Andhra Pradesh State Road Transport Corporation Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Andhra Pradesh State Road Transport Corporation - APSRTC Tender

Works
Civil And Construction
Civil Works Others
Opening Date10 Sep 2024
Closing Date17 Sep 2024
Tender Amount₹ 12,07,725 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
sectioning, tamping as directed with an initial lead of 10M and lift of 3M, etc. complete as directed by the

-

-

-

... More
Engineer-in-charge.

-

-

-

... More
SUPPLY AND FILLING OF CRUSHER DUST in foundations and basement in 150mm thick layers including watering compaction

-

-

-

... More
all incidental operational cost and conveyance of all labour and materials, etc.at site of work complete as directed by the

-

-

-

... More
Engineer-in-charge.

-

-

-

... More
PROVIDING and LAYING PLAIN CEMENT CONCRETE 1:5:10 Pro. (1cement:5 River sand:10metal) using 40mm gauge

-

-

-

... More
hard granite machine crushed metal and pure river sand confirm to IS 383-1970 in FOUNDATION and for BED of

-

-

-

... More
FLOORING including machine mixing, depositing in position, ramming, finishing curing including all incidental

-

-

-

... More
operational charges cost and conveyance of all labour and materials at site of work complete as

-

-

-

... More
directed by the Engineer-in-charge.

-

-

-

... More
PROVIDING and LAYING PLAIN CEMENT CONCRETE 1:3:6 Pro. (1cement:3 River Sand:6metal) using 40mm gauge hard

-

-

-

... More
granite machine crushed metal and pure river sand conforming to IS 383-1970 in FOUNDATION Footing including

-

-

-

... More
machine mixing, depositing in position, ramming, finishing curing including all incidental operational

-

-

-

... More
charges cost and conveyance of all labour and materials at site of work complete as directed by the

-

-

-

... More
Engineer-in-charge.

-

-

-

... More
Providing and Laying RCC minimum strength of M 20 grade using 20mm gauge hard granite machine crushed metal

-

-

-

... More
conforming to IS 456-1978 and river sand as fine aggregate including labour charges for centring, machine mixing,

-

-

-

... More
depositing in position, vibrating, ramming, finishing curing including all incidental operational and seigniorage

-

-

-

... More
charges cost and conveyance of all labour and materials etc.at site of work complete as directed by the

-

-

-

... More
Engineer-in-charge.(excluding cost of steel, binding wire and its fabrication) . .

-

-

-

... More
For RSJ Column Footings

-

-

-

... More
For RSJ Columns

-

-

-

... More
Supply & fabrication of HIGH STRENGTH TMT STEEL bars HYSD/ TMT grade FE 415/500 as per IS 1786-1979)

-

-

-

... More
including labour charges for cutting, bending to required sizes and shapes placing in position with cover blocks of

-

-

-

... More
approved size and tying with binding wire of 20 SWG, forming grills for reinforcement work as per approved designs

-

-

-

... More
and drawings, including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour

-

-

-

... More
charges such as lifting charges , cutting, bending, placing in position, tying, etc., complete for finished item of work

-

-

-

... More
(including overlaps and wastage)

-

-

-

... More
RANDOM RUBBLE STONE MASONRY Of OTHER THAN GRANITE VARIETY in C.M 1:8 Pro.(1cement:8 River sand)

-

-

-

... More
in FOUNDATION and BASEMENT uincluding necessary dressing of stones,using pure river sand, cost of

-

-

-

... More
curing, incidental and operational charges cost and conveyance of all labour and materials, etc. at

-

-

-

... More
site of work complete as directed by the Engineer-in-charge.

-

-

-

... More
PROVIDING and LAYING PLAIN CEMENT CONCRETE 1:2:4 Pro. (1cement:2 River sand:4metal) using 20mm gauge

-

-

-

... More
hard granite machine crushed metal and pure river sand confirm to IS 383-1970 in FOUNDATION and for BED of

-

-

-

... More
FLOORING including machine mixing, depositing in position, ramming, finishing curing including all incidental

-

-

-

... More
operational charges cost and conveyance of all labour and materials at site of work complete as

-

-

-

... More
directed by the Engineer-in-charge.

-

-

-

... More
BRICK MASONRY with 2nd class bricks having a minium crushing strength of 35Kg/Sq.cm. as per IS 1077-1976 in

-

-

-

... More
superstructure for any thickness of WALLS in C.M 1:8 Pro.(1cement : 8 River sand) including soaking of bricks all

-

-

-

... More
incidental, operational, seigniorage charges scaffolding, lift, curing charges, cost and conveyance of all labour

-

-

-

... More
and materials, etc. at site of work complete as directed by the Engineer-in-charge.

-

-

-

... More
CEMENT PLASTERING IN C.M 1:5 Pro. (1cement: 5 River sand) 20MM. thick including FINE RENDERING AND

-

-

-

... More
SMOOTH FINISHING curing, cleaning the surface including all incidental operational, scaffolding and

-

-

-

... More
seigniorage charges, cost and conveyance of all labour and materials, etc. at site of work complete as directed by

-

-

-

... More
the Engineer-in-charge.

-

-

-

... More
Transportation of dismantled materials/ debris and disposing far away up to 5KM distance including loading,

-

-

-

... More
transportation, unloading including all incidental

-

-

-

... More
operationalcharges cost and conveyance of all labour and T& P at site of work complete

-

-

-

... More
as directed by the Engineer-in-charge.

-

-

-

... More
Supply, fabrication and erection of Stanchion using structural steel Box Sections of YST 210 grade

-

-

-

... More
conforming to IS 4923-1997 of size 145x 89 x 4.80mm @ 15.92 kg/m of YST 210 grade and fixing the Stanchions to the pedestal

-

-

-

... More
by using MS base plate of size300 x 250 x 16mm and 500 x 75 x 6mm cleat angles on four sides and providing 1 no.of

-

-

-

... More
cap plate of size 300 x 250 x 8mm along with cleat angles of size 50 x 75 x 6mm on four sides at top of Stanchion

-

-

-

... More
as per design and drawing and painting all structural members with two coats of Aluminium Paint of work, all

-

-

-

... More
over Red Oxide Primer including cost and conveyance of all materials at site labour charges, welding, fabrication,

-

-

-

... More
erection and scaffolding charges, lift charges etc., complete as directed by the Engineer-in-charge .

-

-

-

... More
Supply, fabrication and erection of 6.10 M span tubular trusse using box section of size 49.5x49.5x2.60mm@3.69Kg/M as top

-

-

-

... More
and bottom rafters and 32x32x2.60mm @1.80Kg/m Box Section as verticals & cross members

-

-

-

... More
structural mild steel tubes of YST 210 grade AS PER DESIGN and DRAWING with necessary MS shoe plates, plates for

-

-

-

... More
fixing to the main truss , bolts, nuts, screws, washers etc., including one coat of red oxide zinc chromate primer and two

-

-

-

... More
coats of enamel paint of approved quality and make including cost and conveyance of all materials at site of work,

-

-

-

... More
labour, welding, fabrication, erection and SCAFFOLDING charges etc., complete as directed by the Engineer-in-charge.

-

-

-

... More
Supply Fabricaton and erection of botton tie runner using 60 x 60 x2.6 mm thick @ 4.55Kg per Rm

-

-

-

... More
box section with necessary cleats 160 x 70 x 6mm mild steel of YST 210 grade with 4 nos 12 mm dia bolts as per

-

-

-

... More
design and drawing including labour charges for charges for scutting, welding, cost of welding rods, fabrication and

-

-

-

... More
errection one coat of red oxide primer and two coats of enamel paint of aproved quality and make, all incidental and

-

-

-

... More
operational charges cost and conveyance of all labour and materials etc. at site of work complete as directed by the

-

-

-

... More
Engineer-in-Charge.

-

-

-

... More
Supply Fabricaton and erection of Purlins using 60 x 60 x3.2 mm thick @ 5.50Kg per Rm

-

-

-

... More
box section with necessary cleats 160 x 70 x 6mm mild steel of YST 210 grade with 4 nos 12 mm dia bolts as per

-

-

-

... More
design and drawing including labour charges for charges for scutting, welding, cost of welding rods, fabrication and

-

-

-

... More
errection one coat of red oxide primer and two coats of enamel paint of aproved quality and make, all incidental and

-

-

-

... More
operational charges cost and conveyance of all labour and materials etc. at site of work complete as directed by the

-

-

-

... More
Engineer-in-Charge.

-

-

-

... More
Supply Fabricaton and erection of 32 x 32 x2.60 mm thick @ 1.80Kg per Rm

-

-

-

... More
box section of mild steel of YST 210 grade as per design and drawing for side cladding to the truss

-

-

-

... More
including labour charges for charges for scutting, welding, cost of welding rods, fabrication and

-

-

-

... More
errection one coat of red oxide primer and two coats of enamel paint of aproved quality and make, all incidental and

-

-

-

... More
operational charges cost and conveyance of all labour and materials etc. at site of work complete as directed by the

-

-

-

... More
Engineer-in-Charge.

-

-

-

... More
Supply and fixing of Pre-painted Galvalume Trapezoidal Profile Roofing sheets with 0.50 mm thickness , Coating:

-

-

-

... More
Alu-Zinc coating AZ150 GSM. Tensile Strength: 550 Mpa, Paint coating: Regular Modified Polyester painting ,

-

-

-

... More
painting Thickness( Top): 18 to 20 Microns, ( Bottom): 5 to 7 Microns. Sheet width: 1.020, Length: Maximum 12

-

-

-

... More
Meters with Regular Range Colours. including cost of sheets, necessary accessories fixing materials hire charges

-

-

-

... More
of machinery, labour charges including all incedental and operational charges , taxes, etc complete for finished

-

-

-

... More
item of work as directed by Engineer-in-Charge.

-

-

-

... More
Supplying, fabrication and fixing in position, 16mm. dia. 450mm long mild steel holding down bolts with a cross piece

-

-

-

... More
welded at bottom for gripping in concrete with necessary threading the nuts and washers and painted with one coat of red

-

-

-

... More
oxide primer and two coats of alluminium paint, including all taxes, cost and conveyance of all materials and labour at site

-

-

-

... More
of work, welding fabrication and fixing charges, complete as directed by the Engineer-in-charge.

-

-

-

... More
EMULSION PAINTING TWO coats to EXTERIOR WALLS in addition to primary coat total 3 coats with

-

-

-

... More
approved colour including cost of primer preparing and cleaning the surface and dirt with soap and brushes

-

-

-

... More
including putty cost of brushes, curing cost and conveyance of all labour and materials, etc. at site of work

-

-

-

... More
complete as directed by the Engineer-in-charge. all labour and materials, etc. at site of work complete as directed

-

-

-

... More
by the Engineer-in-charge.

-

-

-

... More
Estimated Contract Value

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.