Andhra Pradesh Township And Infrastructure Development Corporation Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Andhra Pradesh Township And Infrastructure Development Corporation - APTIDCO Tender

Civil And Construction
Civil Works Others
Opening Date16 Apr 2022
Closing Date5 May 2022
Tender Amount₹ 25,55,85,661 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Civil Engineering Works;Filling with Sand for Foundations with initial lead in layers not exceeding 15 Cm. thick consolidating each deposited layer by watering and ramming including cost and conveyance of all materials and water to work site and all operational, incidental charges and all labour charges, hire charges of T&P etc., complete for finished item of work and as directed by the Departmental Authorities.

20.92

-

28482.58

... More
Civil Engineering Works;Filling with SAND intrenches sides of Foundations and Basements with initial lead in layeing not excuding 15cms thick consolidating each deposited layer by watering and ramming includings cost and conveyanced water to wrok site and all operational, incidental, labour charges, hire charges & T& P etc., complete for finished item of work. as directed by the Departmental Authorities.

71.71

-

97633.17

... More
Civil Engineering Works;Filling with Sand for Basements and sides of Foundations with initial lead in layers not exceeding 15 Cm. thick consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T&P etc., complete for finished item of work

9.54

-

12988.71

... More
Civil Engineering Works;Filling with Gravel in trenches sides of foundations and Basements with initial lead in layeing not excuding 15cms thick consolidating each deposited layer by watering and ramming includings cost and conveyanced water to wrok site and all operational, incidental, labour charges, hire charges & T& P etc., complete for finished item of work for filling Basements

5.95

-

8100.93

... More
Civil Engineering Works;Filling with Local Available Earth with initial lead in layers irrespective of thickness and consolidating each deposited layer using by watering including cost and conveyance all materials and water to work site and all operational charges, incidental charges and all labour charges, hire charges, complete for finished item of work.

6054.56

-

1344959.96

... More
Civil Engineering Works;Filling with Stone Crusher Dust for site levelling with initial lead in layers not exceeding 15 Cm. thick consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental and all labour charges etc., complete for finished item of work for irrespective of thickness.

430.19

-

466140.98

... More
Civil Engineering Works;Formation of Embankment with 70% Gravel and 30% Sand and Spreading in uniform layers sectioning and consolidation with vibratory Road Roller @ OMC to meet requirement of table 300-2 of MORT&H, including all hire and operational charges of T&P and seigniorage charges etc., complete for finished item of work as MORT&H specification 395 (4th revision) (Payment will be made based on level for finished item of work.)

3638.03

-

2969141.8

... More
Civil Engineering Works;Formation of embankment with 70% Gravel 30% Sand by mechanical means with all leads and lifts including pre-watering of soil at borrow area, removal of top soil, excavation of soils at borrowed area, conveyance of soil, depositing the soils on the embankment, spreading soils, breaking clods, sectioning and consolidation with Vibratory Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H, including all hire and operational charges of T&P etc., complete for finished item of work as per MoRT&H specification 305 (4th revision) - with a lead beyond 1000m. as directed by the Departmental Authorities.

1072.55

-

908020.83

... More
Civil Engineering Works;Forming embankment with 70% of Gravel and 30% of Sand by mechanical means with all leads and lifts including pre-watering of soil at borrow area, removal of top soil, excavation of soils at borrowed area, conveyance of soil, depositing the soils on the embankment, spreading soils, breaking clods, sectioning including Cost and conveyance of all materials, all hire and operational charges of T&P etc., complete for finished item of work as per MoRT&H specification 305 (4th revision) - with a lead beyond 1000m as directed by the Departmental Authorities for Side Berms.

2541.18

-

2031978.35

... More
Civil Engineering Works;Filling with Sand for Foundations with initial lead in layers not exceeding 15 Cm. thick consolidating each deposited layer by watering and ramming including cost and conveyance of all materials and water to work site and all operational, incidental charges and all labour charges, hire charges of T&P etc., complete for finished item of work and as directed by the Departmental Authorities.

472.91

-

917374.46

... More
Civil Engineering Works;Filling with Sand for Foundations with initial lead in layers not exceeding 15 Cm. thick consolidating each deposited layer by watering and ramming including cost and conveyance of all materials and water to work site and all operational, incidental charges and all labour charges, hire charges of T&P etc., complete for finished item of work and as directed by the Departmental Authorities.

15.53

-

30125.87

... More
Civil Engineering Works;Filling with SAND intrenches sides of Foundations and Basements with initial lead in layeing not excuding 15cms thick consolidating each deposited layer by watering and ramming includings cost and conveyanced water to wrok site and all operational, incidental, labour charges, hire charges & T& P etc., complete for finished item of work. as directed by the Departmental Authorities.

138.83

-

269309.38

... More
Civil Engineering Works;Filling with Sand for Basements and sides of Foundations with initial lead in layers not exceeding 15 Cm. thick consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T&P etc., complete for finished item of work

4.24

-

8224.96

... More
Civil Engineering Works;Filling with Gravel in trenches sides of foundations and Basements with initial lead in layeing not excuding 15cms thick consolidating each deposited layer by watering and ramming includings cost and conveyanced water to wrok site and all operational, incidental, labour charges, hire charges & T& P etc., complete for finished item of work for filling Basements

7.45

-

14451.88

... More
Civil Engineering Works;Filling with Local Available Earth with initial lead in layers irrespective of thickness and consolidating each deposited layer using by watering including cost and conveyance all materials and water to work site and all operational charges, incidental charges and all labour charges, hire charges, complete for finished item of work.

3682.98

-

818137.18

... More
Civil Engineering Works;Filling with Stone Crusher Dust for site levelling with initial lead in layers not exceeding 15 Cm. thick consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental and all labour charges etc., complete for finished item of work for irrespective of thickness.

736.6

-

342651.59

... More
Civil Engineering Works;Formation of Embankment with 70% Gravel and 30% Sand and Spreading in uniform layers sectioning and consolidation with vibratory Road Roller @ OMC to meet requirement of table 300-2 of MORT&H, including all hire and operational charges of T&P and seigniorage charges etc., complete for finished item of work as MORT&H specification 395 (4th revision) (Payment will be made based on level for finished item of work.)

1166

-

987135.6

... More
Civil Engineering Works;Filling with Sand for Foundations with initial lead in layers not exceeding 15 Cm. thick consolidating each deposited layer by watering and ramming including cost and conveyance of all materials and water to work site and all operational, incidental charges and all labour charges, hire charges of T&P etc., complete for finished item of work and as directed by the Departmental Authorities.

313.5

-

608142.98

... More
Civil Engineering Works;Filling with SAND intrenches sides of Foundations and Basements with initial lead in layeing not excuding 15cms thick consolidating each deposited layer by watering and ramming includings cost and conveyanced water to wrok site and all operational, incidental, labour charges, hire charges & T& P etc., complete for finished item of work. as directed by the Departmental Authorities.

289.2

-

561004.62

... More
Civil Engineering Works;Forming embankment with 70% of Gravel and 30% of Sand by mechanical means with all leads and lifts including pre-watering of soil at borrow area, removal of top soil, excavation of soils at borrowed area, conveyance of soil, depositing the soils on the embankment, spreading soils, breaking clods, sectioning and consolidation with Vibratory Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H, including Cost and conveyance of all materials, all hire and operational charges of T&P etc., complete for finished item of work as per MoRT&H specification 305 (4th revision) - with a lead beyond 1000m as directed by the Departmental Authorities

1100.51

-

1448865.44

... More
Civil Engineering Works;Forming embankment with 70% of Gravel and 30% of Sand by mechanical means with all leads and lifts including pre-watering of soil at borrow area, removal of top soil, excavation of soils at borrowed area, conveyance of soil, depositing the soils on the embankment, spreading soils, breaking clods, sectioning including Cost and conveyance of all materials, all hire and operational charges of T&P etc., complete for finished item of work as per MoRT&H specification 305 (4th revision) - with a lead beyond 1000m as directed by the Departmental Authorities for Side Berms

2884.26

-

3661712.28

... More
Civil Engineering Works;Filling with Sand for Foundations with initial lead in layers not exceeding 15 Cm. thick consolidating each deposited layer by watering and ramming including cost and conveyance of all materials and water to work site and all operational, incidental charges and all labour charges, hire charges of T&P etc., complete for finished item of work and as directed by the Departmental Authorities.

426.08

-

300241.53

... More
Civil Engineering Works;Filling with Sand for Foundations with initial lead in layers not exceeding 15 Cm. thick consolidating each deposited layer by watering and ramming including cost and conveyance of all materials and water to work site and all operational, incidental charges and all labour charges, hire charges of T&P etc., complete for finished item of work and as directed by the Departmental Authorities.

12.83

-

9040.79

... More
Civil Engineering Works;Filling with Sand for Foundations with initial lead in layers not exceeding 15 Cm. thick consolidating each deposited layer by watering and ramming including cost and conveyance of all materials and water to work site and all operational, incidental charges and all labour charges, hire charges of T&P etc., complete for finished item of work and as directed by the Departmental Authorities.

5.65

-

3981.33

... More
Civil Engineering Works;Filling with Sand for Foundations with initial lead in layers not exceeding 15 Cm. thick consolidating each deposited layer by watering and ramming including cost and conveyance of all materials and water to work site and all operational, incidental charges and all labour charges, hire charges of T&P etc., complete for finished item of work and as directed by the Departmental Authorities.

7.45

-

5249.72

... More
Civil Engineering Works;Filling with Sand with initial lead in layers not exceeding 15 Cm. thick consolidating each deposited layer by watering and ramming including cost and conveyance of all materials and water to work site and all operational, incidental charges and all labour charges, hire charges of T&P etc., complete for finished item of work and as directed by the Departmental Authorities for pipeline bed.

156.16

-

110039.71

... More
Civil Engineering Works;Filling with Sand for Foundations with initial lead in layers not exceeding 15 Cm. thick consolidating each deposited layer by watering and ramming including cost and conveyance of all materials and water to work site and all operational, incidental charges and all labour charges, hire charges of T&P etc., complete for finished item of work and as directed by the Departmental Authorities.

199.26

-

140410.55

... More
Civil Engineering Works;Site Leveling: Filling with Stone Crusher Dust for filling Plot Area and to fill the ditch portions wherever necessary in layers not exceeding 15 Cm. thick consolidating each deposited layer by watering and ramming including cost and conveyance of all materials and water to work site and all operational, incidental and all labour charges etc., complete for finished item of work for irrespective of thickness as directed by the departmental authorities.

2228.02

-

3214966.02

... More
Civil Engineering Works;Filling with Local available Earth with initial lead in layers irrespective of thickness & consolidating each deposited layer by watering including cost and conveyance all materials and water to work site & all operational charges, incidental charges and all labour charges, hire charges, complete for finished item of work and as directed by the departmental authorities.

19913.91

-

4423675.97

... More
Civil Engineering Works;Filling with Sand for Foundations with initial lead in layers not exceeding 15 Cm. thick consolidating each deposited layer by watering and ramming including cost and conveyance of all materials and water to work site and all operational, incidental charges and all labour charges, hire charges of T&P etc., complete for finished item of work and as directed by the Departmental Authorities.

156.45

-

110244.06

... More
Civil Engineering Works;Filling with Sand with initial lead in layers not exceeding 15 Cm. thick consolidating each deposited layer by watering and ramming including cost and conveyance of all materials and water to work site and all operational, incidental charges and all labour charges, hire charges of T&P etc., complete for finished item of work and as directed by the Departmental Authorities for pipeline bed.

378

-

266361.48

... More
Civil Engineering Works;Construction of Granular Sub-base by providing Well Graded material for Grading-III spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with Vibratory Roller to achieve the desired density, complete as per Technical Specification Clause 401 MORD / MORTH.(CBR Value Minimum 30) including Cost and conveyance of all materials, all hire and operational charges of T&P etc., complete for finished item of work as directed by the Departmental Authorities

3169.17

-

5590067.27

... More
Civil Engineering Works;Providing, Laying, Spreading and Compacting Graded Stone Aggregate to Wet Mix Macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site of work, laying in uniform layers in Sub-Base/Base Course on a well prepared Sub-Base and compacting with smooth wheel roller of 80 to 100 KN / Vibratory Roller 80 to 100 KN weight to achieve the desired density including lighting, barricading and maintenance of diversion etc., as per Tables.400.11 & 400.12 and technical specification Clause.406 MORD/MORTH as directed by the department and including cost & conveyance of all materials to site of work and all operational, incidental, seigniorage and all labour charges etc., complete for finished item of work

3884.94

-

10115218.28

... More
Civil Engineering Works;Construction of Granular Sub-Base by Providing Coarse Graded Material (Grade-III Material), spreading in uniform layers with motor grader with motor grader on prepared surface, mixing by mix in place memthod with Rotavator at OMC and compacting with vibratory Roller to achieve the desired density etc., complete as per Clause.401 MORTH as directed bvy the department and including cost & conveyance of all materials to site of work and all operational, incidential, seigniorage and all labour charges etc., complete for finished item of work. (CBR Value minimum 20)

1556.81

-

2746041.59

... More
Civil Engineering Works;Providing, Laying, Spreading and Compacting Graded Stone Aggregate to Wet Mix Macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site of work, laying in uniform layers in Sub-Base/Base Course on a well prepared Sub-Base and compacting with smooth wheel roller of 80 to 100 KN / Vibratory Roller 80 to 100 KN weight to achieve the desired density including lighting, barricading and maintenance of diversion etc., as per Tables.400.11 & 400.12 and technical specification Clause.406 MORD/ MORTH as directed by the department and including cost & conveyance of all materials to site of work and all operational, incidental, seigniorage and all labour charges etc., complete for finished item of work.

1638.75

-

4266813.38

... More
Civil Engineering Works;Construction of Granular Sub-base by providing Well Graded material for Grading-III spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with Vibratory Roller to achieve the desired density, complete as per Technical Specification Clause 401 MORD / MORTH.(CBR Value Minimum 30) including Cost and conveyance of all materials, all hire and operational charges of T&P etc., complete for finished item of work as directed by the Departmental Authorities

1608.83

-

1576942.99

... More
Civil Engineering Works;Providing, Laying, Spreading and Compacting Graded Stone Aggregate to Wet Mix Macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site of work, laying in uniform layers in Sub-Base/Base Course on a well prepared Sub-Base and compacting with smooth wheel roller of 80 to 100 KN / Vibratory Roller 80 to 100 KN weight to achieve the desired density including lighting, barricading and maintenance of diversion etc., as per Tables.400.11 & 400.12 and technical specification Clause.406 MORD/MORTH as directed by the department and including cost & conveyance of all materials to site of work and all operational, incidental, seigniorage and all labour charges etc., complete for finished item of work

1966.75

-

3531319.29

... More
Civil Engineering Works;Construction of Granular Sub-Base by Providing Coarse Graded Material (Grade-III Material), spreading in uniform layers with motor grader with motor grader on prepared surface, mixing by mix in place memthod with Rotavator at OMC and compacting with vibratory Roller to achieve the desired density etc., complete as per Clause.401 MORTH as directed bvy the department and including cost & conveyance of all materials to site of work and all operational, incidential, seigniorage and all labour charges etc., complete for finished item of work. (CBR Value minimum 20)

498.96

-

489070.61

... More
Civil Engineering Works;Providing, Laying, Spreading and Compacting Graded Stone Aggregate to Wet Mix Macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site of work, laying in uniform layers in Sub-Base/Base Course on a well prepared Sub-Base and compacting with smooth wheel roller of 80 to 100 KN / Vibratory Roller 80 to 100 KN weight to achieve the desired density including lighting, barricading and maintenance of diversion etc., as per Tables.400.11 & 400.12 and technical specification Clause.406 MORD/ MORTH as directed by the department and including cost & conveyance of all materials to site of work and all operational, incidental, seigniorage and all labour charges etc., complete for finished item of work.

525.23

-

943055.72

... More
Civil Engineering Works;Construction of granular sub-base by providing well graded material for grading-III spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with Vibratory Roller to achieve the desired density, complete as per Technical Specification Clause 401 MORD / MORTH.(CBR Value Minimum 30) including Cost and conveyance of all materials, all hire and operational charges of T&P etc., complete for finished item of work as directed by the Departmental Authorities

1650.76

-

3663647.22

... More
Civil Engineering Works;Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with Vibratory Roller 80-100 kN weight to achieve the desired density including Cost and conveyance of all materials, all hire and operational charges of T&P etc., lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD / MORTH. as directed by the Departmental Authorities.

2037.86

-

6263199.68

... More
Civil Engineering Works;P.C.C. work of mix M15 (1:2.5:5) Prop.20 mm Graded hard broken granite machine crushed graded metal incluidng cost and conveyance of all materials and water to work site and all labour charges, and all operational charges incidental machine mixing charges, laying, curing etc., complete as directed by the departmental authorities for Drain Bed.

604.5

-

3406049.21

... More
Civil Engineering Works;P.C.C. work of mix M15 (1:2.5:5) Prop.20 mm Graded hard broken granite machine crushed graded metal incluidng cost and conveyance of all materials and water to work site and all labour charges, and all operational charges incidental machine mixing charges, laying, curing etc., complete as directed by the departmental authorities for Drain Walls.

922.35

-

7564505.95

... More
Civil Engineering Works;P.C.C. work of mix M15 (1:2.5:5) Prop.20 mm Graded hard broken granite machine crushed graded metal incluidng cost and conveyance of all materials and water to work site and all labour charges, and all operational charges incidental machine mixing charges, laying, curing etc., complete as directed by the departmental authorities for Drain Bed.

13.95

-

78601.14

... More
Civil Engineering Works;P.C.C. work of mix M15 (1:2.5:5) Prop.20 mm Graded hard broken granite machine crushed graded metal incluidng cost and conveyance of all materials and water to work site and all labour charges, and all operational charges incidental machine mixing charges, laying, curing etc., complete as directed by the departmental authorities for Drain Walls.

27.9

-

228817.39

... More
Civil Engineering Works;P.C.C. work of mix M15 (1:2.5:5) Prop.20 mm Graded hard broken granite machine crushed graded metal incluidng cost and conveyance of all materials and water to work site and all labour charges, and all operational charges incidental machine mixing charges, laying, curing etc., complete as directed by the departmental authorities for Drain Bed.

315.28

-

1680250.08

... More
Civil Engineering Works;P.C.C. work of mix M15 (1:2.5:5) Prop.20 mm Graded hard broken granite machine crushed graded metal incluidng cost and conveyance of all materials and water to work site and all labour charges, and all operational charges incidental machine mixing charges, laying, curing etc., complete as directed by the departmental authorities for Drain Walls.

546.77

-

4323846.22

... More
Civil Engineering Works;P.C.C. work of mix M15 (1:2.5:5) Prop.20 mm Graded hard broken granite machine crushed graded metal incluidng cost and conveyance of all materials and water to work site and all labour charges, and all operational charges incidental machine mixing charges, laying, curing etc., complete as directed by the departmental authorities for Drain Bed.

10.35

-

55159.19

... More
Civil Engineering Works;P.C.C. work of mix M15 (1:2.5:5) Prop.20 mm Graded hard broken granite machine crushed graded metal incluidng cost and conveyance of all materials and water to work site and all labour charges, and all operational charges incidental machine mixing charges, laying, curing etc., complete as directed by the departmental authorities for Drain Walls.

20.7

-

163695.19

... More
Civil Engineering Works;P.C.C. work of mix M15 (1:2.5:5) Prop.20 mm Graded hard broken granite machine crushed graded metal incluidng cost and conveyance of all materials and water to work site and all labour charges, and all operational charges incidental machine mixing charges, laying, curing etc., complete as directed by the departmental authorities for Drain Bed.

209

-

1113842.51

... More
Civil Engineering Works;P.C.C. work of mix M15 (1:2.5:5) Prop.20 mm Graded hard broken granite machine crushed graded metal incluidng cost and conveyance of all materials and water to work site and all labour charges, and all operational charges incidental machine mixing charges, laying, curing etc., complete as directed by the departmental authorities for Drain Walls.

448.88

-

3549734.06

... More
Civil Engineering Works;P.C.C. work of mix M15 (1:2.5:5) Prop.20 mm Graded hard broken granite machine crushed graded metal incluidng cost and conveyance of all materials and water to work site and all labour charges, and all operational charges incidental machine mixing charges, laying, curing etc., complete as directed by the Departmental authorities for Drain bed.

284.05

-

1608631.96

... More
Civil Engineering Works;P.C.C. work of mix M15 (1:2.5:5) Prop.20 mm Graded hard broken granite machine crushed graded metal incluidng cost and conveyance of all materials and water to work site and all labour charges, and all operational charges incidental machine mixing charges, laying, curing etc., complete including formwork/ centering charges, as directed by the Departmental authorities for Drains walls.

433.42

-

3566591.51

... More
Civil Engineering Works;P.C.C. work of mix M15 (1:2.5:5) Prop.20 mm Graded hard broken granite machine crushed graded metal incluidng cost and conveyance of all materials and water to work site and all labour charges, and all operational charges incidental machine mixing charges, laying, curing etc., complete as directed by the Departmental authorities for Culvert bed.

8.55

-

48420.36

... More
Civil Engineering Works;P.C.C. work of mix M15 (1:2.5:5) Prop.20 mm Graded hard broken granite machine crushed graded metal incluidng cost and conveyance of all materials and water to work site and all labour charges, and all operational charges incidental machine mixing charges, laying, curing etc., complete including formwork/ centering charges, as directed by the Departmental authorities for Culvert walls.

17.1

-

140715.05

... More
Civil Engineering Works;P.C.C. work of mix M15 (1:2.5:5) Prop.20 mm Graded hard broken granite machine crushed graded metal incluidng cost and conveyance of all materials and water to work site and all labour charges, and all operational charges incidental machine mixing charges, laying, curing etc., complete as directed by the Departmental authorities for Drain bed.

104.3

-

590671.76

... More
Civil Engineering Works;P.C.C. work of mix M15 (1:2.5:5) Prop.20 mm Graded hard broken granite machine crushed graded metal incluidng cost and conveyance of all materials and water to work site and all labour charges, and all operational charges incidental machine mixing charges, laying, curing etc., complete including formwork/ centering charges, as directed by the Departmental authorities for Drains walls.

670.5

-

5517510.98

... More
Civil Engineering Works;Construction of un-reinforced, dowel jointed at expansion and construction joint only, Design Mix M30 Grade cement concrete pavement, 200 mm thick, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity using concrete mixcer , laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle vibrator and finished in continuous operation including Cost and conveyance of all materials, all hire and operational charges of T&P etc., provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days as per design & drawing and Technical Specification Clause 1501 MORD excluding cost of Mild steel round bars (dowel bars) as directed by the Departmental Authorities.

3544.31

-

23195630.47

... More
Civil Engineering Works;Construction of un-reinforced, design mix M 30 grade cement concrete pavement, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity using concrete mixer laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle vibrator and finished in continuous operation including Cost and conveyance of all materials, all hire and operational charges of T&P etc., curing of concrete slabs for 14- days as per Design & drawing and Technical Specification Clause 1501 MORD.(As per APDSS and as directed by the Departmental Authorities) for Block Approaches.

345.15

-

2145307.44

... More
Civil Engineering Works;Construction of cement concrete kerb with top and bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade PCC on M-10 grade foundation 150 mm thick, foundation having 50 mm projection beyond kerb stone, kerb stone laid with kerb laying machine, foundation concrete laid manually, all complete as per clause 408 MORTH

207.47

-

2302515.73

... More
Civil Engineering Works;RCC M-20 Design mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site including all operational, incidental and labour charges such as machine mixing, laying concrete, curing,centering and shuttering etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, and as directed by the Departmental authorities for Pre-cast Slab of Drains

351.49

-

2295001.23

... More
Civil Engineering Works;Supply and placing of the Design Mix M 20 Grade Concrete for RCC works corresponding to IS 456 using CONCRETE MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete with minimum cement content as per IS code from standard suppliers approved by the department and also including centering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work as per directed by the Departmental authorities for Culvert Slab.

31.25

-

204042.19

... More
Civil Engineering Works;VRCC. M30 grade design mix concrete corresponding to IS-456 using Weigh Batcher with stone aggregate of 20mm & 12.5mm gauge graded hard broken granite machine crushed metal mechanically mixed with necessary reinforcement including cost and conveyance of all materials and water to work site, and all operational, incidental, labour charges, Centering charges such as Steel Scaffolding pipes, Jack props,Steel centering plates etc., mixing concrete, transportation, pumping of concrete, laying, levelling, curing etc., complete as per standard specifications but excluding cost of steel and its fabrication charges for finished item of work to the required strength as directed by the dept., for GLSR BOTTOM SLAB.

15.08

-

107308.68

... More
Civil Engineering Works;VRCC. M30 grade design mix concrete corresponding to IS-456 using Weigh Batcher with stone aggregate of 20mm & 12.5mm gauge graded hard broken granite machine crushed metal mechanically mixed with necessary reinforcement including cost and conveyance of all materials and water to work site, and all operational, incidental, labour charges, Centering charges such as Steel Scaffolding pipes, Jack props,Steel centering plates etc., mixing concrete, transportation, pumping of concrete, laying, levelling, curing etc., complete as per standard specifications but excluding cost of steel and its fabrication charges for finished item of work to the required strength as directed by the dept., for GLSR SIDE WALLS.

15.75

-

256383.7

... More
Civil Engineering Works;VRCC. M30 grade design mix concrete corresponding to IS-456 using Weigh Batcher with stone aggregate of 20mm & 12.5mm gauge graded hard broken granite machine crushed metal mechanically mixed with necessary reinforcement including cost and conveyance of all materials and water to work site, and all operational, incidental, labour charges, Centering charges such as Steel Scaffolding pipes, Jack props,Steel centering plates etc., mixing concrete, transportation, pumping of concrete, laying, levelling, curing etc., complete as per standard specifications but excluding cost of steel and its fabrication charges for finished item of work to the required strength as directed by the dept., for GLSR TOP RING BEAM.

1.94

-

22861.29

... More
Civil Engineering Works;VRCC. M30 grade design mix concrete corresponding to IS-456 using Weigh Batcher with stone aggregate of 20mm & 12.5mm gauge graded hard broken granite machine crushed metal mechanically mixed with necessary reinforcement including cost and conveyance of all materials and water to work site, and all operational, incidental, labour charges, Centering charges such as Steel Scaffolding pipes, Jack props,Steel centering plates etc., mixing concrete, transportation, pumping of concrete, laying, levelling, curing etc., complete as per standard specifications but excluding cost of steel and its fabrication charges for finished item of work to the required strength as directed by the dept., for GLSR TOP DOME SLAB.

6.14

-

99290.37

... More
Civil Engineering Works;Supply and placing of VRCC. M20 grade design mix concrete corresponding to IS-456 using CONCRETE MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing,centering, laying concrete, vibrating,curing etc.,complete but excluding cost of steel and its fabrication charges with minimum cement content as per IS code from standard suppliers approved by the department etc. complete for finished item of work as directed by the Departmental authorities for VRCC FOOTINGS.

1

-

9241.7

... More
Civil Engineering Works;Supply and placing of VRCC. M20 grade design mix concrete corresponding to IS-456 using CONCRETE MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing,centering, laying concrete, vibrating,curing etc.,complete but excluding cost of steel and its fabrication charges with minimum cement content as per IS code from standard suppliers approved by the department etc. complete for finished item of work as directed by the Departmental authorities for VRCC PLINTH BEAMS.

0.63

-

7461.11

... More
Civil Engineering Works;Supply and placing of VRCC. M20 grade design mix concrete corresponding to IS-456 using CONCRETE MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing,centering, laying concrete, vibrating,curing etc.,complete but excluding cost of steel and its fabrication charges with minimum cement content as per IS code from standard suppliers approved by the department etc. complete for finished item of work as directed by the Departmental authorities for VRCC COLUMNS.

0.92

-

11335.5

... More
Civil Engineering Works;Supply and placing of VRCC. M20 grade design mix concrete corresponding to IS-456 using CONCRETE MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing,centering, laying concrete, vibrating,curing etc.,complete but excluding cost of steel and its fabrication charges with minimum cement content as per IS code from standard suppliers approved by the department etc. complete for finished item of work as directed by the Departmental authorities for ROOF BEAMS.

0.63

-

7256.01

... More
Civil Engineering Works;Supply and placing of VRCC. M20 grade design mix concrete corresponding to IS-456 using CONCRETE MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing,centering, laying concrete, vibrating,curing etc.,complete but excluding cost of steel and its fabrication charges with minimum cement content as per IS code from standard suppliers approved by the department etc. complete for finished item of work as directed by the Departmental authorities for ROOF SLABS.

1.2

-

14844.31

... More
Civil Engineering Works;Supply and placing of VRCC. M20 grade design mix concrete corresponding to IS-456 using CONCRETE MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing,centering, laying concrete, vibrating,curing etc.,complete but excluding cost of steel and its fabrication charges with minimum cement content as per IS code from standard suppliers approved by the department etc. complete for finished item of work as directed by the Departmental authorities for LINTELS.

0.08

-

988.24

... More
Civil Engineering Works;Supply and placing of VRCC. M20 grade design mix concrete corresponding to IS-456 using CONCRETE MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing,centering, laying concrete, vibrating,curing etc.,complete but excluding cost of steel and its fabrication charges with minimum cement content as per IS code from standard suppliers approved by the department etc. complete for finished item of work as directed by the Departmental authorities for Chajja's

0.47

-

5805.91

... More
Civil Engineering Works;Construction of un-reinforced, dowel jointed at expansion and construction joint only, Design Mix M30 Grade cement concrete pavement, 200 mm thick, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity using concrete mixcer , laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle vibrator and finished in continuous operation including Cost and conveyance of all materials, all hire and operational charges of T&P etc., provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days as per design & drawing and Technical Specification Clause 1501 MORD excluding cost of Mild steel round bars (dowel bars) as directed by the Departmental Authorities.

1788.4

-

11163729.32

... More
Civil Engineering Works;Construction of un-reinforced, design mix M 30 grade cement concrete pavement, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity using concrete mixer laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle vibrator and finished in continuous operation including Cost and conveyance of all materials, all hire and operational charges of T&P etc., curing of concrete slabs for 14- days as per Design & drawing and Technical Specification Clause 1501 MORD.(As per APDSS and as directed by the Departmental Authorities) for Block Approaches.

167.4

-

989904.83

... More
Civil Engineering Works;Construction of cement concrete kerb with top and bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade PCC on M-10 grade foundation 150 mm thick, foundation having 50 mm projection beyond kerb stone, kerb stone laid with kerb laying machine, foundation concrete laid manually, all complete as per clause 408 MORTH

105.24

-

1098750.7

... More
Civil Engineering Works;RCC M-20 Design mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site including all operational, incidental and labour charges such as machine mixing, laying concrete, curing,centering and shuttering etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, and as directed by the Departmental authorities for Pre-cast Slab of Drains

183.32

-

1147244.06

... More
Civil Engineering Works;Supply and placing of the Design Mix M 20 Grade Concrete for RCC works corresponding to IS 456 using CONCRETE MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete with minimum cement content as per IS code from standard suppliers approved by the department and also including centering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work as per directed by the Departmental authorities for Culvert Slab.

23.18

-

145063.92

... More
Civil Engineering Works;VRCC. M30 grade design mix concrete corresponding to IS-456 using Weigh Batcher with stone aggregate of 20mm & 12.5mm gauge graded hard broken granite machine crushed metal mechanically mixed with necessary reinforcement including cost and conveyance of all materials and water to work site, and all operational, incidental, labour charges, Centering charges such as Steel Scaffolding pipes, Jack props,Steel centering plates etc., mixing concrete, transportation, pumping of concrete, laying, levelling, curing etc., complete as per standard specifications but excluding cost of steel and its fabrication charges for finished item of work to the required strength as directed by the dept., for GLSR BOTTOM SLAB.

7.92

-

54293.1

... More
Civil Engineering Works;VRCC. M30 grade design mix concrete corresponding to IS-456 using Weigh Batcher with stone aggregate of 20mm & 12.5mm gauge graded hard broken granite machine crushed metal mechanically mixed with necessary reinforcement including cost and conveyance of all materials and water to work site, and all operational, incidental, labour charges, Centering charges such as Steel Scaffolding pipes, Jack props,Steel centering plates etc., mixing concrete, transportation, pumping of concrete, laying, levelling, curing etc., complete as per standard specifications but excluding cost of steel and its fabrication charges for finished item of work to the required strength as directed by the dept., for GLSR SIDE WALLS.

9.99

-

160015.42

... More
Civil Engineering Works;VRCC. M30 grade design mix concrete corresponding to IS-456 using Weigh Batcher with stone aggregate of 20mm & 12.5mm gauge graded hard broken granite machine crushed metal mechanically mixed with necessary reinforcement including cost and conveyance of all materials and water to work site, and all operational, incidental, labour charges, Centering charges such as Steel Scaffolding pipes, Jack props,Steel centering plates etc., mixing concrete, transportation, pumping of concrete, laying, levelling, curing etc., complete as per standard specifications but excluding cost of steel and its fabrication charges for finished item of work to the required strength as directed by the dept., for GLSR TOP RING BEAM.

1.24

-

14289.02

... More
Civil Engineering Works;VRCC. M30 grade design mix concrete corresponding to IS-456 using Weigh Batcher with stone aggregate of 20mm & 12.5mm gauge graded hard broken granite machine crushed metal mechanically mixed with necessary reinforcement including cost and conveyance of all materials and water to work site, and all operational, incidental, labour charges, Centering charges such as Steel Scaffolding pipes, Jack props,Steel centering plates etc., mixing concrete, transportation, pumping of concrete, laying, levelling, curing etc., complete as per standard specifications but excluding cost of steel and its fabrication charges for finished item of work to the required strength as directed by the dept., for GLSR TOP DOME SLAB.

3.14

-

49958.37

... More
Civil Engineering Works;Supply and placing of VRCC. M20 grade design mix concrete corresponding to IS-456 using CONCRETE MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing,centering, laying concrete, vibrating,curing etc.,complete but excluding cost of steel and its fabrication charges with minimum cement content as per IS code from standard suppliers approved by the department etc. complete for finished item of work as directed by the Departmental authorities for VRCC FOOTINGS.

0.49

-

4400.66

... More
Civil Engineering Works;Supply and placing of VRCC. M20 grade design mix concrete corresponding to IS-456 using CONCRETE MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing,centering, laying concrete, vibrating,curing etc.,complete but excluding cost of steel and its fabrication charges with minimum cement content as per IS code from standard suppliers approved by the department etc. complete for finished item of work as directed by the Departmental authorities for VRCC PLINTH BEAMS.

0.63

-

7296.82

... More
Civil Engineering Works;Supply and placing of VRCC. M20 grade design mix concrete corresponding to IS-456 using CONCRETE MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing,centering, laying concrete, vibrating,curing etc.,complete but excluding cost of steel and its fabrication charges with minimum cement content as per IS code from standard suppliers approved by the department etc. complete for finished item of work as directed by the Departmental authorities for VRCC COLUMNS.

0.92

-

11095.6

... More
Civil Engineering Works;Supply and placing of VRCC. M20 grade design mix concrete corresponding to IS-456 using CONCRETE MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing,centering, laying concrete, vibrating,curing etc.,complete but excluding cost of steel and its fabrication charges with minimum cement content as per IS code from standard suppliers approved by the department etc. complete for finished item of work as directed by the Departmental authorities for ROOF BEAMS.

0.63

-

7091.72

... More
Civil Engineering Works;Supply and placing of VRCC. M20 grade design mix concrete corresponding to IS-456 using CONCRETE MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing,centering, laying concrete, vibrating,curing etc.,complete but excluding cost of steel and its fabrication charges with minimum cement content as per IS code from standard suppliers approved by the department etc. complete for finished item of work as directed by the Departmental authorities for ROOF SLABS.

1.4

-

16953.29

... More
Civil Engineering Works;Supply and placing of VRCC. M20 grade design mix concrete corresponding to IS-456 using CONCRETE MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing,centering, laying concrete, vibrating,curing etc.,complete but excluding cost of steel and its fabrication charges with minimum cement content as per IS code from standard suppliers approved by the department etc. complete for finished item of work as directed by the Departmental authorities for LINTELS.

0.07

-

846.46

... More
Civil Engineering Works;Supply and placing of VRCC. M20 grade design mix concrete corresponding to IS-456 using CONCRETE MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing,centering, laying concrete, vibrating,curing etc.,complete but excluding cost of steel and its fabrication charges with minimum cement content as per IS code from standard suppliers approved by the department etc. complete for finished item of work as directed by the Departmental authorities for Chajja's

0.48

-

5804.28

... More
Civil Engineering Works;RCC M-20 Design mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site including all operational, incidental and labour charges such as machine mixing, laying concrete, curing,centering and shuttering etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, and as directed by the Departmental authorities for Pre-cast Slab of Drains

128.25

-

802607.74

... More
Civil Engineering Works;Construction of un-reinforced, dowel jointed at expansion and construction joint only, Design Mix M30 Grade cement concrete pavement, 200 mm thick, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity using concrete mixcer , laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle vibrator and finished in continuous operation including Cost and conveyance of all materials, all hire and operational charges of T&P etc., provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days as per design & drawing and Technical Specification Clause 1501 MORD excluding cost of Mild steel round bars(dowel bars) as directed by the Departmental Authorities.

1874.7

-

12322215.63

... More
Civil Engineering Works;Construction of un-reinforced, design mix M 30 grade cement concrete pavement, 200 mm thick, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity using concrete mixer laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle vibrator and finished in continuous operation including Cost and conveyance of all materials, all hire and operational charges of T&P etc., curing of concrete slabs for 14- days as per Design & drawing and Technical Specification Clause 1501 MORD.(As per APDSS and as directed by the Departmental Authorities) for Block Approaches.

100.8

-

629397.22

... More
Civil Engineering Works;Construction of cement concrete kerb with top and bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade PCC on M-10 grade foundation 150 mm thick, foundation having 50 mm projection beyond kerb stone, kerb stone laid with kerb laying machine, foundation concrete laid manually, all complete as per clause 408 MORTH

98.61

-

1100488.21

... More
Civil Engineering Works;RCC M- 20 Design mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site including all operational, incidental and labour charges such as machine mixing, laying concrete, curing,centering and shuttering etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, and as directed by the Departmental authorities for precast slab for drain.

165.17

-

1082667.88

... More
Civil Engineering Works;VRCC. M30 grade design mix concrete corresponding to IS-456 using Weigh Batcher with stone aggregate of 20mm & 12.5mm gauge graded hard broken granite machine crushed metal mechanically mixed with necessary reinforcement including cost and conveyance of all materials and water to work site, and all operational, incidental, labour charges, Centering charges such as Steel Scaffolding pipes, Jack props,Steel centering plates etc., mixing concrete, transportation, pumping of concrete, laying, levelling, curing etc., complete as per standard specifications but excluding cost of steel and its fabrication charges for finished item of work to the required strength as directed by the dept., for GLSR BOTTOM SLAB.

7.92

-

56552.76

... More
Civil Engineering Works;VRCC. M30 grade design mix concrete corresponding to IS-456 using Weigh Batcher with stone aggregate of 20mm & 12.5mm gauge graded hard broken granite machine crushed metal mechanically mixed with necessary reinforcement including cost and conveyance of all materials and water to work site, and all operational, incidental, labour charges, Centering charges such as Steel Scaffolding pipes, Jack props,Steel centering plates etc., mixing concrete, transportation, pumping of concrete, laying, levelling, curing etc., complete as per standard specifications but excluding cost of steel and its fabrication charges for finished item of work to the required strength as directed by the dept., for GLSR SIDE WALLS.

9.99

-

162865.77

... More
Civil Engineering Works;VRCC. M30 grade design mix concrete corresponding to IS-456 using Weigh Batcher with stone aggregate of 20mm & 12.5mm gauge graded hard broken granite machine crushed metal mechanically mixed with necessary reinforcement including cost and conveyance of all materials and water to work site, and all operational, incidental, labour charges, Centering charges such as Steel Scaffolding pipes, Jack props,Steel centering plates etc., mixing concrete, transportation, pumping of concrete, laying, levelling, curing etc., complete as per standard specifications but excluding cost of steel and its fabrication charges for finished item of work to the required strength as directed by the dept., for GLSR TOP RING BEAM.

1.24

-

14642.8

... More
Civil Engineering Works;VRCC. M30 grade design mix concrete corresponding to IS-456 using Weigh Batcher with stone aggregate of 20mm & 12.5mm gauge graded hard broken granite machine crushed metal mechanically mixed with necessary reinforcement including cost and conveyance of all materials and water to work site, and all operational, incidental, labour charges, Centering charges such as Steel Scaffolding pipes, Jack props,Steel centering plates etc., mixing concrete, transportation, pumping of concrete, laying, levelling, curing etc., complete as per standard specifications but excluding cost of steel and its fabrication charges for finished item of work to the required strength as directed by the dept., for GLSR TOP DOME SLAB.

3.14

-

50854.25

... More
Civil Engineering Works;Supply and placing of VRCC. M20 grade design mix concrete corresponding to IS-456 using CONCRETE MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing,centering, laying concrete, vibrating,curing etc.,complete but excluding cost of steel and its fabrication charges with minimum cement content as per IS code from standard suppliers approved by the department etc. complete for finished item of work as directed by the Departmental authorities for VRCC FOOTINGS.

0.49

-

4540.46

... More
Civil Engineering Works;Supply and placing of VRCC. M20 grade design mix concrete corresponding to IS-456 using CONCRETE MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing,centering, laying concrete, vibrating,curing etc.,complete but excluding cost of steel and its fabrication charges with minimum cement content as per IS code from standard suppliers approved by the department etc. complete for finished item of work as directed by the Departmental authorities for VRCC PLINTH BEAMS.

0.63

-

7476.58

... More
Civil Engineering Works;Supply and placing of VRCC. M20 grade design mix concrete corresponding to IS-456 using CONCRETE MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing,centering, laying concrete, vibrating,curing etc.,complete but excluding cost of steel and its fabrication charges with minimum cement content as per IS code from standard suppliers approved by the department etc. complete for finished item of work as directed by the Departmental authorities for VRCC COLUMNS.

0.92

-

11358.09

... More
Civil Engineering Works;Supply and placing of VRCC. M20 grade design mix concrete corresponding to IS-456 using CONCRETE MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing,centering, laying concrete, vibrating,curing etc.,complete but excluding cost of steel and its fabrication charges with minimum cement content as per IS code from standard suppliers approved by the department etc. complete for finished item of work as directed by the Departmental authorities for ROOF BEAMS.

0.63

-

7271.47

... More
Civil Engineering Works;Supply and placing of VRCC. M20 grade design mix concrete corresponding to IS-456 using CONCRETE MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing,centering, laying concrete, vibrating,curing etc.,complete but excluding cost of steel and its fabrication charges with minimum cement content as per IS code from standard suppliers approved by the department etc. complete for finished item of work as directed by the Departmental authorities for ROOF SLABS.

1.4

-

17352.72

... More
Civil Engineering Works;Supply and placing of VRCC. M20 grade design mix concrete corresponding to IS-456 using CONCRETE MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing,centering, laying concrete, vibrating,curing etc.,complete but excluding cost of steel and its fabrication charges with minimum cement content as per IS code from standard suppliers approved by the department etc. complete for finished item of work as directed by the Departmental authorities for LINTELS.

0.07

-

866.43

... More
Civil Engineering Works;Supply and placing of VRCC. M20 grade design mix concrete corresponding to IS-456 using CONCRETE MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing,centering, laying concrete, vibrating,curing etc.,complete but excluding cost of steel and its fabrication charges with minimum cement content as per IS code from standard suppliers approved by the department etc. complete for finished item of work as directed by the Departmental authorities for Chajja's.

0.48

-

5941.23

... More
Civil Engineering Works;RCC M- 20 Design mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site including all operational, incidental and labour charges such as machine mixing, laying concrete, curing,centering and shuttering etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, and as directed by the Departmental authorities for precast slab for drain.

111.75

-

732506.72

... More
Civil Engineering Works;E.L.S.R :- Constuction of OHSR / ELSR of 600 KL capacity with staging of 22Mts. including fixtures and all the Concrete members shall be designed with M30 grade design mix with Raft Footings including 3 Coats of eppoxy paint food grade of best quality to inner surface of reservoir including roof and 2 Coats of weather proof Emulsion painting for external surfaces, lettering, all required fixtures, Pipes, Bends,Valves etc.,for pipe connections including cost of pipes Bends and Valves as per departmental designs and drawings and The ELSR shall be designed with minimum 2 Rows of Coloumns including cost and conveyance of all materials to work site and the above rate inclusive of following fixtures: A). Pipe Connections and special with DI Materials :1. All pipe connections for Inlet,Outlet,OverFlow,Scour pipes shall be provided with D/F DI Material. 2.The valves for above pipe connections also shall be of DI material of PN 16 Duty confirming to the specifications of SoR item No.28 3. All Specials such as Bends Tees,Reducers,Duck foot Bends, Bell mouths etc., shall be of DI material. Sizes of vertical pipe connections are: 3.1.Innlet Pipe:- 300mm dia 3.2.Outlet Pipe:- 350mm dia 3.3.Overflow Pipe:- 300mm dia 3.4.Scour Pipe:- 200mm dia. 3.5.DI Valves:- 2No's C).Man Hole frames and covers made with CI/DI material with minimum size of 0.6X0.6- for roof and valve chambers. D). CI/DI double Swanneck ventilators(min of 150mm dia) in topdome and slab with flyproof necks- 4No's E).RCC Finial ventilator with fly/bird protection with GI Mesh-1No's DI Manhole frame and cover 0.6 X 0.6m as per IS specfications(Light duty)-2No's. F).RCC Precast ladders of 0.6m width-2No's G). Doglegged stair case of 1m flight width and 1.2m landing width and RCC hand railing of 1m height-1No's (The Dog Legged staircase shall be enclosed with Brick/CRS Wall on 3 sides and front side with MS collapsable gate upto 1st brace level from ground level.) H).RCC Valve chambers as per standard Drawings with RCC Cover slab fixed with CI/DI man hole frame & cover with lock and key arrangment. The Mix shall not be less than VRCC M 20 grade with 150mm thick side walls,150mm thick top slab,150mm thick base slab over base course of 100mm thick(1:4:8) prop. I).Balacony of 1.00m width at floor slab level/middle ring beam level by using Stainless steel pipe of grade 304 hand railing upto 1.20m height, with top railing of 40.mm dia pipe & middle railing of 25mm dia and verticals with 40mm dia. at an interval not more than of 1.00m c/c. J).Water level indicator of reputed make-Digital type(1.No) and conventional type(1.No) K).Lightening Arrestor with all its accessories complete including earthing with relevant IS Codes- 1No's. Compound Wall: Construction of compound wall including ornamental M.S Gate of Size of 3.0X 2.40m is included in the basic rate of ELSRs.length of compound wall hall is maximum of 150m Min. height of the compound wall shall be 1.80m above plinth and thickness 230mm in brick masonry in CM(1:6).The compound wall shall be constructed including earth work excavation in all types of soils for plinth beam of 230mmX300mm and 0.75X0.75X1.20m size fo coloumn footing portions.The footing shall be of 0.75X0.75X0.25m in VRCC M20 grade and constructed over a C.C(1:4:8)prop bed of100mm thick.The coloumns shall be 230X230 mm in size with VRCC M20 Grade at 3.00m c/c spacing having depth of size of 1.20m below ground level and height of 2.00m above GL.The plinth beam of size of 230X300mm shall be constructed in VRCC M20 grade at ground level, over a bed of CC(1:4:8)-100mm thick.450X450mm size coloumns in M20Grade shall be constructed for gate pillars.All the materials shall be followed as per the standards .Tie beam shall be provided above the brick work with 230X200mm size, fixed with MS angular of 25mm X25mmX4mm in "Y" Shape to height of 0.60m, with embedded length of 150mm in concrete.The braded wire fencing with 3 ply of 18 guages shall be streched in 4 rows(2X2).Plastering shall be done with 16mm thick in two coatsi.e., base coat 12mm thick in CM(1:6)prop and 4mm thick 2nd coat CM(1:4)prop on both sides of brick work. snowcern pain in two coats shall be provided for both sides of wall. The M.S ornamental gate as per the approved drawings shall be provided with minimum of 3.60mts widthe and 2.40mts height with enamel paint.Yard lighting shall be arranged on four corners of compound wall. If the length of the wall is increased/decreased.

600000

-

14514000

... More
Civil Engineering Works;E.L.S.R :- Constuction of OHSR / ELSR of 300 KL capacity with staging of 22Mts. including fixtures and all the Concrete members shall be designed with M30 grade design mix with Raft Footings including 3 Coats of eppoxy paint food grade of best quality to inner surface of reservoir including roof and 2 Coats of weather proof emulsion painting for external surfaces, lettering, all required fixtures, Pipes, Bends,Valves etc., for pipe connections excluding cost of pipes Bends and Valves as per departmental designs and drawings but including cost and conveyance of all materials to work site and the above rate inclusive of following fixtures: A. RCC or Aluminum ladder inside 0.60 m wide. B. Doglegged stair case shall be provided with stair case flight with of 1.2m and landing width of 1.2m with SS railing upto 1m height .C. Providing lightening arrester including conductor and earthing etc., complete-1No's. D. RCC Ventilators with copper or Stainless steel fly proof Mesh. E. DI Manhole frame and cover 0.6 X 0.6m as per IS specfications(Light duty)-2No's. F.Water level indicator of good quality with abonite/Copper float approved pattern-1.No's G. The Railing provided to gallery and staircase shall be with stainless steel of grade 304 for height of 1.2m H. The Dog Legged staircase shall be enclosed with Brick/CRS Wall on 3 sides and front side with MS collapsable gate upto 1st brace level from ground level. I.DI Swan neck ventilators in topdome and slab.

300000

-

8397000

... More
Civil Engineering Works;E.L.S.R :- Constuction of OHSR / ELSR of 300 KL capacity with staging of 22Mts. including fixtures and all the Concrete members shall be designed with M30 grade design mix with Raft Footings including 3 Coats of eppoxy paint food grade of best quality to inner surface of reservoir including roof and 2 Coats of weather proof emulsion painting for external surfaces, lettering, all required fixtures, Pipes, Bends,Valves etc., for pipe connections excluding cost of pipes Bends and Valves as per departmental designs and drawings but including cost and conveyance of all materials to work site and the above rate inclusive of following fixtures: A. RCC or Aluminum ladder inside 0.60 m wide. B. Doglegged stair case shall be provided with stair case flight with of 1.2m and landing width of 1.2m with SS railing upto 1m height .C. Providing lightening arrester including conductor and earthing etc., complete-1No's. D. RCC Ventilators with copper or Stainless steel fly proof Mesh. E. DI Manhole frame and cover 0.6 X 0.6m as per IS specfications(Light duty)-2No's. F.Water level indicator of good quality with abonite/Copper float approved pattern-1.No's G. The Railing provided to gallery and staircase shall be with stainless steel of grade 304 for height of 1.2m H. The Dog Legged staircase shall be enclosed with Brick/CRS Wall on 3 sides and front side with MS collapsable gate upto 1st brace level from ground level. I.DI Swan neck ventilators in topdome and slab.

300000

-

8397000

... More
Civil Engineering Works;Manufacture, Supplying and delivery of OD 200mm Dia. HDPE Pipe of Pressure 6.00 Kg./Sq.Cm. conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading, unloading , forwarding charges, labour charges etc., but excluding Excise duty, Sale Tax and speicals etc., complete for finished item of work. (Supply up to 90 mm dia. in coil & above 90 mm dia. straight length.) as directed by the Departmental Authorities.

724.3

-

815503.86

... More
Civil Engineering Works;Manufacture, Supplying and delivery of OD 160mm Dia. HDPE Pipe of Pressure 6.00 Kg./Sq.Cm. conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading, unloading , forwarding charges, labour charges etc., but excluding Excise duty, Sale Tax and speicals etc., complete for finished item of work. (Supply up to 90 mm dia. in coil & above 90 mm dia. straight length.) as directed by the Departmental Authorities.

183.5

-

132804.46

... More
Civil Engineering Works;Manufacture, Supplying and delivery of OD 110mm Dia. HDPE Pipe of Pressure 6.00 Kg./Sq.Cm. conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading, unloading , forwarding charges, labour charges etc., but excluding Excise duty, Sale Tax and speicals etc., complete for finished item of work. (From Borewell Junction point to GLSR connection line) as directed by the Departmental Authorities.

339.2

-

117542.98

... More
Civil Engineering Works;Manufacture, Supplying and delivery of OD 90mm Dia. HDPE Pipe of Pressure 6.00 Kg./Sq.Cm. conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading, unloading , forwarding charges, labour charges etc., but excluding Excise duty, Sale Tax and speicals etc., complete for finished item of work. (From Borewell to Borewell individual connection line upto Junction point.) as directed by the Departmental Authorities.

683

-

155198.09

... More
Civil Engineering Works;Manufacture, Supplying and delivery of OD 63mm Dia. HDPE Pipe of Pressure 6.00 Kg./Sq.Cm. conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding Excise duty, Sale Tax and speicals etc., complete for finished item of work.(Supply up to 90 mm dia. in coil & above 90 mm dia. straight length.) as directed by the Departmental Authorities.

1180

-

134071.6

... More
Civil Engineering Works;Manufacture, Supplying and delivery of OD 32mm Dia. HDPE Pipe of Pressure 6.00 Kg./Sq.Cm. conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding Excise duty, Sale Tax and speicals etc., complete for finished item of work.(Supply up to 90 mm dia. in coil & above 90 mm dia. straight length.) (From line to CPVC pipe connection at upto Ground for Each tank Connection) as directed by the Departmental Authorities.

615

-

29347.8

... More
Civil Engineering Works;Manufacture, Supplying and delivery of OD 200mm Dia. HDPE Pipe of Pressure 6.00 Kg./Sq.Cm. conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading, unloading , forwarding charges, labour charges etc., but excluding Excise duty, Sale Tax and speicals etc., complete for finished item of work. (Supply up to 90 mm dia. in coil & above 90 mm dia. straight length.) as directed by the Departmental Authorities.

18

-

20266.56

... More
Civil Engineering Works;Manufacture, Supplying and delivery of OD 160mm Dia. HDPE Pipe of Pressure 6.00 Kg./Sq.Cm. conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading, unloading , forwarding charges, labour charges etc., but excluding Excise duty, Sale Tax and speicals etc., complete for finished item of work. (Supply up to 90 mm dia. in coil & above 90 mm dia. straight length.) as directed by the Departmental Authorities.

404

-

292386.92

... More
Civil Engineering Works;Manufacture, Supplying and delivery of OD 63mm Dia. HDPE Pipe of Pressure 6.00 Kg./Sq.Cm. conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding Excise duty, Sale Tax and speicals etc., complete for finished item of work.(Supply up to 90 mm dia. in coil & above 90 mm dia. straight length.) as directed by the Departmental Authorities.

1013.59

-

115164.1

... More
Civil Engineering Works;Water Supply Lines: Manufacture, Supplying and delivery of OD 200mm Dia. HDPE Pipe of Pressure 6.00 Kg./Sq.Cm. conforming to IS.4984-1995 including cost and transportation charges to work site and loading,unloading , forwarding charges, labour charges etc., complete as directed by the Departmental Authorities

341.5

-

384501.68

... More
Civil Engineering Works;Manufacture, Supplying and delivery of OD 160mm Dia. HDPE Pipe of Pressure 6.00 Kg./Sq.Cm. conforming to IS.4984-1995 including cost and transportation charges to work site and loading,unloading , forwarding charges, labour charges etc., complete as directed by the Departmental Authorities

755

-

546416.15

... More
Civil Engineering Works;Manufacture, Supplying and delivery of OD 63 mm Dia. HDPE Pipe of Pressure 6.00 Kg./Sq.Cm. conforming to IS.4984-1995 including cost and transportation charges to work site and loading,unloading , forwarding charges, labour charges etc., complete as directed by the Departmental Authorities

336

-

38176.32

... More
Civil Engineering Works;Manufacture,Supply and Delivery of Double wall Corrogated structured wall polyethelene/polypropylne piping system with non smooth external annual corrugated &smooth internalsurface (double wall)for non pressure sewage and drainage application pipes of standard length 6m, grade confirming to IS 16098 (part-II-2013) including rubber gasket,transportation to worksite including loading , unloading charges but excluding all taxes etc., complete as directed by the Departmental authorities. Cost of DWC Pipe (150 mm I.D)

1935.5

-

703689.74

... More
Civil Engineering Works;Manufacture,Supply and Delivery of Double wall Corrogated structured wall polyethelene/polypropylne piping system with non smooth external annual corrugated &smooth internalsurface (double wall)for non pressure sewage and drainage application pipes of standard length 6m, grade confirming to IS 16098 (part-II-2013) including rubber gasket,transportation to worksite including loading , unloading charges but excluding all taxes etc., complete as directed by the Departmental authorities Cost of DWC Pipe (200mm I.D)

578.2

-

347509.76

... More
Civil Engineering Works;Manufacture,Supply and Delivery of Double wall Corrogated structured wall polyethelene/polypropylne piping system with non smooth external annual corrugated &smooth internalsurface (double wall)for non pressure sewage and drainage application pipes of standard length 6m, grade confirming to IS 16098 (part-II-2013) including rubber gasket,transportation to worksite including loading , unloading charges but excluding all taxes etc., complete as directed by the Departmental authorities. Cost of DWC Pipe (150 mm I.D)

806.51

-

293222.84

... More
Civil Engineering Works;Manufacture,Supply and Delivery of Double wall Corrogated structured wall polyethelene/polypropylne piping system with non smooth external annual corrugated &smooth internalsurface (double wall)for non pressure sewage and drainage application pipes of standard length 6m, grade confirming to IS 16098 (part-II-2013) including rubber gasket,transportation to worksite including loading , unloading charges but excluding all taxes etc., complete as directed by the Departmental authorities Cost of DWC Pipe (200mm I.D)

138.82

-

83433.6

... More
Civil Engineering Works;Manufacture,Supply and Delivery of Double wall Corrogated structured wall polyethelene/polypropylne piping system with non smooth external annual corrugated &smooth internalsurface (double wall)for non pressure sewage and drainage application pipes of standard length 6m, grade confirming to IS 16098 (part-II-2013) including rubber gasket,transportation to worksite including loading , unloading charges but excluding all taxes etc., complete as directed by the Departmental authorities. Cost of DWC Pipe (250mm I.D)

319.99

-

299933.03

... More
Civil Engineering Works;Manufacture,Supply and Delivery of Double wall Corrogated structured wall polyethelene/polypropylne piping system with non smooth external annual corrugated &smooth internalsurface (double wall)for non pressure sewage and drainage application pipes of standard length 6m, grade confirming to IS 16098 (part-II-2013) including rubber gasket,transportation to worksite including loading , unloading charges but excluding all taxes etc., complete as directed by the Departmental authorities. Cost of DWC Pipe (250mm I.D)

400

-

374928

... More
Civil Engineering Works;Manufacture,Supply and Delivery of Double wall Corrogated structured wall polyethelene/polypropylne piping system with non smooth external annual corrugated &smooth internalsurface (double wall)for non pressure sewage and drainage application pipes of standard length 6m, grade confirming to IS 16098 (part-II-2013) including rubber gasket,transportation to worksite including loading , unloading charges but excluding all taxes etc., complete as directed by the Departmental authorities Cost of DWC Pipe (200mm I.D)

920.46

-

553214.87

... More
Civil Engineering Works;Manufacture,Supply and Delivery of Double wall Corrogated structured wall polyethelene/polypropylne piping system with non smooth external annual corrugated &smooth internalsurface (double wall)for non pressure sewage and drainage application pipes of standard length 6m, grade confirming to IS 16098 (part-II-2013) including rubber gasket,transportation to worksite including loading , unloading charges but excluding all taxes etc., complete as directed by the Departmental authorities. Cost of DWC Pipe (150 mm I.D)

336

-

122159.52

... More
Civil Engineering Works;Centrifugally cast (Spun) Ductile Iron pressure pipe of 200mm Dia. K7 for water, gas and sewage with Socket Spigot ends conforming to IS.: 8329/2000 in standard working lengths of 4, 5 5.5 & 6 meter for classification K9 suitable for push-on-joint (rubber gasket d jointing) with cement mortar lining inside the pipes with outside zinc coating. Rates are ex-factory, excluding transportation and all taxes. (200mm Dia K7 pipe) as directed by the Departmental Authorities.

2410

-

5042250.2

... More
Civil Engineering Works;Trunk Main: Manufacture, Supplying and delivery of OD 200mm Dia. DI Pipe of K7 Pressure 6.00 Kg./Sq.Cm. conforming to IS.4984-1995 including cost and transportation charges to work site and loading,unloading , forwarding charges, labour charges etc., complete as directed by the Departmental Authorities

3150

-

6559686

... More
Civil Engineering Works;Earth work excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH as directed by the Departmental Authorities

2112.78

-

244702.18

... More
Civil Engineering Works;Providing Mild Steel Round bars( Dowel bars) including labour charges for straightening,cutting, bending to required sizes and shapes, placing in position of approved materials and size as per approved designs and drawings including cost and conveyance of steel bars, all wastage, and all incidental, Operational labour charges such as cutting, bending,placing in position,etc., complete and as directed by the Departmental authorities for CC pavement.

8.86

-

693365.97

... More
Civil Engineering Works;Manufacture,supply and delivery of unplasticised 160mm dia PVC pipes for potable water supplies conforming to IS:4985/2000 include of transportation to the sub divisional stores anywhere in AP exculding excise duty and sales tax etc., (4kg/cm2)

693

-

376354.44

... More
Civil Engineering Works;Painting to kerb with approved Synthetic enamel paint 2 coats over priming coat with approved exterior grade cement making 3 coats in all colours including cost and conveyance of all materials, labour charges etc; complete for finished item of work (APSS No. 912)and as directed by the Department authorities

1590.57

-

493522.06

... More
Civil Engineering Works;Earth work excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH as directed by the Departmental Authorities

4031.11

-

466883.16

... More
Civil Engineering Works;Laying of PCC work of mix (1:4:8) Prop.using 40mm gauge hard broken granite machine crushed metal including cost and conveyance of all materials and water to work site and all operational, incidental, labour charges, machine mixing, laying, levelling, tamping, curing etc., complete as directed by the departmental authorities for Levelling Course for Bed of Drains.

888.52

-

4000356.94

... More
Civil Engineering Works;Providing High Yield Strenth Deformed (HYSD)/Thermo Mechanically Treated (TMT) Steel bars ( Fe.500 grade as per IS1786 and as amended upto date) of different of diameters for RCC works, including labour charges for srraightening,cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of steel bars, all wastage, such as over laps, couplings, chairs, spacer bars, binding wire,cover blocks and all incidental, Operational labour charges such as cutting, bending,placing in position, tying etc., complete for finished item of work as directed by the Departmental authorities

8.79

-

723181.16

... More
Civil Engineering Works;Earth work excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH as directed by the Departmental Authorities

48.83

-

5655.49

... More
Civil Engineering Works;Laying of PCC work of mix (1:4:8) Prop.using 40mm gauge hard broken granite machine crushed metal including cost and conveyance of all materials and water to work site and all operational, incidental, labour charges, machine mixing, laying, levelling, tamping, curing etc., complete as directed by the departmental authorities for Levelling Course for Bed of Drains.

13.95

-

62806.67

... More
Civil Engineering Works;Providing High Yield Strenth Deformed (HYSD)/Thermo Mechanically Treated (TMT) Steel bars ( Fe.500 grade as per IS1786 and as amended upto date) of different of diameters for RCC works, including labour charges for srraightening,cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of steel bars, all wastage, such as over laps, couplings, chairs, spacer bars, binding wire,cover blocks and all incidental, Operational labour charges such as cutting, bending,placing in position, tying etc., complete for finished item of work as directed by the Departmental authorities.

1.56

-

128346.15

... More
Civil Engineering Works;Laying of Alcorr or similar type of Class SN8 structured wall (External Annular Corrugated & Smooth Internal surface) Polythelene pipes, on the lower bedding (Constructed at bottom of trenches) at prescribed gradient, depth & alignment including installation and jointing of the same with the help of coupler (on line/ off line) attached to one end of the pipe & sliding the coupler end over the elastomeric sealing rubber ring fitted on the specified valley of the spigot end of next pipe, testing the water tightness of the joint assembly, ensuring the continuity tests of specified pipe segments etc. complete as per drawing, specifications & detail engineering, including carriage of pipes & fittings from site stacks to the place of laying etc. as per direction of Engineer-in-charge.(Payment to be made on the basis of actual finished length of pipe line). Cost of DWC Pipe (150 mm I.D)

1935.5

-

150407.71

... More
Civil Engineering Works;Laying of Alcorr or similar type of Class SN8 structured wall (External Annular Corrugated & Smooth Internal surface) Polythelene pipes, on the lower bedding (Constructed at bottom of trenches) at prescribed gradient, depth & alignment including installation and jointing of the same with the help of coupler (on line/ off line) attached to one end of the pipe & sliding the coupler end over the elastomeric sealing rubber ring fitted on the specified valley of the spigot end of next pipe, testing the water tightness of the joint assembly, ensuring the continuity tests of specified pipe segments etc. complete as per drawing, specifications & detail engineering, including carriage of pipes & fittings from site stacks to the place of laying etc. as per direction of Engineer-in-charge.(Payment to be made on the basis of actual finished length of pipe line). Cost of DWC Pipe (200 mm I.D)

578.2

-

74102.11

... More
Civil Engineering Works;Construction of 904m (3'-0") Dia. Solid block Masonry INSPECTION CHAMBER as per IS.4111, Part-I-1986 with CM(1:6)Prop. Fly-Ash blocks of 225mm thick from approved source having a minium crushing strength of 50 Kg/Sq.Cm.including plastering with CM(1:3)Prop., 1/2" thick both inside and outside and fitted with 20" Dia. RCC Manhole Covers and Frames including excavating pits upto a depth of 1524mm (5'-0") in all sorts of soils (excluding rock) and laying CC(1:4:8) Prop. 150mm thick using 40mm HBG metal and PCC(1:2:4)Prop. benching and channel 100mm thick as per standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site of work, and all operational, incidental, labour charges like mixing cement mortar, construcing masonry, lift charges, curing etc., complete for finished item of work as per standard specification as directed by the Departmental authorities

37

-

394942.81

... More
Civil Engineering Works;Construction of 904.0 m (3'-0")Dia. Solid block Masonry INSPECTION CHAMBER as per IS.4111, Part-I-1986 with CM(1:6)Prop. Fly-Ash blocks of 225mm thick from approved source having a minium crushing strength of 10 N/Sq. mm. Including plastering with CM(1:3)Prop. 1/2" thick both inside and outside and fitted with 20" Dia. RCC Manhole Covers and Frames including excavating pits upto a depth of 904.00 mm (3'-0") in all sorts of soils (excluding rock) and laying CC(1:4:8) Prop. 150mm thick using 40mm HBG metal and PCC(1:2:4)Prop. benching and channel 100mm thick as per standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site of work and all operational, incidental, labour charges like mixing cement mortar, construcing masonry, lift charges, curing etc., complete for finished item of work as per standard specification as directed by the Departmental authorities

13

-

88176.66

... More
Civil Engineering Works;Supply and delivery of "Resilient Seated Soft Sealing" 200 mm dia Gate Valves (Sluice Valves) with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or Equivalent as per IS1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, Replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The Valves should be Vacuum tight and 100% leak proof with face to face dimensions as BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS - 1538 excluding all taxes, duties and transportation. (PN -1.6Mpa) as directed by the Departmental Authorities.

2

-

57214.24

... More
Civil Engineering Works;Supply and delivery of "Resilient Seated Soft Sealing" 100 mm dia Gate Valves (Sluice Valves) with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or Equivalent as per IS1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, Replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The Valves should be Vacuum tight and 100% leak proof with face to face dimensions as BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS - 1538 excluding all taxes, duties and transportation. (PN -1.6Mpa)

2

-

28344.68

... More
Civil Engineering Works;Supply and delivery of C.I. D/F Scour Valves of 100 mm Dia. conforming to IS 14846/2000 with amendments No.1 &2 heavy duty with CI grade FG 260 as per IS 210.Two coats of primer suitable for epozy paints finish shall be applied to all metal surface and finally two coats of Epoxy paint.The valve shall be tested for colsed end test against Hydrostatic test requirement of type P.N.I including cost and conveyance charges to work site loading & unloading and all other connected taxes etc., complete for finished item of work as directed by the Departmental Authorities.

2

-

28344.68

... More
Civil Engineering Works;Supply and delivery of C.I. D/F AIR VALVES OF 50 mm Dia. conforming to IS 14846/2000 with amendments No.1 & 2 heavy duty with CI grade FG-260 as per IS 210.Two coats of primer suitable for epoxy paints finish shall be applied to all metal surface and finally two coats of Epoxy paint.The valve shall be tested for colsed end test against Hydrostatic test requirement of type PN-1 including cost and conveyance charges to work site loading & unloading and all other connected taxes etc., complete for finished item of work as directed by the Departmental Authorities.

4

-

51440.32

... More
Civil Engineering Works;Supply and delivery of Centrifugally cast (spun) Ductile Iron 200 mm dia D/F 90 deg Duck foot bends confirming to IS:9523/2000 having dimensions as per table. The rates mentioned here under are for fittings, zinc coated externally with inside mortar lining (with finishing as per class 13/IS 9523/2000 (ex-words) including cost and conveyance of all materials to work site and inlcuding loading, unloading and all other connected taxes etc., complete for finished item of work (Weight = 45.00 Kgs) as directed by the Departmental Authorities.

4

-

14004.28

... More
Civil Engineering Works;Supply and delivery of D.I. D/F 100 mm Dia. Semi Circular Bends for scour valve as per speD.Ifications of IS No.,7181/1986, 5531/1988 & 3950/1979 inlcuding cost and conveyance loading unloading and all other connected taxes etc., complete for finished item of work (each of 32.11 kgs weight).as directed by the Departmental Authorities.

2

-

8647.64

... More
Civil Engineering Works;Manufacture, Supplying and delivery of 200mm Dia. HDPE TEES conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding Excise duty,Sale Tax and speicals etc.,complete for finished item of work as directed by the Departmental Authorities.

1

-

3270.98

... More
Civil Engineering Works;Manufacture, Supplying and delivery of 90mm Dia. HDPE TEES conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site & loading, unloading , forwarding charges, labour charges etc., but excluding Excise duty,Sale Tax and speicals etc.,complete for finished item of work as directed by the Departmental Authorities.

4

-

1654.24

... More
Civil Engineering Works;Manufacture, Supplying and delivery of 200mm Dia. HDPE BENDS conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding Excise duty,Sale Tax and speicals etc.,complete for finished item of work as directed by the Departmental Authorities.

4

-

11325.16

... More
Civil Engineering Works;Manufacture, Supplying and delivery of 160mm Dia. HDPE BENDS conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding Excise duty,Sale Tax and speicals etc.,complete for finished item of work as directed by the Departmental Authorities.

2

-

2913.08

... More
Civil Engineering Works;Manufacture, Supplying and delivery of 110mm Dia. HDPE BENDS conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding Excise duty,Sale Tax and speicals etc.,complete for finished item of work as directed by the Departmental Authorities.

1

-

502.18

... More
Civil Engineering Works;Manufacture, Supplying and delivery of 90mm Dia. HDPE BENDS conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding Excise duty,Sale Tax and speicals etc.,complete for finished item of work as directed by the Departmental Authorities.

1

-

379.47

... More
Civil Engineering Works;Manufacture, Supplying and delivery of HDPE (PE-100 Grade) OD 200mm Dia. M.S.Flange conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site, loading,unloading charges and including all taxes etc., complete for finished item of work. as directed by the Departmental Authorities.

4

-

2785.84

... More
Civil Engineering Works;Manufacture, Supplying and delivery of HDPE (PE-100 Grade) OD 110mm Dia. M.S.Flange conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site, loading,unloading charges and including all taxes etc., complete for finished item of work. as directed by the Departmental Authorities.

8

-

1563.36

... More
Civil Engineering Works;Earth work excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH as directed by the Departmental Authorities

1708.06

-

197827.51

... More
Civil Engineering Works;Lowering, Laying and Jointing of 200mm Dia. HDPE Pipes by butt fusion welding as per IS:7634/Part-II/1975 as amended from time to time to the alighment and gradient and testing the pipe line to the required prpessure including cost and conveyance of all materials to work site & all operational, incidential and all labour charges etc.,complete for finished item of work as directed by the Departmental Authorities.

724.3

-

73415.05

... More
Civil Engineering Works;Lowering, Laying and Jointing of 160mm Dia. HDPE Pipes by butt fusion welding as per IS:7634/Part-II/1975 as amended from time to time to the alighment and gradient and testing the pipe line to the required prpessure including cost and conveyance of all materials to work site & all operational, incidential and all labour charges etc.,complete for finished item of work as directed by the Departmental Authorities.

183.5

-

12593.61

... More
Civil Engineering Works;Lowering, Laying and Jointing of 110mm Dia. HDPE Pipes by butt fusion welding as per IS:7634/Part-II/1975 as amended from time to time to the alighment and gradient and testing the pipe line to the required prpessure including cost and conveyance of all materials to work site & all operational, incidential and all labour charges etc.,complete for finished item of work as directed by the Departmental Authorities.

339.2

-

15572.67

... More
Civil Engineering Works;Lowering, Laying and Jointing of 90mm Dia. HDPE Pipes by butt fusion welding as per IS:7634/Part-II/1975 as amended from time to time to the alighment and gradient and testing the pipe line to the required prpessure including cost and conveyance of all materials to work site & all operational, incidential and all labour charges etc.,complete for finished item of work as directed by the Departmental Authorities.

683

-

26630.17

... More
Civil Engineering Works;Lowering, Laying and Jointing of 63mm Dia. HDPE Pipes by butt fusion welding as per IS:7634/Part-II/1975 as amended from time to time to the alighment and gradient and testing the pipe line to the required prpessure including cost and conveyance of all materials to work site & all operational, incidential and all labour charges etc.,complete for finished item of work as directed by the Departmental Authorities.

1180

-

39353

... More
Civil Engineering Works;Lowering, Laying and Jointing of 32mm Dia. HDPE Pipes by butt fusion welding as per IS:7634/Part-II/1975 as amended from time to time to the alighment and gradient and testing the pipe line to the required prpessure including cost and conveyance of all materials to work site & all operational, incidential and all labour charges etc.,complete for finished item of work as directed by the Departmental Authorities.

615

-

28855.8

... More
Civil Engineering Works;Lowering and keeping in position of 200 mm Dia. Sluice Valve including conveyance of all materials to work site and nuts and bolts,rubber packing and shallock and all other charges etc., complete as per the direction of the department for finihsed item of work as directed by the Departmental Authorities.

2

-

1074.32

... More
Civil Engineering Works;Lowering and keeping in position of 100 mm Dia. Sluice Valve including conveyance of all materials to work site and nuts and bolts,rubber packing and shallock and all other charges etc., complete as per the direction of the department for finihsed item of work as directed by the Departmental Authorities.

2

-

384.22

... More
Civil Engineering Works;Lowering and keeping in position of 100 mm Dia. SCOUR VALVE including conveyance of all materials to work site and nuts and bolts,rubber packing and shallock and all other charges etc., complete as per the direction of the department for finihsed item of work as directed by the Departmental Authorities.

2

-

384.22

... More
Civil Engineering Works;Labor charges for fixing Air valves including boring the mains and threading the bore fixing nipple etc., complete.as per the direction of the department for finihsed item of work.

4

-

1387.92

... More
Civil Engineering Works;Jointing for 200mm Dia CI/DI pipes and fittings with rubber gasket (push-on-joint), excluding the cost of the gasket but including all sundries filling with water, with a water lead up to 500m and testing to required pressure, etc. complete Reference to specifications IS 3114/1994/12888/1987 as directed by the Departmental Authorities.

4

-

1126.52

... More
Civil Engineering Works;Labour charges for jointing 200mm Dia. Sluice Valve with flanged ends including cost of joining material such as rubber insertion, white lead including filling with water with lead up to 500 meters and testing to required presure complete(Reference to specifications BIS No.3114/94).

4

-

2108.28

... More
Civil Engineering Works;Labour charges for jointing 100mm Dia. Sluice Valve with flanged ends including cost of joining material such as rubber insertion, white lead including filling with water with lead up to 500 meters and testing to required presure complete(Reference to specifications BIS No.3114/94).

4

-

2003.52

... More
Civil Engineering Works;Labour charges for jointing 100mm Dia. Scour Valve with flanged ends including cost of joining material such as rubber insertion, white lead including filling with water with lead up to 500 meters and testing to required presure complete(Reference to specifications BIS No.3114/94).

8

-

4007.04

... More
Civil Engineering Works;Construction of 3'-0" Dia. (upto a depth of 0.90 Mts.) Solid block Masonry INSPECTION CHAMBER as per IS.4111, Part-I-1986 with CM(1:6)Prop. Fly-Ash blocks of 225mm thick from approved source having a minium crushing strength of 50 Kg/Sq.Cm.including plastering with CM(1:3)Prop., 1/2" thick both inside and outside and fitted with 20" Dia. RCC Manhole Covers and Frames including excavating pits upto a depth of 0.90 mts. (3'-0") in all sorts of soils (excluding rock) and laying CC(1:4:8) Prop. 150mm thick using 40mm HBG metal and PCC(1:2:4)Prop. benching and channel 100mm thick as per standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site of work, seignorage on all materials and all operational, incidental, labour charges like mixing cement mortar, construcing masonry, lift charges, curing etc., complete for finished item of work as per standard specification. (For Valve Chambers) as directed by the Departmental Authorities.

4

-

27131.28

... More
Civil Engineering Works;Supply and delivery of Bolts & Nuts with double washers including cost and conveyance of all materials to site of work,shallok/White lead etc.,for flanged joints excluding labour charges for fixing values. ( No.of Bolts for each valve 8 Nos. and total weight of Bolts 1.50 Kg./8 Nos.) as directed by the Departmental Authorities.

48

-

6053.28

... More
Civil Engineering Works;Supply and delivery of Rubber Packing including cost and conveyance of all materials to site of work etc., complete ( weight 0.44 Kgs. per joint .) as directed by the Departmental Authorities.

14.4

-

1521.5

... More
Civil Engineering Works;Refilling the pipe line trenches with excavated earth complying with standard specification after the pipe laid including all leads and lifts, depositing surplus earth watering, tamping, levelling and forming to the original level including labour charges etc., complete as directed by the department as directed by the Departmental Authorities.

1708.06

-

353739.23

... More
Civil Engineering Works;Supply and delivery of D.I. Double Flanged swing check type (Reflux Valves) Non Return Valves of 100 mm Dia. conforming to IS-5312 (Pts.1&2 with amendments upto date, if any) having body, cover, door, bearing holder with D.I., Hinge pipe, Door pin, door suspension pin with stainless steel (IS.6603), body seat ring, door face ring, bearing bushes, plugs for hinge pin with leaded tin bronze (IS.318), bolts, nuts with carbon steel, gaskets with rubber, hinges with cast steel inlcuding cost and conveyance of all materials to work site and loading, unloading, transportation etc., complete as directed by the Departmental Authorities as directed by the Departmental Authorities.

2

-

36218.18

... More
Civil Engineering Works;Supply ,delivery and fixing of 50 mm dia Gunmetal gate valve (GM Peet) as per IS-778 Class-I Indian make heavy type including cost and conveyance of all materials to work site, loading, unloading transportation charges etc., complete as directed by the Departmental Authorities as directed by the Departmental Authorities.

177

-

664831.47

... More
Civil Engineering Works;Earth work excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH as directed by the Departmental Authorities

171.68

-

19883.98

... More
Civil Engineering Works;PCC work of mix (1:4:8) Prop.using 40mm gauge hard broken granite machine crushed metal including cost and conveyance of all materials and all operational, incidental, labour charges, machine mixing, laying, levelling, tamping, curing, seigniorage charges and all other taxes etc., complete for Bed of Foundations.

9.54

-

42951.66

... More
Civil Engineering Works;Providing High Yield Strenth Deformed (HYSD)/Thermo Mechanically Treated (TMT) Steel bars ( Fe.500 grade as per IS1786 and as amended upto date) of different of diameters for RCC works, including labour charges for srraightening,cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of steel bars, all wastage, such as over laps, couplings, chairs, spacer bars, binding wire,cover blocks and all incidental, Operational labour charges such as cutting, bending,placing in position, tying etc., complete for finished item of work as directed by the Departmental authorities.

3.89

-

320042.63

... More
Civil Engineering Works;Providing Impervious coat Plastering to exposed RCC Slab surface with CM(1:4) Prop.20mm thick mixed with approved water proofing compound @ 1 Kg/bag of cement and laid over roof when the slab is green and fine rendering with cement slurry including cost & conveyance of all materials and water to work site and all operational, incidental charges, labour charges for mixing mortar, laying rendering smooth and thread lining, curing, rounding of junctions of walls and slab etc., complete for finished item of work.

152.54

-

77496.42

... More
Civil Engineering Works;Painting to new walls with snow cem or other equal and approved water proof cement paint 2 coats over priming coat with approved exterior grade cement making 3 coats all colours including cost and conveyance of all materials, labour charges etc; complete for finished item of work. GLSR WALLS

63.67

-

14667.02

... More
Civil Engineering Works;Supplying and fixing of RCC Cover of 22" Dia. of 3" thick with nominal reinforcement and hooks for lifting including cost and conveyance of all materials to work site and operational, incidental and all labour charges for fixing charges etc., complete for finiahed item of work.

2

-

1506.54

... More
Civil Engineering Works;Supply and Transportation of 10 H.P Three Phase Open Well Submersible Pumpset (100x75) make of Kirloskar/Crompton/ Texmo/KSB/Lubi of approved by the dept., suitable for errection in Open Well with water resistant dynamically balanced impeller with stainless steel shaft, sleeves, pump coupling and pivot of 3 Phase, 415 V, 50 Hz, A.C. Power supply, heavy copper winding with water proof insulation and high precision, strength not to be effected by chemical in water with suitable bronze bearings, 10 HP Pump errected with necessary H-type clamps, nuts & bolts etc., of suitable size and strength and including cost and conveyance of all materials to site of work, transportation and all labour charges etc.,complete. (total =3 Nos. ie., 1 No. for pumping and 3 No for stand by )

3

-

142246.56

... More
Civil Engineering Works;Supply and run of 4 of 56/0.3mm (4.00Sq.mm) FR P.V.C. insulated flexible copper cableFRLS/FRLS-H/HFFR/ ZHFR PVC insulated 1100V grade as per IS.694/1990 specification for Copper Cable of Category-II of make V-Guard/Bonton /Finecab/ HPL /Million/Fortune Art /Sudhakar/Orbit/ Tamra/ Anchor/Plaza/ Vihan/Ollvin/Laser/Beljin/ Rhino/ Standard / Vimal etc., including cost of cable, all materials and labour charges for fixing etc., complete as directed by the Department authorities.

75

-

15762.75

... More
Civil Engineering Works;Supply and Erection of Panel Mounting 125-A, 4 Pole, 25-KA, MCCB with thermal magnetic setting/Microprocessor based release arrangement with all connections etc., and supply of 125A 4 pole MCCB adjustable confirms to IS/IEC 60947-2 having breaking capacity 25-KA with Thermal Magnetic setting based release arrangement with all connections etc., complete on existing Panel Board including cost and conveyance of all materials to work site and all labour charges etc., complete as directed by the dept., of make L&T/Schneider/Siemens/Hager.

3

-

36899.4

... More
Civil Engineering Works;Supplying and fixing of approved make Semi Automatic Star Delta Starter fitted in CRCA sheet enclosure suitable for 3 Phase, 415-V, 50 Hz Motor Pump set, suitable for 7.50 HP to 12.50 HP automatic Star Delta Starter Motor totally enclosed with over load protection and No-volt relay to complete including cost and conveyance of all materials to work site, Transportation and all labour charges etc., complete.

3

-

54893.1

... More
Civil Engineering Works;Supplying and fixing of 100mm Dia. B class G.I. Pipe properties and weight as per IS.1239 with fittings such as elbows, tees, couplings, nipples, plugs including excavation for trenches and refilling the trenches complete except for G.I. bends, unions and GI connectors with checkout and socket of Tata/Zenith make or equivalent etc., complete including cost and conveyance of all materials to work site, Transportation and all labour charges etc., complete for Motors Section pipe lines.

45

-

38958.75

... More
Civil Engineering Works;Supplying and fixing of 25mm Dia. Nominal Bore G.I. Pipe Medium Grade properties and weight as per IS.1239 with fittings such as elbows, tees, couplings, nipples, plugs including excavation for trenches and refilling the trenches complete except for G.I. bends, unions and GI connectors with checkout and socket of Tata/Zenith make or equivalent etc., complete including cost and conveyance of all materials to work site, Transportation and all labour charges etc., complete for Sump Railings.

105

-

32209.8

... More
Civil Engineering Works;Providing Independent Earthing from Main switch Board for earth continuity with No.8, G.I wire including excavation of earth in hard gravel/hard desintegrated rock upto 5'-6'' depth below ground level of section 5'x2'x3' duly providing 40mm Dia G.I Pipe of 2mts, length using GI bolts&nuts and fixing earth wire including supply and fixing 1'-6'' dia 0'-8'' depth hume pipe ring and refilling the pit with 4 Kgs hard coke, 20Kgs salt and excavated earth including all labour charges etc., complete for finished item of work.

1

-

4302.43

... More
Civil Engineering Works;Earth work excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH as directed by the Departmental Authorities

6.4

-

741.25

... More
Civil Engineering Works;PCC(1:4:8)Prop.with 40mm guage graded hard broken granite machine crushed metal including cost and conveyance of all materials and water to work site and all operational, incidental, labour charges for laying, tamping,curing machine mixing etc.,complete for Bed of Flooring and Foundations.

1.15

-

16157.34

... More
Civil Engineering Works;Brick Masonry in C.M.(1:6) Prop. with Fly Ash cement solid blocks of size 290x225x140mm for manufacturing with compressive strength of 50 Kg/Sq.cm using fly ash, cement, gypsum and stone dust including cost and conveyance of all materials and water to work site, scaffolding and all labour charges,curing etc.,complete.

7.32

-

45806.14

... More
Civil Engineering Works;Providing High Yield Strenth Deformed (HYSD)/Thermo Mechanically Treated (TMT) Steel bars ( Fe.500 grade as per IS1786 and as amended upto date) of different of diameters for RCC works, including labour charges for srraightening,cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of steel bars, all wastage, such as over laps, couplings, chairs, spacer bars, binding wire,cover blocks and all incidental, Operational labour charges such as cutting, bending,placing in position, tying etc., complete for finished item of work as directed by the Departmental authorities.

0.32

-

26327.41

... More
Civil Engineering Works;Door of size 3?-0? x 6?-6?:- Providing and fixing Door Frames fabricated from sections made of galvanized Stell powder coated (base steel as per IS-513, galvanized as per IS-277 with zinc of 120 grams/square meter), the factory made section are powder coated with pure polyester powder of 50-60 microns thick with total coated thickness of 1.25mm, size of Door Frame section of 105x60mm with a rebate of 38mm to accommodate 30mm thick Door Shutter with groove to insert gasket in the frame section, frame sectiion filled with polyurethane foam, cut to length and joined by way of welding each frame provided with :: (a) 2mm thick MS powder coated butt hinges of 100mm long - 3 Nos for Single Shutter, 6 Nos., for double shutter (b) CRCA electroplates stiffeners of 6 Nos - 3 in each vertical (c) 40mm x 200mm x 1.20mm hold fasts screwd to stiffeners - 6 Nos. with split end tail (d) Nylon Aldrops Receiver - 1 No. for Single shutter frame (e) Tie Road - 1 No. and supplying and fixing of Single Leaf Flush Door Shutter Solid bond Wood black Board type with Commercial ply on both faces of 30mm thick conforming to IS.2202 including cost of fixtures such as (i) 2 Nos.-250mm long M.S.powder coated Aldrops, (ii) 1 No.-250mm long 10mm Dia. M.S.Powder Coated Tower Bolt, (iii) 2 Nos.-125mm long M.S.powder coated Door Handles and (iv) 1 No. M.S.Powder coated Door Stopper and including cost and conveyance of all materials to work site and all labour charges etc., complete as directed by the department.

1

-

7688.86

... More
Civil Engineering Works;0.60 x 0.90 m Window::- Providing and Fixing of openable windows made of Pre-painted steel (base steel as per IS 513 of 0.58mm thick Galvanized as per IS 277 with zinc of 120 GSM ) primer coated with epoxy primer of 5-7 microns thick. finish painted with a polyester paint of 12-16 microns thick and back coated with 5-7 microns thick alkyd backer and section for outer frame of 48 x 50mm, centre mullion of 48 x 50 mm section for shutter of 48 x 25 mm and the fixed glass beading section should be 12 x 12mm and the outer frame and mullions to have rebate for glazed shutter with a 20mm provision for guard bars/grills and the sections cut to length metre joined with corner bracket, centre mullion fixed with mullion cap, handle, stay, 2 nos. of stairless steel heavy duty pivot hinges provided per shutter and windows fitted with 5mm thick plain float glass with rubber gaskets including fixing the frames in concrete/masonry wall by means of self expanding screws, including 10mm square guard bars with 6" (152.4mm) pitch etc., complete for finished item of work. (Single shutter window 2'0" x 4'0" (609.6mm x 1219.2mm). Outer frame section size of 48 x 50mm shutter frame section size of 48 x 25mm.

1

-

3522.84

... More
Civil Engineering Works;Supply and fixing to Cement JALLIES 40mm thick including cost and conveyance of all materials and water to work site and all operational, incidental charges, mxing, laying and all labour charges, curing with neat finishing etc., complete for finished item of work as directed by the dept.

0.17

-

49.64

... More
Civil Engineering Works;Plastering 12mm thick in Single Coat in CM(1:3)Prop. with sponge finishing including cost and conveyance of all materials and water to site of work and all operational, incidental charges, scaffolding charges, hacking surface and all labour charges, curing etc.,complete for finished item of work to the required strength as directed by the dept.,for CEILING

11.5

-

4085.72

... More
Civil Engineering Works;Plastering 12mm thick in Single Coat in CM(1:4)Prop. with sponge finishing including cost and conveyance of all materials and water to site of work and all operational, incidental charges, scaffolding charges, hacking surface and all labour charges, curing etc., complete for finished item of work to the required strength as directed by the dept., for INTERNAL WALLS and EXTERNAL WALLS..

61.7

-

22679.69

... More
Civil Engineering Works;Painting to Doors and M.S.Grills with primer and two coats with Synthetic enamel paint in all shades of Grade-I aprpoved brand and colour including cost and conveyance of all materials to work site and all operational, incidential and all labour charges such as sand paper, cleaning the surface, cost of brushes etc., complete for finished item of work as directed by the department (Three coats).

3.56

-

646.92

... More
Civil Engineering Works;Painting to new walls with approved water proof cement paint 2 coats over priming coat with approved exterior grade cement making 3 coats in all colours including cost of priming coat and cost and conveyance of all materials, labour charges etc; complete for finished item of work and as directed by the Departmental authorities

61.7

-

14213.21

... More
Civil Engineering Works;Earth work excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH as directed by the Departmental Authorities

1037.88

-

120207.26

... More
Civil Engineering Works;Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means as per MORTH specification and as directed by the Engineer-in-Charge.

8193.75

-

283749.56

... More
Civil Engineering Works;Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom for finished item of work as per MORTH & H and as directed by the Engineer-in-Charge.

8193.75

-

60551.81

... More
Civil Engineering Works;Providing and laying of 50mm thick bituminous macadam with HOT Mix Plant producing an average output of 37.50 tonnes per hour using hard blasted granate crushed aggregates of Grade.II premixed with bituminous binder of V.G. 30 grade @ 3.40% by weight of total mixer, transported to site laid over a previously prepared surface with mechanical paver finisher to the required grade, level and alignment and rolled to achieve the desired compaction for finished item of work as directed by the Engineer-in-Charge including hire and operational charges all T&P and all other contingent charges necessay including cost of seigniorage charges on all materials etc., complete and as per MORTH Specification. Note: Quantity of bitumen is proposed for rate analysis only. The actual quantity will deperd upon job mix formula.

409.69

-

2987836.39

... More
Civil Engineering Works;Providing 25mm thick compacted semi dense bituminous concrete by hot mix plant using hard blasted granite crushed aggregate of grading-II premixed with bituminous binder V.G.30 grade @ 5.00 per cent of mix and filler, transporting the hot mix to work site, laying with a Mechnical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification complete for finished item of work in all respects as directed by Engineer-in-charge. Note: The percent of bitumen is proposed for rate analysis only. The actual percent shall be arrived based on job mix formula.

204.84

-

1808790.46

... More
Civil Engineering Works;Supplying & Commissioning of RO based Drinking water plant 1000LPH. which consist of the followings 1.RAW WATER TRANSFER PUMP: Quantity required : One No. Material of construction : CI. Capacity : 2.5 m3/hr at 2.5kg/cm2, head-25m. Make of material : Kirloskar/ CRI/Eqvt. 2. DUAL MADIA FILLTER : Numbers required : One No. Normal operating flow rate : 2.5m3/hr Size of unit Dia × Ht. mm : 14?×65? ,Material of construction : FRP,Normal operating pressure : 3.0kg /cm2,Tested Pressure: 11.0 kg/cm2,Max. pressure drop : 0.5kg/cm2 ,Flow control : Top mounted multi port valve ,Media : Graded silex &sand,Make : Waterlife/Pentair ,3. ACTIVATED CARBON FILTER: Numbers required : One No. Normal operating flow rate : 1.0m3/hr ,Size of unit dia × Ht. mm : 12×48 ,Material of construction : FRP ,Normal operating pressure : 2.5 kg/cm2,Max. Pressure Drop : 0.5 kg/cm2 Flow control : Top mounted multi-port valve ,Media : Activated Carbon ,Activated Carbon Make : VBD/Eqvt. Make: Waterlife/Pentair,4. ANTISCALANT DOSING SYSTEM: No. required : One No. ,Type : Diaphragm type electronic pump Capacity : 0-5 LPH Make : E-dose / HITECH 5.MICRON FILTER: Quantity required : Two No. Type : Disposable cartridge Operating flow rate : 1.0 m3/hr ,Operating pressure : 2.5 kg/cm2,Micron rating : 5 micron ,Type of cartridge : PP Wound ,MoC : Polycarbonate. 6. HIGH PRESSURE PUMP: Quantity required : One No. Operating flow rate : 2.5 m3/hr ,Operating pressure : 12-14 kg/cm 2 ,Make of pump : Sumo/CRI/Eqvt. Type of drive : Single phase, 230 V, 50 Hz 2900 rpm. 7. RO MENBRANE HOUSING: Quantity required : TWO No. Material of pressure tube : FRP 4040 Element capacity : 02 No. Max. working pressure : 300 psi Make : Waterlife 8. RO MENBRANE: Quantity required : 4 No. Dimensions : Dia-8?, Length?40? ,Working pressure : 180 psi Element : Spiral wound Membrane. Make : /HITECH /Eqvt. Pore size of semi-permeable membrane- 0.0001 micron diameters. 9. ELECTRICAL CONTROL PANEL ,Quantity required : One no. Material of construction : SS with powder coating, skid mount. Electrical components make : L&T/Siemens/Havell?s. 10.U.V System

1

-

168000

... More
Civil Engineering Works;Civil Works for RO Plantation mountation Works and Etc..

1

-

7000

... More
Civil Engineering Works;Supplying & laying of CPVC PIPES of 54.00mm OD Pipe SDR-11 and fittings or equal and for Hot & Cold confirming to IS.15778-2007 with malleable specials such as Tees, Elbows, Check nuts, unions, bushes etc., colvent cement including fixing in walls, ceiling floors including cost and conveyance of all materials to site of work and include for necessary excavation in all sorts of soils, chasing in the walls etc., refilling consolidation with the excavated earth and making bores in walls ceiling etc., and making good the chased surface in cement mortar and complete. When making a transition use metal threads fittings, including all taxes for finished item of work as directed by the department.

15

-

8623.5

... More
Civil Engineering Works;Supplying & laying of CPVC PIPES of 34.9mm OD Pipe SDR-11 and fittings or equal and for Hot & Cold confirming to IS.15778-2007 with malleable specials such as Tees, Elbows, Check nuts, unions, bushes etc., colvent cement including fixing in walls, ceiling floors including cost and conveyance of all materials to site of work and include for necessary excavation in all sorts of soils, chasing in the walls etc., refilling consolidation with the excavated earth and making bores in walls ceiling etc., and making good the chased surface in cement mortar and complete. When making a transition use metal threads fittings, including all taxes for finished item of work as directed by the dept.

3

-

818.01

... More
Civil Engineering Works;Supplying and fixing of 32mm N.B. size Gunmetal Gate (G.M.Peet) Valve as per IS.778, Class-I of Indian make heavy type including cost and conveyance of all materials to work site and all jointing materials, labour charges etc., complete for finished item of work as directed by the department.

1

-

1898.51

... More
Civil Engineering Works;Supplying and fixing of CP Long body bib cock fancy type deluxe heavy duty 12.70mm Dia. Indian make heavy duty of approved make including cost and conveyance of all materials to work site and all jointing materials, labour charges etc., complete for finished item of work.

5

-

3255

... More
Civil Engineering Works;Brick Masonry in C.M.(1:4) Prop. with Fly Ash cement/lime solid blocks in size 290x225x140 mm of IS-12894-1990 class-5 manufacturing with compressive strength of 50 Kg/Sq.Cm. using fly ash, cement, gypsum and stone dust including cost and conveyance of all materials and water to work site, scaffolding and all labour charges, curing etc., complete. Water Tank Pillers= 2 Nos. (Size:1.5x1.5x0.3x2Nos=1.35Cum.)

1.35

-

7010.77

... More
Civil Engineering Works;Drilling of Bore hole (which may be carried out by pilot bore hole) to a finished dia of 200/225/300 /350/450 mm hole (for insertion of 110/140/160/180/200mm PVC Pipe/175/200mm PVC Blue casing pipe) by Rotary drilling rig in all formations suitable for Rotary drilling such as alluvium, Loamy, clayey, sandy, burled channels, highly disturbed and bouldary zones high sheared and fractured zones followed by jointed to massive soft, medium rock, all formations typical and suitable for rotary drilling etc. including insertion of casing pipe , couplings, cap, plug fixation, and including filling the peripheral gap with rebuIlled pebbled gravel packing, bore development, conducting yield test, and all other required in the fixation of pipes assembly etc. but excluding the cost of casing pipe, couplings, dummys, damps etc., as recommended by the departmental Geologist. The bore should be developed with compressor air until clear water free from sand and other materials continuously discharged. The size of gravel used for gravel packing should be as per 1SI specification used for rotary tube well. The pebbled gravel acking should be carried out in such a way that the theoretical quantity consumed completely.

610

-

829600

... More
Civil Engineering Works;Cost and supply of 175 mm dia. PVC blue casing pipe including transportation to the work site.

610

-

704550

... More
Civil Engineering Works;180mm dia. PVC Casing pipe perforation charge

610

-

208620

... More
Civil Engineering Works;Supply & Fixing of 180mm dia. PVC Bor Cap

10

-

3150

... More
Civil Engineering Works;Geological Survey charges excluding taxes for Plain Area

10

-

13000

... More
Civil Engineering Works;Supply and Transportation of 5 HP, 5-10 Stage, 5 star rated vertical Submersible Motor Pumpset, confirming to IS.8034 and motor confirming to IS.9283 with water proof winding, Pump shall be suitable for various delivery dead and dischage with stainles steel shaft, Motor suitable for wrking on 415V (+)/(-) 10%, Three Phase 50 Hz AC supply, etc., complete for 6" Bore Well. Makes: Kirloskar/Crompton/Texmo/ CRI/KSB/Lubi/PSG/ Aryen Varsha

10

-

457988.9

... More
Civil Engineering Works;Supplying and Run of 4 of 56/0.3mm (4.0 Sq.mm.) insulated flexible copper cable of Gold medal/ standard/million/suncab make in the existing metalic/Non metalic conduit pipe including all materials and all labour charges etc., complete for Motors connection.

1950

-

409831.5

... More
Civil Engineering Works;Supply and Erection of Panel Mounting 125-A, 4 Pole, 25-KA, MCCB with thermal magnetic setting/Microprocessor based release arrangement with all connections etc., and supply of 125A 4 pole MCCB adjustable confirms to IS/IEC 60947-2 having breaking capacity 25-KA with Thermal Magnetic setting based release arrangement with all connections etc., complete on existing Panel Board including cost and conveyance of all materials to work site and all labour charges etc., complete as directed by the dept., of make L&T/Schneider/Siemens/ Hager.

10

-

122998

... More
Civil Engineering Works;Supplying and fixing of approved make Semi Automatic Star Delta Starter fitted in CRCA sheet enclosure suitable for 3 Phase, 415-V, 50 Hz Motor Pump set, suitable for 7.50 HP to 12.50 HP automatic Star Delta Starter Motor totally enclosed with over load protection and No-volt relay to complete including cost and conveyance of all materials to work site, Transportation and all labour charges etc., complete.

10

-

182977

... More
Civil Engineering Works;Manufacture, Supplying and delivery of OD 50mm Dia. HDPE Pipe of Pressure 8.00 Kg./Sq.Cm. conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading, unloading, forwarding charges, labour charges etc., but excluding Excise duty, Sale Tax and speicals etc., complete for finished item of work.(from Bore Hole Pipe)

600

-

55896

... More
Civil Engineering Works;Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH as directed by the Departmentalal Authorities

1072.55

-

124222.74

... More
Civil Engineering Works;Providing Mild Steel Round bars( Dowel bars) including labour charges for straightening,cutting, bending to required sizes and shapes, placing in position of approved materials and size as per approved designs and drawings including cost and conveyance of steel bars, all wastage, and all incidental, Operational labour charges such as cutting, bending,placing in position,etc., complete and as directed by the Departmental authorities for CC pavement.

4.47

-

349813.3

... More
Civil Engineering Works;Manufacture,supply and delivery of unplasticised 160mm dia PVC pipes for potable water supplies conforming to IS:4985/2000 include of transportation to the sub divisional stores anywhere in AP exculding excise duty and sales tax etc., (4kg/cm2)

538.2

-

292285.66

... More
Civil Engineering Works;Painting to kerb with approved Synthetic enamel paint 2 coats over priming coat with approved exterior grade cement making 3 coats in all colours including cost and conveyance of all materials, labour charges etc; complete for finished item of work (APSS No. 912)and as directed by the Department authorities

2157.37

-

669388.76

... More
Civil Engineering Works;Earth work excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH as directed by the Departmental Authorities

2102.43

-

243503.44

... More
Civil Engineering Works;Laying of PCC work of mix (1:4:8) Prop.using 40mm gauge hard broken granite machine crushed metal including cost and conveyance of all materials and water to work site and all operational, incidental, labour charges, machine mixing, laying, levelling, tamping, curing etc., complete as directed by the departmental authorities for Levelling Course for Bed of Drains.

482.68

-

2031551.85

... More
Civil Engineering Works;Providing High Yield Strenth Deformed (HYSD)/Thermo Mechanically Treated (TMT) Steel bars ( Fe.500 grade as per IS1786 and as amended upto date) of different of diameters for RCC works, including labour charges for srraightening,cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of steel bars, all wastage, such as over laps, couplings, chairs, spacer bars, binding wire,cover blocks and all incidental, Operational labour charges such as cutting, bending,placing in position, tying etc., complete for finished item of work as directed by the Departmental authorities

11

-

905004.87

... More
Civil Engineering Works;Earth work excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH as directed by the Departmental Authorities

36.23

-

4196.16

... More
Civil Engineering Works;Laying of PCC work of mix (1:4:8) Prop.using 40mm gauge hard broken granite machine crushed metal including cost and conveyance of all materials and water to work site and all operational, incidental, labour charges, machine mixing, laying, levelling, tamping, curing etc., complete as directed by the departmental authorities for Levelling Course for Bed of Drains.

10.35

-

43562.12

... More
Civil Engineering Works;Providing High Yield Strenth Deformed (HYSD)/Thermo Mechanically Treated (TMT) Steel bars ( Fe.500 grade as per IS1786 and as amended upto date) of different of diameters for RCC works, including labour charges for srraightening,cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of steel bars, all wastage, such as over laps, couplings, chairs, spacer bars, binding wire,cover blocks and all incidental, Operational labour charges such as cutting, bending,placing in position, tying etc., complete for finished item of work as directed by the Departmental authorities.

1.85

-

152205.36

... More
Civil Engineering Works;Laying of Alcorr or similar type of Class SN8 structured wall (External Annular Corrugated & Smooth Internal surface) Polythelene pipes, on the lower bedding (Constructed at bottom of trenches) at prescribed gradient, depth & alignment including installation and jointing of the same with the help of coupler (on line/ off line) attached to one end of the pipe & sliding the coupler end over the elastomeric sealing rubber ring fitted on the specified valley of the spigot end of next pipe, testing the water tightness of the joint assembly, ensuring the continuity tests of specified pipe segments etc. complete as per drawing, specifications & detail engineering, including carriage of pipes & fittings from site stacks to the place of laying etc. as per direction of Engineer-in-charge.(Payment to be made on the basis of actual finished length of pipe line). Cost of DWC Pipe (150 mm I.D)

806.51

-

62673.89

... More
Civil Engineering Works;Laying of Alcorr or similar type of Class SN8 structured wall (External Annular Corrugated & Smooth Internal surface) Polythelene pipes, on the lower bedding (Constructed at bottom of trenches) at prescribed gradient, depth & alignment including installation and jointing of the same with the help of coupler (on line/ off line) attached to one end of the pipe & sliding the coupler end over the elastomeric sealing rubber ring fitted on the specified valley of the spigot end of next pipe, testing the water tightness of the joint assembly, ensuring the continuity tests of specified pipe segments etc. complete as per drawing, specifications & detail engineering, including carriage of pipes & fittings from site stacks to the place of laying etc. as per direction of Engineer-in-charge.(Payment to be made on the basis of actual finished length of pipe line). Cost of DWC Pipe (200 mm I.D)

138.82

-

17791.17

... More
Civil Engineering Works;Laying of Alcorr or similar type of Class SN8 structured wall (External Annular Corrugated & Smooth Internal surface) Polythelene pipes, on the lower bedding (Constructed at bottom of trenches) at prescribed gradient, depth & alignment including installation and jointing of the same with the help of coupler (on line/ off line) attached to one end of the pipe & sliding the coupler end over the elastomeric sealing rubber ring fitted on the specified valley of the spigot end of next pipe, testing the water tightness of the joint assembly, ensuring the continuity tests of specified pipe segments etc. complete as per drawing, specifications & detail engineering, including carriage of pipes & fittings from site stacks to the place of laying etc. as per direction of Engineer-in-charge.(Payment to be made on the basis of actual finished length of pipe line). Cost of DWC Pipe (250 mm I.D)

319.99

-

64132.4

... More
Civil Engineering Works;Construction of 904m (3'-0") Dia. Solid block Masonry INSPECTION CHAMBER as per IS.4111, Part-I-1986 with CM(1:6)Prop. Fly-Ash blocks of 225mm thick from approved source having a minium crushing strength of 50 Kg/Sq.Cm.including plastering with CM(1:3)Prop., 1/2" thick both inside and outside and fitted with 20" Dia. RCC Manhole Covers and Frames including excavating pits upto a depth of 1524mm (5'-0") in all sorts of soils (excluding rock) and laying CC(1:4:8) Prop. 150mm thick using 40mm HBG metal and PCC(1:2:4)Prop. benching and channel 100mm thick as per standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site of work, and all operational, incidental, labour charges like mixing cement mortar, construcing masonry, lift charges, curing etc., complete for finished item of work as per standard specification as directed by the Departmental authorities

13

-

138763.69

... More
Civil Engineering Works;Construction of 904.0 m (3'-0")Dia. Solid block Masonry INSPECTION CHAMBER as per IS.4111, Part-I-1986 with CM(1:6)Prop. Fly-Ash blocks of 225mm thick from approved source having a minium crushing strength of 10 N/Sq. mm. Including plastering with CM(1:3)Prop. 1/2" thick both inside and outside and fitted with 20" Dia. RCC Manhole Covers and Frames including excavating pits upto a depth of 904.00 mm (3'-0") in all sorts of soils (excluding rock) and laying CC(1:4:8) Prop. 150mm thick using 40mm HBG metal and PCC(1:2:4)Prop. benching and channel 100mm thick as per standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site of work and all operational, incidental, labour charges like mixing cement mortar, construcing masonry, lift charges, curing etc., complete for finished item of work as per standard specification as directed by the Departmental authorities

19

-

128873.58

... More
Civil Engineering Works;Supply and delivery of "Resilient Seated Soft Sealing" 200 mm dia Gate Valves (Sluice Valves) with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or Equivalent as per IS1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, Replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The Valves should be Vacuum tight and 100% leak proof with face to face dimensions as BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS - 1538 excluding all taxes, duties and transportation. (PN -1.6Mpa) as directed by the Departmental Authorities.

1

-

28607.12

... More
Civil Engineering Works;Supply and delivery of "Resilient Seated Soft Sealing" 150 mm dia Gate Valves (Sluice Valves) with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or Equivalent as per IS1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, Replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The Valves should be Vacuum tight and 100% leak proof with face to face dimensions as BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS - 1538 excluding all taxes, duties and transportation. (PN -1.6Mpa)

5

-

110229.25

... More
Civil Engineering Works;Supply and delivery of C.I. D/F Scour Valves of 100 mm Dia. conforming to IS 14846/2000 with amendments No.1 &2 heavy duty with CI grade FG 260 as per IS 210.Two coats of primer suitable for epozy paints finish shall be applied to all metal surface and finally two coats of Epoxy paint.The valve shall be tested for colsed end test against Hydrostatic test requirement of type P.N.I including cost and conveyance charges to work site loading & unloading and all other connected taxes etc., complete for finished item of work as directed by the Departmental Authorities.

1

-

14172.34

... More
Civil Engineering Works;Supply and delivery of C.I. D/F AIR VALVES OF 50 mm Dia. conforming to IS 14846/2000 with amendments No.1 & 2 heavy duty with CI grade FG-260 as per IS 210.Two coats of primer suitable for epoxy paints finish shall be applied to all metal surface and finally two coats of Epoxy paint.The valve shall be tested for colsed end test against Hydrostatic test requirement of type PN-1 including cost and conveyance charges to work site loading & unloading and all other connected taxes etc., complete for finished item of work as directed by the Departmental Authorities.

2

-

25720.16

... More
Civil Engineering Works;Supply and delivery of Centrifugally cast (spun) Ductile Iron 200 mm dia D/F 90 deg Duck foot bends confirming to IS:9523/2000 having dimensions as per table. The rates mentioned here under are for fittings, zinc coated externally with inside mortar lining (with finishing as per class 13/IS 9523/2000 (ex-words) including cost and conveyance of all materials to work site and inlcuding loading, unloading and all other connected taxes etc., complete for finished item of work (Weight = 45.00 Kgs) as directed by the Departmental Authorities.

1

-

3501.07

... More
Civil Engineering Works;Supply and delivery of D.I. D/F 100 mm Dia. Semi Circular Bends for scour valve as per speD.Ifications of IS No.,7181/1986, 5531/1988 & 3950/1979 inlcuding cost and conveyance loading unloading and all other connected taxes etc., complete for finished item of work (each of 32.11 kgs weight).as directed by the Departmental Authorities.

1

-

4323.82

... More
Civil Engineering Works;Manufacture, Supplying and delivery of 160mm Dia. HDPE TEES conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding Excise duty,Sale Tax and speicals etc.,complete for finished item of work as directed by the Departmental Authorities.

1

-

1751.94

... More
Civil Engineering Works;Manufacture, Supplying and delivery of 63mm Dia. HDPE TEES conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site & loading, unloading , forwarding charges, labour charges etc., but excluding Excise duty,Sale Tax and speicals etc.,complete for finished item of work as directed by the Departmental Authorities.

34

-

6605.52

... More
Civil Engineering Works;Manufacture, Supplying and delivery of 160mm Dia. HDPE BENDS conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding Excise duty,Sale Tax and speicals etc.,complete for finished item of work as directed by the Departmental Authorities.

2

-

2913.08

... More
Civil Engineering Works;Manufacture, Supplying and delivery of 63mm Dia. HDPE BENDS conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., but excluding Excise duty,Sale Tax and speicals etc.,complete for finished item of work as directed by the Departmental Authorities.

5

-

857.8

... More
Civil Engineering Works;Manufacture, Supplying and delivery of HDPE (PE-100 Grade) OD 160 mm Dia. HDPE End caps conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site, loading,unloading charges and including all taxes etc., complete for finished item of work.as directed by the Departmental Authorities.

6

-

2160.96

... More
Civil Engineering Works;Manufacture, Supplying and delivery of HDPE (PE-100 Grade) OD 200mm Dia. M.S.Flange conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site, loading,unloading charges and including all taxes etc., complete for finished item of work. as directed by the Departmental Authorities.

2

-

1392.92

... More
Civil Engineering Works;Manufacture, Supplying and delivery of HDPE (PE-100 Grade) OD 160mm Dia. M.S.Flange conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site, loading,unloading charges and including all taxes etc., complete for finished item of work. as directed by the Departmental Authorities.

10

-

3817.5

... More
Civil Engineering Works;Earth work excavation and depositing on bank with an initial lead of 10mts and lift of 2mts in sand or loose soils, wet Sand not under water, silt in canals, channels and drains etc., and incluidng all operational, incidental, labour charges, shuch as shoring, sheeting, planking, strutting and dewatering charges etc., complete for finished item of work for Water Supply Main Lines. as directed by the Departmental Authorities.

1112.72

-

128875.23

... More
Civil Engineering Works;Lowering, Laying and Jointing of 200mm Dia. HDPE Pipes by butt fusion welding as per IS:7634/Part-II/1975 as amended from time to time to the alighment and gradient and testing the pipe line to the required prpessure including cost and conveyance of all materials to work site & all operational, incidential and all labour charges etc.,complete for finished item of work as directed by the Departmental Authorities.

18

-

8269.38

... More
Civil Engineering Works;Lowering, Laying and Jointing of 160mm Dia. HDPE Pipes by butt fusion welding as per IS:7634/Part-II/1975 as amended from time to time to the alighment and gradient and testing the pipe line to the required prpessure including cost and conveyance of all materials to work site & all operational, incidential and all labour charges etc.,complete for finished item of work as directed by the Departmental Authorities.

404

-

120303.12

... More
Civil Engineering Works;Lowering, Laying and Jointing of 63mm Dia. HDPE Pipes by butt fusion welding as per IS:7634/Part-II/1975 as amended from time to time to the alighment and gradient and testing the pipe line to the required prpessure including cost and conveyance of all materials to work site & all operational, incidential and all labour charges etc.,complete for finished item of work as directed by the Departmental Authorities.

1013.59

-

69816.08

... More
Civil Engineering Works;Lowering and keeping in position of 200 mm Dia. Sluice Valve including conveyance of all materials to work site and nuts and bolts,rubber packing and shallock and all other charges etc., complete as per the direction of the department for finihsed item of work as directed by the Departmental Authorities.

1

-

537.16

... More
Civil Engineering Works;Lowering and keeping in position of 150 mm Dia. Sluice Valve including conveyance of all materials to work site and nuts and bolts,rubber packing and shallock and all other charges etc., complete as per the direction of the department for finihsed item of work as directed by the Departmental Authorities.

5

-

1628

... More
Civil Engineering Works;Lowering and keeping in position of 100 mm Dia. SCOUR VALVE including conveyance of all materials to work site and nuts and bolts,rubber packing and shallock and all other charges etc., complete as per the direction of the department for finihsed item of work as directed by the Departmental Authorities.

1

-

192.11

... More
Civil Engineering Works;Labor charges for fixing Air valves including boring the mains and threading the bore fixing nipple etc., complete.as per the direction of the department for finihsed item of work.

2

-

693.96

... More
Civil Engineering Works;Lowering and keeping in position of 100mm Dia. Non Return Valve including conveyance of all materials to work site and nuts and bolts,rubber packing and shallock and all other charges etc., complete as per the direction of the department for finihsed item of work as directed by the Departmental Authorities.

1

-

192.11

... More
Civil Engineering Works;Labour charges for jointing 200mm Dia. Sluice Valve with flanged ends including cost of joining material such as rubber insertion, white lead including filling with water with lead up to 500 meters and testing to required presure complete(Reference to specifications BIS No.3114/94).

2

-

1054.14

... More
Civil Engineering Works;Labour charges for jointing 150mm Dia. Sluice Valve with flanged ends including cost of joining material such as rubber insertion, white lead including filling with water with lead up to 500 meters and testing to required presure complete(Reference to specifications BIS No.3114/94).

10

-

4864.4

... More
Civil Engineering Works;Labour charges for jointing 100mm Dia. Scour Valve with flanged ends including cost of joining material such as rubber insertion, white lead including filling with water with lead up to 500 meters and testing to required presure complete(Reference to specifications BIS No.3114/94).

10

-

3163.3

... More
Civil Engineering Works;Labour charges for jointing 100mm Dia. Non Return Valve with flanged ends including cost of joining material such as rubber insertion, white lead including filling with water with lead up to 500 meters and testing to required presure complete(Reference to specifications BIS No.3114/94).

2

-

632.66

... More
Civil Engineering Works;Construction of 3'-0" Dia. (upto a depth of 0.90 Mts.) Solid block Masonry INSPECTION CHAMBER as per IS.4111, Part-I-1986 with CM(1:6)Prop. Fly-Ash blocks of 225mm thick from approved source having a minium crushing strength of 50 Kg/Sq.Cm.including plastering with CM(1:3)Prop., 1/2" thick both inside and outside and fitted with 20" Dia. RCC Manhole Covers and Frames including excavating pits upto a depth of 0.90 mts. (3'-0") in all sorts of soils (excluding rock) and laying CC(1:4:8) Prop. 150mm thick using 40mm HBG metal and PCC(1:2:4)Prop. benching and channel 100mm thick as per standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site of work, seignorage on all materials and all operational, incidental, labour charges like mixing cement mortar, construcing masonry, lift charges, curing etc., complete for finished item of work as per standard specification. (For Valve Chambers) as directed by the Departmental Authorities.

8

-

54262.56

... More
Civil Engineering Works;Supply and delivery of Bolts & Nuts with double washers including cost and conveyance of all materials to site of work,shallok/White lead etc.,for flanged joints excluding labour charges for fixing values. ( No.of Bolts for each valve 8 Nos. and total weight of Bolts 1.50 Kg./8 Nos.) as directed by the Departmental Authorities.

70.68

-

8913.05

... More
Civil Engineering Works;Supply and delivery of Rubber Packing including cost and conveyance of all materials to site of work etc., complete ( weight 0.44 Kgs. per joint .) as directed by the Departmental Authorities.

28.8

-

3043.01

... More
Civil Engineering Works;Refilling the pipe line trenches with excavated earth complying with standard specification after the pipe laid including all leads and lifts, depositing surplus earth watering, tamping, levelling and forming to the original level including labour charges etc., complete as directed by the department as directed by the Departmental Authorities.

1112.72

-

230444.31

... More
Civil Engineering Works;Supply and delivery of D.I. Double Flanged swing check type (Reflux Valves) Non Return Valves of 100 mm Dia. conforming to IS-5312 (Pts.1&2 with amendments upto date, if any) having body, cover, door, bearing holder with D.I., Hinge pipe, Door pin, door suspension pin with stainless steel (IS.6603), body seat ring, door face ring, bearing bushes, plugs for hinge pin with leaded tin bronze (IS.318), bolts, nuts with carbon steel, gaskets with rubber, hinges with cast steel inlcuding cost and conveyance of all materials to work site and loading, unloading, transportation etc., complete as directed by the Departmental Authorities as directed by the Departmental Authorities.

1

-

18109.09

... More
Civil Engineering Works;Supply ,delivery and fixing of 50 mm dia Gunmetal gate valve (GM Peet) as per IS-778 Class-I Indian make heavy type including cost and conveyance of all materials to work site, loading, unloading transportation charges etc., complete as directed by the Departmental Authorities as directed by the Departmental Authorities.

90

-

338049.9

... More
Civil Engineering Works;Earth work excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH as directed by the Departmental Authorities

70.65

-

8182.68

... More
Civil Engineering Works;PCC work of mix (1:4:8) Prop.using 40mm gauge hard broken granite machine crushed metal including cost and conveyance of all materials and all operational, incidental, labour charges, machine mixing, laying, levelling, tamping, curing, seigniorage charges and all other taxes etc., complete for Bed of Foundations.

4.24

-

17845.74

... More
Civil Engineering Works;Providing High Yield Strenth Deformed (HYSD)/Thermo Mechanically Treated (TMT) Steel bars ( Fe.500 grade as per IS1786 and as amended upto date) of different of diameters for RCC works, including labour charges for srraightening,cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of steel bars, all wastage, such as over laps, couplings, chairs, spacer bars, binding wire,cover blocks and all incidental, Operational labour charges such as cutting, bending,placing in position, tying etc., complete for finished item of work as directed by the Departmental authorities.

2.56

-

210619.32

... More
Civil Engineering Works;Providing Impervious coat Plastering to exposed RCC Slab surface with CM(1:4) Prop.20mm thick mixed with approved water proofing compound @ 1 Kg/bag of cement and laid over roof when the slab is green and fine rendering with cement slurry including cost & conveyance of all materials and water to work site and all operational, incidental charges, labour charges for mixing mortar, laying rendering smooth and thread lining, curing, rounding of junctions of walls and slab etc., complete for finished item of work.

119.48

-

62209.65

... More
Civil Engineering Works;Painting to new walls with snow cem or other equal and approved water proof cement paint 2 coats over priming coat with approved exterior grade cement making 3 coats all colours including cost and conveyance of all materials, labour charges etc; complete for finished item of work. GLSR WALLS

54.75

-

12612.21

... More
Civil Engineering Works;Supplying and fixing of RCC Cover of 22" Dia. of 3" thick with nominal reinforcement and hooks for lifting including cost and conveyance of all materials to work site and operational, incidental and all labour charges for fixing charges etc., complete for finiahed item of work.

2

-

1506.54

... More
Civil Engineering Works;Supply and Transportation of 10 H.P Three Phase Open Well Submersible Pumpset (100x75) make of Kirloskar/Crompton/ Texmo/KSB/Lubi of approved by the dept., suitable for errection in Open Well with water resistant dynamically balanced impeller with stainless steel shaft, sleeves, pump coupling and pivot of 3 Phase, 415 V, 50 Hz, A.C. Power supply, heavy copper winding with water proof insulation and high precision, strength not to be effected by chemical in water with suitable bronze bearings, 10 HP Pump errected with necessary H-type clamps, nuts & bolts etc., of suitable size and strength and including cost and conveyance of all materials to site of work, transportation and all labour charges etc.,complete. (total =3 Nos. ie., 1 No. for pumping and 3 No for stand by )

2

-

94831.04

... More
Civil Engineering Works;Supply and run of 4 of 56/0.3mm (4.00Sq.mm) FR P.V.C. insulated flexible copper cableFRLS/FRLS-H/HFFR/ ZHFR PVC insulated 1100V grade as per IS.694/1990 specification for Copper Cable of Category-II of make V-Guard/Bonton /Finecab/ HPL /Million/Fortune Art /Sudhakar/Orbit/ Tamra/ Anchor/Plaza/ Vihan/Ollvin/Laser/Beljin/ Rhino/ Standard / Vimal etc., including cost of cable, all materials and labour charges for fixing etc., complete as directed by the Department authorities.

50

-

10508.5

... More
Civil Engineering Works;Supply and Erection of Panel Mounting 125-A, 4 Pole, 25-KA, MCCB with thermal magnetic setting/Microprocessor based release arrangement with all connections etc., and supply of 125A 4 pole MCCB adjustable confirms to IS/IEC 60947-2 having breaking capacity 25-KA with Thermal Magnetic setting based release arrangement with all connections etc., complete on existing Panel Board including cost and conveyance of all materials to work site and all labour charges etc., complete as directed by the dept., of make L&T/Schneider/Siemens/Hager.

3

-

36899.4

... More
Civil Engineering Works;Supplying and fixing of approved make Semi Automatic Star Delta Starter fitted in CRCA sheet enclosure suitable for 3 Phase, 415-V, 50 Hz Motor Pump set, suitable for 7.50 HP to 12.50 HP automatic Star Delta Starter Motor totally enclosed with over load protection and No-volt relay to complete including cost and conveyance of all materials to work site, Transportation and all labour charges etc., complete.

2

-

36595.4

... More
Civil Engineering Works;Supplying and fixing of 100mm Dia. B class G.I. Pipe properties and weight as per IS.1239 with fittings such as elbows, tees, couplings, nipples, plugs including excavation for trenches and refilling the trenches complete except for G.I. bends, unions and GI connectors with checkout and socket of Tata/Zenith make or equivalent etc., complete including cost and conveyance of all materials to work site, Transportation and all labour charges etc., complete for Motors Section pipe lines.

30

-

25972.5

... More
Civil Engineering Works;Supplying and fixing of 25mm Dia. Nominal Bore G.I. Pipe Medium Grade properties and weight as per IS.1239 with fittings such as elbows, tees, couplings, nipples, plugs including excavation for trenches and refilling the trenches complete except for G.I. bends, unions and GI connectors with checkout and socket of Tata/Zenith make or equivalent etc., complete including cost and conveyance of all materials to work site, Transportation and all labour charges etc., complete for Sump Railings.

100

-

30676

... More
Civil Engineering Works;Providing Independent Earthing from Main switch Board for earth continuity with No.8, G.I wire including excavation of earth in hard gravel/hard desintegrated rock upto 5'-6'' depth below ground level of section 5'x2'x3' duly providing 40mm Dia G.I Pipe of 2mts, length using GI bolts&nuts and fixing earth wire including supply and fixing 1'-6'' dia 0'-8'' depth hume pipe ring and refilling the pit with 4 Kgs hard coke, 20Kgs salt and excavated earth including all labour charges etc., complete for finished item of work.

1

-

4302.43

... More
Civil Engineering Works;Earth work excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH as directed by the Departmental Authorities

6.4

-

741.25

... More
Civil Engineering Works;PCC(1:4:8)Prop.with 40mm guage graded hard broken granite machine crushed metal including cost and conveyance of all materials and water to work site and all operational, incidental, labour charges for laying, tamping,curing machine mixing etc.,complete for Bed of Flooring and Foundations.

1.15

-

4840.24

... More
Civil Engineering Works;Brick Masonry in C.M.(1:6) Prop. with Fly Ash cement solid blocks of size 290x225x140mm for manufacturing with compressive strength of 50 Kg/Sq.cm using fly ash, cement, gypsum and stone dust including cost and conveyance of all materials and water to work site, scaffolding and all labour charges,curing etc.,complete.

7.4

-

46751.65

... More
Civil Engineering Works;Providing High Yield Strenth Deformed (HYSD)/Thermo Mechanically Treated (TMT) Steel bars ( Fe.500 grade as per IS1786 and as amended upto date) of different of diameters for RCC works, including labour charges for srraightening,cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of steel bars, all wastage, such as over laps, couplings, chairs, spacer bars, binding wire,cover blocks and all incidental, Operational labour charges such as cutting, bending,placing in position, tying etc., complete for finished item of work as directed by the Departmental authorities.

0.29

-

23859.22

... More
Civil Engineering Works;Door of size 3?-0? x 6?-6?:- Providing and fixing Door Frames fabricated from sections made of galvanized Stell powder coated (base steel as per IS-513, galvanized as per IS-277 with zinc of 120 grams/square meter), the factory made section are powder coated with pure polyester powder of 50-60 microns thick with total coated thickness of 1.25mm, size of Door Frame section of 105x60mm with a rebate of 38mm to accommodate 30mm thick Door Shutter with groove to insert gasket in the frame section, frame sectiion filled with polyurethane foam, cut to length and joined by way of welding each frame provided with :: (a) 2mm thick MS powder coated butt hinges of 100mm long - 3 Nos for Single Shutter, 6 Nos., for double shutter (b) CRCA electroplates stiffeners of 6 Nos - 3 in each vertical (c) 40mm x 200mm x 1.20mm hold fasts screwd to stiffeners - 6 Nos. with split end tail (d) Nylon Aldrops Receiver - 1 No. for Single shutter frame (e) Tie Road - 1 No. and supplying and fixing of Single Leaf Flush Door Shutter Solid bond Wood black Board type with Commercial ply on both faces of 30mm thick conforming to IS.2202 including cost of fixtures such as (i) 2 Nos.-250mm long M.S.powder coated Aldrops, (ii) 1 No.-250mm long 10mm Dia. M.S.Powder Coated Tower Bolt, (iii) 2 Nos.-125mm long M.S.powder coated Door Handles and (iv) 1 No. M.S.Powder coated Door Stopper and including cost and conveyance of all materials to work site and all labour charges etc., complete as directed by the department.

1

-

7688.86

... More
Civil Engineering Works;0.60 x 0.90 m Window::- Providing and Fixing of openable windows made of Pre-painted steel (base steel as per IS 513 of 0.58mm thick Galvanized as per IS 277 with zinc of 120 GSM ) primer coated with epoxy primer of 5-7 microns thick. finish painted with a polyester paint of 12-16 microns thick and back coated with 5-7 microns thick alkyd backer and section for outer frame of 48 x 50mm, centre mullion of 48 x 50 mm section for shutter of 48 x 25 mm and the fixed glass beading section should be 12 x 12mm and the outer frame and mullions to have rebate for glazed shutter with a 20mm provision for guard bars/grills and the sections cut to length metre joined with corner bracket, centre mullion fixed with mullion cap, handle, stay, 2 nos. of stairless steel heavy duty pivot hinges provided per shutter and windows fitted with 5mm thick plain float glass with rubber gaskets including fixing the frames in concrete/masonry wall by means of self expanding screws, including 10mm square guard bars with 6" (152.4mm) pitch etc., complete for finished item of work. (Single shutter window 2'0" x 4'0" (609.6mm x 1219.2mm). Outer frame section size of 48 x 50mm shutter frame section size of 48 x 25mm.

1

-

3522.84

... More
Civil Engineering Works;Supply and fixing to Cement JALLIES 40mm thick including cost and conveyance of all materials and water to work site and all operational, incidental charges, mxing, laying and all labour charges, curing with neat finishing etc., complete for finished item of work as directed by the dept.

0.35

-

102.2

... More
Civil Engineering Works;Plastering 12mm thick in Single Coat in CM(1:3)Prop. with sponge finishing including cost and conveyance of all materials and water to site of work and all operational, incidental charges, scaffolding charges, hacking surface and all labour charges, curing etc.,complete for finished item of work to the required strength as directed by the dept.,for CEILING

7.5

-

2732.25

... More
Civil Engineering Works;Plastering 12mm thick in Single Coat in CM(1:4)Prop. with sponge finishing including cost and conveyance of all materials and water to site of work and all operational, incidental charges, scaffolding charges, hacking surface and all labour charges, curing etc., complete for finished item of work to the required strength as directed by the dept., for INTERNAL WALLS and EXTERNAL WALLS..

64.61

-

24565.37

... More
Civil Engineering Works;Painting to Doors and M.S.Grills with primer and two coats with Synthetic enamel paint in all shades of Grade-I aprpoved brand and colour including cost and conveyance of all materials to work site and all operational, incidential and all labour charges such as sand paper, cleaning the surface, cost of brushes etc., complete for finished item of work as directed by the department (Three coats).

1.78

-

323.46

... More
Civil Engineering Works;Painting to new walls with approved water proof cement paint 2 coats over priming coat with approved exterior grade cement making 3 coats in all colours including cost of priming coat and cost and conveyance of all materials, labour charges etc; complete for finished item of work and as directed by the Departmental authorities

64.61

-

14883.56

... More
Civil Engineering Works;Earth work excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH as directed by the Departmental Authorities

332.64

-

38526.36

... More
Civil Engineering Works;Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means as per MORTH specification and as directed by the Engineer-in-Charge.

2626.13

-

90706.53

... More
Civil Engineering Works;Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom for finished item of work as per MORTH & H and as directed by the Engineer-in-Charge.

2626.13

-

19354.58

... More
Civil Engineering Works;Providing and laying of 50mm thick bituminous macadam with HOT Mix Plant producing an average output of 37.50 tonnes per hour using hard blasted granate crushed aggregates of Grade.II premixed with bituminous binder of V.G. 30 grade @ 3.40% by weight of total mixer, transported to site laid over a previously prepared surface with mechanical paver finisher to the required grade, level and alignment and rolled to achieve the desired compaction for finished item of work as directed by the Engineer-in-Charge including hire and operational charges all T&P and all other contingent charges necessay including cost of seigniorage charges on all materials etc., complete and as per MORTH Specification. Note: Quantity of bitumen is proposed for rate analysis only. The actual quantity will deperd upon job mix formula.

131.31

-

859526.37

... More
Civil Engineering Works;Providing 25mm thick compacted semi dense bituminous concrete by hot mix plant using hard blasted granite crushed aggregate of grading-II premixed with bituminous binder V.G.30 grade @ 5.00 per cent of mix and filler, transporting the hot mix to work site, laying with a Mechnical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification complete for finished item of work in all respects as directed by Engineer-in-charge. Note: The percent of bitumen is proposed for rate analysis only. The actual percent shall be arrived based on job mix formula.

65.65

-

519051.22

... More
Civil Engineering Works;Earth work excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH as directed by the Departmental Authorities

1985.5

-

229960.61

... More
Civil Engineering Works;Laying of PCC work of mix (1:4:8) Prop.using 40mm gauge hard broken granite machine crushed metal including cost and conveyance of all materials and water to work site and all operational, incidental, labour charges, machine mixing, laying, levelling, tamping, curing etc., complete as directed by the departmental authorities for Levelling Course for Bed of Drains.

209

-

879660.1

... More
Civil Engineering Works;Providing High Yield Strenth Deformed (HYSD)/Thermo Mechanically Treated (TMT) Steel bars ( Fe.500 grade as per IS1786 and as amended upto date) of different of diameters for RCC works, including labour charges for srraightening,cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of steel bars, all wastage, such as over laps, couplings, chairs, spacer bars, binding wire,cover blocks and all incidental, Operational labour charges such as cutting, bending,placing in position, tying etc., complete for finished item of work as directed by the Departmental authorities

7.7

-

633503.41

... More
Civil Engineering Works;Supply and delivery of "Resilient Seated Soft Sealing" 200 mm dia Gate Valves (Sluice Valves) with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or Equivalent as per IS1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, Replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The Valves should be Vacuum tight and 100% leak proof with face to face dimensions as BS:5163 Type A/IS:14846. All the valves should be with fusion bonded Electrostatic Powder coating both inside and outside (Min 250 Microns)- RAL 5005 with Pocket Less Straight through body Passage conforming to Design standards of DIN-3202F4/BS:5163 Type A Flange drilling as per IS - 1538 excluding all taxes, duties and transportation. (PN -1.6Mpa) as directed by the Departmental Authorities.

1

-

28607.12

... More
Civil Engineering Works;Supply and delivery of C.I. D/F Scour Valves of 100 mm Dia. conforming to IS 14846/2000 with amendments No.1 &2 heavy duty with CI grade FG 260 as per IS 210.Two coats of primer suitable for epozy paints finish shall be applied to all metal surface and finally two coats of Epoxy paint.The valve shall be tested for colsed end test against Hydrostatic test requirement of type P.N.I including cost and conveyance charges to work site loading & unloading and all other connected taxes etc., complete for finished item of work as directed by the Departmental Authorities.

1

-

14172.34

... More
Civil Engineering Works;Supply and delivery of Centrifugally cast (spun) Ductile Iron 200 mm dia D/F 90 deg Duck foot bends confirming to IS:9523/2000 having dimensions as per table. The rates mentioned here under are for fittings, zinc coated externally with inside mortar lining (with finishing as per class 13/IS 9523/2000 (ex-words) including cost and conveyance of all materials to work site and inlcuding loading, unloading and all other connected taxes etc., complete for finished item of work (Weight = 45.00 Kgs) as directed by the Departmental Authorities.

1

-

3501.07

... More
Civil Engineering Works;Centrifugally cast (spun) Ductile Iron Fittings of 200mm DI Double Socket Bends conforming to IS:9523/2000 having dimensions as per table. The rates mentioned here under are for fittings, zinc coated externally with inside mortar lining (with finishing as per class 13/IS 9523/2000) ( ex-works) Excluding Transportation and all Taxes.

4

-

1012.72

... More
Civil Engineering Works;Earth work excavation and depositing on bank with an initial lead of 10mts and lift of 2mts in sand or loose soils, wet Sand not under water, silt in canals, channels and drains etc., and incluidng all operational, incidental, labour charges, shuch as shoring, sheeting, planking, strutting and dewatering charges etc., complete for finished item of work for Water Supply Main Lines. as directed by the Departmental Authorities.

2602.8

-

301456.3

... More
Civil Engineering Works;Lowering of 200mm Dia CI/DI Pipes (all classes) and specials (fittings) with flanged ends carefully into trench and laying them true to alignment and gradient including all sundries but excluding cost and conveyance of pipes from source of supply. (Reference to specifications. BIS No.3114/1994)

2410

-

277487.4

... More
Civil Engineering Works;Lowering and keeping in position of 200 mm Dia. Sluice Valve including conveyance of all materials to work site and nuts and bolts,rubber packing and shallock and all other charges etc., complete as per the direction of the department for finihsed item of work as directed by the Departmental Authorities.

1

-

537.16

... More
Civil Engineering Works;Lowering and keeping in position of 100 mm Dia. SCOUR VALVE including conveyance of all materials to work site and nuts and bolts,rubber packing and shallock and all other charges etc., complete as per the direction of the department for finihsed item of work as directed by the Departmental Authorities.

1

-

192.11

... More
Civil Engineering Works;Labour charges for jointing 200mm Dia. Sluice Valve with flanged ends including cost of joining material such as rubber insertion, white lead including filling with water with lead up to 500 meters and testing to required presure complete(Reference to specifications BIS No.3114/94).

2

-

1054.14

... More
Civil Engineering Works;Labour charges for jointing 100mm Dia. Scour Valve with flanged ends including cost of joining material such as rubber insertion, white lead including filling with water with lead up to 500 meters and testing to required presure complete(Reference to specifications BIS No.3114/94).

2

-

632.66

... More
Civil Engineering Works;Construction of 3'-0" Dia. (upto a depth of 0.90 Mts.) Solid block Masonry INSPECTION CHAMBER as per IS.4111, Part-I-1986 with CM(1:6)Prop. Fly-Ash blocks of 225mm thick from approved source having a minium crushing strength of 50 Kg/Sq.Cm.including plastering with CM(1:3)Prop., 1/2" thick both inside and outside and fitted with 20" Dia. RCC Manhole Covers and Frames including excavating pits upto a depth of 0.90 mts. (3'-0") in all sorts of soils (excluding rock) and laying CC(1:4:8) Prop. 150mm thick using 40mm HBG metal and PCC(1:2:4)Prop. benching and channel 100mm thick as per standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site of work, seignorage on all materials and all operational, incidental, labour charges like mixing cement mortar, construcing masonry, lift charges, curing etc., complete for finished item of work as per standard specification. (For Valve Chambers) as directed by the Departmental Authorities.

2

-

13565.64

... More
Civil Engineering Works;Supply and delivery of Bolts & Nuts with double washers including cost and conveyance of all materials to site of work,shallok/White lead etc.,for flanged joints excluding labour charges for fixing values. ( No.of Bolts for each valve 8 Nos. and total weight of Bolts 1.50 Kg./8 Nos.) as directed by the Departmental Authorities.

24

-

3026.64

... More
Civil Engineering Works;Supply and delivery of Rubber Packing including cost and conveyance of all materials to site of work etc., complete ( weight 0.44 Kgs. per joint .) as directed by the Departmental Authorities.

7.2

-

760.75

... More
Civil Engineering Works;Refilling the pipe line trenches with excavated earth complying with standard specification after the pipe laid including all leads and lifts, depositing surplus earth watering, tamping, levelling and forming to the original level including labour charges etc., complete as directed by the department as directed by the Departmental Authorities.

2602.8

-

539039.88

... More
Civil Engineering Works;Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH as directed by the Departmentalal Authorities

1100.51

-

127461.07

... More
Civil Engineering Works;Providing Mild Steel Round bars( Dowel bars) including labour charges for straightening,cutting, bending to required sizes and shapes, placing in position of approved materials and size as per approved designs and drawings including cost and conveyance of steel bars, all wastage, and all incidental, Operational labour charges such as cutting, bending,placing in position,etc., complete and as directed by the Departmental authorities for CC pavement.

4.69

-

367030.07

... More
Civil Engineering Works;Manufacture,supply and delivery of unplasticised 160mm dia PVC pipes for potable water supplies conforming to IS:4985/2000 include of transportation to the sub divisional stores anywhere in AP exculding excise duty and sales tax etc., (4kg/cm2)

192.5

-

104542.9

... More
Civil Engineering Works;Painting to kerb with approved Synthetic enamel paint 2 coats over priming coat with approved exterior grade cement making 3 coats in all colours including cost and conveyance of all materials, labour charges etc; complete for finished item of work (APSS No. 912)and as directed by the Department authorities

1972.26

-

611952.83

... More
Civil Engineering Works;Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH as directed by the Departmental Authorities

1894.21

-

219387.4

... More
Civil Engineering Works;Laying PCC work of mix (1:4:8) Prop.using 40mm gauge hard broken granite machine crushed metal including cost and conveyance of all materials and water to worksite and all operational, incidental, labour charges, machine mixing, laying, levelling, tamping, curing,etc., complete as directed by the Departmental authorities for Levelling course for Drains.

334.45

-

1515018.37

... More
Civil Engineering Works;Providing High Yield Strenth Deformed (HYSD)/Thermo Mechanically Treated (TMT) Steel bars ( Fe.500 grade as per IS1786 and as amended upto date) of different of diameters for RCC works, including labour charges for srraightening,cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of steel bars, all wastage, such as over laps, couplings, chairs, spacer bars, binding wire,cover blocks and all incidental, Operational labour charges such as cutting, bending,placing in position, tying etc., complete for finished item of work as directed by the Departmental authorities

6.61

-

543562.38

... More
Civil Engineering Works;Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH as directed by the Departmental Authorities

29.93

-

3466.49

... More
Civil Engineering Works;Laying PCC work of mix (1:4:8) Prop.using 40mm gauge hard broken granite machine crushed metal including cost and conveyance of all materials and water to worksite and all operational, incidental, labour charges, machine mixing, laying, levelling, tamping, curing,etc., complete as directed by the Departmental authorities for Levelling course for Drains.

8.55

-

38730.47

... More
Civil Engineering Works;Supply and placing of the Design Mix M 20 Grade Concrete for RCC works corresponding to IS 456 using CONCRETE MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete with minimum cement content as per IS code from standard suppliers approved by the department and also including centering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work as per directed by the Departmental authorities for Culvert slab.

19.15

-

125525.76

... More
Civil Engineering Works;Providing High Yield Strenth Deformed (HYSD)/Thermo Mechanically Treated (TMT) Steel bars ( Fe.500 grade as per IS1786 and as amended upto date) of different of diameters for RCC works, including labour charges for srraightening,cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of steel bars, all wastage, such as over laps, couplings, chairs, spacer bars, binding wire,cover blocks and all incidental, Operational labour charges such as cutting, bending,placing in position, tying etc., complete for finished item of work as directed by the Departmental authorities

1.15

-

94614.15

... More
Civil Engineering Works;Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH as directed by the Departmental Authorities

70.65

-

8182.68

... More
Civil Engineering Works;Laying PCC work of mix (1:4:8) Prop.using 40mm gauge hard broken granite machine crushed metal including cost and conveyance of all materials and water to worksite and all operational, incidental, labour charges, machine mixing, laying, levelling, tamping, curing,etc., complete as directed by the Departmental authorities for Levelling course for Drains.

4.24

-

19206.69

... More
Civil Engineering Works;Providing High Yield Strenth Deformed (HYSD)/Thermo Mechanically Treated (TMT) Steel bars ( Fe.500 grade as per IS1786 and as amended upto date) of different of diameters for RCC works, including labour charges for srraightening,cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of steel bars, all wastage, such as over laps, couplings, chairs, spacer bars, binding wire,cover blocks and all incidental, Operational labour charges such as cutting, bending,placing in position, tying etc., complete for finished item of work as directed by the Departmental authorities

2.67

-

219669.36

... More
Civil Engineering Works;Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg of water proof compound per bag of cement laid over roof when it is green including cost and conveyanceof all materials, all operational, incidental and labour charges for mixing mortar, laying, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc, complete for finished item of work and as directed by the Departmental authorities

66.77

-

32965.02

... More
Civil Engineering Works;Painting to new walls with approved water proof cement paint 2 coats over priming coat with approved exterior grade cement making 3 coats in all colours including cost of priming coat and cost and conveyance of all materials, labour charges etc; complete for finished item of work and as directed by the Departmental authorities

54.73

-

12607.6

... More
Civil Engineering Works;Supplying and fixing of RCC Cover of 22" Dia. of 3" thick with nominal reinforcement as directed by the department and hooks for lifting including cost and conveyance of all materials to work site and operational, incidental and all labour charges for fixing charges etc., complete for finished item of work.

2

-

1506.54

... More
Civil Engineering Works;Supply and Transportation of 10 H.P Three Phase Open Well Submersible Pumpset (100x75) make of Kirloskar/Crompton/ Texmo/KSB/Lubi of approved by the dept., suitable for errection in Open Well with water resistant dynamically balanced impeller with stainless steel shaft, sleeves, pump coupling and pivot of 3 Phase, 415 V, 50 Hz, A.C. Power supply, heavy copper winding with water proof insulation and high precision, strength not to be effected by chemical in water with suitable bronze bearings, 10 HP Pump errected with necessary H-type clamps, nuts & bolts etc., of suitable size and strength and including cost and conveyance of all materials to site of work, transportation and all labour charges etc.,complete. (total = 2 Nos. ie., 1 No. for pumping and 1 Nos. for stand by )

2

-

94831.04

... More
Civil Engineering Works;Supply and run of 4 of 56/0.3mm (4.00Sq.mm) FR P.V.C. insulated flexible copper cableFRLS/FRLS-H/HFFR/ ZHFR PVC insulated 1100V grade as per IS.694/1990 specification for Copper Cable of Category-II of make V-Guard/Bonton /Finecab/ HPL /Million/Fortune Art /Sudhakar/Orbit/ Tamra/ Anchor/Plaza/ Vihan/Ollvin/Laser/Beljin/ Rhino/ Standard / Vimal etc., including cost of cable, all materials and labour charges for fixing etc., complete as directed by the Department authorities.

50

-

10508

... More
Civil Engineering Works;Supply and Erection of PANEL MOUNTING 125-A, 4 Pole, 25-KA, MCCB adjustable of make L&T/Schneider/Siemens/Legrand/Hager confirms to IS/IEC 60847-2 having breaking capacity 35/36-KA with Thermal Magnetic setting/ Microprocessor based release arrangement with all connections etc., complete on existing Panel Board including cost and conveyance of all materials to work site and all labour charges etc., complete as directed by the departmental Authorities.

2

-

24599.62

... More
Civil Engineering Works;Supplying and fixing of approved make Automatic Star Delta Starter of make C&S/Crompton / L&T / Siemens/BCH suitable for 3 Phase, 415-V, 50 Hz Motor Pump set, suitable for 7.50 HP to 12.50 HP automatic Star Delta Starter Motor totally enclosed with over load protection and No-volt relay to complete including cost and conveyance of all materials to work site, Transportation and all labour charges etc., complete and as directed by the Departmental authorities

2

-

36595.38

... More
Civil Engineering Works;Supplying and fixing of 100mm Dia. B class G.I. Pipe properties and weight as per IS.1239 with fittings such as elbows, tees, couplings, nipples, plugs including excavation for trenches and refilling the trenches complete except for G.I. bends, unions and GI connectors with checkout and socket of Tata/Zenith make or equivalent etc., complete including cost and conveyance of all materials to work site, Transportation and all labour charges etc., complete for connecting Motor at Sump to Panel Board and as directed by the Departmental authorities

30

-

25972.5

... More
Civil Engineering Works;Supplying and fixing of 25mm Dia. Nominal Bore G.I. Pipe Medium Grade properties and weight as per IS.1239 with fittings such as elbows, tees, couplings, nipples, plugs including excavation for trenches and refilling the trenches complete except for G.I. bends, unions and GI connectors with checkout and socket of Tata/Zenith make or equivalent etc., complete including cost and conveyance of all materials to work site, Transportation and all labour charges etc., complete. for sump railings and inside and outside ladders and as directed by the Departmental authorities

105

-

32209.8

... More
Civil Engineering Works;Providing Independent Earthing from Main switch Board for earth continuity with No.8, G.I wire including excavation of earth in all soils upto 5'-6'' depth below ground level of section 5'x2'x3' duly providing 40mm Dia G.I Pipe of 2mts, length using GI bolts&nuts and fixing earth wire including supply and fixing 1'-6'' dia 0'-8'' depth hume pipe ring and refilling the pit with 40 Kgs hard coke, 20Kgs salt and excavated earth including all labour charges etc., complete for finished item of work and as directed by the Departmental authorities

1

-

4302.43

... More
Civil Engineering Works;Pump Room: Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH as directed by the Departmental Authorities

6.4

-

741.25

... More
Civil Engineering Works;Laying PCC work of mix (1:4:8) Prop.using 40mm gauge hard broken granite machine crushed metal including cost and conveyance of all materials and water to worksite and all operational, incidental, labour charges, machine mixing, laying, levelling, tamping, curing,etc., complete as directed by the Departmental authorities for Levelling course for Pump Room.

1.15

-

5209.36

... More
Civil Engineering Works;Plastering 12 mm thick Single coat with C.M. (1:3) Prop. with smooth finishing including cost and conveyance of all materials and water to work site and all operational, incidental charges and all labour charges, hacking surface, scaffolding, leads, lifts , curing etc., complete for finished item of work etc., complete. for Ceiling as directed by the Departmental Authorities.

7.5

-

2587.73

... More
Civil Engineering Works;Plastering 12 mm thick Single coat with C.M. (1:4) Prop. with smooth finishing including cost and conveyance of all materials and water to work site and all operational, incidental charges and all labour charges, hacking surface, scaffolding, leads, lifts , curing etc., complete. for Ceiling as directed by the Departmental Authorities.

64.62

-

21808.6

... More
Civil Engineering Works;Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg of water proof compound per bag of cement laid over roof when it is green including cost and conveyanceof all materials, all operational, incidental and labour charges for mixing mortar, laying, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc, complete for finished item of work and as directed by the Departmental authorities

12.54

-

6191.12

... More
Civil Engineering Works;Brick Masonry in C.M.(1:6) Prop. with Fly Ash cement solid blocks in size 290x225x140 mm for manufacturing of flyash solid blocks using flyash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and stone dust including cost and conveyance of all materials , and all labour charges,scaffolding, curing etc., complete with a compresive streangth not less than 50 kg/sqm for walls for Superstructure Walls as directed by the Departmental Authorities.

7.4

-

45801.41

... More
Civil Engineering Works;Providing High Yield Strenth Deformed (HYSD)/Thermo Mechanically Treated (TMT) Steel bars ( Fe.500 grade as per IS1786 and as amended upto date) of different of diameters for RCC works, including labour charges for srraightening,cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of steel bars, all wastage, such as over laps, couplings, chairs, spacer bars, binding wire,cover blocks and all incidental, Operational labour charges such as cutting, bending,placing in position, tying etc., complete for finished item of work as directed by the Departmental authorities

0.3

-

24681.95

... More
Civil Engineering Works;DOOR of SIZE 0.90 x 2.00 m:- Providing and fixing Door Frames fabricated from sections made of galvanized Stell powder coated (base steel as per IS-513, galvanized as per IS-277 with zinc of 120 grams/square meter), the factory made section are powder coated with pure polyester powder of 50-60 microns thick with total coated thickness of 1.25mm, size of Door Frame section of 105x60mm with a rebate of 38mm to accommodate 35mm thick Door Shutter with groove to insert gasket in the frame section, frame sectiion filled with polyurethane foam, cut to length and joined by way of welding each frame provided with :: (a) 2mm thick MS powder coated butt hinges of 100mm long - 3 Nos for Single Shutter, 6 Nos., for double shutter (b) CRCA electroplates stiffeners of 6 Nos - 3 in each vertical (c) 40mm x 200mm x 1.20mm hold fasts screwd to stiffeners - 6 Nos. with split end tail (d) Nylon Aldrops Receiver - 1 No. for Single shutter frame (e) Tie Road - 1 No. and supplying and fixing of Single Leaf Flush Door Shutter Solid bond Wood black Board type with Commercial ply on both faces of 30mm thick conforming to IS.2202 including cost of fixtures such as (i) 2 Nos.-250mm long M.S.powder coated Aldrops, (ii) 1 No.-250mm long 10mm Dia. M.S.Powder Coated Tower Bolt, (iii) 2 Nos.-125mm long M.S.powder coated Door Handles and (iv) 1 No. M.S.Powder coated Door Stopper and including cost and conveyance of all materials to work site and all labour charges etc., complete as directed by the departmental authorities

1

-

7688.86

... More
Civil Engineering Works;0.60 x 0.90 m Window::- Providing and Fixing of openable windows made of Pre-painted steel (base steel as per IS 513 of 0.58mm thick Galvanized as per IS 277 with zinc of 120 GSM ) primer coated with epoxy primer of 5-7 microns thick. finish painted with a polyester paint of 12-16 microns thick and back coated with 5-7 microns thick alkyd backer and section for outer frame of 48 x 50mm, centre mullion of 48 x 50 mm section for shutter of 48 x 25 mm and the fixed glass beading section should be 12 x 12mm and the outer frame and mullions to have rebate for glazed shutter with a 20mm provision for guard bars/grills and the sections cut to length metre joined with corner bracket, centre mullion fixed with mullion cap, handle, stay, 2 nos. of stairless steel heavy duty pivot hinges provided per shutter and windows fitted with 5mm thick plain float glass with rubber gaskets including fixing the frames in concrete/masonry wall by means of self expanding screws, including 10mm square guard bars with 6" (152.4mm) pitch etc., complete for finished item of work. (Single shutter window 2'0" x 4'0" (609.6mm x 1219.2mm). Outer frame section size of 48 x 50mm shutter frame section size of 48 x 25mm and as directed by the Departmental Authorities

1

-

3522.84

... More
Civil Engineering Works;Supply and fixing to Cement JALLIES 40mm thick including cost and conveyance of all materials and water to work site and all operational, incidental charges, fixing, laying and all labour charges, curing etc., complete for finished item of work as directed by the departmental authorities

0.35

-

102.2

... More
Civil Engineering Works;Painting to Doors and M.S.Grills with primer and two coats with Synthetic enamel paint in all shades of Grade-I aprpoved brand and colour including cost and conveyance of all materials to work site and all operational, incidential and all labour charges such as sand paper, cleaning the surface, cost of brushes etc., complete for finished item of work as directed by the department (Three coats).

1.78

-

323.46

... More
Civil Engineering Works;Painting to new walls with approved water proof cement paint 2 coats over priming coat with approved exterior grade cement making 3 coats in all colours including cost of priming coat and cost and conveyance of all materials, labour charges etc; complete for finished item of work and as directed by the Departmental authorities

64.62

-

14885.86

... More
Civil Engineering Works;Supply and delivery of " Resilient Seated Soft Sealing "Gate valve (Sluice valves) with body and bonet of Ducitle Iron GGG-40/SG-400/15 or GGG 50/SG-500/7 or equivalent as per I S1865, IS:3896-2, and Wedge fully rubber line with food grade quality grade -W 270 , grade EPDM, Replaceable Spindle Nut without gland packing with 3-O ring protection system on the shaft and Seals of NBR. The Valves should be Vacume tight and 100% leak proof with face to face dimensions as BS:5163 type -A/IS:14846. All the valves should be with fusion bonded electrostatic powder coating both inside and outside (Min 250 microns)-RAL5005 with Packet Less straight through body passage conforming to design standards of DIN-3202 F4/BS:5163 Type A flange drilling as per IS-1538Supply and delivery of .D.I. Double Flanged Sluice Valves of 200mm Dia.including cost and conveyance of all materials to work site, loading, unloading transportation charges and excluding all other connected taxes etc., complete (pn-1.0 (MPa) as directed by the Departmental Authorities

2

-

57214.24

... More
Civil Engineering Works;Supply and delivery of " Resilient Seated Soft Sealing "Gate valve (Sluice valves) with body and bonet of Ducitle Iron GGG-40/SG-400/15 or GGG 50/SG-500/7 or equivalent as per I S1865, IS:3896-2, and Wedge fully rubber line with food grade quality grade -W 270 , grade EPDM, Replaceable Spindle Nut without gland packing with 3-O ring protection system on the shaft and Seals of NBR. The Valves should be Vacume tight and 100% leak proof with face to face dimensions as BS:5163 type -A/IS:14846. All the valves should be with fusion bonded electrostatic powder coating both inside and outside (Min 250 microns)-RAL5005 with Packet Less straight through body passage conforming to design standards of DIN-3202 F4/BS:5163 Type A flange drilling as per IS-1538 D.I. Double Flanged Sluice Valves of 150mm Dia. , including cost and conveyance of all materials to work site, loading, unloading transportation charges and excluding all other connected taxes etc., complete (pn-1.0 (MPa) as directed by the Departmental Authorities

3

-

66137.55

... More
Civil Engineering Works;Supply and delivery of " Resilient Seated Soft Sealing "Gate valve (Sluice valves) with body and bonet of Ducitle Iron GGG-40/SG-400/15 or GGG 50/SG-500/7 or equivalent as per I S1865, IS:3896-2, and Wedge fully rubber line with food grade quality grade -W 270 , grade EPDM, Replaceable Spindle Nut without gland packing with 3-O ring protection system on the shaft and Seals of NBR. The Valves should be Vacume tight and 100% leak proof with face to face dimensions as BS:5163 type -A/IS:14846. All the valves should be with fusion bonded electrostatic powder coating both inside and outside (Min 250 microns)-RAL5005 with Packet Less straight through body passage conforming to design standards of DIN-3202 F4/BS:5163 Type A flange drilling as per IS-1538 D.I. Double Flanged Sluice Valves of 100mm Dia. (Scour Valve) , including cost and conveyance of all materials to work site, loading, unloading transportation charges and excluding all other connected taxes etc., complete .(pn-1.0 (MPa) as directed by the Departmental Authorities

1

-

14172.34

... More
Civil Engineering Works;Supply ,delivery and fixing of 50 mm dia Gunmetal gate valve (GM Peet) as per IS-778 Class-I Indian make heavy type including cost and conveyance of all materials to work site, loading, unloading transportation charges etc., complete as directed by the Departmental Authorities

28

-

105171.08

... More
Civil Engineering Works;Supply and delivery of tamper proof D.I., Flanged Single Chamber Air Release Valves of 50mm Dia. with body and cover made of Ductile Iron Grade GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS-1865, IS-3896-2 with food grade epoxy powder coating (EP-P) (Min:250 Micron) inside and outside of color blue RAL 5005. All internal parts such as float, shell, cove bolts etc., made of austenitic alloy steel of SS AISI 304/316 and DN-50 float of and other components with ABS/PTFE/ EPDM/NBR and generally conforming to DIN/BIS/AWWA standards (or) combination flange drilling as per IS-1538 and including cost and conveyance of all materials to work site, loading, unloading transportation charges etc., complete as directed by the Departmental Authorities.

2

-

25720.16

... More
Civil Engineering Works;Manufacture, Supplying and delivery of OD 200mm Dia. HDPE BENDS conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., complete as directed by the Departmental Authorities

2

-

5662.58

... More
Civil Engineering Works;Manufacture, Supplying and delivery of OD 160mm Dia. HDPE BENDS conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., Complete as directed by the Departmental Authorities

5

-

7282.7

... More
Civil Engineering Works;Manufacture, Supplying and delivery of OD 160mm Dia. HDPE TEEs conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading , forwarding charges, labour charges etc., complete as directed by the Departmental Authorities.

3

-

9812.94

... More
Civil Engineering Works;Manufacture, Supplying and delivery of OD 160mm x 200mm Dia. HDPE Reducers conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading, forwarding charges, labour charges etc., complete as directed by the Departmental Authorities.

28

-

49054.32

... More
Civil Engineering Works;Manufacture, Supplying and delivery of 200mm Dia. M.S. Flanges conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading, forwarding charges, labour charges etc., complete as directed by the Departmental Authorities.

5

-

7617.9

... More
Civil Engineering Works;Manufacture, Supplying and delivery of 160mm Dia. M.S. Flanges conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading, forwarding charges, labour charges etc., complete as directed by the Departmental Authorities.

4

-

2785.84

... More
Civil Engineering Works;Manufacture, Supplying and delivery of 110mm Dia. M.S. Flanges conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials to work site and loading,unloading, forwarding charges, labour charges etc., complete as directed by the Departmental Authorities.

6

-

2290.5

... More
Civil Engineering Works;Supply and delivery of D.I. Double Flanged swing check type (Reflux Valves) Non Return Valves of 100 mm Dia. conforming to IS-5312 (Pts.1&2 with amendments upto date, if any) having body, cover, door, bearing holder with D.I., Hinge pipe, Door pin, door suspension pin with stainless steel (IS.6603), body seat ring, door face ring, bearing bushes, plugs for hinge pin with leaded tin bronze (IS.318), bolts, nuts with carbon steel, gaskets with rubber, hinges with cast steel inlcuding cost and conveyance of all materials to work site and loading, unloading, transportation etc., complete as directed by the Departmental Authorities.

1

-

18109.09

... More
Civil Engineering Works;Earthwork in excavation as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH as directed by the Departmental Authorities for pipe line trench work

1336.79

-

154827.02

... More
Civil Engineering Works;Lowering, Laying and Jointing of 200mm Dia.HDPE pipes by but fusion welding as per IS.7634-Part-II/1975 as amended from time to time to the alignment and gradient and testing the pipe line to the required pressure including cost and conveyance of all materials to work site and all operational, incidential and all labour charges etc., complete as directed by the Departmental Authorities.

341.5

-

34614.44

... More
Civil Engineering Works;Lowering, Laying and Jointing of 160mm Dia. HDPE Pipes by but fusion welding as per IS.7634-Part-II/1975 as amended from time to time to the alignment and gradient and testing the pipe line to the required pressure including cost and conveyance of all materials to work site and all operational, incidential and all labour charges etc., complete as directed by the Departmental Authorities.

755

-

51815.65

... More
Civil Engineering Works;Lowering, Laying and Jointing of 63mm Dia. HDPE Pipes by but fusion welding as per IS.7634-Part-II/1975 as amended from time to time to the alignment and gradient and testing the pipe line to the required pressure including cost and conveyance of all materials to work site and all operational, incidential and all labour charges etc., complete as directed by the Departmental Authorities.

336

-

11205.6

... More
Civil Engineering Works;Labour charges for Lowering and keeping in position of 200 mm Dia. Sluice valve including conveyance of all materials to work site and nuts and bolts,rubber packing and shallock and all other charges etc., complete as per the direction of the department for finihsed item of work.excluding cost of Jointing materials like bolts, nuts rubber insertion etc.,as directed by the Departmental Authorities.

2

-

1074.34

... More
Civil Engineering Works;Lowering and keeping in position of 150 mm Dia. Sluice valve including conveyance of all materials to work site and nuts and bolts,rubber packing and shallock and all other charges etc., complete as per the direction of the department for finihsed item of work excluding cost of Jointing materials like bolts, nuts rubber insertion etc.,as directed by the Departmental Authorities.

3

-

976.83

... More
Civil Engineering Works;Lowering and keeping in position of 100 mm Dia. Scour valve including conveyance of all materials to work site and nuts and bolts,rubber packing and shallock and all other charges etc., complete as per the direction of the department for finihsed item of work .excluding cost of Jointing materials like bolts, nuts rubber insertion etc.,as directed by the Departmental Authorities.

1

-

192.11

... More
Civil Engineering Works;Labour charges for jointing Jointing C.I., D.I. pipes and fittings with rubber gasket (push-on-joint), including the cost of the gasket , filling with water, with a water lead up to 500m and testing to required pressure, etc. complete Reference to specifications IS 3114/1994/12888/1987 including cost and conveyance of all materials etc.,complete forr 200mm Dia. Sluice Valve as directed by the Departmental Authorities.

4

-

2108.24

... More
Civil Engineering Works;Labour charges for jointing Jointing C.I., D.I. pipes and fittings with rubber gasket (push-on-joint), including the cost of the gasket , filling with water, with a water lead up to 500m and testing to required pressure, etc. complete Reference to specifications IS 3114/1994/12888/1987 including cost and conveyance of all materials etc.,complete for 150mm Dia. Sluice Valve. as directed by the Departmental Authorities.

6

-

2918.64

... More
Civil Engineering Works;Labour charges for jointing Jointing C.I., D.I. pipes and fittings with rubber gasket (push-on-joint), including the cost of the gasket , filling with water, with a water lead up to 500m and testing to required pressure, etc. complete Reference to specifications IS 3114/1994/12888/1987 including cost and conveyance of all materials etc.,complete for 100mm Dia. Scour Valve. as directed by the Departmental Authorities.

2

-

632.66

... More
Civil Engineering Works;Construction of 904.0 m (3'-0")Dia. Solid block Masonry INSPECTION CHAMBER as per IS.4111, Part-I-1986 with CM(1:6)Prop. Fly-Ash blocks of 225mm thick from approved source having a minium crushing strength of 10 N/Sq. mm. Including plastering with CM(1:3)Prop. 1/2" thick both inside and outside and fitted with 20" Dia. RCC Manhole Covers and Frames including excavating pits upto a depth of 904.00 mm (3'-0") in all sorts of soils (excluding rock) and laying CC(1:4:8) Prop. 150mm thick using 40mm HBG metal and PCC(1:2:4)Prop. benching and channel 100mm thick as per standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site of work, seignorage on all materials and all operational, incidental, labour charges like mixing cement mortar, construcing masonry, lift charges, curing etc., complete for finished item of work as per standard specification.(FOR Valve Pits) as directed by the Departmental Authorities.

7

-

47479.74

... More
Civil Engineering Works;Supply and delivery of Bolts & Nuts with double washers including cost and conveyance of all materials to site of work, shallok/White lead etc., for flanged joints excluding labour charges for fixing values.

13.5

-

1702.35

... More
Civil Engineering Works;Supply and delivery of Rubber Packing 6mm thick including cost and conveyance of all materials to site of work etc., complete for D/F Joints

8.1

-

855.85

... More
Civil Engineering Works;Manufacture, Supplying and delivery of 200mm Dia. HDPE End Caps conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials loading,unloading, forwarding charges, labour charges etc., complete as directed by the Departmental Authorities.

2

-

1279.3

... More
Civil Engineering Works;Manufacture, Supplying and delivery of 160mm Dia. HDPE End Caps conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials loading,unloading, forwarding charges, labour charges etc., complete as directed by the Departmental Authorities.

5

-

1800.8

... More
Civil Engineering Works;Manufacture, Supplying and delivery of 63mm Dia. HDPE End Caps conforming to IS.4984-1995 including transportation charges to work site and including cost and conveyance of all materials loading,unloading, forwarding charges, labour charges etc., complete as directed by the Departmental Authorities.

4

-

304.48

... More
Civil Engineering Works;Laying of Alcorr or similar type of Class SN8 structured wall (External Annular Corrugated & Smooth Internal surface) Polythelene pipes, on the lower bedding (Constructed at bottom of trenches) at prescribed gradient, depth & alignment including installation and jointing of the same with the help of coupler (on line/ off line) attached to one end of the pipe & sliding the coupler end over the elastomeric sealing rubber ring fitted on the specified valley of the spigot end of next pipe, testing the water tightness of the joint assembly, ensuring the continuity tests of specified pipe segments etc. complete as per drawing, specifications & detail engineering, including carriage of pipes & fittings from site stacks to the place of laying etc. as per direction of Engineer-in-charge.(Payment to be made on the basis of actual finished length of pipe line). Cost of DWC Pipe (250 mm I.D)

400

-

80168

... More
Civil Engineering Works;Laying of Alcorr or similar type of Class SN8 structured wall (External Annular Corrugated & Smooth Internal surface) Polythelene pipes, on the lower bedding (Constructed at bottom of trenches) at prescribed gradient, depth & alignment including installation and jointing of the same with the help of coupler (on line/ off line) attached to one end of the pipe & sliding the coupler end over the elastomeric sealing rubber ring fitted on the specified valley of the spigot end of next pipe, testing the water tightness of the joint assembly, ensuring the continuity tests of specified pipe segments etc. complete as per drawing, specifications & detail engineering, including carriage of pipes & fittings from site stacks to the place of laying etc. as per direction of Engineer-in-charge.(Payment to be made on the basis of actual finished length of pipe line). Cost of DWC Pipe (200 mm I.D)

920.46

-

117966.15

... More
Civil Engineering Works;Laying of Alcorr or similar type of Class SN8 structured wall (External Annular Corrugated & Smooth Internal surface) Polythelene pipes, on the lower bedding (Constructed at bottom of trenches) at prescribed gradient, depth & alignment including installation and jointing of the same with the help of coupler (on line/ off line) attached to one end of the pipe & sliding the coupler end over the elastomeric sealing rubber ring fitted on the specified valley of the spigot end of next pipe, testing the water tightness of the joint assembly, ensuring the continuity tests of specified pipe segments etc. complete as per drawing, specifications & detail engineering, including carriage of pipes & fittings from site stacks to the place of laying etc. as per direction of Engineer-in-charge.(Payment to be made on the basis of actual finished length of pipe line). Cost of DWC Pipe (150 mm I.D)

336

-

26110.56

... More
Civil Engineering Works;Construction of 904m (3'-0") Dia. Solid block Masonry INSPECTION CHAMBER as per IS.4111, Part-I-1986 with CM(1:6)Prop. Fly-Ash blocks of 225mm thick from approved source having a minium crushing strength of 50 Kg/Sq.Cm.including plastering with CM(1:3)Prop., 1/2" thick both inside and outside and fitted with 20" Dia. RCC Manhole Covers and Frames including excavating pits upto a depth of 1524mm (5'-0") in all sorts of soils (excluding rock) and laying CC(1:4:8) Prop. 150mm thick using 40mm HBG metal and PCC(1:2:4)Prop. benching and channel 100mm thick as per standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site of work, and all operational, incidental, labour charges like mixing cement mortar, construcing masonry, lift charges, curing etc., complete for finished item of work as per standard specification as directed by the Departmental authorities

18

-

192134.34

... More
Civil Engineering Works;Construction of 904.0 m (3'-0")Dia. Solid block Masonry INSPECTION CHAMBER as per IS.4111, Part-I-1986 with CM(1:6)Prop. Fly-Ash blocks of 225mm thick from approved source having a minium crushing strength of 10 N/Sq. mm. Including plastering with CM(1:3)Prop. 1/2" thick both inside and outside and fitted with 20" Dia. RCC Manhole Covers and Frames including excavating pits upto a depth of 904.00 mm (3'-0") in all sorts of soils (excluding rock) and laying CC(1:4:8) Prop. 150mm thick using 40mm HBG metal and PCC(1:2:4)Prop. benching and channel 100mm thick as per standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site of work and all operational, incidental, labour charges like mixing cement mortar, construcing masonry, lift charges, curing etc., complete for finished item of work as per standard specification as directed by the Departmental authorities

26

-

176353.32

... More
Civil Engineering Works;Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH as directed by the Departmental Authorities

1602.84

-

185640.93

... More
Civil Engineering Works;Outfall Drain: Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH as directed by the Departmental Authorities

1303.75

-

151000.33

... More
Civil Engineering Works;Laying PCC work of mix (1:4:8) Prop.using 40mm gauge hard broken granite machine crushed metal including cost and conveyance of all materials and water to worksite and all operational, incidental, labour charges, machine mixing, laying, levelling, tamping, curing,etc., complete as directed by the Departmental authorities for Levelling course for Drains.

104.3

-

472466.48

... More
Civil Engineering Works;Providing High Yield Strenth Deformed (HYSD)/Thermo Mechanically Treated (TMT) Steel bars ( Fe.500 grade as per IS1786 and as amended upto date) of different of diameters for RCC works, including labour charges for srraightening,cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of steel bars, all wastage, such as over laps, couplings, chairs, spacer bars, binding wire,cover blocks and all incidental, Operational labour charges such as cutting, bending,placing in position, tying etc., complete for finished item of work as directed by the Departmental authorities

11.18

-

919814.04

... More
Civil Engineering Works;Supply and delivery of " Resilient Seated Soft Sealing "Gate valve (Sluice valves) with body and bonet of Ducitle Iron GGG-40/SG-400/15 or GGG 50/SG-500/7 or equivalent as per I S1865, IS:3896-2, and Wedge fully rubber line with food grade quality grade -W 270 , grade EPDM, Replaceable Spindle Nut without gland packing with 3-O ring protection system on the shaft and Seals of NBR. The Valves should be Vacume tight and 100% leak proof with face to face dimensions as BS:5163 type -A/IS:14846. All the valves should be with fusion bonded electrostatic powder coating both inside and outside (Min 250 microns)-RAL5005 with Packet Less straight through body passage conforming to design standards of DIN-3202 F4/BS:5163 Type A flange drilling as per IS-1538Supply and delivery of .D.I. Double Flanged Sluice Valves of 200mm Dia.including cost and conveyance of all materials to work site, loading, unloading transportation charges and excluding all other connected taxes etc., complete (pn-1.0 (MPa) as directed by the Departmental Authorities

2

-

57214.24

... More
Civil Engineering Works;Earthwork in excavation as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH as directed by the Departmental Authorities for pipe line trench work

3024

-

350239.68

... More
Civil Engineering Works;Lowering, Laying and Jointing of 200mm Dia. DI Pipes by but fusion welding as per IS.7634-Part-II/1975 as amended from time to time to the alignment and gradient and testing the pipe line to the required pressure including cost and conveyance of all materials to work site and all operational, incidential and all labour charges etc., complete as directed by the Departmental Authorities.

3150

-

362691

... More
Civil Engineering Works;Labour charges for Lowering and keeping in position of 200 mm Dia. Sluice valve including conveyance of all materials to work site and nuts and bolts,rubber packing and shallock and all other charges etc., complete as per the direction of the department for finihsed item of work.excluding cost of Jointing materials like bolts, nuts rubber insertion etc.,as directed by the Departmental Authorities.

2

-

1074.32

... More
Civil Engineering Works;Labour charges for jointing Jointing C.I., D.I. pipes and fittings with rubber gasket (push-on-joint), including the cost of the gasket , filling with water, with a water lead up to 500m and testing to required pressure, etc. complete Reference to specifications IS 3114/1994/12888/1987 including cost and conveyance of all materials etc.,complete forr 200mm Dia. Sluice Valve as directed by the Departmental Authorities.

2

-

1054.12

... More
Civil Engineering Works;Construction of 904.0 m (3'-0")Dia. Solid block Masonry INSPECTION CHAMBER as per IS.4111, Part-I-1986 with CM(1:6)Prop. Fly-Ash blocks of 225mm thick from approved source having a minium crushing strength of 10 N/Sq. mm. Including plastering with CM(1:3)Prop. 1/2" thick both inside and outside and fitted with 20" Dia. RCC Manhole Covers and Frames including excavating pits upto a depth of 904.00 mm (3'-0") in all sorts of soils (excluding rock) and laying CC(1:4:8) Prop. 150mm thick using 40mm HBG metal and PCC(1:2:4)Prop. benching and channel 100mm thick as per standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site of work, seignorage on all materials and all operational, incidental, labour charges like mixing cement mortar, construcing masonry, lift charges, curing etc., complete for finished item of work as per standard specification.(FOR Valve Pits) as directed by the Departmental Authorities.

2

-

13565.64

... More
Civil Engineering Works;Supply and delivery of Bolts & Nuts with double washers including cost and conveyance of all materials to site of work, shallok/White lead etc., for flanged joints excluding labour charges for fixing values.

14.89

-

1877.78

... More
Civil Engineering Works;Supply and delivery of Rubber Packing 6mm thick including cost and conveyance of all materials to site of work etc., complete for D/F Joints

25.46

-

2690.1

... More
Civil Engineering Works;Labour charges for jointing Jointing C.I., D.I. pipes and fittings with rubber gasket (push-on-joint), including the cost of the gasket , filling with water, with a water lead up to 500m and testing to required pressure, etc. complete Reference to specifications IS 3114/1994/12888/1987 including cost and conveyance of all materials etc.,complete forr 200mm Dia. Sluice Valve as directed by the Departmental Authorities.

525

-

147850.5

... More
Civil Engineering Works;Cutting open C.C road surface with concrete saw cutter and removal with breaker

7.2

-

22806.65

... More
Civil Engineering Works;Cutting Open B.T. Road surface (as well as asphalt concrete upto 75mm thick) including Water Bound macadam

7.2

-

746.86

... More
Civil Engineering Works;Supply and delivery of tamper proof D.I., Flanged Single Chamber Air Release Valves of 50mm Dia. with body and cover made of Ductile Iron Grade GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent as per IS-1865, IS-3896-2 with food grade epoxy powder coating (EP-P) (Min:250 Micron) inside and outside of color blue RAL 5005. All internal parts such as float, shell, cove bolts etc., made of austenitic alloy steel of SS AISI 304/316 and DN-50 float of and other components with ABS/PTFE/ EPDM/NBR and generally conforming to DIN/BIS/AWWA standards (or) combination flange drilling as per IS-1538 and including cost and conveyance of all materials to work site, loading, unloading transportation charges etc., complete as directed by the Departmental Authorities.

6

-

77160.48

... More
Civil Engineering Works;Labor charges for fixing Air valves including boring the mains and threading the bore fixing nipple etc., complete.as per the direction of the department for finihsed item of work.

6

-

2081.88



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.