4:8) Prop. 150mm thick using 40mm HBG metal and PCC(1:2:4)Prop. benching and channel 100mm thick as per standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site of work, seignorage on all materials and all operational, incidental, labour charges like mixing cement mortar, construcing masonry, lift charges, curing etc., complete for finished item of work as per standard specification.

50

-

339141

... More
Physical Infrastructure for Package RT Package 1;Laying of 150mm ID of Class SN8 structured wall (External Annular Corrugated & Smooth Internal surface) Polythelene pipes, on the lower bedding (Constructed at bottom of trenches) at prescribed gradient, depth & alignment including installation and jointing of the same with the help of coupler (on line/ off line) attached to one end of the pipe & sliding the coupler end over the elastomeric sealing rubber ring fitted on the specified valley of the spigot end of next pipe, testing the water tightness of the joint assembly, ensuring the continuity tests of specified pipe segments etc. complete as per drawing, specifications & detail engineering, including carriage of pipes & fittings from site stacks to the place of laying etc. as per directions of Engineer-in-charge.

530

-

48049.8

... More
Physical Infrastructure for Package RT Package 1;Laying of 200mm ID of Class SN8 structured wall (External Annular Corrugated & Smooth Internal surface) Polythelene pipes, on the lower bedding (Constructed at bottom of trenches) at prescribed gradient, depth & alignment including installation and jointing of the same with the help of coupler (on line/ off line) attached to one end of the pipe & sliding the coupler end over the elastomeric sealing rubber ring fitted on the specified valley of the spigot end of next pipe, testing the water tightness of the joint assembly, ensuring the continuity tests of specified pipe segments etc. complete as per drawing, specifications & detail engineering, including carriage of pipes & fittings from site stacks to the place of laying etc. as per directions of Engineer-in-charge.

1000

-

149520

... More
Physical Infrastructure for Package RT Package 1;Laying of 250mm ID of Class SN8 structured wall (External Annular Corrugated & Smooth Internal surface) Polythelene pipes, on the lower bedding (Constructed at bottom of trenches) at prescribed gradient, depth & alignment including installation and jointing of the same with the help of coupler (on line/ off line) attached to one end of the pipe & sliding the coupler end over the elastomeric sealing rubber ring fitted on the specified valley of the spigot end of next pipe, testing the water tightness of the joint assembly, ensuring the continuity tests of specified pipe segments etc. complete as per drawing, specifications & detail engineering, including carriage of pipes & fittings from site stacks to the place of laying etc. as per directions of Engineer-in-charge.

500

-

116910

... More
Physical Infrastructure for Package RT Package 1;Laying of 300mm ID of Class SN8 structured wall (External Annular Corrugated & Smooth Internal surface) Polythelene pipes, on the lower bedding (Constructed at bottom of trenches) at prescribed gradient, depth & alignment including installation and jointing of the same with the help of coupler (on line/ off line) attached to one end of the pipe & sliding the coupler end over the elastomeric sealing rubber ring fitted on the specified valley of the spigot end of next pipe, testing the water tightness of the joint assembly, ensuring the continuity tests of specified pipe segments etc. complete as per drawing, specifications & detail engineering, including carriage of pipes & fittings from site stacks to the place of laying etc. as per directions of Engineer-in-charge.

1000

-

310170

... More
Physical Infrastructure for Package RT Package 1;Laying of 400mm ID of Class SN8 structured wall (External Annular Corrugated & Smooth Internal surface) Polythelene pipes, on the lower bedding (Constructed at bottom of trenches) at prescribed gradient, depth & alignment including installation and jointing of the same with the help of coupler (on line/ off line) attached to one end of the pipe & sliding the coupler end over the elastomeric sealing rubber ring fitted on the specified valley of the spigot end of next pipe, testing the water tightness of the joint assembly, ensuring the continuity tests of specified pipe segments etc. complete as per drawing, specifications & detail engineering, including carriage of pipes & fittings from site stacks to the place of laying etc. as per directions of Engineer-in-charge.

1000

-

559890

... More
Physical Infrastructure for Package RT Package 1;Manufacture,Supply and Delivery of ID 150 mm Dia. Double wall Corrogated structured wall polyethelene/polypropylne piping system class SN-8 with non smooth external annular corrugated &smooth internalsurface (double wall)for non pressure sewage and drainage application pipes of standard length 6m, grade confirming to IS 16098 (part-II-2013) including transportation to worksite excluding all taxes etc., as directed by the Departmental authorities

530

-

192692.1

... More
Physical Infrastructure for Package RT Package 1;Manufacture,Supply and Delivery of ID 200 mm Dia. Double wall Corrogated structured wall polyethelene/polypropylne piping system class SN-8 with non smooth external annular corrugated &smooth internalsurface (double wall)for non pressure sewage and drainage application pipes of standard length 6m, grade confirming to IS 16098 (part-II-2013) including transportation to worksite excluding all taxes etc., as directed by the Departmental authorities

1000

-

601020

... More
Physical Infrastructure for Package RT Package 1;Manufacture,Supply and Delivery of ID 250 mm Dia. Double wall Corrogated structured wall polyethelene/polypropylne piping system class SN-8 with non smooth external annular corrugated &smooth internalsurface (double wall)for non pressure sewage and drainage application pipes of standard length 6m, grade confirming to IS 16098 (part-II-2013) including transportation to worksite excluding all taxes etc., as directed by the Departmental authorities

500

-

468660

... More
Physical Infrastructure for Package RT Package 1;Manufacture,Supply and Delivery of ID 300 mm Dia. Double wall Corrogated structured wall polyethelene/polypropylne piping system class SN-8 with non smooth external annular corrugated &smooth internalsurface (double wall)for non pressure sewage and drainage application pipes of standard length 6m, grade confirming to IS 16098 (part-II-2013) including transportation to worksite excluding all taxes etc., as directed by the Departmental authorities

1000

-

1248630

... More
Physical Infrastructure for Package RT Package 1;Manufacture,Supply and Delivery of ID 400 mm Dia. Double wall Corrogated structured wall polyethelene/polypropylne piping system class SN-8 with non smooth external annular corrugated &smooth internalsurface (double wall)for non pressure sewage and drainage application pipes of standard length 6m, grade confirming to IS 16098 (part-II-2013) including transportation to worksite excluding all taxes etc., as directed by the Departmental authorities

1000

-

2258670

... More
Physical Infrastructure for Package RT Package 1;Manufacture, Supply, & Delivery of OD 110 mm dia HDPE END CAPS (PE ?100 Grade) fittings conforming to IS 4984 - 2016 including transportation to anywhere in A.P. Excluding all taxes as directed by the departmental authorities.

4

-

581.72

... More
Physical Infrastructure for Package RT Package 1;Manufacture, Supply, & Delivery of OD 160 mm dia HDPE END CAPS (PE ?100 Grade) fittings conforming to IS 4984 - 2016 including transportation to anywhere in A.P. Excluding all taxes as directed by the departmental authorities.

4

-

1440.64

... More
Physical Infrastructure for Package RT Package 1;Supply and delivery of Rubber Packing including cost and conveyance of all materials to site of work etc., complete ( weight 0.44 Kgs. per joint .)

39.6

-

4184.14

... More
Physical Infrastructure for Package RT Package 1;Supply and delivery of Bolts & Nuts with double washers including cost and conveyance of all materials to site of work, shallok/White lead etc., for flanged joints excluding labour charges for fixing values. ( No.of Bolts for each valve 8 Nos. and total weight of Bolts 1.50 Kg./8 Nos.)

66

-

8323.26

... More
Physical Infrastructure for Package RT Package 1;Construction of 904.0 m (3'-0")Dia. Solid block Masonry INSPECTION CHAMBER/MANHOLES as per IS.4111, Part-I-1986 with CM(1:6)Prop. Fly-Ash blocks of 225mm thick from approved source having a minium crushing strength of 10 N/Sq. mm. Including plastering with CM(1:3)Prop. 1/2" thick both inside and outside and fitted with 20" Dia. RCC Manhole Covers and Frames including excavating pits upto a depth of 904.00 mm (5'-0") in all sorts of soils (excluding rock) and laying CC(1:4:8) Prop. 150mm thick using 40mm HBG metal and PCC(1:2:4)Prop. benching and channel 100mm thick as per standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site of work, seignorage on all materials and all operational, incidental, labour charges like mixing cement mortar, construcing masonry, lift charges, curing etc., complete for finished item of work as per standard specification as directed by the Departmental authorities

44

-

469661.72

... More
Physical Infrastructure for Package RT Package 1;Labour charges for jointing D.I. Pipes and Valves with Double flanged ends including cost of jointing materials such as bolts, nuts rubber insertion, white lead including filling with water with lead upto 500 Mts. and testing to required pressure including cost and conveyance of all materials etc.,complete for 100mm Dia. Scour Valve.

12

-

4223.16

... More
Physical Infrastructure for Package RT Package 1;Labour charges for jointing D.I. Pipes and Valves with Double flanged ends including cost of jointing materials such as bolts, nuts rubber insertion, white lead including filling with water with lead upto 500 Mts. and testing to required pressure including cost and conveyance of all materials etc.,complete for 100mm Dia. Sluice Valve.

30

-

10557.9

... More
Physical Infrastructure for Package RT Package 1;providing and fixing double acting air valve 150mm including boring the main threading the bore and fixing nipple etc.,excluding the cost of rubber insertions, bolts & nuts, air valve & flanged tail pieces complete

28

-

14224.84

... More
Physical Infrastructure for Package RT Package 1;providing and fixing double acting air valve 50mm including boring the main threading the bore and fixing nipple etc.,excluding the cost of rubber insertions, bolts & nuts, air valve & flanged tail pieces complete

1

-

404.9

... More
Physical Infrastructure for Package RT Package 1;Labour charges for jointing D.I. Pipes and Valves with Double flanged ends including cost of jointing materials such as bolts, nuts rubber insertion, white lead including filling with water with lead upto 500 Mts. and testing to required pressure including cost and conveyance of all materials etc.,complete for 200mm Dia. Sluice Valve..

18

-

9884.16

... More
Physical Infrastructure for Package RT Package 1;Lowering and keeping in position of 100 mm Dia. Scour valve including conveyance of all materials to work site and nuts and bolts,rubber packing and shallock and all other charges etc., complete as per the direction of the department for finihsed item of work .

6

-

1345.32

... More
Physical Infrastructure for Package RT Package 1;Lowering and keeping in position of 100 mm Dia. Sluice valve including conveyance of all materials to work site and nuts and bolts,rubber packing and shallock and all other charges etc., complete as per the direction of the department for finihsed item of work .

15

-

3363.3

... More
Physical Infrastructure for Package RT Package 1;Lowering and keeping in position of 50 mm Dia. Sluice Valve including conveyance of all materials to work site, nuts and bolts, rubber packing and white lead and all other charges etc., complete as per the direction of the department for finihsed item of work .

14

-

5320.42

... More
Physical Infrastructure for Package RT Package 1;Lowering and keeping in position of 200 mm Dia. Sluice valve including conveyance of all materials to work site and nuts and bolts,rubber packing and shallock and all other charges etc., complete as per the direction of the department for finihsed item of work .

9

-

5642.55

... More
Physical Infrastructure for Package RT Package 1;Lowering, Laying and Jointing of 63mm Dia. HDPE Pipes by butt fusion welding as per IS:7634/Part-II/1975 as amended from time to time to the alighment and gradient and testing the pipe line to the required prpessure including cost and conveyance of all materials to work site and all operational, incidential and all labour charges etc., Complete as directed by the departmental authorities.

636

-

22934.16

... More
Physical Infrastructure for Package RT Package 1;Lowering, Laying and Jointing of 110mm Dia. HDPE Pipes by butt fusion welding as per IS:7634/Part-II/1975 as amended from time to time to the alighment and gradient and testing the pipe line to the required prpessure including cost and conveyance of all materials to work site and all operational, incidential and all labour charges etc., Complete as directed by the departmental authorities.

2500

-

124684.37

... More
Physical Infrastructure for Package RT Package 1;Lowering, Laying and Jointing of 160mm Dia. HDPE Pipes by butt fusion welding as per IS:7634/Part-II/1975 as amended from time to time to the alighment and gradient and testing the pipe line to the required prpessure including cost and conveyance of all materials to work site and all operational, incidential and all labour charges etc., Complete as directed by the departmental authorities.

1500

-

112815

... More
Physical Infrastructure for Package RT Package 1;Lowering, Laying and Jointing of 200 mm Dia. HDPE Pipes by butt fusion welding as per IS:7634/Part-II/1975 as amended from time to time to the alighment and gradient and testing the pipe line to the required prpessure including cost and conveyance of all materials to work site and all operational, incidential and all labour charges etc., Complete as directed by the departmental authorities.

800

-

89592

... More
Physical Infrastructure for Package RT Package 1;Filling with Sand for Foundations with initial lead in layers not exceeding 15 Cm. thick consolidating each deposited layer by watering and ramming including cost and conveyance of all materials and water to work site and all operational, incidental charges and all labour charges, hire charges of T&P etc., complete for finished item of work and as directed by the Departmental Authorities.

584.49

-

415264.56

... More
Physical Infrastructure for Package RT Package 1;Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH as directed by the Departmentalal Authorities

4952.84

-

592755.89

... More
Physical Infrastructure for Package RT Package 1;Manufacture, Supplying and delivery of 110 mm Dia.HDPE (PE-100 GRADE) MS Flanges conforming to IS.4984-1995 including transportation charges, loading,unloading to work site , including all taxes complete for finished item of work

42

-

8207.64

... More
Physical Infrastructure for Package RT Package 1;Manufacture, Supplying and delivery of 160 mm Dia.HDPE (PE-100 GRADE) MS Flanges conforming to IS.4984-1995 including transportation charges, loading,unloading to work site , including all taxes complete for finished item of work

28

-

10689

... More
Physical Infrastructure for Package RT Package 1;Manufacture, Supply, & Delivery of OD 200 mm dia HDPE FLANGES (PE ?100 Grade) fittings conforming to IS 4984 - 2016 including transportation to anywhere in A.P. Excluding all taxes as directed by the departmental authorities.

18

-

12536.28

... More
Physical Infrastructure for Package RT Package 1;Manufacture, Supply, & Delivery of OD 110 mm dia HDPE TEES (PE ?100 Grade) fittings conforming to IS 4984 - 2016 including transportation to anywhere in A.P. Excluding all taxes as directed by the departmental authorities.

15

-

7345.2

... More
Physical Infrastructure for Package RT Package 1;Manufacture, Supply, & Delivery of OD 160 mm dia HDPE TEES (PE ?100 Grade) fittings conforming to IS 4984 - 2016 including transportation to anywhere in A.P. Excluding all taxes as directed by the departmental authorities.

14

-

24527.16

... More
Physical Infrastructure for Package RT Package 1;Manufacture, Supply, & Delivery of OD 200 mm dia HDPE TEES (PE ?100 Grade) fittings conforming to IS 4984 - 2016 including transportation to anywhere in A.P. Excluding all taxes as directed by the departmental authorities.

9

-

29438.82

... More
Physical Infrastructure for Package RT Package 1;Manufacture, Supply, & Delivery of OD 110 mm dia HDPE Bends (PE ?100 Grade) fittings conforming to IS 4984 - 2016 including transportation to anywhere in A.P. Excluding all taxes as directed by the departmental authorities.

15

-

7532.7

... More
Physical Infrastructure for Package RT Package 1;Manufacture, Supply, & Delivery of OD 160 mm dia HDPE Bends (PE ?100 Grade) fittings conforming to IS 4984 - 2016 including transportation to anywhere in A.P. Excluding all taxes as directed by the departmental authorities.

14

-

20391.56

... More
Physical Infrastructure for Package RT Package 1;Manufacture, Supply, & Delivery of OD 200 mm dia HDPE Bends (PE ?100 Grade) fittings conforming to IS 4984 - 2016 including transportation to anywhere in A.P. Excluding all taxes as directed by the departmental authorities.

9

-

25481.61

... More
Physical Infrastructure for Package RT Package 1;Supply and delivery of D.I. D/F 100 mm Dia. Semi circular Bends with externally zince coated with inside mortar lining (with finishing as per Class 13/IS 9523/2000) conforming to IS No.9523/2000 inlcuding transportation loading unloading and all other taxes etc., complete for finished item of work (each of 32.11 kgs weight).

6

-

25942.92

... More
Physical Infrastructure for Package RT Package 1;Supply and delivery of tamper proof D.I., Flanged Single Chamber Air Valves of 50mm Dia. with body and cover made of Ductile Iron Grade GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS-1865, IS-3896-2 with food grade epoxy powder coating (EP-P) (Min:250 Micron) inside and outside of color blue RAL 5005. All internal parts such as float, shell, cove bolts etc., made of austenitic alloy steel of SS AISI 304/316 and DN-50 float of and other components with ABS/PTFE/ EPDM/NBR and generally conforming to DIN/BIS/AWWA standards (or) combination flange drilling as per IS-1538 and including cost and conveyance of all materials to work site, loading, unloading transportation charges Complete as directed by the departmental authorities. (PN 1.0 (mpa)

1

-

12860.08

... More
Physical Infrastructure for Package RT Package 1;Supply and delivery of "Resilient Seated Soft Sealing" Gate Valves 100mm (Scour Valve) with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or Equivalent as per IS1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, Replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The Valves should be Vacuum tight and 100% leak proof with face to face dimensions as BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS - 1538 excluding all taxes, duties and transportation etc.,as directed by the Departmental authorities. PN 1.0 (MPa)

6

-

85034.04

... More
Physical Infrastructure for Package RT Package 1;Supply and delivery of 50 mm dia Gunmetal gate valve (GM Peet) as per IS-778 Class-I Indian make heavy type

55

-

206586.05

... More
Physical Infrastructure for Package RT Package 1;Supply and delivery of 100 MM Dia PN 1.0 (MPA) "Resilient Seated Soft Sealing" Gate Valves (Sluice Valves PN- 01 MPA) with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or Equivalent as per IS1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, Replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The Valves should be Vacuum tight and 100% leak proof with face to face dimensions as BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN 3202F4/BS:5163 Type A Flange drilling as per IS - 1538 excluding all taxes, dutiesand transportation.

15

-

212585.1

... More
Physical Infrastructure for Package RT Package 1;Supply and delivery of "Resilient Seated Soft Sealing" Gate Valves 150mm (Sluice Valves) with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or Equivalent as per IS1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, Replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The Valves should be Vacuum tight and 100% leak proof with face to face dimensions as BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS - 1538 excluding all taxes, duties and transportation etc.,as directed by the Departmental authorities. PN 1.0 (MPa)

14

-

308641.9

... More
Physical Infrastructure for Package RT Package 1;Supply and delivery of "Resilient Seated Soft Sealing" Gate Valves 200mm (Sluice Valves) with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or Equivalent as per IS1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, Replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The Valves should be Vacuum tight and 100% leak proof with face to face dimensions as BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS - 1538 excluding all taxes, duties and transportation etc.,as directed by the Departmental authorities.(pn-1 (MPa)

9

-

257464.08

... More
Physical Infrastructure for Package RT Package 1;Manufacture, Supplying and delivery of 63 mm Dia. HDPE Pipes of Pressure 6.00 Kg./Sq.Cm. conforming to IS.4984-2016 including transportation charges to work site but excluding all taxes etc., completed as directed by the departmental authorities.

636

-

72262.32

... More
Physical Infrastructure for Package RT Package 1;Manufacture, Supplying and delivery of 110 mm Dia. HDPE Pipes of Pressure 6.00 Kg./Sq.Cm. conforming to IS.4984-2016 including transportation charges to work site but excluding all taxes etc., completed as directed by the departmental authorities.

2500

-

866325

... More
Physical Infrastructure for Package RT Package 1;Manufacture, Supplying and delivery of 160 mm Dia. HDPE Pipes of Pressure 6.00 Kg./Sq.Cm. conforming to IS.4984-2016 including transportation charges to work site but excluding all taxes etc., completed as directed by the departmental authorities.

1500

-

1085595

... More
Physical Infrastructure for Package RT Package 1;Manufacture, Supplying and delivery of 200 mm Dia. HDPE Pipes of Pressure 6.00 Kg./Sq.Cm. conforming to IS.4984-2016 including transportation charges to work site but excluding all taxes etc., completed as directed by the departmental authorities.

800

-

900736

... More
Physical Infrastructure for Package RT Package 1;Manufacture, Supplying and delivery of OD 90 mm Dia. HDPE Pipes of Pressure 8.00 Kg./Sq.Cm. conforming to IS.4984-2016 including transportation charges to work site but excluding all taxes etc., completed as directed by the departmental authorities.

336

-

86274.72

... More
Physical Infrastructure for Package RT Package 1;Supplying and fixing of approved make Automatic Star Delta Starter of make C&S/Crompton / L&T / Siemens/BCH suitable for 3 Phase, 415-V, 50 Hz Motor Pump set, suitable for 7.50 HP to 12.50 HP automatic Star Delta Starter Motor totally enclosed with over load protection and No-volt relay to complete including cost and conveyance of all materials to work site, Transportation and all labour charges etc., complete and as directed by the Departmental authorities

6

-

110587.14

... More
Physical Infrastructure for Package RT Package 1;Supply and Erection of PANEL MOUNTING 125-A, 4 Pole, 25-KA, MCCB adjustable of make L&T/Schneider/ Siemens/Legrand/Hager confirms to IS/IEC 60847-2 having breaking capacity 35/36-KA with Thermal Magnetic setting/ Microprocessor based release arrangement with all connections etc., complete on existing Panel Board including cost and conveyance of all materials to work site and all labour charges etc., complete as directed by the departmental Authorities.

6

-

74305.86

... More
Physical Infrastructure for Package RT Package 1;Supply and run of 4 of 56/0.3mm (4.00Sq.mm) FR P.V.C. insulated flexible copper cableFRLS/FRLS-H/HFFR/ ZHFR PVC insulated 1100V grade as per IS.694/1990 specification for Copper Cable of Category-II of make V-Guard/Bonton /Finecab/ HPL / Million /Fortune Art / Sudhakar/Orbit/ Tamra/ Anchor/Plaza/ Vihan/Ollvin/Laser/Beljin/Rhino/ Standard / Vimal etc., including cost of cable, all materials and labour charges for fixing etc., complete as directed by the Department authorities.

1170

-

253246.5

... More
Physical Infrastructure for Package RT Package 1;Supply and Transportation of 5 HP, 5-10 Stage, 5 star rated vertical Submersible Motor Pumpset, confirming to IS.8034 and motor confirming to IS.9283 with water proof winding, Pump shall be suitable for various delivery Head and dischage with stainless steel shaft, Motor suitable for working on 415V (+)/(-) 10%, Three Phase 50 Hz AC supply, etc., complete for 6" Bore Well. Makes: Kirloskar/Crompton/Texmo/ CRI/KSB/Lubi/PSG/ Aryen Varsha

6

-

279510.6

... More
Physical Infrastructure for Package RT Package 1;Geological Survey charges excluding taxes for Plain Area

6

-

7800

... More
Physical Infrastructure for Package RT Package 1;Supply & Fixing of 180mm dia. PVC Bore Cap

6

-

1890

... More
Physical Infrastructure for Package RT Package 1;180mm dia. PVC Casing pipe perforation charge

366

-

125172

... More
Physical Infrastructure for Package RT Package 1;Cost and supply of 175 mm dia. PVC blue casing pipe including transportation to the work site.

366

-

422730

... More
Physical Infrastructure for Package RT Package 1;Drilling of Bore hole (which may be carried out by pilot bore hole) to a finished dia of 200/225/300 /350/450 mm hole (for insertion of 110/140/160/180/200mm PVC Pipe/175/200mm PVC Blue casing pipe) by Rotary drilling rig in all formations suitable for Rotary drilling such as alluvium, Loamy, clayey, sandy, burled channels, highly disturbed and bouldary zones high sheared and fractured zones followed by jointed to massive soft, medium rock, all formations typical and suitable for rotary drilling etc. including insertion of casing pipe , couplings, cap, plug fixation, and including filling the peripheral gap with rebuIlled pebbled gravel packing, bore development, conducting yield test, and all other required in the fixation of pipes assembly etc. but excluding the cost of casing pipe, couplings, dummys, damps etc., as recommended by the departmental Geologist. The bore should be developed with compressor air until clear water free from sand and other materials continuously discharged. The size of gravel used for gravel packing should be as per 1SI specification used for rotary tube well. The pebbled gravel acking should be carried out in such a way that the theoretical quantity consumed completely.

366

-

497760

... More
Physical Infrastructure for Package RT Package 1;Painting to new walls with approved water proof cement paint 2 coats over priming coat with approved exterior grade cement making 3 coats all colours including cost of priming coat and cost and conveyance of all materials, labour charges etc; complete for finished item of work as directed by the departmental authorities

64.61

-

16916.19

... More
Physical Infrastructure for Package RT Package 1;Painting to New wood work with primer and two coats with Synthetic enamel paint in all shades of Grade-I aprpoved brand and colour including cost and conveyance of all materials to work site and all operational, incidential and all labour charges such as sand paper, cleaning the surface, cost of brushes etc., complete for finished item of work as directed by the department (Three coats).

1.78

-

364.22

... More
Physical Infrastructure for Package RT Package 1;Plastering 12mm thick in CM(1:4)Prop. with sponge finishing including cost and conveyance of all materials and water to site of work and all operational, incidental charges, scaffolding charges, hacking surface and all labour charges, curing etc., complete for finished item of work to the as directed by the department for EXTERNAL WALLS.

64.61

-

26707.84

... More
Physical Infrastructure for Package RT Package 1;Plastering 12mm thick in CM(1:3)Prop. with sponge finishing including cost and conveyance of all materials and water to site of work and all operational, incidental charges, scaffolding charges, hacking surface and all labour charges, curing etc.,complete for finished item of work to as directed by the dept.,for CEILING

7.5

-

3159.3

... More
Physical Infrastructure for Package RT Package 1;Supply and fixing to Cement JALLIES 40mm thick including cost and conveyance of all materials and water to work site and all operational, incidental charges, fixing, laying and all labour charges, curing etc., complete for finished item of work as directed by the department.

0.36

-

105.12

... More
Physical Infrastructure for Package RT Package 1;2'-0"x 4'-0" Window::- Providing and Fixing of openable windows made of Pre-painted steel (base steel as per IS 513 of 0.58mm thick Galvanized as per IS 277 with zinc of 120 GSM ) primer coated with epoxy primer of 5-7 microns thick. finish painted with a polyester paint of 12-16 microns thick and back coated with 5-7 microns thick alkyd backer and section for outer frame of 48 x 50mm, centre mullion of 48 x 50 mm section for shutter of 48 x 25 mm and the fixed glass beading section should be 12 x 12mm and the outer frame and mullions to have rebate for glazed shutter with a 20mm provision for guard bars/grills and the sections cut to length metre joined with corner bracket, centre mullion fixed with mullion cap, handle, stay, 2 nos. of stairless steel heavy duty pivot hinges provided per shutter and windows fitted with 5mm thick plain float glass with rubber gaskets including fixing the frames in concrete/masonry wall by means of self expanding screws, including 10mm square guard bars with 6" (152.4mm) pitch etc., complete for finished item of work. (Single shutter window 2'0" x 4'0" (609.6mm x 1219.2mm). Outer frame section size of 48 x 50mm shutter frame section size of 48 x 25mm.

1

-

3522.84

... More
Physical Infrastructure for Package RT Package 1;Door of size 3?-0? x 6?-6?:- Providing and fixing Door Frames fabricated from sections made of galvanized Stell powder coated (base steel as per IS-513, galvanized as per IS-277 with zinc of 120 grams/square meter), the factory made section are powder coated with pure polyester powder of 50-60 microns thick with total coated thickness of 1.25mm, size of Door Frame section of 105x60mm with a rebate of 38mm to accommodate 35mm thick Door Shutter with groove to insert gasket in the frame section, frame sectiion filled with polyurethane foam, cut to length and joined by way of welding each frame provided with :: (a) 2mm thick MS powder coated butt hinges of 100mm long - 3 Nos for Single Shutter, 6 Nos., for double shutter (b) CRCA electroplates stiffeners of 6 Nos - 3 in each vertical (c) 40mm x 200mm x 1.20mm hold fasts screwd to stiffeners - 6 Nos. with split end tail (d) Nylon Aldrops Receiver - 1 No. for Single shutter frame (e) Tie Road - 1 No. and supplying and fixing of Single Leaf Flush Door Shutter Solid bond Wood black Board type with Commercial ply on both faces of 30mm thick conforming to IS.2202 including cost of fixtures such as (i) 2 Nos.-250mm long M.S.powder coated Aldrops, (ii) 1 No.-250mm long 10mm Dia. M.S.Powder Coated Tower Bolt, (iii) 2 Nos.-125mm long M.S.powder coated Door Handles and (iv) 1 No. M.S.Powder coated Door Stopper and including cost and conveyance of all materials to work site and all labour charges etc., complete as directed by the department.

1

-

7838.54

... More
Physical Infrastructure for Package RT Package 1;Providing High Yield Strenth Deformed (HYSD)/Thermo Mechanically Treated (TMT) Steel bars ( Fe.500 grade as per IS1786 and as amended upto date) of different of diameters for RCC works, including labour charges for srraightening,cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-spacing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of steel bars, all wastage, such as over laps, couplings, chairs, spacer bars, binding wire,cover blocks and all incidental, Operational labour charges such as cutting, bending,placing in position, tying etc., complete for finished item of work as directed by the Departmental authorities

0.29

-

25052.13

... More
Physical Infrastructure for Package RT Package 1;VRCC M20 grade design mix concrete corresponding to IS-456 using CONCRETE MIXER / WEIGH BATCHER at site with stone aggregate of 20 mm graded size hard broken granite machine crushed metal mechanically mixed with necessary reinforcement including cost and conveyance of all materials and water to work site and all operational, incidental, labour charges, centering charges such as Steel Scaffolding Pipes, Jack Props, Steel Centering Plates, etc., mixing concrete, transportation, pumping of concrete,laying , levelling, curing etc., as per standard specifications but excluding cost of steel and its fabrication charges for finished item of work to the required strength as directed by the department for CHAJJAS (Sunshades) of average 50 mm thick (60mm thick at fixed end and 40mm thick at free end) including Plastering 12mm thick single coat in CM(1:5) Prop. and finished to average thickness of 50mm.For Chajjas

0.48

-

6570.22

... More
Physical Infrastructure for Package RT Package 1;VRCC M20 grade design mix concrete corresponding to IS-456 using CONCRETE MIXER / WEIGH BATCHER at site with stone aggregate of 20 mm graded size hard broken granite machine crushed metal mechanically mixed with necessary reinforcement including cost and conveyance of all materials and water to work site and all operational, incidental, labour charges, centering charges such as Steel Scaffolding Pipes, Jack Props, Steel Centering Plates, etc., mixing concrete, transportation, pumping of concrete,laying , levelling, curing etc., as per standard specifications but excluding cost of steel and its fabrication charges for finished item of work to the required strength as directed by the department for LINTELS.

0.07

-

958.16

... More
Physical Infrastructure for Package RT Package 1;Brick Masonry in C.M.(1:6) Prop. with Fly Ash cement solid blocks in size 290x225x140mm of IS-12894-1990 class-5 manufacturing with compressive strength of 50 Kg/Sq.cm using fly ash, cement, gypsum and stone dust including cost and conveyance of all materials and water to work site, scaffolding and all labour charges,curing etc.,complete as directed by the Departmental Authorities. for Superstructure Walls (Main Walls).

7.42

-

50746.57

... More
Physical Infrastructure for Package RT Package 1;Providing Impervious coat Plastering to exposed RCC Slab surface with CM(1:3) Prop.20mm thick mixed with approved water proofing compound @ 1 Kg/bag of cement and laid over roof when the slab is green and fine rendering with cement slurry including cost & conveyance of all materials and water to work site and all operational, incidental charges, labour charges for mixing mortar, laying rendering smooth and thread lining, curing, rounding of junctions of walls and slab etc., complete for finished item of work as directed by the departmental authorities

12.54

-

7513.72

... More
Physical Infrastructure for Package RT Package 1;VRCC M20 grade design mix concrete corresponding to IS-456 using CONCRETE MIXER / WEIGH BATCHER at site with stone aggregate of 20 mm graded size hard broken granite machine crushed metal mechanically mixed with necessary reinforcement including cost and conveyance of all materials and water to work site and all operational, incidental, labour charges, centering charges such as Steel Scaffolding Pipes, Jack Props, Steel Centering Plates, etc., mixing concrete, transportation, pumping of concrete,laying , levelling, curing etc., as per standard specifications but excluding cost of steel and its fabrication charges for finished item of work to the required strength as directed by the department for ROOF SLABS.

1.4

-

18989.22

... More
Physical Infrastructure for Package RT Package 1;VRCC M20 grade design mix concrete corresponding to IS-456 using CONCRETE MIXER / WEIGH BATCHER at site with stone aggregate of 20 mm graded size hard broken granite machine crushed metal mechanically mixed with necessary reinforcement including cost and conveyance of all materials and water to work site and all operational, incidental, labour charges, centering charges such as Steel Scaffolding Pipes, Jack Props, Steel Centering Plates, etc., mixing concrete, transportation, pumping of concrete,laying , levelling, curing etc., as per standard specifications but excluding cost of steel and its fabrication charges for finished item of work to the required strength as directed by the department for ROOF BEAMS.

0.63

-

7953.06

... More
Physical Infrastructure for Package RT Package 1;VRCC M20 grade design mix concrete corresponding to IS-456 using CONCRETE MIXER / WEIGH BATCHER at site with stone aggregate of 20 mm graded size hard broken granite machine crushed metal mechanically mixed with necessary reinforcement including cost and conveyance of all materials and water to work site and all operational, incidental, labour charges, centering charges such as Steel Scaffolding Pipes, Jack Props, Steel Centering Plates, etc., mixing concrete, transportation, pumping of concrete,laying , levelling, curing etc., as per standard specifications but excluding cost of steel and its fabrication charges for finished item of work to the required strength as directed by the department for VRCC COLUMNS.

0.92

-

12708.94

... More
Physical Infrastructure for Package RT Package 1;VRCC M20 grade design mix concrete corresponding to IS-456 using CONCRETE MIXER / WEIGH BATCHER at site with stone aggregate of 20 mm graded size machine crushed hard granite metal mechanically mixed with necessary reinforcement including cost and conveyance of all materials and water to work site and all operational, incidental, labour charges, centering charges such as casurina ballies, bamboos, wooden reapers, runners, wood posts, Wall Plates, Steel centering plates etc., mixing concrete, transportation, pumping of concrete,laying,levelling, curing etc., as per standard specifications but excluding cost of steel and its fabrication charges etc., for finished item of work to the required strength as directed by the dept., for VRCC PLINTH BEAMS.

0.63

-

8222.34

... More
Physical Infrastructure for Package RT Package 1;VRCC M20 grade Design Mix concrete corresponding to IS-456 using CONCRETE MIXER / WEIGH BATCHER at site with stone aggregate of 20 mm graded size Machine hard broken granite machine crushed metal mechanically mixed with necessary reinforcement including cost and conveyance of all materials and water to work site and all operational, incidental, labour charges, Centering charges such as casurina ballies, bamboos, wooden reapers, runners, wood posts, wall plates, steel centering plates etc., mixing concrete, transportation pumping concrete, laying, levelling, curing etc., as per standard specifications but excluding cost of steel and its fabrication charges etc., for finished item of work to the required strength as directed by the dept.,for Footings

0.49

-

5014.95

... More
Physical Infrastructure for Package RT Package 1;Laying PCC work of mix (1:4:8) Prop.using 40mm gauge hard broken granite machine crushed metal including cost and conveyance of all materials and water to worksite and all operational, incidental, labour charges, machine mixing, laying, levelling, tamping, curing,etc., complete as directed by the Departmental authorities for Levelling course for PUMP HOUSE

1.15

-

5682.44

... More
Physical Infrastructure for Package RT Package 1;Filling with Sand for Foundations with initial lead in layers not exceeding 15 Cm. thick consolidating each deposited layer by watering and ramming including cost and conveyance of all materials and water to work site and all operational, incidental charges and all labour charges, hire charges of T&P etc., complete for finished item of work and as directed by the Departmental Authorities.

7.76

-

5513.27

... More
Physical Infrastructure for Package RT Package 1;Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH as directed by the Departmentalal Authorities

6.4

-

765.95

... More
Physical Infrastructure for Package RT Package 1;Providing Independent Earthing from Main switch Board for earth continuity with No.8, G.I wire including excavation of earth in all soils upto 5'-6'' depth below ground level of section 5'x2'x3' duly providing 40mm Dia G.I Pipe of 2mts, length using GI bolts&nuts and fixing earth wire including supply and fixing 1'-6'' dia 0'-8'' depth hume pipe ring and refilling the pit with 40 Kgs hard coke, 20Kgs salt and excavated earth including all labour charges etc., complete for finished item of work and as directed by the Departmental authorities

1

-

4422.29

... More
Physical Infrastructure for Package RT Package 1;Supplying and fixing of 25mm Dia. Nominal Bore G.I. Pipe Medium Grade properties and weight as per IS.1239 with fittings such as elbows, tees, couplings, nipples, plugs including excavation for trenches and refilling the trenches complete except for G.I. bends, unions and GI connectors with checkout and socket of Tata/Zenith make or equivalent etc., complete including cost and conveyance of all materials to work site, Transportation and all labour charges etc., complete. for sump railings and inside and outside ladders and as directed by the Departmental authorities

105

-

32209.85

... More
Physical Infrastructure for Package RT Package 1;Supplying and fixing of 100mm Dia. B class G.I. Pipe properties and weight as per IS.1239 with fittings such as elbows, tees, couplings, nipples, plugs including excavation for trenches and refilling the trenches complete except for G.I. bends, unions and GI connectors with checkout and socket of Tata/Zenith make or equivalent etc., complete including cost and conveyance of all materials to work site, Transportation and all labour charges etc., complete for connecting Motor at Sump to Panel Board and as directed by the Departmental authorities

30

-

25972.39

... More
Physical Infrastructure for Package RT Package 1;Supplying and fixing of approved make Automatic Star Delta Starter of make C&S/Crompton / L&T / Siemens/BCH suitable for 3 Phase, 415-V, 50 Hz Motor Pump set, suitable for 7.50 HP to 12.50 HP automatic Star Delta Starter Motor totally enclosed with over load protection and No-volt relay to complete including cost and conveyance of all materials to work site, Transportation and all labour charges etc., complete and as directed by the Departmental authorities

2

-

36862.38

... More
Physical Infrastructure for Package RT Package 1;Supply and Erection of PANEL MOUNTING 125-A, 4 Pole, 25-KA, MCCB adjustable of make L&T/Schneider/ Siemens/Legrand/Hager confirms to IS/IEC 60847-2 having breaking capacity 35/36-KA with Thermal Magnetic setting/ Microprocessor based release arrangement with all connections etc., complete on existing Panel Board including cost and conveyance of all materials to work site and all labour charges etc., complete as directed by the departmental Authorities.

2

-

24768.6

... More
Physical Infrastructure for Package RT Package 1;Supply and run of 4 of 56/0.3mm (4.00Sq.mm) FR P.V.C. insulated flexible copper cableFRLS/FRLS-H/HFFR/ ZHFR PVC insulated 1100V grade as per IS.694/1990 specification for Copper Cable of Category-II of make V-Guard/Bonton /Finecab/ HPL / Million /Fortune Art / Sudhakar/Orbit/ Tamra/ Anchor/Plaza/ Vihan/Ollvin/Laser/Beljin/Rhino/ Standard / Vimal etc., including cost of cable, all materials and labour charges for fixing etc., complete as directed by the Department authorities.

50

-

10822.5

... More
Physical Infrastructure for Package RT Package 1;Supply and erecting 3 Phase, 10.00 HP ISI make submersible pumpset confirming to IS 14220 : 1994 of Makes: Kirloskar / Crompton / Texmo / CRI / KSB/Lubi /PSG/ AryenVarsha of suitable for erection in open well with water resistant dynamically balanced impeller with stainless steel shaft sleeves, pump coupling and pivot with squirrel cage Induction Motor of 3 phase, 415V, 50Hz.., A.C.Supply, heavy copper windings with water proof insulation and high precision strength not to be effected by chemicals in water with suitable bronze bearings, 10 HP pump erected with necessary H-type clamps of suitable size and strength including cost of all materials, Transportation and labour charges etc., complete and as directed by the Departmental authorities

2

-

96123.98

... More
Physical Infrastructure for Package RT Package 1;Supplying and fixing of RCC Cover of 22" Dia. of 3" thick with nominal reinforcement as directed by the department and hooks for lifting including cost and conveyance of all materials to work site and operational, incidental and all labour charges for fixing charges etc., complete for finiahed item of work as directed by the departmental authorities

2

-

1506.54

... More
Physical Infrastructure for Package RT Package 1;Painting to new walls with approved water proof cement paint 2 coats over priming coat with approved exterior grade cement making 3 coats all colours including cost of priming coat and cost and conveyance of all materials, labour charges etc; complete for finished item of work as directed by the departmental authorities

51.81

-

13564.89

... More
Physical Infrastructure for Package RT Package 1;Providing Impervious coat Plastering to exposed RCC Slab surface with CM(1:3) Prop.20mm thick mixed with approved water proofing compound @ 1 Kg/bag of cement and laid over roof when the slab is green and fine rendering with cement slurry including cost & conveyance of all materials and water to work site and all operational, incidental charges, labour charges for mixing mortar, laying rendering smooth and thread lining, curing, rounding of junctions of walls and slab etc., complete for finished item of work as directed by the departmental authorities

126.18

-

75604.53

... More
Physical Infrastructure for Package RT Package 1;Providing High Yield Strenth Deformed (HYSD)/Thermo Mechanically Treated (TMT) Steel bars ( Fe.500 grade as per IS1786 and as amended upto date) of different of diameters for RCC works, including labour charges for srraightening,cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-spacing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of steel bars, all wastage, such as over laps, couplings, chairs, spacer bars, binding wire,cover blocks and all incidental, Operational labour charges such as cutting, bending,placing in position, tying etc., complete for finished item of work as directed by the Departmental authorities

3.63

-

308467.24

... More
Physical Infrastructure for Package RT Package 1;Supply and placing of the Design Mix Concrete M30 grade for RCC works corresponding to IS 456 using Concrete MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water to site, all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete with minimum cement content as per IS code from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges and seignorage charges for finished item of work and as directed by the Departmental authorities. for GLSR TOP DOME SLABS.

2.81

-

49658.43

... More
Physical Infrastructure for Package RT Package 1;Supply and placing of the Design Mix Concrete M30 grade for RCC works corresponding to IS 456 using Concrete MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water to site, all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete with minimum cement content as per IS code from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges and seignorage charges for finished item of work and as directed by the Departmental authorities. for GLSR TOP RING BEAM.

1.71

-

22058.59

... More
Physical Infrastructure for Package RT Package 1;Supply and placing of the Design Mix Concrete M30 grade for RCC works corresponding to IS 456 using Concrete MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water to site, all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete with minimum cement content as per IS code from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges and seignorage charges for finished item of work and as directed by the Departmental authorities. for GLSR SIDE WALLS.

13.83

-

238312.75

... More
Physical Infrastructure for Package RT Package 1;Supply and placing of the Design Mix Concrete M30 grade for RCC works corresponding to IS 456 using Concrete MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water to site, all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete with minimum cement content as per IS code from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges and seignorage charges for finished item of work and as directed by the Departmental authorities. for GLSR BOTTOM SLABS.

11.86

-

93141.68

... More
Physical Infrastructure for Package RT Package 1;Laying PCC work of mix (1:4:8) Prop.using 40mm gauge hard broken granite machine crushed metal including cost and conveyance of all materials and water to worksite and all operational, incidental, labour charges, machine mixing, laying, levelling, tamping, curing,etc., complete as directed by the Departmental authorities for Levelling course for GLSR.

7.54

-

37257.03

... More
Physical Infrastructure for Package RT Package 1;Filling with Sand for Foundations with initial lead in layers not exceeding 15 Cm. thick consolidating each deposited layer by watering and ramming including cost and conveyance of all materials and water to work site and all operational, incidental charges and all labour charges, hire charges of T&P etc., complete for finished item of work and as directed by the Departmental Authorities.

7.54

-

5356.97

... More
Physical Infrastructure for Package RT Package 1;Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH as directed by the Departmentalal Authorities

135.65

-

16234.59

... More
Physical Infrastructure for Package RT Package 1;Constuction of OHSR / ELSR of 500 KL capacity with staging of 22Mts. including fixtures and all the Concrete members shall be designed with M30 grade design mix with Raft Footings including 3 Coats of eppoxy paint food grade of best quality to inner surface of reservoir including roof and 2 Coats of weather proof emulsion painting for external surfaces, lettering, all required fixtures, Pipes, Bends,Valves etc., for pipe connections excluding cost of pipes Bends and Valves as per departmental designs and drawings but including cost and conveyance of all materials to work site and the above rate inclusive of following fixtures: A. RCC or Aluminum ladder inside 0.60 m wide B. Doglegged stair case shall be provided with stair case flight with of 1.2m and landing width of 1.2m with SS railing upto 1m height C. Providing lightening arrester including conductor and earthing etc., complete-1No's D. RCC Ventilators with copper or Stainless steel fly proof Mesh E. DI Manhole frame and cover 0.6 X 0.6m as per IS specfications(Light duty)-2No's. F.Water level indicator of good quality with abonite/Copper float approved pattern-1.No's G. The Railing provided to gallery and staircase shall be with stainless steel of grade 304 for height of 1.2m H. The Dog Legged staircase shall be enclosed with Brick/CRS Wall on 3 sides and front side with MS collapsable gate upto 1st brace level from ground level. I.DI Swan neck ventilators in topdome and slab. I.DI Swan neck ventilators in topdome and slab. Compount wall : Construction of compound wall including ornamental M.S. gate of size 3.0x2.40 Mts. is included in the basic rate of ELSRs. Length of compount wall hass be minimum of 150 Mts. min., height of the compount wall shall be 1.80 Mts. above plinth and thickness 230mm in brick masonry in CM(1:6)Prop. The Compound wall shall be constructed including earth work excavation in all type of soils, for Plinth Beam of 230x300mm and 0.75X0.75X1.20 Mts. size for column footing portion. The footing shall be 0.75X0.75X0.25 Mts. in VRCC M20 grade constructed over a CC(1:4:8) Porp bed of 100mm thick. The column shall be 230x230mm in size with VRCC M20 grade at 3.00M c/c spacing having depth of 1.20 M below Gound level and height of 2.0 M above GL. The Plinth Beam Size 230x300mm shall be constructed in VRCC M20 grade in GL over a bed of CC (1:4:8) 100mm thick. 450x450mm size columns M 20 grade shall be constructed for Gate Pillors. The Tie Beam shall be provided obove the Brick Work with 230 X 200 MM size fixed with MS angulars of 25x25x4mm in Y Shape to height of 0.60 M with embeded length of 150mm in concrete the barbed wire fencing with 3 ply 18 guage shall be stretched in 4 rows 2X2 plastering shall be done with 16 mm thick in two coats base coat 12mm thick in CM (1:6) Prop and 4mm thick CM (1:4) Prop on both side of Brick Work. Snow cem paint in two coats shall be provided for both side of wall. The M.S. ornamental Gate as directed by the department shall be provided with minimum of 3.60Mwidth 2.40M heigth with enamel paint . Yard lighting shall be arranged on four corners of compound wall. STAFF QUARTER: Staff quarter should constructed for a minimum plinth area of 40 Sqm with the following specifications: RCC framed structure with concrete grade not less M20 grade design mix at the location Specified by the Department at thetime of execution with Verandah, Hall, Bed Room, Kitchen and Bath and WC with floor area of 40 Sqm excluding Balconies and Stair Case. MS Hallow frame with cold rolled processed stell sheet 1.20 mm thick bright CRCA confirming IS: 4351/76 Flush Door shutter with solid bond wood door shall be provided. NCL windows centre fixed both sides openable shutter window 1.35 X 1.35 M outer frame section 40X50 mm shutter frame section with a size of 48X20mm mullion section of size 48X50mm fixed beeding section of 12x12mm shall be provided Flooring with polished cuddapah stone shall be provided wall shall be provided with snow cem paint in coats over primary coat . Electrical and water supply arrangement shall be provided as directed by the dept. Water storage Tank made with Plastic/Polymer material of reputed make with necessary out let and inlet connection pipes shall be provided and Septic Tank for 5 users shall be provided as specified by the department.

500000

-

12120000

... More
Physical Infrastructure for Package RT Package 1;Providing High Yield Strenth Deformed (HYSD)/Thermo Mechanically Treated (TMT) Steel bars ( Fe.500 grade as per IS1786 and as amended upto date) of different of diameters for RCC works, including labour charges for srraightening,cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-spacing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of steel bars, all wastage, such as over laps, couplings, chairs, spacer bars, binding wire,cover blocks and all incidental, Operational labour charges such as cutting, bending,placing in position, tying etc., complete for finished item of work as directed by the Departmental authorities

1.57

-

133414.2

... More
Physical Infrastructure for Package RT Package 1;Supply and placing of the Design Mix M 20 Grade Concrete for RCC works corresponding to IS 456 using CONCRETE MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete with minimum cement content as per IS code from standard suppliers approved by the department and also including centering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work as per directed by the Departmental authorities for Culvert slab.

26.21

-

188739

... More
Physical Infrastructure for Package RT Package 1;P.C.C. work of mix M15 (1:2.5:5) Prop.20 mm Graded hard broken granite machine crushed graded metal incluidng cost and conveyance of all materials and water to work site and all labour charges, and all operational charges incidental machine mixing charges, laying, curing etc., complete including formwork/ centering charges, as directed by the Departmental authorities for Culvert walls.

23.4

-

202666.93

... More
Physical Infrastructure for Package RT Package 1;P.C.C. work of mix M15 (1:2.5:5) Prop.20 mm Graded hard broken granite machine crushed graded metal incluidng cost and conveyance of all materials and water to work site and all labour charges, and all operational charges incidental machine mixing charges, laying, curing etc., complete as directed by the Departmental authorities for Culvert bed.

11.7

-

71516.37

... More
Physical Infrastructure for Package RT Package 1;Laying PCC work of mix (1:4:8) Prop.using 40mm gauge hard broken granite machine crushed metal including cost and conveyance of all materials and water to worksite and all operational, incidental, labour charges, machine mixing, laying, levelling, tamping, curing,etc., complete as directed by the Departmental authorities for Levelling course for Culverts.

11.7

-

57812.63

... More
Physical Infrastructure for Package RT Package 1;Filling with Sand for Foundations with initial lead in layers not exceeding 15 Cm. thick consolidating each deposited layer by watering and ramming including cost and conveyance of all materials and water to work site and all operational, incidental charges and all labour charges, hire charges of T&P etc., complete for finished item of work and as directed by the Departmental Authorities.

17.55

-

12468.81

... More
Physical Infrastructure for Package RT Package 1;Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH as directed by the Departmentalal Authorities

17.55

-

2100.38

... More
Physical Infrastructure for Package RT Package 1;Providing High Yield Strenth Deformed (HYSD)/Thermo Mechanically Treated (TMT) Steel bars ( Fe.500 grade as per IS1786 and as amended upto date) of different of diameters for RCC works, including labour charges for srraightening,cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-spacing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of steel bars, all wastage, such as over laps, couplings, chairs, spacer bars, binding wire,cover blocks and all incidental, Operational labour charges such as cutting, bending,placing in position, tying etc., complete for finished item of work as directed by the Departmental authorities

16.56

-

1407222.43

... More
Physical Infrastructure for Package RT Package 1;RCC M- 20 Design mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site including all operational, incidental and labour charges such as machine mixing, laying concrete, curing,centering and shuttering etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, and as directed by the Departmental authorities for precast slab for drain.

414

-

2981226.42

... More
Physical Infrastructure for Package RT Package 1;Construction of un-reinforced, design mix M 30 grade cement concrete pavement, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity using concrete mixer laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle vibrator and finished in continuous operation including Cost and conveyance of all materials, all hire and operational charges of T&P etc., curing of concrete slabs for 14- days as per Design & drawing and Technical Specification Clause 1501 MORD.(As per APDSS and as directed by the Departmental Authorities) for Block Approaches.

190.8

-

1296621.47

... More
Physical Infrastructure for Package RT Package 1;P.C.C. work of mix M15 Prop. (1:2.5:5) 20 mm Graded hard broken granite machine crushed graded metal incluidng cost and conveyance of all materials and water to work site and all labour charges, and all operational charges incidental machine mixing charges, laying, curing etc., complete as directed by the Departmental authorities for Drain walls (1:2.5:5)

1086.4

-

9409288.67

... More
Physical Infrastructure for Package RT Package 1;P.C.C. work of mix M15 Prop.(1:2.5:5) 20 mm Graded hard broken granite machine crushed graded metal incluidng cost and conveyance of all materials and water to work site and all labour charges, and all operational charges incidental machine mixing charges, laying, curing etc., complete as directed by the Departmental authorities for Drain bed.

712

-

4352107.12

... More
Physical Infrastructure for Package RT Package 1;Laying PCC work of mix (1:4:8) Prop.using 40mm gauge hard broken granite machine crushed metal including cost and conveyance of all materials and water to worksite and all operational, incidental, labour charges, machine mixing, laying, levelling, tamping, curing,etc., complete as directed by the Departmental authorities for Levelling course for Drains.

807.4

-

3989565.25

... More
Physical Infrastructure for Package RT Package 1;Filling with Sand for Foundations with initial lead in layers not exceeding 15 Cm. thick consolidating each deposited layer by watering and ramming including cost and conveyance of all materials and water to work site and all operational, incidental charges and all labour charges, hire charges of T&P etc., complete for finished item of work and as directed by the Departmental Authorities.

1068

-

758785.52

... More
Physical Infrastructure for Package RT Package 1;Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH as directed by the Departmentalal Authorities

4616

-

552442.88

... More
Physical Infrastructure for Package RT Package 1;Plastering in CM(1:4)Prop. 1/2" (12mm) thick in single coat with sponge finishing including cost and conveyance of all materials and water to work site and all operational, incidental, seigniorage and all labour charges,curing etc.,complete as directed by the Departmental authorities for Protection Walls and Retaining Walls.

3982.23

-

1646134.42

... More
Physical Infrastructure for Package RT Package 1;Filling with Gravel in trenches sides of foundations and Basements with initial lead in layeing not excuding 15cms thick consolidating each deposited layer by watering and ramming includings cost and conveyanced water to work site and all operational, incidental, labour charges, hire charges & T& P etc., complete as directed by the Departmental authorities for finished item of work for filling Basements. (APSS No.309 & 310)

8395.35

-

2862604.47

... More
Physical Infrastructure for Package RT Package 1;Brick Masonry in C.M.(1:6) Prop. with Fly Ash cement solid blocks in size 290x225x140mm of IS-12894-1990 class-5 manufacturing with compressive strength of 50 Kg/Sq.cm using fly ash, cement, gypsum and stone dust including cost and conveyance of all materials and water to work site, scaffolding and all labour charges,curing etc.,complete as directed by the Departmental authorities for Protection Walls

1132.18

-

7743160.17

... More
Physical Infrastructure for Package RT Package 1;Laying PCC work of mix (1:4:8) Prop.using 40mm gauge hard broken granite machine crushed metal including cost and conveyance of all materials and water to worksite and all operational, incidental, labour charges, machine mixing, laying, levelling, tamping, curing,etc., complete as directed by the Departmental authorities for Levelling course for Drains.

226.44

-

1118896.65

... More
Physical Infrastructure for Package RT Package 1;Filling with Sand for Foundations with initial lead in layers not exceeding 15 Cm. thick consolidating each deposited layer by watering and ramming including cost and conveyance of all materials and water to work site and all operational, incidental charges and all labour charges, hire charges of T&P etc., complete for finished item of work and as directed by the Departmental Authorities.

226.44

-

160879.58

... More
Physical Infrastructure for Package RT Package 1;Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH as directed by the Departmentalal Authorities

1144.98

-

137031.21

... More
Physical Infrastructure for Package RT Package 1;Painting to kerb with approved Synthetic enamel paint 2 coats over priming coat with approved exterior grade cement making 3 coats in all colours including cost and conveyance of all materials, labour charges etc; complete for finished item of work (APSS No. 912)and as directed by the Department authorities

4800

-

1640304

... More
Physical Infrastructure for Package RT Package 1;Manufacture,supply and delivery of unplasticised 160mm dia PVC pipes for potable water supplies conforming to IS:4985/2000 include of transportation to the sub divisional stores anywhere in AP exculding excise duty and sales tax etc., (4kg/cm2)

700

-

380156

... More
Physical Infrastructure for Package RT Package 1;Construction of cement concrete kerb with top and bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade PCC on M-10 grade foundation 150 mm thick, foundation having 50 mm projection beyond kerb stone, kerb stone laid with kerb laying machine, foundation concrete laid manually, all complete as per clause 408 MORTH

8000

-

2863920

... More
Physical Infrastructure for Package RT Package 1;Providing Mild Steel Round bars ( Dowel bars) including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position of approved materials and size as per approved designs and drawings including cost and conveyance of steel bars, all wastage, and all incidental, Operational labour charges such as cutting, bending,placing in position,etc., complete and as directed by the Departmental authorities for CC pavement.

6.42

-

519776.36

... More
Physical Infrastructure for Package RT Package 1;Construction of un-reinforced, dowel jointed at expansion and construction joint only, Design Mix M30 Grade cement concrete pavement, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity using concrete mixcer , laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle vibrator and finished in continuous operation including Cost and conveyance of all materials, all hire and operational charges of T&P etc., provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days as per design & drawing and Technical Specification Clause 1501 MORD excluding cost of Mild steel round bars(dowel bars) as directed by the Departmental Authorities for Main Roads.

3637.68

-

26019197.36

... More
Physical Infrastructure for Package RT Package 1;Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with Vibratory Roller 80-100 kN weight to achieve the desired density including Cost and conveyance of all materials, all hire and operational charges of T&P etc., lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD / MORTH. as directed by the Departmental Authorities.

4062.28

-

9549689.07

... More
Physical Infrastructure for Package RT Package 1;Construction of granular sub-base by providing well graded material for grading-III spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with Vibratory Roller to achieve the desired density, complete as per Technical Specification Clause 401 MORD / MORTH.(CBR Value Minimum 30) including Cost and conveyance of all materials, all hire and operational charges of T&P etc., complete for finished item of work as directed by the Departmental Authorities

3323.43

-

5040014.83

... More
Physical Infrastructure for Package RT Package 1;Forming embankment with 70% of Gravel and 30% of Sand by mechanical means with all leads and lifts including pre-watering of soil at borrow area, removal of top soil, excavation of soils at borrowed area, conveyance of soil, depositing the soils on the embankment, spreading soils, breaking clods, sectioning and consolidation with Vibratory Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H, including Cost and conveyance of all materials, all hire and operational charges of T&P etc., complete for finished item of work as per MoRT&H specification 305 (4th revision) - with a lead beyond 1000m as directed by the Departmental Authorities for Side Berms

7523.43

-

3923694.45

... More
Physical Infrastructure for Package RT Package 1;Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH as directed by the Departmentalal Authorities

3301.94

-

395176.18

... More
Physical Infrastructure for Package RT Package 1;Providing Impervious coat Plastering to exposed RCC Slab surface with CM(1:3) Prop.20mm thick mixed with approved water proofing compound @ 1 Kg/bag of cement and laid over roof when the slab is green and fine rendering with cement slurry including cost & conveyance of all materials and water to work site and all operational, incidental charges, labour charges for mixing mortar, laying rendering smooth and thread lining, curing, rounding of junctions of walls and slab etc., complete for finished item of work as directed by the departmental authorities

100.29

-

45904.59

... More
Physical Infrastructure for Package RT Package 1;Providing and fixing of Openable Windows made of pre-painted steel (Base steel as per IS 513 of 0.58 mm thick galvanized as per IS 277 with Zinc of 120 GSM), primer coated with epoxy primer of 5-7 microns thick, finish painted with a polyester paint of 12-16 microns thick and back coated with 5-7micronsthick alkyd backer and section for outer frame of 48 x 50 mm, centre mullionof 48 x 50 mm, section for shutter of 48 x 25 mm and the fixed glass beadingsection should be 12 x 12 mm and the outer frame and mullions to haverebate for glazed shutter with a 20 mm provision for guard bars/grills and thesections cut to length metre joined with corner bracket, centre mullion fixedwith mullion cap, handle, stay, 2 nos. of stainless steel heavy duty pivot hingesprovided per shutter and windows fitted with 5 mm thick plain float glass withrubber gaskets including fixing the frames in concrete/masonry wall by meansof self expanding screws, Including 10mm Square guard bars with 6?(152.4mm) pitch etc., complete for finished item of work. Centre fixed both side openable shutter window 5?0?x4?0? (1524mm x1219.2mm). Outer frame section size of 72x50mm. Shutter frame section size of 48 x 25 mm. Mullion section size of 72x50mm. Fixed beading section size of 12 x 12 mm.

4.32

-

32516.6

... More
Physical Infrastructure for Package RT Package 1;Painting with synthetic Enamel paint of grade-I in two coats over a primary coat including cost of paint, labour charges etc, complete for finished item of work

20.16

-

2628.06

... More
Physical Infrastructure for Package RT Package 1;Supplying and fixing of Rolling shutter made of 80X 1.25 mm machine rolled lathes including top cover, bearings, and locking arrangements , a coat of red oxide primer etc complete

12

-

47718.36

... More
Physical Infrastructure for Package RT Package 1;Providing two coats of Oil Bound Distemper of approved colour to interior surfaces over one coat primer including cost & conveyance of all materials,labour charges etc., complete

184.07

-

41965.12

... More
Physical Infrastructure for Package RT Package 1;Providing two coats of Snowcem Paint of approved colour to exterior surfaces over one coat primer including cost & conveyance of all materials,labour charges etc., complete

224.67

-

31743.03

... More
Physical Infrastructure for Package RT Package 1;20 mm thick Cement Mortar plastering to external & Interior walls in two coats, first coat of 16mm thick in CM (1:6) and 2nd coat of 4mm in C.M. (1:4) with dubara sponge finishing including making grooves at columns and beams including cost and conveyanance etc., complete.

428.89

-

240642.39

... More
Physical Infrastructure for Package RT Package 1;Brick work in C.M. (1:6) prop using 2nd class well burnt grounded moulded bricks including cost and conveyance of all materials, seigniorage, sales tax on all materials, labour charges, including mortar mixing, scaffolding, laying, curing, finishing including VAT and labour cess.

32.69

-

214355.73

... More
Physical Infrastructure for Package RT Package 1;Providing High Yield Strenth Deformed (HYSD)/Thermo Mechanically Treated (TMT) Steel bars ( Fe.500 grade as per IS1786 and as amended upto date) of different of diameters for RCC works, including labour charges for srraightening,cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-spacing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of steel bars, all wastage, such as over laps, couplings, chairs, spacer bars, binding wire,cover blocks and all incidental, Operational labour charges such as cutting, bending,placing in position, tying etc., complete for finished item of work as directed by the Departmental authorities

13.45

-

1143274.19

... More
Physical Infrastructure for Package RT Package 1;Supply and placing of the Design Mix Concrete M30 grade for RCC works corresponding to IS 456 using Concrete MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water to site, all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete with minimum cement content as per IS code from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges and seignorage charges for finished item of work and as directed by the Departmental authorities. for SUNSHADES.

2.16

-

2482.55

... More
Physical Infrastructure for Package RT Package 1;Supply and placing of the Design Mix Concrete M30 grade for RCC works corresponding to IS 456 using Concrete MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water to site, all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete with minimum cement content as per IS code from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges and seignorage charges for finished item of work and as directed by the Departmental authorities. for CORBEL BEAM

3.15

-

40864.32

... More
Physical Infrastructure for Package RT Package 1;Supply and placing of the Design Mix Concrete M30 grade for RCC works corresponding to IS 456 using Concrete MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water to site, all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete with minimum cement content as per IS code from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges and seignorage charges for finished item of work and as directed by the Departmental authorities. for LINTEL BEAM

0.22

-

3137.46

... More
Physical Infrastructure for Package RT Package 1;Supply and placing of the Design Mix Concrete M30 grade for RCC works corresponding to IS 456 using Concrete MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water to site, all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete with minimum cement content as per IS code from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges and seignorage charges for finished item of work and as directed by the Departmental authorities. for FLOOR BEAM.

4.46

-

57307.48

... More
Physical Infrastructure for Package RT Package 1;Supply and placing of the Design Mix Concrete M30 grade for RCC works corresponding to IS 456 using Concrete MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water to site, all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete with minimum cement content as per IS code from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges and seignorage charges for finished item of work and as directed by the Departmental authorities. for FLOOR SLAB.

27.77

-

290729.68

... More
Physical Infrastructure for Package RT Package 1;Supply and placing of the Design Mix Concrete M30 grade for RCC works corresponding to IS 456 using Concrete MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water to site, all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete with minimum cement content as per IS code from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges and seignorage charges for finished item of work and as directed by the Departmental authorities. for COLUMNS.

3.78

-

54188.76

... More
Physical Infrastructure for Package RT Package 1;Supply and placing of the Design Mix Concrete M30 grade for RCC works corresponding to IS 456 using Concrete MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water to site, all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete with minimum cement content as per IS code from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges and seignorage charges for finished item of work and as directed by the Departmental authorities. for GLSR TOP DOME SLABS.

14.65

-

176000.51

... More
Physical Infrastructure for Package RT Package 1;Supply and placing of the Design Mix Concrete M30 grade for RCC works corresponding to IS 456 using Concrete MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water to site, all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete with minimum cement content as per IS code from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges and seignorage charges for finished item of work and as directed by the Departmental authorities. for GLSR ROOF BEAM.

4.8

-

62218.32

... More
Physical Infrastructure for Package RT Package 1;Supply and placing of the Design Mix Concrete M30 grade for RCC works corresponding to IS 456 using Concrete MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water to site, all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete with minimum cement content as per IS code from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges and seignorage charges for finished item of work and as directed by the Departmental authorities. for GLSR TOP RING BEAM.

5.25

-

68107.2

... More
Physical Infrastructure for Package RT Package 1;Supply and placing of the Design Mix Concrete M30 grade for RCC works corresponding to IS 456 using Concrete MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water to site, all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete with minimum cement content as per IS code from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges and seignorage charges for finished item of work and as directed by the Departmental authorities. for GLSR SIDE WALLS.

36.76

-

505093.43

... More
Physical Infrastructure for Package RT Package 1;Supply and placing of the Design Mix Concrete M30 grade for RCC works corresponding to IS 456 using Concrete MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water to site, all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete with minimum cement content as per IS code from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges and seignorage charges for finished item of work and as directed by the Departmental authorities. for GLSR BOTTOM SLABS.

29.69

-

321137.73

... More
Physical Infrastructure for Package RT Package 1;Laying PCC work of mix (1:4:8) Prop.using 40mm gauge hard broken granite machine crushed metal including cost and conveyance of all materials and water to worksite and all operational, incidental, labour charges, machine mixing, laying, levelling, tamping, curing,etc., complete as directed by the Departmental authorities for Levelling course for GLSR.

20.83

-

110193.82

... More
Physical Infrastructure for Package RT Package 1;Filling with Sand for Foundations with initial lead in layers not exceeding 15 Cm. thick consolidating each deposited layer by watering and ramming including cost and conveyance of all materials and water to work site and all operational, incidental charges and all labour charges, hire charges of T&P etc., complete for finished item of work and as directed by the Departmental Authorities.

41.66

-

38176.81

... More
Physical Infrastructure for Package RT Package 1;Bailing out water by using oil Engine Driven pumpset inlcuding cost and conveyance , hire charges , crew charges etc complete as directed by the Departmental Authorities.

800

-

41280

... More
Physical Infrastructure for Package RT Package 1;RBR-FNDN-1- (iv) - In hard rock blasting prohibited: Earthwork excavation in hard rock such as sheet rock and boulders in habitant areas where conventional blasting can not be done for foundations pipe line trenches, including all incidental and operational charges etc., complete.including setting out, removal of stumps and other deleterious material and disposal upto a lead of 50 m, etc complete as per specification drawings and as directed by the departmental officer with an initial lead of 50 M and with all lifts and delifts for foundation including all incidental and operational charges etc., complete

30.2

-

57233.09

... More
Physical Infrastructure for Package RT Package 1;Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH as directed by the Departmentalal Authorities

178.09

-

24358.74

... More
Physical Infrastructure for Package RT Package 1;Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH as directed by the Departmentalal Authorities

20.83

-

10341.18

... More
Physical Infrastructure for Package RT Package 1;Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH as directed by the Departmentalal Authorities

374.92

-

44870.66

... More
Physical Infrastructure for Package RT Package 1;Geological Survey charges excluding taxes for Plain Area

20

-

60000

... More
Physical Infrastructure for Package RT Package 1;150mm dia galvanised bore cover with bolts and nuts.

60

-

14724.6

... More
Physical Infrastructure for Package RT Package 1;PVC / Cotton Insulation tape Role ( 10 Mtrs)

1600

-

36352

... More
Physical Infrastructure for Package RT Package 1;Supply and Erection of PANEL MOUNTING 125-A, 4 Pole, 25-KA, MCCB adjustable of make L&T/Schneider/ Siemens/Legrand/Hager confirms to IS/IEC 60847-2 having breaking capacity 35/36-KA with Thermal Magnetic setting/ Microprocessor based release arrangement with all connections etc., complete on existing Panel Board including cost and conveyance of all materials to work site and all labour charges etc., complete as directed by the departmental Authorities.

60

-

449915.4

... More
Physical Infrastructure for Package RT Package 1;Supply of 6 Sqmm WPSC (Weather Proof Single Core) ISI Alluminium Wire.Makes : Finolex / RR Kabel / Havells /Polycab / GM /Million / V-Guard / Gold Medal / Kundancab / HPL / RPG /Nandicab / Nakoda / Payal / Finecab / Gemini / Vimal /Suncab

16000

-

275040

... More
Physical Infrastructure for Package RT Package 1;Manufacture, Supply, &Delivery of HDPE Pipes conforming to IS 4984 - 1995 including transportation toany where in T.G, excludingTaxes and specials etc.,complete. (supply upto 90mm diain coil & above 90mm diastraight length in 6m.)OD 32 mm 12.5kg/sqcm(PE-100 Grade)

16000

-

872640

... More
Physical Infrastructure for Package RT Package 1;Supply and run of 4 of 56/0.3mm (4.00Sq.mm) FR P.V.C. insulated flexible copper cableFRLS/FRLS-H/HFFR/ ZHFR PVC insulated 1100V grade as per IS.694/1990 specification for Copper Cable of Category-II of make V-Guard/Bonton /Finecab/ HPL / Million /Fortune Art / Sudhakar/Orbit/ Tamra/ Anchor/Plaza/ Vihan/Ollvin/Laser/Beljin/Rhino/ Standard / Vimal etc., including cost of cable, all materials and labour charges for fixing etc., complete as directed by the Department authorities.

16000

-

2508640

... More
Physical Infrastructure for Package RT Package 1;Supply and Transportation of 5 HP, 21 stage, 5 star rated vertical Submersible Motor Pumpset, confirming to IS.8034 and motor confirming to IS.9283 with water proof winding, Pump shall be suitable for various delivery Head and dischage with stainless steel shaft, Motor suitable for working on 415V (+)/(-) 10%, Three Phase 50 Hz AC supply, etc., complete for 6" Bore Well. Makes: Kirloskar/Crompton/Texmo/ CRI/KSB/Lubi/PSG/ Aryen Varsha

20

-

962319

... More
Physical Infrastructure for Package RT Package 1;Cost and supply of 200 mm dia. PVC blue casing pipe including transportation to the work site.

480

-

629880

... More
Physical Infrastructure for Package RT Package 1;Drilling of Bore hole (which may be carried out by pilot bore hole) to a finished dia of 200/225/300 /350/450 mm hole (for insertion of 110/140/160/180/200mm PVC Pipe/175/200mm PVC Blue casing pipe) by Rotary drilling rig in all formations suitable for Rotary drilling such as alluvium, Loamy, clayey, sandy, burled channels, highly disturbed and bouldary zones high sheared and fractured zones followed by jointed to massive soft, medium rock, all formations typical and suitable for rotary drilling etc. including insertion of casing pipe , couplings, cap, plug fixation, and including filling the peripheral gap with rebuIlled pebbled gravel packing, bore development, conducting yield test, and all other required in the fixation of pipes assembly etc. but excluding the cost of casing pipe, couplings, dummys, damps etc., as recommended by the departmental Geologist. The bore should be developed with compressor air until clear water free from sand and other materials continuously discharged. The size of gravel used for gravel packing should be as per 1SI specification used for rotary tube well. The pebbled gravel acking should be carried out in such a way that the theoretical quantity consumed completely.

2000

-

836000

... More
Physical Infrastructure for Package RT Package 1;Drilling of Bore hole (which may be carried out by pilot bore hole) to a finished dia of 200/225/300 /350/450 mm hole (for insertion of 110/140/160/180/200mm PVC Pipe/175/200mm PVC Blue casing pipe) by Rotary drilling rig in all formations suitable for Rotary drilling such as alluvium, Loamy, clayey, sandy, burled channels, highly disturbed and bouldary zones high sheared and fractured zones followed by jointed to massive soft, medium rock, all formations typical and suitable for rotary drilling etc. including insertion of casing pipe , couplings, cap, plug fixation, and including filling the peripheral gap with rebuIlled pebbled gravel packing, bore development, conducting yield test, and all other required in the fixation of pipes assembly etc. but excluding the cost of casing pipe, couplings, dummys, damps etc., as recommended by the departmental Geologist. The bore should be developed with compressor air until clear water free from sand and other materials continuously discharged. The size of gravel used for gravel packing should be as per 1SI specification used for rotary tube well. The pebbled gravel acking should be carried out in such a way that the theoretical quantity consumed completely.

3000

-

1098000

... More
Physical Infrastructure for Package RT Package 1;Providing High Yield Strenth Deformed STEEL bars/TMT (Fe.500 Grade as per IS1786- 1985 and as amended upto date) of different of diameters including labour charges for straightening, cutting, bending to required size, shapes, placing in position with cover blocks of approved materials and size and tying firmly with M.S.Binding wire of 20 SWG forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of steel bars, including all wastage, such as over laps, welding joints, chairs, space bars and all operational, incidental, labour charges, including sales and other taxes on all materials etc., complete for finished item of work (payment will be made on the basis of wieght of fabrication deformed bars only) (No re-rolled steel shall be allowed) complete for (8mm to 40mm).

7.2

-

611835.84

... More
Physical Infrastructure for Package RT Package 1;VRCC. M20 grade Nominal Mix Concrete corresponding to IS-456 using WEIGH BATCHER with 20mm and 12.50mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work.,for culvert Slab.& Bed Blocks

180

-

1285500.6

... More
Physical Infrastructure for Package RT Package 1;P.C.C. work of mix M15 Prop. (1:2.5:5) 20 mm Graded hard broken granite machine crushed graded metal incluidng cost and conveyance of all materials and water to work site and all labour charges, and all operational charges incidental machine mixing charges, laying, curing etc., complete as directed by the Departmental authorities for Drain walls (1:2.5:5)

141.75

-

1218590.73

... More
Physical Infrastructure for Package RT Package 1;P.C.C. work of mix M15 Prop.(1:2.5:5) 20 mm Graded hard broken granite machine crushed graded metal incluidng cost and conveyance of all materials and water to work site and all labour charges, and all operational charges incidental machine mixing charges, laying, curing etc., complete as directed by the Departmental authorities for Drain bed.

66

-

399017.8

... More
Physical Infrastructure for Package RT Package 1;Laying PCC work of mix (1:4:8) Prop.using 40mm gauge hard broken granite machine crushed metal including cost and conveyance of all materials and water to worksite and all operational, incidental, labour charges, machine mixing, laying, levelling, tamping, curing,etc., complete as directed by the Departmental authorities for Levelling course for Drains.

33

-

160942.32

... More
Physical Infrastructure for Package RT Package 1;Filling with Sand for Foundations with initial lead in layers not exceeding 15 Cm. thick consolidating each deposited layer by watering and ramming including cost and conveyance of all materials and water to work site and all operational, incidental charges and all labour charges, hire charges of T&P etc., complete for finished item of work and as directed by the Departmental Authorities.

49.5

-

35168.43

... More
Physical Infrastructure for Package RT Package 1;Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH as directed by the Departmentalal Authorities

297

-

35544.96

... More
Physical Infrastructure for Package RT Package 1;Construction of un-reinforced, dowel jointed at expansion and construction joint only, Design Mix M30 Grade cement concrete pavement, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity using concrete mixcer , laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle vibrator and finished in continuous operation including Cost and conveyance of all materials, all hire and operational charges of T&P etc., provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days as per design & drawing and Technical Specification Clause 1501 MORD excluding cost of Mild steel round bars(dowel bars) as directed by the Departmental Authorities for Main Roads.

1101.34

-

7804663.89

... More
Physical Infrastructure for Package RT Package 1;Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with Vibratory Roller 80-100 kN weight to achieve the desired density including Cost and conveyance of all materials, all hire and operational charges of T&P etc., lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD / MORTH. as directed by the Departmental Authorities.

1136.67

-

2727347.44

... More
Physical Infrastructure for Package RT Package 1;Construction of granular sub-base by providing well graded material for grading-III spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with Vibratory Roller to achieve the desired density, complete as per Technical Specification Clause 401 MORD / MORTH.(CBR Value Minimum 30) including Cost and conveyance of all materials, all hire and operational charges of T&P etc., complete for finished item of work as directed by the Departmental Authorities

937.15

-

1465353.82

... More
Physical Infrastructure for Package RT Package 1;Forming embankment with 70% of Gravel and 30% of Sand by mechanical means with all leads and lifts including pre-watering of soil at borrow area, removal of top soil, excavation of soils at borrowed area, conveyance of soil, depositing the soils on the embankment, spreading soils, breaking clods, sectioning and consolidation with Vibratory Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H, including Cost and conveyance of all materials, all hire and operational charges of T&P etc., complete for finished item of work as per MoRT&H specification 305 (4th revision) - with a lead beyond 1000m as directed by the Departmental Authorities for Side Berms

1785.55

-

854527.9

... More
Physical Infrastructure for Package RT Package 1;Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH as directed by the Departmentalal Authorities

969.6

-

116041.73

... More
Physical Infrastructure for Package RT Package 1;Providing High Yield Strenth Deformed (HYSD)/Thermo Mechanically Treated (TMT) Steel bars ( Fe.500 grade as per IS1786 and as amended upto date) of different of diameters for RCC works, including labour charges for srraightening,cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-spacing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of steel bars, all wastage, such as over laps, couplings, chairs, spacer bars, binding wire,cover blocks and all incidental, Operational labour charges such as cutting, bending,placing in position, tying etc., complete for finished item of work as directed by the Departmental authorities

89.21

-

7580646.06

... More
Physical Infrastructure for Package RT Package 1;Providing weep holes with 75 mm dia . Of required length with PVC pipe of make (Sudhakar/nandi/prince) conforming to IS 49851:2000 of 4.00 kg/sq cm pressure and bell mouth finishing at inlet including cost , all taxes and all labour charges for conveyance to site cutting into required sizes , placing in position maintaing slopes as diorected by engineer in charge etc.. inncluding metal spall backing x 30 cms size in rear complete for weep holes in all respects as per the specification and dirtection of engineer in charge for retaining walls. (RM)

396.48

-

33784.06

... More
Physical Infrastructure for Package RT Package 1;VRCC. M20 grade design mix concrete corresponding to IS-456 using WEIGH BATCHER with 20mm and 12.50mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete as directed by the Departmental Authorities but excluding cost of steel and its fabrication charges for finished item of workt.,for RCC WALLS

756

-

9989141.4

... More
Physical Infrastructure for Package RT Package 1;VRCC. M20 grade design mix concrete corresponding to IS-456 using WEIGH BATCHER with 20mm and 12.50mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete as directed by the Departmental Authorities. but excluding cost of steel and its fabrication charges for finished item of workt.,for RAFT

235.2

-

1768823.95

... More
Physical Infrastructure for Package RT Package 1;Laying PCC work of mix (1:4:8) Prop.using 40mm gauge hard broken granite machine crushed metal including cost and conveyance of all materials and water to worksite and all operational, incidental, labour charges, machine mixing, laying, levelling, tamping, curing,etc., complete as directed by the Departmental authorities for Levelling course for PUMP HOUSE

100.8

-

491605.63

... More
Physical Infrastructure for Package RT Package 1;Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH as directed by the Departmentalal Authorities

504

-

60318.72

... More
Physical Infrastructure for Package RT Package 1;Refilling trenches with excavated earth complying with standard specifications after the pipe laid including all leads and lifts, depositing surplus earth watering, tamping, levelling and forming to the original level including labour charges etc., complete as directed by the department.

7653

-

1949930.82

... More
Physical Infrastructure for Package RT Package 1;Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH as directed by the Departmentalal Authorities

15504

-

1855518.72

... More
Physical Infrastructure for Package RT Package 1;Filling with Sand for Foundations with initial lead in layers not exceeding 15 Cm. thick consolidating each deposited layer by watering and ramming including cost and conveyance of all materials and water to work site and all operational, incidental charges and all labour charges, hire charges of T&P etc., complete for finished item of work and as directed by the Departmental Authorities.

244.95

-

174030.44

... More
Physical Infrastructure for Package RT Package 1;Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH as directed by the Departmentalal Authorities

1938.05

-

231945.82

... More
Physical Infrastructure for Package RT Package 1;Construction of 904m (3'-0") Dia. Solid block Masonry INSPECTION CHAMBER as per IS.4111, Part-I-1986 with CM(1:6)Prop. Fly-Ash blocks of 225mm thick from approved source having a minium crushing strength of 50 Kg/Sq.Cm.including plastering with CM(1:3)Prop., 1/2" thick both inside and outside and fitted with 20" Dia. RCC Manhole Covers and Frames including excavating pits upto a depth of 1524mm (5'-0") in all sorts of soils (excluding rock) and laying CC(1:4:8) Prop. 150mm thick using 40mm HBG metal and PCC(1:2:4)Prop. benching and channel 100mm thick as per standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site of work, seignorage on all materials and all operational, incidental, labour charges like mixing cement mortar, construcing masonry, lift charges, curing etc., complete for finished item of work as per standard specification.

17

-

181460.2

... More
Physical Infrastructure for Package RT Package 1;Construction of 904.0 m (3'-0")Dia. Solid block Masonry INSPECTION CHAMBER as per IS.4111, Part-I-1986 with CM(1:6)Prop. Fly-Ash blocks of 225mm thick from approved source having a minium crushing strength of 10 N/Sq. mm. Including plastering with CM(1:3)Prop. 1/2" thick both inside and outside and fitted with 20" Dia. RCC Manhole Covers and Frames including excavating pits upto a depth of 904.00 mm (3'-0") in all sorts of soils (excluding rock) and laying CC(1:4:8) Prop. 150mm thick using 40mm HBG metal and PCC(1:2:4)Prop. benching and channel 100mm thick as per standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site of work, seignorage on all materials and all operational, incidental, labour charges like mixing cement mortar, construcing masonry, lift charges, curing etc., complete for finished item of work as per standard specification.

15

-

101742.23

... More
Physical Infrastructure for Package RT Package 1;Laying of 150mm ID of Class SN8 structured wall (External Annular Corrugated & Smooth Internal surface) Polythelene pipes, on the lower bedding (Constructed at bottom of trenches) at prescribed gradient, depth & alignment including installation and jointing of the same with the help of coupler (on line/ off line) attached to one end of the pipe & sliding the coupler end over the elastomeric sealing rubber ring fitted on the specified valley of the spigot end of next pipe, testing the water tightness of the joint assembly, ensuring the continuity tests of specified pipe segments etc. complete as per drawing, specifications & detail engineering, including carriage of pipes & fittings from site stacks to the place of laying etc. as per directions of Engineer-in-charge.

550

-

49865.62

... More
Physical Infrastructure for Package RT Package 1;Laying of 200mm ID of Class SN8 structured wall (External Annular Corrugated & Smooth Internal surface) Polythelene pipes, on the lower bedding (Constructed at bottom of trenches) at prescribed gradient, depth & alignment including installation and jointing of the same with the help of coupler (on line/ off line) attached to one end of the pipe & sliding the coupler end over the elastomeric sealing rubber ring fitted on the specified valley of the spigot end of next pipe, testing the water tightness of the joint assembly, ensuring the continuity tests of specified pipe segments etc. complete as per drawing, specifications & detail engineering, including carriage of pipes & fittings from site stacks to the place of laying etc. as per directions of Engineer-in-charge.

220

-

32893.81

... More
Physical Infrastructure for Package RT Package 1;Laying of 300mm ID of Class SN8 structured wall (External Annular Corrugated & Smooth Internal surface) Polythelene pipes, on the lower bedding (Constructed at bottom of trenches) at prescribed gradient, depth & alignment including installation and jointing of the same with the help of coupler (on line/ off line) attached to one end of the pipe & sliding the coupler end over the elastomeric sealing rubber ring fitted on the specified valley of the spigot end of next pipe, testing the water tightness of the joint assembly, ensuring the continuity tests of specified pipe segments etc. complete as per drawing, specifications & detail engineering, including carriage of pipes & fittings from site stacks to the place of laying etc. as per directions of Engineer-in-charge.

580

-

179897.99

... More
Physical Infrastructure for Package RT Package 1;Laying of 400 mm ID of Class SN8 structured wall (External Annular Corrugated & Smooth Internal surface) Polythelene pipes, on the lower bedding (Constructed at bottom of trenches) at prescribed gradient, depth & alignment including installation and jointing of the same with the help of coupler (on line/ off line) attached to one end of the pipe & sliding the coupler end over the elastomeric sealing rubber ring fitted on the specified valley of the spigot end of next pipe, testing the water tightness of the joint assembly, ensuring the continuity tests of specified pipe segments etc. complete as per drawing, specifications & detail engineering, including carriage of pipes & fittings from site stacks to the place of laying etc. as per directions of Engineer-in-charge.

550

-

307942.1

... More
Physical Infrastructure for Package RT Package 1;Manufacture,Supply and Delivery of ID 150 mm Dia. Double wall Corrogated structured wall polyethelene/polypropylne piping system class SN-8 with non smooth external annular corrugated &smooth internalsurface (double wall)for non pressure sewage and drainage application pipes of standard length 6m, grade confirming to IS 16098 (part-II-2013) including transportation to worksite excluding all taxes etc., as directed by the Departmental authorities

550

-

199962.4

... More
Physical Infrastructure for Package RT Package 1;Manufacture,Supply and Delivery of ID 200 mm Dia. Double wall Corrogated structured wall polyethelene/polypropylne piping system class SN-8 with non smooth external annular corrugated &smooth internalsurface (double wall)for non pressure sewage and drainage application pipes of standard length 6m, grade confirming to IS 16098 (part-II-2013) including transportation to worksite excluding all taxes etc., as directed by the Departmental authorities

220

-

132225.14

... More
Physical Infrastructure for Package RT Package 1;Manufacture,Supply and Delivery of ID 300 mm Dia. Double wall Corrogated structured wall polyethelene/polypropylne piping system class SN-8 with non smooth external annular corrugated &smooth internalsurface (double wall)for non pressure sewage and drainage application pipes of standard length 6m, grade confirming to IS 16098 (part-II-2013) including transportation to worksite excluding all taxes etc., as directed by the Departmental authorities

580

-

724204.73

... More
Physical Infrastructure for Package RT Package 1;Manufacture,Supply and Delivery of ID 400 mm Dia. Double wall Corrogated structured wall polyethelene/polypropylne piping system class SN-8 with non smooth external annular corrugated &smooth internalsurface (double wall)for non pressure sewage and drainage application pipes of standard length 6m, grade confirming to IS 16098 (part-II-2013) including transportation to worksite excluding all taxes etc., as directed by the Departmental authorities

550

-

1242266.41

... More
Physical Infrastructure for Package RT Package 1;Manufacture, Supply, & Delivery of OD 110 mm dia HDPE END CAPS (PE ?100 Grade) fittings conforming to IS 4984 - 2016 including transportation to anywhere in A.P. Excluding all taxes as directed by the departmental authorities.

4

-

581.72

... More
Physical Infrastructure for Package RT Package 1;Supply and delivery of Rubber Packing including cost and conveyance of all materials to site of work etc., complete ( weight 0.44 Kgs. per joint .)

9.9

-

1046.03

... More
Physical Infrastructure for Package RT Package 1;Supply and delivery of Bolts & Nuts with double washers including cost and conveyance of all materials to site of work, shallok/White lead etc., for flanged joints excluding labour charges for fixing values. ( No.of Bolts for each valve 8 Nos. and total weight of Bolts 1.50 Kg./8 Nos.)

16.5

-

2080.82

... More
Physical Infrastructure for Package RT Package 1;Construction of 904.0 m (3'-0")Dia. Solid block Masonry INSPECTION CHAMBER/MANHOLES as per IS.4111, Part-I-1986 with CM(1:6)Prop. Fly-Ash blocks of 225mm thick from approved source having a minium crushing strength of 10 N/Sq. mm. Including plastering with CM(1:3)Prop. 1/2" thick both inside and outside and fitted with 20" Dia. RCC Manhole Covers and Frames including excavating pits upto a depth of 904.00 mm (5'-0") in all sorts of soils (excluding rock) and laying CC(1:4:8) Prop. 150mm thick using 40mm HBG metal and PCC(1:2:4)Prop. benching and channel 100mm thick as per standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site of work, seignorage on all materials and all operational, incidental, labour charges like mixing cement mortar, construcing masonry, lift charges, curing etc., complete for finished item of work as per standard specification as directed by the Departmental authorities

11

-

117415.42

... More
Physical Infrastructure for Package RT Package 1;Labour charges for jointing D.I. Pipes and Valves with Double flanged ends including cost of jointing materials such as bolts, nuts rubber insertion, white lead including filling with water with lead upto 500 Mts. and testing to required pressure including cost and conveyance of all materials etc.,complete for 100mm Dia. Sluice Valve.

10

-

3515.3

... More
Physical Infrastructure for Package RT Package 1;providing and fixing double acting air valve 50mm including boring the main threading the bore and fixing nipple etc.,excluding the cost of rubber insertions, bolts & nuts, air valve & flanged tail pieces complete

6

-

2428.8

... More
Physical Infrastructure for Package RT Package 1;Labour charges for jointing D.I. Pipes and Valves with Double flanged ends including cost of jointing materials such as bolts, nuts rubber insertion, white lead including filling with water with lead upto 500 Mts. and testing to required pressure including cost and conveyance of all materials etc.,complete for 200mm Dia. Sluice Valve..

4

-

2196.48

... More
Physical Infrastructure for Package RT Package 1;Lowering and keeping in position of 100 mm Dia. Sluice valve including conveyance of all materials to work site and nuts and bolts,rubber packing and shallock and all other charges etc., complete as per the direction of the department for finihsed item of work .

5

-

1121.1

... More
Physical Infrastructure for Package RT Package 1;Lowering and keeping in position of 150 mm Dia. Sluice Valve including conveyance of all materials to work site, nuts and bolts, rubber packing and white lead and all other charges etc., complete as per the direction of the department for finihsed item of work .

3

-

1140.09

... More
Physical Infrastructure for Package RT Package 1;Lowering and keeping in position of 200 mm Dia. Sluice valve including conveyance of all materials to work site and nuts and bolts,rubber packing and shallock and all other charges etc., complete as per the direction of the department for finihsed item of work .

2

-

1253.38

... More
Physical Infrastructure for Package RT Package 1;Lowering, Laying and Jointing of 63mm Dia. HDPE Pipes by butt fusion welding as per IS:7634/Part-II/1975 as amended from time to time to the alighment and gradient and testing the pipe line to the required prpessure including cost and conveyance of all materials to work site and all operational, incidential and all labour charges etc., Complete as directed by the departmental authorities.

480

-

17308.8

... More
Physical Infrastructure for Package RT Package 1;Lowering, Laying and Jointing of 110mm Dia. HDPE Pipes by butt fusion welding as per IS:7634/Part-II/1975 as amended from time to time to the alighment and gradient and testing the pipe line to the required prpessure including cost and conveyance of all materials to work site and all operational, incidential and all labour charges etc., Complete as directed by the departmental authorities.

630

-

31420.46

... More
Physical Infrastructure for Package RT Package 1;Lowering, Laying and Jointing of 160mm Dia. HDPE Pipes by butt fusion welding as per IS:7634/Part-II/1975 as amended from time to time to the alighment and gradient and testing the pipe line to the required prpessure including cost and conveyance of all materials to work site and all operational, incidential and all labour charges etc., Complete as directed by the departmental authorities.

960

-

72201.6

... More
Physical Infrastructure for Package RT Package 1;Lowering, Laying and Jointing of 200 mm Dia. HDPE Pipes by butt fusion welding as per IS:7634/Part-II/1975 as amended from time to time to the alighment and gradient and testing the pipe line to the required prpessure including cost and conveyance of all materials to work site and all operational, incidential and all labour charges etc., Complete as directed by the departmental authorities.

250

-

27997.5

... More
Physical Infrastructure for Package RT Package 1;Filling with Sand for Foundations with initial lead in layers not exceeding 15 Cm. thick consolidating each deposited layer by watering and ramming including cost and conveyance of all materials and water to work site and all operational, incidental charges and all labour charges, hire charges of T&P etc., complete for finished item of work and as directed by the Departmental Authorities.

247.35

-

175735.58

... More
Physical Infrastructure for Package RT Package 1;Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH as directed by the Departmentalal Authorities

2088.45

-

249945.7

... More
Physical Infrastructure for Package RT Package 1;Manufacture, Supplying and delivery of 110 mm Dia.HDPE (PE-100 GRADE) MS Flanges conforming to IS.4984-1995 including transportation charges, loading,unloading to work site , including all taxes complete for finished item of work

6

-

1172.52

... More
Physical Infrastructure for Package RT Package 1;Manufacture, Supplying and delivery of 160 mm Dia.HDPE (PE-100 GRADE) MS Flanges conforming to IS.4984-1995 including transportation charges, loading,unloading to work site , including all taxes complete for finished item of work

6

-

2290.5

... More
Physical Infrastructure for Package RT Package 1;Manufacture, Supply, & Delivery of OD 200 mm dia HDPE FLANGES (PE ?100 Grade) fittings conforming to IS 4984 - 2016 including transportation to anywhere in A.P. Excluding all taxes as directed by the departmental authorities.

8

-

5571.68

... More
Physical Infrastructure for Package RT Package 1;Manufacture, Supply, & Delivery of OD 160 mm dia HDPE TEES (PE ?100 Grade) fittings conforming to IS 4984 - 2016 including transportation to anywhere in A.P. Excluding all taxes as directed by the departmental authorities.

8

-

14015.52

... More
Physical Infrastructure for Package RT Package 1;Manufacture, Supply, & Delivery of OD 200 mm dia HDPE TEES (PE ?100 Grade) fittings conforming to IS 4984 - 2016 including transportation to anywhere in A.P. Excluding all taxes as directed by the departmental authorities.

3

-

9812.94

... More
Physical Infrastructure for Package RT Package 1;Manufacture, Supply, & Delivery of OD 200 mm dia HDPE Bends (PE ?100 Grade) fittings conforming to IS 4984 - 2016 including transportation to anywhere in A.P. Excluding all taxes as directed by the departmental authorities.

2

-

5662.58

... More
Physical Infrastructure for Package RT Package 1;Supply and delivery of tamper proof D.I., Flanged Single Chamber Air Valves of 50mm Dia. with body and cover made of Ductile Iron Grade GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS-1865, IS-3896-2 with food grade epoxy powder coating (EP-P) (Min:250 Micron) inside and outside of color blue RAL 5005. All internal parts such as float, shell, cove bolts etc., made of austenitic alloy steel of SS AISI 304/316 and DN-50 float of and other components with ABS/PTFE/ EPDM/NBR and generally conforming to DIN/BIS/AWWA standards (or) combination flange drilling as per IS-1538 and including cost and conveyance of all materials to work site, loading, unloading transportation charges Complete as directed by the departmental authorities. (PN 1.0 (mpa)

1

-

12860.08

... More
Physical Infrastructure for Package RT Package 1;Supply and delivery of 50 mm dia Gunmetal gate valve (GM Peet) as per IS-778 Class-I Indian make heavy type

40

-

150244.4

... More
Physical Infrastructure for Package RT Package 1;Supply and delivery of 100 MM Dia PN 1.0 (MPA) "Resilient Seated Soft Sealing" Gate Valves (Sluice Valves PN- 01 MPA) with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or Equivalent as per IS1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, Replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The Valves should be Vacuum tight and 100% leak proof with face to face dimensions as BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN 3202F4/BS:5163 Type A Flange drilling as per IS - 1538 excluding all taxes, dutiesand transportation.

5

-

70861.7

... More
Physical Infrastructure for Package RT Package 1;Supply and delivery of "Resilient Seated Soft Sealing" Gate Valves 150mm (Sluice Valves) with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or Equivalent as per IS1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, Replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The Valves should be Vacuum tight and 100% leak proof with face to face dimensions as BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS - 1538 excluding all taxes, duties and transportation etc.,as directed by the Departmental authorities. PN 1.0 (MPa)

3

-

66137.55

... More
Physical Infrastructure for Package RT Package 1;Supply and delivery of "Resilient Seated Soft Sealing" Gate Valves 200mm (Sluice Valves) with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or Equivalent as per IS1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, Replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The Valves should be Vacuum tight and 100% leak proof with face to face dimensions as BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS - 1538 excluding all taxes, duties and transportation etc.,as directed by the Departmental authorities.(pn-1 (MPa)

2

-

57214.24

... More
Physical Infrastructure for Package RT Package 1;Manufacture, Supplying and delivery of 63 mm Dia. HDPE Pipes of Pressure 6.00 Kg./Sq.Cm. conforming to IS.4984-2016 including transportation charges to work site but excluding all taxes etc., completed as directed by the departmental authorities.

480

-

54537.6

... More
Physical Infrastructure for Package RT Package 1;Manufacture, Supplying and delivery of 110 mm Dia. HDPE Pipes of Pressure 6.00 Kg./Sq.Cm. conforming to IS.4984-2016 including transportation charges to work site but excluding all taxes etc., completed as directed by the departmental authorities.

630

-

218313.9

... More
Physical Infrastructure for Package RT Package 1;Manufacture, Supplying and delivery of 160 mm Dia. HDPE Pipes of Pressure 6.00 Kg./Sq.Cm. conforming to IS.4984-2016 including transportation charges to work site but excluding all taxes etc., completed as directed by the departmental authorities.

960

-

694780.8

... More
Physical Infrastructure for Package RT Package 1;Manufacture, Supplying and delivery of 200 mm Dia. HDPE Pipes of Pressure 6.00 Kg./Sq.Cm. conforming to IS.4984-2016 including transportation charges to work site but excluding all taxes etc., completed as directed by the departmental authorities.

250

-

281480

... More
Physical Infrastructure for Package RT Package 1;Manufacture, Supplying and delivery of OD 90 mm Dia. HDPE Pipes of Pressure 8.00 Kg./Sq.Cm. conforming to IS.4984-2016 including transportation charges to work site but excluding all taxes etc., completed as directed by the departmental authorities.

600

-

154062

... More
Physical Infrastructure for Package RT Package 1;Supplying and fixing of approved make Automatic Star Delta Starter of make C&S/Crompton / L&T / Siemens/BCH suitable for 3 Phase, 415-V, 50 Hz Motor Pump set, suitable for 7.50 HP to 12.50 HP automatic Star Delta Starter Motor totally enclosed with over load protection and No-volt relay to complete including cost and conveyance of all materials to work site, Transportation and all labour charges etc., complete and as directed by the Departmental authorities

6

-

110587.14

... More
Physical Infrastructure for Package RT Package 1;Supply and Erection of PANEL MOUNTING 125-A, 4 Pole, 25-KA, MCCB adjustable of make L&T/Schneider/ Siemens/Legrand/Hager confirms to IS/IEC 60847-2 having breaking capacity 35/36-KA with Thermal Magnetic setting/ Microprocessor based release arrangement with all connections etc., complete on existing Panel Board including cost and conveyance of all materials to work site and all labour charges etc., complete as directed by the departmental Authorities.

6

-

74305.86

... More
Physical Infrastructure for Package RT Package 1;Supply and run of 4 of 56/0.3mm (4.00Sq.mm) FR P.V.C. insulated flexible copper cableFRLS/FRLS-H/HFFR/ ZHFR PVC insulated 1100V grade as per IS.694/1990 specification for Copper Cable of Category-II of make V-Guard/Bonton /Finecab/ HPL / Million /Fortune Art / Sudhakar/Orbit/ Tamra/ Anchor/Plaza/ Vihan/Ollvin/Laser/Beljin/Rhino/ Standard / Vimal etc., including cost of cable, all materials and labour charges for fixing etc., complete as directed by the Department authorities.

1170

-

253246.5

... More
Physical Infrastructure for Package RT Package 1;Supply and Transportation of 5 HP, 5-10 Stage, 5 star rated vertical Submersible Motor Pumpset, confirming to IS.8034 and motor confirming to IS.9283 with water proof winding, Pump shall be suitable for various delivery Head and dischage with stainless steel shaft, Motor suitable for working on 415V (+)/(-) 10%, Three Phase 50 Hz AC supply, etc., complete for 6" Bore Well. Makes: Kirloskar/Crompton/Texmo/ CRI/KSB/Lubi/PSG/ Aryen Varsha

6

-

279510.6

... More
Physical Infrastructure for Package RT Package 1;Geological Survey charges excluding taxes for Plain Area

6

-

7800

... More
Physical Infrastructure for Package RT Package 1;Supply & Fixing of 180mm dia. PVC Bore Cap

6

-

1890

... More
Physical Infrastructure for Package RT Package 1;180mm dia. PVC Casing pipe perforation charge

366

-

125172

... More
Physical Infrastructure for Package RT Package 1;Cost and supply of 175 mm dia. PVC blue casing pipe including transportation to the work site.

366

-

422730

... More
Physical Infrastructure for Package RT Package 1;Drilling of Bore hole (which may be carried out by pilot bore hole) to a finished dia of 200/225/300 /350/450 mm hole (for insertion of 110/140/160/180/200mm PVC Pipe/175/200mm PVC Blue casing pipe) by Rotary drilling rig in all formations suitable for Rotary drilling such as alluvium, Loamy, clayey, sandy, burled channels, highly disturbed and bouldary zones high sheared and fractured zones followed by jointed to massive soft, medium rock, all formations typical and suitable for rotary drilling etc. including insertion of casing pipe , couplings, cap, plug fixation, and including filling the peripheral gap with rebuIlled pebbled gravel packing, bore development, conducting yield test, and all other required in the fixation of pipes assembly etc. but excluding the cost of casing pipe, couplings, dummys, damps etc., as recommended by the departmental Geologist. The bore should be developed with compressor air until clear water free from sand and other materials continuously discharged. The size of gravel used for gravel packing should be as per 1SI specification used for rotary tube well. The pebbled gravel acking should be carried out in such a way that the theoretical quantity consumed completely.

366

-

497760

... More
Physical Infrastructure for Package RT Package 1;Painting to new walls with approved water proof cement paint 2 coats over priming coat with approved exterior grade cement making 3 coats all colours including cost of priming coat and cost and conveyance of all materials, labour charges etc; complete for finished item of work as directed by the departmental authorities

64.61

-

16916.19

... More
Physical Infrastructure for Package RT Package 1;Painting to New wood work with primer and two coats with Synthetic enamel paint in all shades of Grade-I aprpoved brand and colour including cost and conveyance of all materials to work site and all operational, incidential and all labour charges such as sand paper, cleaning the surface, cost of brushes etc., complete for finished item of work as directed by the department (Three coats).

1.78

-

364.22

... More
Physical Infrastructure for Package RT Package 1;Plastering 12mm thick in CM(1:4)Prop. with sponge finishing including cost and conveyance of all materials and water to site of work and all operational, incidental charges, scaffolding charges, hacking surface and all labour charges, curing etc., complete for finished item of work to the as directed by the department for EXTERNAL WALLS.

64.61

-

26487.52

... More
Physical Infrastructure for Package RT Package 1;Plastering 12mm thick in CM(1:3)Prop. with sponge finishing including cost and conveyance of all materials and water to site of work and all operational, incidental charges, scaffolding charges, hacking surface and all labour charges, curing etc.,complete for finished item of work to as directed by the dept.,for CEILING

7.5

-

3133.73

... More
Physical Infrastructure for Package RT Package 1;Supply and fixing to Cement JALLIES 40mm thick including cost and conveyance of all materials and water to work site and all operational, incidental charges, fixing, laying and all labour charges, curing etc., complete for finished item of work as directed by the department.

0.36

-

105.12

... More
Physical Infrastructure for Package RT Package 1;2'-0"x 4'-0" Window::- Providing and Fixing of openable windows made of Pre-painted steel (base steel as per IS 513 of 0.58mm thick Galvanized as per IS 277 with zinc of 120 GSM ) primer coated with epoxy primer of 5-7 microns thick. finish painted with a polyester paint of 12-16 microns thick and back coated with 5-7 microns thick alkyd backer and section for outer frame of 48 x 50mm, centre mullion of 48 x 50 mm section for shutter of 48 x 25 mm and the fixed glass beading section should be 12 x 12mm and the outer frame and mullions to have rebate for glazed shutter with a 20mm provision for guard bars/grills and the sections cut to length metre joined with corner bracket, centre mullion fixed with mullion cap, handle, stay, 2 nos. of stairless steel heavy duty pivot hinges provided per shutter and windows fitted with 5mm thick plain float glass with rubber gaskets including fixing the frames in concrete/masonry wall by means of self expanding screws, including 10mm square guard bars with 6" (152.4mm) pitch etc., complete for finished item of work. (Single shutter window 2'0" x 4'0" (609.6mm x 1219.2mm). Outer frame section size of 48 x 50mm shutter frame section size of 48 x 25mm.

1

-

3522.84

... More
Physical Infrastructure for Package RT Package 1;Door of size 3?-0? x 6?-6?:- Providing and fixing Door Frames fabricated from sections made of galvanized Stell powder coated (base steel as per IS-513, galvanized as per IS-277 with zinc of 120 grams/square meter), the factory made section are powder coated with pure polyester powder of 50-60 microns thick with total coated thickness of 1.25mm, size of Door Frame section of 105x60mm with a rebate of 38mm to accommodate 35mm thick Door Shutter with groove to insert gasket in the frame section, frame sectiion filled with polyurethane foam, cut to length and joined by way of welding each frame provided with :: (a) 2mm thick MS powder coated butt hinges of 100mm long - 3 Nos for Single Shutter, 6 Nos., for double shutter (b) CRCA electroplates stiffeners of 6 Nos - 3 in each vertical (c) 40mm x 200mm x 1.20mm hold fasts screwd to stiffeners - 6 Nos. with split end tail (d) Nylon Aldrops Receiver - 1 No. for Single shutter frame (e) Tie Road - 1 No. and supplying and fixing of Single Leaf Flush Door Shutter Solid bond Wood black Board type with Commercial ply on both faces of 30mm thick conforming to IS.2202 including cost of fixtures such as (i) 2 Nos.-250mm long M.S.powder coated Aldrops, (ii) 1 No.-250mm long 10mm Dia. M.S.Powder Coated Tower Bolt, (iii) 2 Nos.-125mm long M.S.powder coated Door Handles and (iv) 1 No. M.S.Powder coated Door Stopper and including cost and conveyance of all materials to work site and all labour charges etc., complete as directed by the department.

1

-

7838.54

... More
Physical Infrastructure for Package RT Package 1;Providing High Yield Strenth Deformed (HYSD)/Thermo Mechanically Treated (TMT) Steel bars ( Fe.500 grade as per IS1786 and as amended upto date) of different of diameters for RCC works, including labour charges for srraightening,cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-spacing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of steel bars, all wastage, such as over laps, couplings, chairs, spacer bars, binding wire,cover blocks and all incidental, Operational labour charges such as cutting, bending,placing in position, tying etc., complete for finished item of work as directed by the Departmental authorities

0.29

-

25023.24

... More
Physical Infrastructure for Package RT Package 1;VRCC M20 grade design mix concrete corresponding to IS-456 using CONCRETE MIXER / WEIGH BATCHER at site with stone aggregate of 20 mm graded size hard broken granite machine crushed metal mechanically mixed with necessary reinforcement including cost and conveyance of all materials and water to work site and all operational, incidental, labour charges, centering charges such as Steel Scaffolding Pipes, Jack Props, Steel Centering Plates, etc., mixing concrete, transportation, pumping of concrete,laying , levelling, curing etc., as per standard specifications but excluding cost of steel and its fabrication charges for finished item of work to the required strength as directed by the department for CHAJJAS (Sunshades) of average 50 mm thick (60mm thick at fixed end and 40mm thick at free end) including Plastering 12mm thick single coat in CM(1:5) Prop. and finished to average thickness of 50mm.For Chajjas

0.02

-

272.62

... More
Physical Infrastructure for Package RT Package 1;VRCC M20 grade design mix concrete corresponding to IS-456 using CONCRETE MIXER / WEIGH BATCHER at site with stone aggregate of 20 mm graded size hard broken granite machine crushed metal mechanically mixed with necessary reinforcement including cost and conveyance of all materials and water to work site and all operational, incidental, labour charges, centering charges such as Steel Scaffolding Pipes, Jack Props, Steel Centering Plates, etc., mixing concrete, transportation, pumping of concrete,laying , levelling, curing etc., as per standard specifications but excluding cost of steel and its fabrication charges for finished item of work to the required strength as directed by the department for LINTELS.

0.07

-

954.16

... More
Physical Infrastructure for Package RT Package 1;Brick Masonry in C.M.(1:6) Prop. with Fly Ash cement solid blocks in size 290x225x140mm of IS-12894-1990 class-5 manufacturing with compressive strength of 50 Kg/Sq.cm using fly ash, cement, gypsum and stone dust including cost and conveyance of all materials and water to work site, scaffolding and all labour charges,curing etc.,complete as directed by the Departmental Authorities. for Superstructure Walls (Main Walls).

7.42

-

50577.98

... More
Physical Infrastructure for Package RT Package 1;Providing Impervious coat Plastering to exposed RCC Slab surface with CM(1:3) Prop.20mm thick mixed with approved water proofing compound @ 1 Kg/bag of cement and laid over roof when the slab is green and fine rendering with cement slurry including cost & conveyance of all materials and water to work site and all operational, incidental charges, labour charges for mixing mortar, laying rendering smooth and thread lining, curing, rounding of junctions of walls and slab etc., complete for finished item of work as directed by the departmental authorities

12.54

-

7453.9

... More
Physical Infrastructure for Package RT Package 1;VRCC M20 grade design mix concrete corresponding to IS-456 using CONCRETE MIXER / WEIGH BATCHER at site with stone aggregate of 20 mm graded size hard broken granite machine crushed metal mechanically mixed with necessary reinforcement including cost and conveyance of all materials and water to work site and all operational, incidental, labour charges, centering charges such as Steel Scaffolding Pipes, Jack Props, Steel Centering Plates, etc., mixing concrete, transportation, pumping of concrete,laying , levelling, curing etc., as per standard specifications but excluding cost of steel and its fabrication charges for finished item of work to the required strength as directed by the department for ROOF SLABS.

1.4

-

18909.31

... More
Physical Infrastructure for Package RT Package 1;VRCC M20 grade design mix concrete corresponding to IS-456 using CONCRETE MIXER / WEIGH BATCHER at site with stone aggregate of 20 mm graded size hard broken granite machine crushed metal mechanically mixed with necessary reinforcement including cost and conveyance of all materials and water to work site and all operational, incidental, labour charges, centering charges such as Steel Scaffolding Pipes, Jack Props, Steel Centering Plates, etc., mixing concrete, transportation, pumping of concrete,laying , levelling, curing etc., as per standard specifications but excluding cost of steel and its fabrication charges for finished item of work to the required strength as directed by the department for ROOF BEAMS.

0.63

-

7917.1

... More
Physical Infrastructure for Package RT Package 1;VRCC M20 grade design mix concrete corresponding to IS-456 using CONCRETE MIXER / WEIGH BATCHER at site with stone aggregate of 20 mm graded size hard broken granite machine crushed metal mechanically mixed with necessary reinforcement including cost and conveyance of all materials and water to work site and all operational, incidental, labour charges, centering charges such as Steel Scaffolding Pipes, Jack Props, Steel Centering Plates, etc., mixing concrete, transportation, pumping of concrete,laying , levelling, curing etc., as per standard specifications but excluding cost of steel and its fabrication charges for finished item of work to the required strength as directed by the department for VRCC COLUMNS.

0.92

-

12656.43

... More
Physical Infrastructure for Package RT Package 1;VRCC M20 grade design mix concrete corresponding to IS-456 using CONCRETE MIXER / WEIGH BATCHER at site with stone aggregate of 20 mm graded size machine crushed hard granite metal mechanically mixed with necessary reinforcement including cost and conveyance of all materials and water to work site and all operational, incidental, labour charges, centering charges such as casurina ballies, bamboos, wooden reapers, runners, wood posts, Wall Plates, Steel centering plates etc., mixing concrete, transportation, pumping of concrete,laying,levelling, curing etc., as per standard specifications but excluding cost of steel and its fabrication charges etc., for finished item of work to the required strength as directed by the dept., for VRCC PLINTH BEAMS.

0.63

-

8186.38

... More
Physical Infrastructure for Package RT Package 1;VRCC M20 grade Design Mix concrete corresponding to IS-456 using CONCRETE MIXER / WEIGH BATCHER at site with stone aggregate of 20 mm graded size Machine hard broken granite machine crushed metal mechanically mixed with necessary reinforcement including cost and conveyance of all materials and water to work site and all operational, incidental, labour charges, Centering charges such as casurina ballies, bamboos, wooden reapers, runners, wood posts, wall plates, steel centering plates etc., mixing concrete, transportation pumping concrete, laying, levelling, curing etc., as per standard specifications but excluding cost of steel and its fabrication charges etc., for finished item of work to the required strength as directed by the dept.,for Footings

0.49

-

4986.98

... More
Physical Infrastructure for Package RT Package 1;Laying PCC work of mix (1:4:8) Prop.using 40mm gauge hard broken granite machine crushed metal including cost and conveyance of all materials and water to worksite and all operational, incidental, labour charges, machine mixing, laying, levelling, tamping, curing,etc., complete as directed by the Departmental authorities for Levelling course for PUMP HOUSE

1.15

-

5608.6

... More
Physical Infrastructure for Package RT Package 1;Filling with Sand for Foundations with initial lead in layers not exceeding 15 Cm. thick consolidating each deposited layer by watering and ramming including cost and conveyance of all materials and water to work site and all operational, incidental charges and all labour charges, hire charges of T&P etc., complete for finished item of work and as directed by the Departmental Authorities.

7.44

-

5285.92

... More
Physical Infrastructure for Package RT Package 1;Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH as directed by the Departmentalal Authorities

6.4

-

765.95

... More
Physical Infrastructure for Package RT Package 1;Providing Independent Earthing from Main switch Board for earth continuity with No.8, G.I wire including excavation of earth in all soils upto 5'-6'' depth below ground level of section 5'x2'x3' duly providing 40mm Dia G.I Pipe of 2mts, length using GI bolts&nuts and fixing earth wire including supply and fixing 1'-6'' dia 0'-8'' depth hume pipe ring and refilling the pit with 40 Kgs hard coke, 20Kgs salt and excavated earth including all labour charges etc., complete for finished item of work and as directed by the Departmental authorities

1

-

4422.29

... More
Physical Infrastructure for Package RT Package 1;Supplying and fixing of 25mm Dia. Nominal Bore G.I. Pipe Medium Grade properties and weight as per IS.1239 with fittings such as elbows, tees, couplings, nipples, plugs including excavation for trenches and refilling the trenches complete except for G.I. bends, unions and GI connectors with checkout and socket of Tata/Zenith make or equivalent etc., complete including cost and conveyance of all materials to work site, Transportation and all labour charges etc., complete. for sump railings and inside and outside ladders and as directed by the Departmental authorities

105

-

32209.85

... More
Physical Infrastructure for Package RT Package 1;Supplying and fixing of 100mm Dia. B class G.I. Pipe properties and weight as per IS.1239 with fittings such as elbows, tees, couplings, nipples, plugs including excavation for trenches and refilling the trenches complete except for G.I. bends, unions and GI connectors with checkout and socket of Tata/Zenith make or equivalent etc., complete including cost and conveyance of all materials to work site, Transportation and all labour charges etc., complete for connecting Motor at Sump to Panel Board and as directed by the Departmental authorities

30

-

25972.39

... More
Physical Infrastructure for Package RT Package 1;Supplying and fixing of approved make Automatic Star Delta Starter of make C&S/Crompton / L&T / Siemens/BCH suitable for 3 Phase, 415-V, 50 Hz Motor Pump set, suitable for 7.50 HP to 12.50 HP automatic Star Delta Starter Motor totally enclosed with over load protection and No-volt relay to complete including cost and conveyance of all materials to work site, Transportation and all labour charges etc., complete and as directed by the Departmental authorities

2

-

36862.38

... More
Physical Infrastructure for Package RT Package 1;Supply and Erection of PANEL MOUNTING 125-A, 4 Pole, 25-KA, MCCB adjustable of make L&T/Schneider/ Siemens/Legrand/Hager confirms to IS/IEC 60847-2 having breaking capacity 35/36-KA with Thermal Magnetic setting/ Microprocessor based release arrangement with all connections etc., complete on existing Panel Board including cost and conveyance of all materials to work site and all labour charges etc., complete as directed by the departmental Authorities.

2

-

24768.6

... More
Physical Infrastructure for Package RT Package 1;Supply and run of 4 of 56/0.3mm (4.00Sq.mm) FR P.V.C. insulated flexible copper cableFRLS/FRLS-H/HFFR/ ZHFR PVC insulated 1100V grade as per IS.694/1990 specification for Copper Cable of Category-II of make V-Guard/Bonton /Finecab/ HPL / Million /Fortune Art / Sudhakar/Orbit/ Tamra/ Anchor/Plaza/ Vihan/Ollvin/Laser/Beljin/Rhino/ Standard / Vimal etc., including cost of cable, all materials and labour charges for fixing etc., complete as directed by the Department authorities.

50

-

10822.5

... More
Physical Infrastructure for Package RT Package 1;Supply and erecting 3 Phase, 10.00 HP ISI make submersible pumpset confirming to IS 14220 : 1994 of Makes: Kirloskar / Crompton / Texmo / CRI / KSB/Lubi /PSG/ AryenVarsha of suitable for erection in open well with water resistant dynamically balanced impeller with stainless steel shaft sleeves, pump coupling and pivot with squirrel cage Induction Motor of 3 phase, 415V, 50Hz.., A.C.Supply, heavy copper windings with water proof insulation and high precision strength not to be effected by chemicals in water with suitable bronze bearings, 10 HP pump erected with necessary H-type clamps of suitable size and strength including cost of all materials, Transportation and labour charges etc., complete and as directed by the Departmental authorities

2

-

96123.98

... More
Physical Infrastructure for Package RT Package 1;Supplying and fixing of RCC Cover of 22" Dia. of 3" thick with nominal reinforcement as directed by the department and hooks for lifting including cost and conveyance of all materials to work site and operational, incidental and all labour charges for fixing charges etc., complete for finiahed item of work as directed by the departmental authorities

2

-

1506.54

... More
Physical Infrastructure for Package RT Package 1;Painting to new walls with approved water proof cement paint 2 coats over priming coat with approved exterior grade cement making 3 coats all colours including cost of priming coat and cost and conveyance of all materials, labour charges etc; complete for finished item of work as directed by the departmental authorities

41.84

-

10954.55

... More
Physical Infrastructure for Package RT Package 1;Providing Impervious coat Plastering to exposed RCC Slab surface with CM(1:3) Prop.20mm thick mixed with approved water proofing compound @ 1 Kg/bag of cement and laid over roof when the slab is green and fine rendering with cement slurry including cost & conveyance of all materials and water to work site and all operational, incidental charges, labour charges for mixing mortar, laying rendering smooth and thread lining, curing, rounding of junctions of walls and slab etc., complete for finished item of work as directed by the departmental authorities

121.85

-

72428.86

... More
Physical Infrastructure for Package RT Package 1;Providing High Yield Strenth Deformed (HYSD)/Thermo Mechanically Treated (TMT) Steel bars ( Fe.500 grade as per IS1786 and as amended upto date) of different of diameters for RCC works, including labour charges for srraightening,cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-spacing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of steel bars, all wastage, such as over laps, couplings, chairs, spacer bars, binding wire,cover blocks and all incidental, Operational labour charges such as cutting, bending,placing in position, tying etc., complete for finished item of work as directed by the Departmental authorities

3.56

-

302518.83

... More
Physical Infrastructure for Package RT Package 1;Supply and placing of the Design Mix Concrete M30 grade for RCC works corresponding to IS 456 using Concrete MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water to site, all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete with minimum cement content as per IS code from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges and seignorage charges for finished item of work and as directed by the Departmental authorities. for GLSR TOP DOME SLABS.

2.27

-

39985.96

... More
Physical Infrastructure for Package RT Package 1;Supply and placing of the Design Mix Concrete M30 grade for RCC works corresponding to IS 456 using Concrete MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water to site, all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete with minimum cement content as per IS code from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges and seignorage charges for finished item of work and as directed by the Departmental authorities. for GLSR TOP RING BEAM.

1.71

-

21960.98

... More
Physical Infrastructure for Package RT Package 1;Supply and placing of the Design Mix Concrete M30 grade for RCC works corresponding to IS 456 using Concrete MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water to site, all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete with minimum cement content as per IS code from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges and seignorage charges for finished item of work and as directed by the Departmental authorities. for GLSR SIDE WALLS.

13.83

-

237523.34

... More
Physical Infrastructure for Package RT Package 1;Supply and placing of the Design Mix Concrete M30 grade for RCC works corresponding to IS 456 using Concrete MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water to site, all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete with minimum cement content as per IS code from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges and seignorage charges for finished item of work and as directed by the Departmental authorities. for GLSR BOTTOM SLABS.

11.86

-

92464.71

... More
Physical Infrastructure for Package RT Package 1;Laying PCC work of mix (1:4:8) Prop.using 40mm gauge hard broken granite machine crushed metal including cost and conveyance of all materials and water to worksite and all operational, incidental, labour charges, machine mixing, laying, levelling, tamping, curing,etc., complete as directed by the Departmental authorities for Levelling course for GLSR.

7.54

-

36772.88

... More
Physical Infrastructure for Package RT Package 1;Filling with Sand for Foundations with initial lead in layers not exceeding 15 Cm. thick consolidating each deposited layer by watering and ramming including cost and conveyance of all materials and water to work site and all operational, incidental charges and all labour charges, hire charges of T&P etc., complete for finished item of work and as directed by the Departmental Authorities.

7.54

-

5356.97

... More
Physical Infrastructure for Package RT Package 1;Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH as directed by the Departmentalal Authorities

135.65

-

16234.59

... More
Physical Infrastructure for Package RT Package 1;Constuction of OHSR / ELSR of 400 KL capacity with staging of 22Mts. including fixtures and all the Concrete members shall be designed with M30 grade design mix with Raft Footings including 3 Coats of eppoxy paint food grade of best quality to inner surface of reservoir including roof and 2 Coats of weather proof emulsion painting for external surfaces, lettering, all required fixtures, Pipes, Bends,Valves etc., for pipe connections excluding cost of pipes Bends and Valves as per departmental designs and drawings but including cost and conveyance of all materials to work site and the above rate inclusive of following fixtures: A. RCC or Aluminum ladder inside 0.60 m wide B. Doglegged stair case shall be provided with stair case flight with of 1.2m and landing width of 1.2m with SS railing upto 1m height C. Providing lightening arrester including conductor and earthing etc., complete-1No's D. RCC Ventilators with copper or Stainless steel fly proof Mesh E. DI Manhole frame and cover 0.6 X 0.6m as per IS specfications(Light duty)-2No's. F.Water level indicator of good quality with abonite/Copper float approved pattern-1.No's G. The Railing provided to gallery and staircase shall be with stainless steel of grade 304 for height of 1.2m H. The Dog Legged staircase shall be enclosed with Brick/CRS Wall on 3 sides and front side with MS collapsable gate upto 1st brace level from ground level. I.DI Swan neck ventilators in topdome and slab. I.DI Swan neck ventilators in topdome and slab.

400000

-

8728000

... More
Physical Infrastructure for Package RT Package 1;Providing High Yield Strenth Deformed (HYSD)/Thermo Mechanically Treated (TMT) Steel bars ( Fe.500 grade as per IS1786 and as amended upto date) of different of diameters for RCC works, including labour charges for srraightening,cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-spacing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of steel bars, all wastage, such as over laps, couplings, chairs, spacer bars, binding wire,cover blocks and all incidental, Operational labour charges such as cutting, bending,placing in position, tying etc., complete for finished item of work as directed by the Departmental authorities

4.48

-

380697.86

... More
Physical Infrastructure for Package RT Package 1;Supply and placing of the Design Mix M 20 Grade Concrete for RCC works corresponding to IS 456 using CONCRETE MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete with minimum cement content as per IS code from standard suppliers approved by the department and also including centering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work as per directed by the Departmental authorities for Culvert slab.

74.59

-

532697.17

... More
Physical Infrastructure for Package RT Package 1;P.C.C. work of mix M15 (1:2.5:5) Prop.20 mm Graded hard broken granite machine crushed graded metal incluidng cost and conveyance of all materials and water to work site and all labour charges, and all operational charges incidental machine mixing charges, laying, curing etc., complete including formwork/ centering charges, as directed by the Departmental authorities for Culvert walls.

66.6

-

572544.22

... More
Physical Infrastructure for Package RT Package 1;P.C.C. work of mix M15 (1:2.5:5) Prop.20 mm Graded hard broken granite machine crushed graded metal incluidng cost and conveyance of all materials and water to work site and all labour charges, and all operational charges incidental machine mixing charges, laying, curing etc., complete as directed by the Departmental authorities for Culvert bed.

33.3

-

201322.62

... More
Physical Infrastructure for Package RT Package 1;Laying PCC work of mix (1:4:8) Prop.using 40mm gauge hard broken granite machine crushed metal including cost and conveyance of all materials and water to worksite and all operational, incidental, labour charges, machine mixing, laying, levelling, tamping, curing,etc., complete as directed by the Departmental authorities for Levelling course for Culverts.

33.3

-

162405.43

... More
Physical Infrastructure for Package RT Package 1;Filling with Sand for Foundations with initial lead in layers not exceeding 15 Cm. thick consolidating each deposited layer by watering and ramming including cost and conveyance of all materials and water to work site and all operational, incidental charges and all labour charges, hire charges of T&P etc., complete for finished item of work and as directed by the Departmental Authorities.

49.95

-

35488.14

... More
Physical Infrastructure for Package RT Package 1;Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH as directed by the Departmentalal Authorities

116.55

-

13948.7

... More
Physical Infrastructure for Package RT Package 1;Providing High Yield Strenth Deformed (HYSD)/Thermo Mechanically Treated (TMT) Steel bars ( Fe.500 grade as per IS1786 and as amended upto date) of different of diameters for RCC works, including labour charges for srraightening,cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-spacing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of steel bars, all wastage, such as over laps, couplings, chairs, spacer bars, binding wire,cover blocks and all incidental, Operational labour charges such as cutting, bending,placing in position, tying etc., complete for finished item of work as directed by the Departmental authorities

10.61

-

901608.09

... More
Physical Infrastructure for Package RT Package 1;RCC M- 20 Design mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site including all operational, incidental and labour charges such as machine mixing, laying concrete, curing,centering and shuttering etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, and as directed by the Departmental authorities for precast slab for drain.

265.28

-

1894542.22

... More
Physical Infrastructure for Package RT Package 1;Construction of un-reinforced, design mix M 30 grade cement concrete pavement, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity using concrete mixer laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle vibrator and finished in continuous operation including Cost and conveyance of all materials, all hire and operational charges of T&P etc., curing of concrete slabs for 14- days as per Design & drawing and Technical Specification Clause 1501 MORD.(As per APDSS and as directed by the Departmental Authorities) for Block Approaches.

51

-

337493.01

... More
Physical Infrastructure for Package RT Package 1;P.C.C. work of mix M15 Prop. (1:2.5:5) 20 mm Graded hard broken granite machine crushed graded metal incluidng cost and conveyance of all materials and water to work site and all labour charges, and all operational charges incidental machine mixing charges, laying, curing etc., complete as directed by the Departmental authorities for Drain walls (1:2.5:5)

1017.45

-

8746773.46

... More
Physical Infrastructure for Package RT Package 1;P.C.C. work of mix M15 Prop.(1:2.5:5) 20 mm Graded hard broken granite machine crushed graded metal incluidng cost and conveyance of all materials and water to work site and all labour charges, and all operational charges incidental machine mixing charges, laying, curing etc., complete as directed by the Departmental authorities for Drain bed.

540

-

3264691.1

... More
Physical Infrastructure for Package RT Package 1;Laying PCC work of mix (1:4:8) Prop.using 40mm gauge hard broken granite machine crushed metal including cost and conveyance of all materials and water to worksite and all operational, incidental, labour charges, machine mixing, laying, levelling, tamping, curing,etc., complete as directed by the Departmental authorities for Levelling course for Drains.

612

-

2984748.48

... More
Physical Infrastructure for Package RT Package 1;Filling with Sand for Foundations with initial lead in layers not exceeding 15 Cm. thick consolidating each deposited layer by watering and ramming including cost and conveyance of all materials and water to work site and all operational, incidental charges and all labour charges, hire charges of T&P etc., complete for finished item of work and as directed by the Departmental Authorities.

810

-

575483.4

... More
Physical Infrastructure for Package RT Package 1;Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH as directed by the Departmentalal Authorities

4284

-

512709.12

... More
Physical Infrastructure for Package RT Package 1;Plastering in CM(1:4)Prop. 1/2" (12mm) thick in single coat with sponge finishing including cost and conveyance of all materials and water to work site and all operational, incidental, seigniorage and all labour charges,curing etc.,complete as directed by the Departmental authorities for Protection Walls and Retaining Walls.

1382.01

-

566568.82

... More
Physical Infrastructure for Package RT Package 1;Filling with Gravel in trenches sides of foundations and Basements with initial lead in layeing not excuding 15cms thick consolidating each deposited layer by watering and ramming includings cost and conveyanced water to work site and all operational, incidental, labour charges, hire charges & T& P etc., complete as directed by the Departmental authorities for finished item of work for filling Basements. (APSS No.309 & 310)

2907.45

-

811207.62

... More
Physical Infrastructure for Package RT Package 1;Brick Masonry in C.M.(1:6) Prop. with Fly Ash cement solid blocks in size 290x225x140mm of IS-12894-1990 class-5 manufacturing with compressive strength of 50 Kg/Sq.cm using fly ash, cement, gypsum and stone dust including cost and conveyance of all materials and water to work site, scaffolding and all labour charges,curing etc.,complete as directed by the Departmental authorities for Protection Walls

392.46

-

2675180.04

... More
Physical Infrastructure for Package RT Package 1;Laying PCC work of mix (1:4:8) Prop.using 40mm gauge hard broken granite machine crushed metal including cost and conveyance of all materials and water to worksite and all operational, incidental, labour charges, machine mixing, laying, levelling, tamping, curing,etc., complete as directed by the Departmental authorities for Levelling course for Drains.

78.49

-

382798.87

... More
Physical Infrastructure for Package RT Package 1;Filling with Sand for Foundations with initial lead in layers not exceeding 15 Cm. thick consolidating each deposited layer by watering and ramming including cost and conveyance of all materials and water to work site and all operational, incidental charges and all labour charges, hire charges of T&P etc., complete for finished item of work and as directed by the Departmental Authorities.

78.49

-

55765.05

... More
Physical Infrastructure for Package RT Package 1;Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH as directed by the Departmentalal Authorities

397.26

-

47544.08

... More
Physical Infrastructure for Package RT Package 1;Painting to kerb with approved Synthetic enamel paint 2 coats over priming coat with approved exterior grade cement making 3 coats in all colours including cost and conveyance of all materials, labour charges etc; complete for finished item of work (APSS No. 912)and as directed by the Department authorities

3240

-

1107245.89

... More
Physical Infrastructure for Package RT Package 1;Manufacture,supply and delivery of unplasticised 160mm dia PVC pipes for potable water supplies conforming to IS:4985/2000 include of transportation to the sub divisional stores anywhere in AP exculding excise duty and sales tax etc., (4kg/cm2)

140

-

76031.16

... More
Physical Infrastructure for Package RT Package 1;Construction of cement concrete kerb with top and bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade PCC on M-10 grade foundation 150 mm thick, foundation having 50 mm projection beyond kerb stone, kerb stone laid with kerb laying machine, foundation concrete laid manually, all complete as per clause 408 MORTH

5400

-

1894195.06

... More
Physical Infrastructure for Package RT Package 1;Providing Mild Steel Round bars ( Dowel bars) including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position of approved materials and size as per approved designs and drawings including cost and conveyance of steel bars, all wastage, and all incidental, Operational labour charges such as cutting, bending,placing in position,etc., complete and as directed by the Departmental authorities for CC pavement.

5

-

405215.06

... More
Physical Infrastructure for Package RT Package 1;Construction of un-reinforced, dowel jointed at expansion and construction joint only, Design Mix M30 Grade cement concrete pavement, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity using concrete mixcer , laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle vibrator and finished in continuous operation including Cost and conveyance of all materials, all hire and operational charges of T&P etc., provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days as per design & drawing and Technical Specification Clause 1501 MORD excluding cost of Mild steel round bars(dowel bars) as directed by the Departmental Authorities for Main Roads.

3194.6

-

22638644.24

... More
Physical Infrastructure for Package RT Package 1;Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with Vibratory Roller 80-100 kN weight to achieve the desired density including Cost and conveyance of all materials, all hire and operational charges of T&P etc., lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD / MORTH. as directed by the Departmental Authorities.

3446.54

-

8269672.62

... More
Physical Infrastructure for Package RT Package 1;Construction of granular sub-base by providing well graded material for grading-III spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with Vibratory Roller to achieve the desired density, complete as per Technical Specification Clause 401 MORD / MORTH.(CBR Value Minimum 30) including Cost and conveyance of all materials, all hire and operational charges of T&P etc., complete for finished item of work as directed by the Departmental Authorities

2787.9

-

4359248.77

... More
Physical Infrastructure for Package RT Package 1;Forming embankment with 70% of Gravel and 30% of Sand by mechanical means with all leads and lifts including pre-watering of soil at borrow area, removal of top soil, excavation of soils at borrowed area, conveyance of soil, depositing the soils on the embankment, spreading soils, breaking clods, sectioning and consolidation with Vibratory Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H, including Cost and conveyance of all materials, all hire and operational charges of T&P etc., complete for finished item of work as per MoRT&H specification 305 (4th revision) - with a lead beyond 1000m as directed by the Departmental Authorities for Side Berms

5651.25

-

2704576.66

... More
Physical Infrastructure for Package RT Package 1;Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH as directed by the Departmentalal Authorities

2789.25

-

333817

... More
Physical Infrastructure for Package RT Package 1;Item Detailed Spectification Description

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.