Andhra Pradesh State Housing Corporation Tender
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Andhra Pradesh State Housing Corporation - APSHCL Tender
Civil And Construction
Building Construction
Opening Date7 Mar 2023
Closing Date21 Mar 2023
Tender Amount₹ 31,05,856
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
598983Bid Award Id
ViewTender No
4450 Renovation to Command Control center 2023Tender Authority
Andhra Pradesh State Housing Corporation ViewPurchaser Address
-Website
http://https://apgovhousing.apcfss.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Renovation to Command Control Center;Providing and applying synthetic plaster putty or equivalent putty such as birla wall care putty or texture paint or equivalent such as NCL/ Saicoat texture paint of average 2 to 3 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying putty/ texture paint filler by putty knife / muslin pad, air dry for 2 - 3 hrs for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work for external walls - excluding cost of access scaffolding etc., complete including cost & conveyance of all materials and labour charges etc., complete for finished item of work
412.5
341
140662.5
... More
Renovation to Command Control Center;Painting to new walls with 2 coats of Synthetic polymer plastic emulsion paint of approved brand and shade over a base coat of appropriate primer of approved brand, making 3 coats after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 911 for internal walls etc., complete including cost & conveyance of all materials and labour charges etc., complete for finished item of work
412.5
133
54862.5
... More
Renovation to Command Control Center;WOODEN WALL PANELLING. green panel, duro, sharon, century,Green ply optima-G ?Gold? grade or equivalent bwp 710 gurjan 25 years plywood with one side premium quality Green laminates or equivalent, wall-based aluminum 2?/1? leveling and framing on the plane levelled wall supply 19mm ply + 9mm ply +selected laminated fixing etc., complete including cost & conveyance of all materials and labour charges etc., complete for finished item of work
35.9
7520
270000.31
... More
Renovation to Command Control Center;FLOORING with 4mm interlocking vinyl floring tile with using 3mm layer including material and labour as per standard etc., complete including cost & conveyance of all materials and labour charges etc., complete for finished item of work
278.88
390
108902.64
... More
Renovation to Command Control Center;Wooden wall partition of 12 mm ply back to back on ms frame section grid. Finish laminate 1mm thck of greenlam or equivalent etc., complete including cost & conveyance of all materials and labour charges etc., complete for finished item of work
20.16
8432
169999.2
... More
Renovation to Command Control Center;Manufacture, Supply, a table with KOERON top and laminates as per the design provided. 2100x1200x750 as per design etc., complete including cost & conveyance of all materials and labour charges etc., complete for finished item of work
1
155000
155000
... More
Renovation to Command Control Center;Executive chairs : 3-Pad, white Feather-lite Chrome Executive chair,High back Revolving chair (Chrome YS 6040 C Padded) or equivalent (helix model)etc., complete including cost & conveyance of all materials and labour charges etc., complete for finished item of work
3
25000
75000
... More
Renovation to Command Control Center;Tea table of size (300mmx600mmx300mm) of plywood of toplaminate finish of make greenlam or equivalent etc., complete including cost & conveyance of all materials and labour charges etc., complete for finished item of work
1
10000
10000
... More
Renovation to Command Control Center;Chairs : work station chairs and conference room chairs amaze model featherlite chairs etc., complete including cost & conveyance of all materials and labour charges etc., complete for finished item of work
50
9000
450000
... More
Renovation to Command Control Center;Glass partition of 12mm thick with bottom ss patches and top ss path fittings, all hardware ozone or titan etc., complete including cost & conveyance of all materials and labour charges etc., complete for finished item of worK
37.29
7240
270000.48
... More
Renovation to Command Control Center;3+1 seater sofa of leatherete of premium quality etc., complete including cost & conveyance of all materials and labour charges etc., complete for finished item of work
1
62000
62000
... More
Renovation to Command Control Center;Tables of size 900x500x750mm with powder coaterd ms legs and laminate finish top as per design provided wiwth 1mm thick laminate finish (greenlam or equivalent) etc., complete including cost & conveyance of all materials and labour charges etc., complete for finished item of work
32
1450
46400
... More
Renovation to Command Control Center;Profile lighting hanging model as per the provided design pattern, 48 watt, led of 180leds per meter, of standard make and warranty etc., complete including cost & conveyance of all materials and labour charges etc., complete for finished item of work
50
4100
205000
... More
Renovation to Command Control Center;Dadoing with glazed full body porcelain wall tiles of size 300 x 600 mm with any type of design texture such as marble finish, wooden, bamboo, stone finishes etc., scratch less, stain free and thickness between 6-8 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs set over 12mm thick in C.M. (1:5) Prop.based coat and neat cement paint spread at the rate 3.30 Kgs of Cement paste fixed with pigments of machine shade, including cost and conveyance of all materials and water etc., from approved sources to work site all operational, incidental labour charges such as mixing mortar fixing in position, lift charges, watering curing etc., complete for finished item of work. (APSS No 701 & 707) for Bath rooms for Lift Manual etc., complete including cost & conveyance of all materials and labour charges etc., complete for finished item of work
30.36
810
24606.78
... More
Renovation to Command Control Center;Flooring with non-skid ceramic tiles of size 300 x 300 mm not less than 7.3 mm thick of Somany/HR Jhonson/Naveen Ceramics/Kajaria/ Nitco/ Sphinx make set over a base coat of CM (1:8) prop. 12mm thick and neat grey cement slurry of honey like consistency spread at the rate of 33 kgs per 10 sqm and jointed with white cement mixed with pigment of matching shade to match the shade of tiles over a bed of C.C. or R.C.C. slab, including cost and conveyance of all materials like cement, sand, water, ceramic tiles, white cement etc., to site (excluding cost of C.C. bed)excluding cost of seigniorage on all materials , but including cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer-in-charge curing etc., complete for finished item of work. (APSS No.707 & 701) for Lift Manual.l etc., complete including cost & conveyance of all materials and labour charges etc., complete for finished item of work
7.56
981
7422.41
... More
Renovation to Command Control Center;Supply, Installation and commissioning approved make floor mounted close coupled EWC suit CASCADE model 'P' or 'S' trap with dual flush porcelain cistern fixed on EWC with all internal parts of dual flush cistern, ultra solid seat cover of approvedmake with rubber buffer and cap 15 mm angle stop cock 450 mm long PVC inter connection pipe wall flanges all of approved make etc. complete for finished item of work in all respects etc., complete including cost & conveyance of all materials and labour charges etc., complete for finished item of work
1
17500
17500
... More
Renovation to Command Control Center;Supply, Installation and commissioning approved make TABLE top wash basin with modular vanity set as per the design etc., complete including cost & conveyance of all materials and labour charges etc., complete for finished item of work
1
12500
12500
... More
Renovation to Command Control Center;Plumbing pipes and sanitary working fixtures as per the design.,etc., complete including cost & conveyance of all materials and labour charges etc., complete for finished item of work
1
350000
350000
... More
Renovation to Command Control Center;Electrical trays on ceiling, low volatage and high voltage cabling as per the elctrical design.etc., complete including cost & conveyance of all materials and labour charges etc., complete for finished item of work
1
275000
275000
... More
Renovation to Command Control Center;Conference table of size 4000mm x 1800mm u shape (600mm spacing) of height 750mm with Standard 18mm greenlam ply and 1mm thick laminate of century or equivalent and all ss hardware as per standards including cost and conveyance of all materials and labour charges etc., complete for the finished items of the work
1
275000
275000
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements