Andhra Pradesh State Cooperative Rural Irrigation Corporation Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Andhra Pradesh State Cooperative Rural Irrigation Corporation - APSCRIC Tender

Civil And Construction
Building Construction
Opening Date28 Dec 2022
Closing Date5 Jan 2023
Tender Amount₹ 94,80,670 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of incomplete Building;Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and sales & other taxes on all materials , centering using Steel scaffolding pipes , jack props , wallers , Foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, vibrating, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) Roof slab 165mm thick

671.07

-

1464301.58

... More
Construction of incomplete Building;Providing Thermo Mechanically Treated (TMT) (Fe 500 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc. ,and overheads & contractors profit complete for finished item of work.( APSS No.126)

26000

-

2573480

... More
Construction of incomplete Building;Brick masonary in CM(1:6) prop, Fly ash cement/lime solid blocks with compressive strength of 75 kg/sq.cm - IS:12894-1990 - CLASS - 7.5 - 225 x 100 x60 mm including cost and conveyance seignorage fee mixing of cement mortar and laying of bricks and mortar to specified thickness watering curing including scaffolding hire and operational charges of machinery all labour charges and all water lead charges etc complete for finished item of work (BLD-CSTN, Vede pageno: 671)

93.84

-

869246.49

... More
Construction of incomplete Building;Ornamental ceiling plastering 12mm thick single coat in CM (1:5) using screened sand including cost and conveyance of all materials like cement, sand, water etc., to site, including sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work.(SS 901,903 & 904)

671.07

-

135267.58

... More
Construction of incomplete Building;Plastering 20mm thick in two coats using screened sand with base coat of 16mm thick in CM(1:6) and top coat of 4mm thick in CM(1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work .(SS 901,903 & 904)

518.04

-

270064.61

... More
Construction of incomplete Building;Plastering 12mm thick in two coats using screened sand with base coat of 16mm thick in CM(1:6) and top coat of 4mm thick in CM(1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work .(SS 901,903 & 904)

518.04

-

261024.81

... More
Construction of incomplete Building;Flooring with 16 to 18mm thick high polished granite stone slabs other than black and regular colours (i.e. of shades like paradiso / bala flower / copper silk / laka red / lavender blue) with borders and design as per the pattern approved by the Engineer-in-Charge of length not less than 2.43 mts set over base coat of cement mortar (1:8) , 20mm thick using screened sand over CC bed already laid or RCC roof slab including neat grey cement slurry of honey like consistency spread @ 3.3 Kg per sqm and jointed neatly with white cement paste mixed with pigment of matching shade to full depth including cost and conveyance of all materials like cement , sand , water , granite slabs etc., to work site and all operational, incidental labour & lift charges, polishing charges and all other taxes on all materials, cost of base coat and overheads & contractors profit complete for finished item of work (S.S.701 & special)

56.4

-

226190.51

... More
Construction of incomplete Building;Flooring with soluble salt porcelain vitrified tiles screen printed and polished of size 600 x 600 mm and thickness between 8 to 10mm 1st quality conforming to IS: 13711, IS: 13712, IS: 13630(Parts 1 to 15) of any colour and finish in all shades and designs with borders and design as per the approved flooring pattern as directed by the Engineer-In -Charge, laying tiles using spacers of 2mm thick, set over a base coat of CM (1:8) prop. 12mm thick using screened sand over CC bed already laid or RCC roof slab , including neat cement slurry of honey like consistancy spread @ 3.3 kgs per Sqm. and jointed neately with white cement paste to full depth mixed with pigment of matching shade including cost and conveyance of all materials like cement, sand, water, tiles, white cement etc., to site (excluding cost of C.C. bed) including cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer- in-charge etc.,and overheads & contractors profit complete for finished item of work. (APSS No.701 & 707)

671.07

-

709253.88

... More
Construction of incomplete Building;White washing two coats with whiting of approved quality to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work, but excluding conveyance charges of materials (BLD-CSTN-9-5)

671.07

-

30755.14

... More
Construction of incomplete Building;Painting to new walls with 2 coats of water proof cement paint of apporved brand and shade over a base coat of approved cement primer grade I making making 3 coats in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 912.

1036.08

-

249591.67

... More
Construction of incomplete Building;Supply and delivery of MS Gate confirming to I.S.S. including cost & conveyance of all materials, including cost of welding charges, placing in position tying grills etc., complete.

4000

-

473760

... More
Construction of incomplete Building;Painting with synthetic enamel paint of grade - I in 2 coats to new iron work including cost and conveyance of all materials etc complete to the finished item of work.

200

-

28174

... More
Construction of incomplete Building;Providing and applying synthetic plaster putty or plaster of paris putty or lime punning of average 1 to 2 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying knifing paste filler by putty knife / muslin pad, air dry for 2 - 3 hrs, sand with 180 and 320 No., emery paper for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work for Internal walls.

518.04

-

114502.38

... More
Construction of incomplete Building;Supply and Fixing of 25mm dia 2.0 mm thick PVC pipe (ISI MARK) concealed in Walls with all required accessories including masonary work and labour charges etc., complete.over head charges & Contractor profit excluding GST.

600

-

74514

... More
Construction of incomplete Building;Supply and Fixing of 25mm dia 2.0 mm thick PVC pipe (ISI MARK) concealed in Walls with all required accessories including masonary work and labour charges etc., complete.over head charges & Contractor profit excluding GST.

550

-

57090

... More
Construction of incomplete Building;Supplying and Run of 2 of 36/0.3mm (2.5sq.mm) PVC insulated flexible copper cable(ISI Mark) in existing pipe for mains including cost of all materials and labour charges etc.complete (As per R&B Electrical specifications No.3.1.1) including over head charges & Contractor profit excluding GST.

1100

-

90244

... More
Construction of incomplete Building;S&D of 16A/6A, 2 in one socket with 16A switch control modular type with MS flush boxes with front cover plate including all labour charges etc., complete.

50

-

14400

... More
Construction of incomplete Building;Providing independent earthing for Important equipment with 40mm dia 'B' class 2.5m long G.I pipe and 19mm dia 'B' class G.I pipe of 0.3mtr. long connected with reducer providing G.I funnel with mesh enclosed in C.C.Chamber of 400m x 400m x 400mm with R.C.C. Slab cover duly providing staggered holes filling with salt and charcoal from the bottom of the pipe giving earth connection from electrode through G.I strip of 40 x 6mm x 200mm length with all accessories and labour charges complete, as per IS specifications 732/1982 (Part II)

3

-

12538.47

... More
Construction of incomplete Building;Supply and fixing SPN Distribution board with IP-20 protection suitable for single phase Earth Leakage Circute Braker (ELCB) / Residual Current Circute Braker (RCCB) / Double Pole (DP) Isolator as incomer and 10kA SP MCBs as out going including internal c

6

-

24588.56

... More
Construction of incomplete Building;Wiring with 2 runs of 14/0.3mm (1.0 Sq.mm) Fire Retardant (FR) P.V.C. insulated flexible copper cable (ISI MARK) in existing pipe with 6A modular switch, Ceiling rose and 3mm thick hylam sheet covering to GI switch control box including all labour charges etc., complete for light, bell, fan and exhaust fan points in Non-Residential Buildings

200

-

157516

... More
Construction of incomplete Building;Supply and fixing of 1x36/40Wbox type tube light luminaire with copper/VPIT choke,condensor, starters etc.and 1No.36/40W tube etc. complete (As per R&B Electrical specifications No.8.2.2) including over head charges & Contractor profit excluding GST

100

-

38834

... More
Construction of incomplete Building;Supplying and fixing of Batten Holder/angle Holder in lieu of ceiling Rose of light point complete with all connections and all labour charges etc.complete (As per R&B Electrical specifications No.2.1.7) including over head charges & Contractor profit excluding GST

50

-

11446.5

... More
Construction of incomplete Building;Supplying and fixing of stainless steel ( grade 304 ) hand railing as per approved drawing with top rail of 50mm dia pipe and 2mm thick medium class and vertical posts of 25mm dia and 1.6mm thick medium class 2 Nos for each step fixed with base plate of 75mm dia using bonding agent and anchor fastner and welding, drilling of 25mm dia holes with pneumatic compressor for fixing railing, buffing, polishing all members of the railing thouroughly , lacquer finishing to present seamless finish including cost and conveyance of all materials, electrodes, welding charges, cost of all consumables, labour charges , overheads & contractors profit etc., complete for finished item of work.

72.6

-

390458.77

... More
Construction of incomplete Building;Supplying and fixing of 1200 mm [48"] sweep 230 V AC 50 Hz Ceiling Fan with 3 Blades and double bearing and regulator including trasportation and giving connection with twin core wire etc., complete - for 1 No. including over head charges & Contractor profit excluding GST

50

-

172087.5



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.