Andhra Pradesh State Road Transport Corporation Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Andhra Pradesh State Road Transport Corporation - APSRTC Tender

Works
Civil And Construction
Building Construction
Opening Date12 Aug 2024
Closing Date17 Aug 2024
Tender Amount₹ 21,23,900 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
EARTH WORK EXCAVATION in all kinds of soils wet or dry such as clay, hard clay, black cotton soil, red earth,

-

-

-

... More
moorum, gravel etc., in loose and slushy conditions except rock requiring blasting for foundation of walls and

-

-

-

... More
column footings with necessary site clearance, marking out temporary stepping,sloping,shoring, strutting

-

-

-

... More
sectioning, tamping as directed with an initial lead of 10M and lift of 3M, etc. complete as directed by the

-

-

-

... More
Engineer-in-charge.

-

-

-

... More
PROVIDING and LAYING PLAIN CEMENT CONCRETE 1:5:10 Pro. (1cement:5sand:10metal) using 40mm gauge

-

-

-

... More
hard granite machine crushed metal and pure river sand confirm to IS 383-1970 in FOUNDATION and for BED of

-

-

-

... More
FLOORING including machine mixing, depositing in position, ramming, finishing curing including all incidental

-

-

-

... More
operational and seigniorage charges cost and conveyance of all labour and materials at site of work complete as

-

-

-

... More
directed by the Engineer-in-charge.

-

-

-

... More
SUPPLY AND FILLING OF SAND in 150mm thick layers complying with standard specifications including

-

-

-

... More
watering consolidation,seigniorage charges, cost and conveyance of all labour and materials, etc.at site of work

-

-

-

... More
complete as directed by the Engineer-in-charge.

-

-

-

... More
RANDOM RUBBLE STONE MASONRY Of OTHER THAN GRANITE VARIETY in C.M 1:8 Pro.(1cement:8sand)

-

-

-

... More
in FOUNDATION and BASEMENT uincluding necessary dressing of stones,using pure river sand, cost of

-

-

-

... More
curing, incidental, seigniorage and operational charges cost and conveyance of all labour and materials, etc. at

-

-

-

... More
site of work complete as directed by the Engineer-in-charge.

-

-

-

... More
Providing and Laying RCC minimum strength of M 20 grade using 330 kgs of cement , using 20mm gauge hard granite machine

-

-

-

... More
crushed metal conforming to IS 456-1978 and river sand as fine aggregate including labour charges for centring, machine mixing,

-

-

-

... More
depositing in position, vibrating, ramming, finishing curing including all incidental operational and seigniorage

-

-

-

... More
charges cost and conveyance of all labour and materials etc.at site of work complete as directed by the

-

-

-

... More
Engineer-in-charge.(excluding cost of steel, binding wire and its fabrication) . .

-

-

-

... More
Ground floor

-

-

-

... More
For Column Footings

-

-

-

... More
For Rectangular Columns & Pedastal

-

-

-

... More
For beams

-

-

-

... More
For Landing slab, waist slab & steps

-

-

-

... More
First Floor

-

-

-

... More
For Rectangular Columns

-

-

-

... More
For Beams

-

-

-

... More
For Roof Slab

-

-

-

... More
For Lintels

-

-

-

... More
For Chajjas & Racks

-

-

-

... More
Supply & fabrication of HIGH STRENGTH TMT STEEL bars HYSD/ TMT grade FE 500/500D/550 as per IS 1786-1979)

-

-

-

... More
including labour charges for cutting, bending to required sizes and shapes placing in position with cover blocks of

-

-

-

... More
approved size and tying with binding wire of 20 SWG, forming grills for reinforcement work as per approved designs

-

-

-

... More
and drawings, including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour

-

-

-

... More
charges such as lifting charges , cutting, bending, placing in position, tying, etc., complete for finished item of work

-

-

-

... More
(including overlaps and wastage)

-

-

-

... More
Ground floor

-

-

-

... More
First Floor

-

-

-

... More
BRICK MASONRY with 2nd class clay bricks having a minium crushing strength of 35Kg/Sq.cm. as per IS 1077-1976 in

-

-

-

... More
superstructure for any thickness of WALLS in C.M 1:8 Pro.(1cement : 8 River sand) including soaking of bricks all

-

-

-

... More
incidental, operational, seigniorage charges scaffolding, lift, curing charges, cost and conveyance of all labour

-

-

-

... More
and materials, etc. at site of work complete as directed by the Engineer-in-charge. ( First Floor)

-

-

-

... More
REINFORCED BRICK MASONRY with 2nd class bricks having a minimum CRUSHING STRENGTH of 35Kg/Sq.Cm. as per IS

-

-

-

... More
1077-1976as per IS 128934-1990 in CM 1:4 Pro.(1cement:4sand) in SUPERSTRUCTURE for 115 mm THICK WALLS

-

-

-

... More
with 6mm dia. M.S rounds at every third layer including soaking of bricks, curing and all incidental operational, seigniorage

-

-

-

... More
charges, scaffolding and lift charges, cost and conveyance of all labour and materials, etc. at site of work complete as

-

-

-

... More
directed by the Engineer-in-charge (excluding cost of steel binding wire and its fabrication)

-

-

-

... More
Ground floor

-

-

-

... More
First Floor

-

-

-

... More
CEMENT PLASTERING IN C.M 1:5 Pro. (1cement: 5River sand) 20MM. thick including FINE RENDERING AND

-

-

-

... More
SMOOTH FINISHING curing, cleaning the surface including all incidental operational, scaffolding and

-

-

-

... More
seigniorage charges, cost and conveyance of all labour and materials, etc. at site of work complete as directed by

-

-

-

... More
the Engineer-in-charge.

-

-

-

... More
Ground floor

-

-

-

... More
First floor

-

-

-

... More
CEMENT PLASTERING IN C.M 1:5 Pro. (1cement: 5 River sand) 12 MM. thick including FINE RENDERING AND

-

-

-

... More
SMOOTH FINISHING curing, cleaning the surface including all incidental operational, scaffolding and

-

-

-

... More
seigniorage charges, cost and conveyance of all labour and materials, etc. at site of work complete as directed by

-

-

-

... More
the Engineer-in-charge.

-

-

-

... More
Ground floor

-

-

-

... More
First Floor

-

-

-

... More
IMPERVIOUS coat 20mm thick in C.M (1:3) Pro. (1cement:3sand)including cost of water proofing compound of

-

-

-

... More
approved make and quality at 1 Kg. per bag of cement laid when the roof slab is green including fine finishing rendering

-

-

-

... More
smooth the surface with cement, curing, seigniorage all incidental and operational charges cost and conveyance of all

-

-

-

... More
labour and materials, etc. at site of work complete as directed by the Engineer-in-charge.(Bus Station toilet roof)

-

-

-

... More
SUPPLYING AND LAYING CERAMIC TILES of best quality having uniform colour of approved make and texture Ist

-

-

-

... More
class of size NOT LESS THAN 300x 300mm for FLOORING set in C.M 1:8 Pro. (1cement:8sand) and pointed with

-

-

-

... More
LATICRETE polymer compound including polishing charges,all leads and lifts all incidental,operational charges curing,

-

-

-

... More
mixing seigniorage and polishing the finished surface etc. cost and conveyance of all labour and materials, etc. at site of

-

-

-

... More
work complete as directed by the Engineer-in-charge.

-

-

-

... More
SUPPLYING AND LAYING CERAMIC TILES of best quality of size 300 x 450 having uniform colour of approved make and

-

-

-

... More
texture Ist class for DADOOING & SKIRTING set in C.M 1:3 Pro. (1cement:3sand) and pointed with polymer compound

-

-

-

... More
including polishing charges, all leads and lifts all incidental,operational charges curing, mixing seigniorage and polishing the finished

-

-

-

... More
surface etc.cost and conveyance of all labour and materials,etc. at site of work complete as directed by the Engineer-in-charge.

-

-

-

... More
Supplying and laying of double charged/multi charged stain free full body porcelain Vitrified floor Tiles with double layer

-

-

-

... More
pigment of size not less than 600 x 600mmand thickness between 8 - 10mm of 1st quality having uniform colour of

-

-

-

... More
approved make and texture conforming to IS13711, IS 13712, IS 13630 (Parts 1 to 15) for FLOORING set in C.M 1:5

-

-

-

... More
Pro. (1cement:5sand) 20mm thick and and laidwith line and level using cement slurry at 3.30 kgs per square metre of

-

-

-

... More
area and pointing the joints with white cementmixed with coloured pigment to match with colour of tile including cost of

-

-

-

... More
all materials, labour charges, leads charges,seigniorage charges, incidental and operational charges, curing and

-

-

-

... More
cleaning etc., at site of work complete as directed by theEngineer-in-charge

-

-

-

... More
Supplying and fixing of doors of any size with MT wood frame of size 75x100mm & shutter made out of single piece

-

-

-

... More
30mm thick solid bond wood block board type wiyh teak ply on both sides of approved colour and

-

-

-

... More
quality and providing teak wood liping alround the shutter with necessary hardware i.e aluminium powder coated 4nos. hinges,

-

-

-

... More
2 nos.300 mm tower bolts, 1 no.door stopper, 2 nos. 300 mm aldrops etc., two pairs of MS holdfasts for fixing the wooden

-

-

-

... More
frame into the wall, four nos. of hinges for fixing the shutter to the frame, providing one coat of tar to the door frame on the wall

-

-

-

... More
side including cost and conveyance of all labour and materials, etc. at site of work complete as directed by the

-

-

-

... More
Engineer-in-charge.

-

-

-

... More
Supply fabrication and fixing of powder coated sliding Aluminium windows using Aluminium Extrusions with 12 to 15

-

-

-

... More
microns anodisation and powder coating of Jindal or equivalent make of size 62 x 29.5 x 1.50mm thick (Jindal 21138) for frame,

-

-

-

... More
40 x 18 x1.55mm (Jindal 20736) for shutter frame and glazing clip of 19.00 x 17.30 x 0.70mm (Jindal 19352) with 5 mm thick float

-

-

-

... More
glass of make Modiguard/ Saint gobain including all round EPDM rubber beading for fixing glass with necessary accessories 100mm

-

-

-

... More
long aluminium handles, rollers, locking arrangements including cost of all labour charges for fabrication and fixing necessary

-

-

-

... More
hardware such as cleat angles, screws, bolts and brackets etc. including fixing to Brick masonry wall including cost and

-

-

-

... More
conveyance of all labour and materials, all wastages, lift charges, scaffolding charges etc. complete as directed by the

-

-

-

... More
Engineer-in-charge.

-

-

-

... More
Providing and fixing factory made solid Wood Polymer Comoosite ( WPC ) singles extruded Door Frame of section of size 45 x75 MM thick with

-

-

-

... More
encapsulation of 8MM rigid layer on all the six surfaces. The door frame will have a rebat 32MM two Vertical members

-

-

-

... More
are to be joined together with the horizontal member using 8x50 MM long MS Star full ontrol hand drilling

-

-

-

... More
machine The ready assembled door frame is fixed to the wall using hold fast or thread screws to be used boltf asteners.

-

-

-

... More
A minimum of 4 No.s of screws to be provided for each vertical member & solid bottom minimum 2nos. for horizontal member

-

-

-

... More
and Providing and fixing 28 -30 MM thick solid Wood Polymer Composite (WPC )single extruded door shutter with 3mm top

-

-

-

... More
and rigid layer with an overall density of 750kg/Cum. It will be fixed tothe frame using 3 inch /4 inch hinges. A minimum of

-

-

-

... More
4 hinges will be required forfixing the door with the frame and with hard ware such as Alu. tower bolts 150mm 2nos,Alu.

-

-

-

... More
all drop 200mm , Alu. Handles 2nos , 4 no ms pc hinges etc. complete as directed by Engineeer -in- Charge

-

-

-

... More
EMULSION PAINTING TWO coats to INTERIOR WALLS in addition to primary coat total 3 coats with approved

-

-

-

... More
colour including cost of primer preparing and cleaning the surface and dirt with soap and brushes including putty

-

-

-

... More
cost of brushes, curing cost and conveyance of all labour and materials, etc. at site of work complete as directed

-

-

-

... More
by the Engineer-in-charge.

-

-

-

... More
EMULSION PAINTING TWO coats to EXTERIOR WALLS in addition to primary coat total 3 coats with

-

-

-

... More
approved colour including cost of primer preparing and cleaning the surface and dirt with soap and brushes

-

-

-

... More
including putty cost of brushes, curing cost and conveyance of all labour and materials, etc. at site of work

-

-

-

... More
complete as directed by the Engineer-in-charge. all labour and materials, etc. at site of work complete as directed

-

-

-

... More
by the Engineer-in-charge.

-

-

-

... More
TRANSPORTATION OF EXCAVATED SOIL/DEBRIS by vehicle and filling the same in the low lying areas of the yard

-

-

-

... More
with a lead up to 05KM including cost and conveyance of all labourand materials,hire charges of vehicles with

-

-

-

... More
necessary crew including cost of fuel all necessary hire charges of T&P , etc. site of work complete as directed by

-

-

-

... More
the Engineer-in-charge.

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.