Andhra Pradesh State Road Transport Corporation Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Andhra Pradesh State Road Transport Corporation - APSRTC Tender

Works
Civil And Construction
Civil Works Others
Opening Date22 Oct 2024
Closing Date28 Oct 2024
Tender Amount₹ 7,31,453 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
cost and conveyance of all labour, T&P at site of work complete as directed by Engineer-in- Charge

-

-

-

... More
Supply, fabrication and erection of 15.24 M span tubular truss made out MS Box Section of YST210 Grade as per design and

-

33578

100736

... More
drawing using 49.5x49.5x2.60mm @3.60Kg/M box section for top and bottom rafters and 32x32x2.00mm @1.80Kg/M

-

-

-

... More
box section for verticals and cross members and fixin gthe truss on existing RCC Beam using MS Plates

-

-

-

... More
of size175x175x12mm at every alternate verticals and ends of the truss

-

-

-

... More
fixing to the truss with bolts, nuts, screws, washers etc., including one coat of red oxide zinc chromate primer and two

-

-

-

... More
coats of enamel paint of approved quality and make including cost and conveyance of all materials at site of work,

-

-

-

... More
labour, welding, fabrication, erection and SCAFFOLDING charges etc., complete as directed by the Engineer-in-charge.

-

-

-

... More
Supply Fabricaton and erection of Purlins using 60x60x3.20mm @5.50 Kg/M box section

-

948

13282

... More
with necessary cleat plates 160 x70 x 6mm mild steel square tubes of YST 210 grade with 4 nos.12 mm dia bolts as

-

-

-

... More
per design and drawing including labour charges for cutting, welding, cost of welding rods, fabrication and erection one

-

-

-

... More
coat of red oxide primer and two coats of enamel paint of aproved quality and make, all incidental and

-

-

-

... More
operational charges cost and conveyance of all labour and materials etc. at site of work complete as directed by the

-

-

-

... More
Engineer-in-Charge.

-

-

-

... More
Supply and fixing of Pre-painted Galvalume Trapezoidal Profile Roofing sheets with 0.50 mm thickness , Coating:

-

543

126945

... More
Alu-Zinc coating AZ150 GSM. Tensile Strength: 550 Mpa, Paint coating: Regular Modified Polyester painting ,

-

-

-

... More
painting Thickness( Top): 18 to 20 Microns, ( Bottom): 5 to 7 Microns. Sheet width: 1.020, Length: Maximum 12

-

-

-

... More
Meters with Regular Range Colours. including cost of sheets, necessary accessories fixing materials hire charges

-

-

-

... More
of machinery, labour charges including all incedental and operational charges , taxes, etc complete for finished

-

-

-

... More
item of work as directed by Engineer-in-Charge.

-

-

-

... More
Supply and fixing of Pre-painted Galvalume Trapezoidal Profile Roofing accessories with 0.50 mm thickness , Coating:

-

333

10041

... More
Alu-Zinc coating AZ150 GSM. Tensile Strength: 550 Mpa, Paint coating: Regular Modified Polyester painting ,

-

-

-

... More
painting Thickness( Top): 18 to 20 Microns, ( Bottom): 5 to 7 Microns.medium size Ridge, Barge cap, Corner Trim

-

-

-

... More
L Flashing down pipes, Gutter etc Sheet width: 0.585m, Length: 2.50m

-

-

-

... More
Meters with Regular Range Colours. including cost of sheets, necessary accessories fixing materials hire charges

-

-

-

... More
of machinery, labour charges including all incedental and operational charges , taxes, etc complete for finished

-

-

-

... More
item of work as directed by Engineer-in-Charge.

-

-

-

... More
labour charges for cutting the groove 3"x3" in Brick masonry for inserting the Galvalume sheets and providing PCC

-

142

1881

... More
1:1.5:3 (1 cement :1.5 RiverSand : 3 Metal) Prop in the groove for finishing including all incedental and operational charges

-

-

-

... More
etc, complete for finished item of work as directed by Engineer-in-Charge.

-

-

-

... More
SPECIALISED INJECTION GROUTING WITH CEMENT AND FREE FLOW ADDITIVES :

-

166

45288

... More
a]. Drilling of holes with power drilling machine to the required depth [12mm to 14mm dia holes] b]. Fixing of Rubber Nozzles

-

-

-

... More
with cement and quick setting, Rapid hardening compound putty Rapidstrong qs or equivalent.

-

-

-

... More
c]. Grouting of holes with 140 PSI Grout pump with cement slurry mixing with Specialized Free flow, Non-shrink Grout additive -

-

-

-

... More
RAPIDSTRONG GROUT ADMIX (Armstrong ) /POWER n GROUT ADMIX (EBT) / CEBEX 100 (Fosroc )/ ZORIGROUT GP1 (PMCC) /

-

-

-

... More
SIKAGROUT ANCHKOR NSQ (Sika) /WATERSHIELD GROUT ADMIXi.e., 250 Grams per bag of 50 Kgs Cement add required water

-

-

-

... More
to make slurry form.

-

-

-

... More
d]. After completion of grouting, Remove the Rubber nozzles

-

-

-

... More
e]. Later sealing of the hole with polymer cement putty - ROOFCRETE AR (Armstrong ) / ZORIGROUT CMG (PMCC) / POWER n

-

-

-

... More
GUARD ARM (EBT) / WATERSHIELD AR / Fosroc

-

-

-

... More
NITOBOND AR + Cement

-

-

-

... More
including all incidental operational and seigniorage charges cost and conveyance of all

-

-

-

... More
labour and materials at site of work complete as directed by the Engineer-in-charge.

-

-

-

... More
Structural repairs to the ceiling of RCC Slab duly chipping the concrete surface until to achieve the hard mother concrete ,

-

1467

268683

... More
cleaning the surface, cleaning of steel reinforcement with sand paper and Iron brushes

-

-

-

... More
or removing of rust, applying Anti corrosive agent of rust converter-rust encapsulating coating

-

-

-

... More
for steel during repairs to protect, to convert the rust of reinforcement steel coverage 50sft per Ltr/Coat., applying

-

-

-

... More
Styrene butadiene rubber based Bonding agent for Mortar/Concrete ( Mix 1:1 ratio of cement)complies with

-

-

-

... More
ASTM D4541/BS EN 12390 , strengthening the ceiling with C.C.1:1.5:3 Pro using 6mm down graded HGMC metal

-

-

-

... More
40mm thick average thickness using construction chemicals and redoing the ceiling with cement plastering 12mm thick

-

-

-

... More
in C.M 1: 3 &1:5 Pro with neat finish, including curing , scaffolding arrangements at different places,

-

-

-

... More
cost of construction chemicals, all incidental, operational, seigniorage charges, cost and conveyance

-

-

-

... More
of all labour and materials at site of work complete.(G.F)as directed by the Engineer-in-charge.

-

-

-

... More
EMULSION PAINTING TWO coats to INTERIOR WALLS in addition to primary coat total 3 coats with approved

-

161

30740

... More
colour including cost of primer preparing and cleaning the surface and dirt with soap and brushes including putty

-

-

-

... More
cost of brushes, curing cost and conveyance of all labour and materials, etc. at site of work complete as directed

-

-

-

... More
by the Engineer-in-charge.

-

-

-

... More
labour charges for removing of ACP cladding and stacking the materials for re-use including all incidental

-

18

3015

... More
operationalcharges cost and conveyance of all labour and T& P at site of work complete

-

-

-

... More
as directed by the Engineer-in-charge.

-

-

-

... More
Transportation of dismantled materials/ debris and disposing far away up to 5KM distance including loading,

-

244

10383

... More
transportation, unloading including all incidental

-

-

-

... More
operationalcharges cost and conveyance of all labour and T& P at site of work complete

-

-

-

... More
as directed by the Engineer-in-charge.

-

-

-

... More
BRICK MASONRY with 2nd class bricks having a minium crushing strength of 35Kg/Sq.cm. as per IS 1077-1976 in

-

7527

16034

... More
superstructure for any thickness of WALLS in C.M 1:4 Pro.(1cement : 4 River sand) including soaking of bricks all

-

-

-

... More
incidental, operational charges scaffolding, lift, curing charges, cost and conveyance of all labour

-

-

-

... More
and materials, etc. at site of work complete as directed by the Engineer-in-charge.

-

-

-

... More
CEMENT PLASTERING IN C.M 1:4 Pro. (1cement: 4River sand) 20MM. thick including FINE RENDERING AND

-

366

7696

... More
SMOOTH FINISHING curing, cleaning the surface including all incidental operational, scaffolding

-

-

-

... More
charges, cost and conveyance of all labour and materials, etc. at site of work complete as directed by

-

-

-

... More
the Engineer-in-charge.

-

-

-

... More
Labour Charges for removing of doors and stacking the useful material carefully for re-use including all incidental

-

244

490

... More
operationalcharges cost and conveyance of all labour and T& P at site of work complete

-

-

-

... More
as directed by the Engineer-in-charge.

-

-

-

... More
Labour Charges for cutting of protuded reinforcement from the slab Beams after removing damaged slab with hand

-

300

4500

... More
power cutting machine carefully including all incidental operationalcharges cost and conveyance of all labour and T& P

-

-

-

... More
at site of work complete as directed by the Engineer-in-charge.

-

-

-

... More
Estimated Contract Value

-

-

731453



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.