Andhra Pradesh State Civil Supplies Corporation Limited Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Andhra Pradesh State Civil Supplies Corporation Limited - APSCSCL Tender

Civil And Construction
Building Construction
Opening Date2 Dec 2020
Closing Date10 Dec 2020
Tender Amount₹ 2,16,858 
This is an estimated amount, exact amount may vary.
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Maintenance and Repairs;Flooring with Vitrified Tiles of 1st quality of approved make & color not less than 7.3 mm thick in all shades and designs over a base coat of Cement Concrete (1:8) prop including cost of color pigment for jointing the tiles to match the tiles, cost and conveyance of all materials to site of work etc., complete for finished item of work.

40

-

55912.04

... More
Maintenance and Repairs;Supply & Fixing of Granite stone tiles 8 mm thick (mirror polished of all shades) including labour charges, transportation charges, cost & conveyance of all the materials etc., complete for finished item of work.

4

-

5002.8

... More
Maintenance and Repairs;RCC Nominal Mix (Cement fine aggregrate: coarse agrgreate) Corresponding to table 9 of IS 456 using 12 mm size graded machine crushed hard granite metal (Coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (Sand) coarse aggregate, water etc., to site and including seigniorage charges, sales & other taxes on all materials including all operational charges such as machine mixing, laying , concrete, curing etc., complete for finished item of work, but including centering, shuttering etc., complete for finshed item of work For CEMENT SELVES

1.6

-

7396.59

... More
Maintenance and Repairs;Supplying & fixing stainless steel sink size 20" x18" x 8 "(508x457.2x203.2mm) 1 mm thick with accessories, including labour charges, bib tap, nahani trap, waste pipe, including transportation charges,cost & conveyance of all the materials etc., for complete finished item of work.

1

-

6605.94

... More
Maintenance and Repairs;Providing & fixing of G.I Sheet with a supporting rods including transportation charges, labour charges, etc., cost & conveyance of all the materials, complete for all finished item of work.

-

-

10000

... More
Maintenance and Repairs;Removing & refixing the power box at the suitable place including new materials, shifting etc., cost & conveyance of all the materials, complete for all finished item of work.

-

-

5000

... More
Maintenance and Repairs;Removing the existing aluminium glass door including, shifting etc., cost & conveyance of all the materials, complete for all finished item of work.

-

-

1000

... More
Maintenance and Repairs;Supplying HBG Stone Dust 2.30m chips below size including cost and conveyance of all materials, labour charges etc., complete for furnished item of work

3

-

2206.65

... More
Maintenance and Repairs;Plastering with CM 2 coats, 12mm thick, base coat in CM (1:5), 8mm thick and top coat in CM (1:3), 4mm thick with sponze finishing including cost and conveyance of all materials, labour charges, scaffolding charges, lift charges, curing, water leads, seigniorage etc., complete for finished item of work.

55

-

26345.28

... More
Maintenance and Repairs;Painting to new walls with two coats of ready mixed oil bound washable distsemper of approved brand and shade over a base coat of appropriate primer of approved branddd, making 3 coats in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to wrok site and all operational, incidental, labour charges etc., complete for finished item of work.

90

-

14554.62

... More
Maintenance and Repairs;Supply and Fixing of 4?.00? 40 Watts ISI make "Crompton " make Tube Light fitting patty type including cost of copper choke, tube, starter, etc., complete: per Each

3

-

4015.77

... More
Maintenance and Repairs;Wiring with Run off 2 of 1.40mm PVC insulated copper wire with No.14 SWG Gi Wire for earth continuity in ¾? M.s conduit pipe with necessary 5 Amps Kosla type make with necessary earth clips including cost and conveyance of all materials to site of work, labour charges etc., complete for finished item of work.

8

-

5416

... More
Maintenance and Repairs;Supply and Fixing of 6 Amps 3/2 wall plug including flush type switch in common board including cost and conveyance of all materials to site of work, labour charges etc., complete for finished item of work.:

6

-

531.66

... More
Maintenance and Repairs;Supply and Fixing of 16 Amps flush type switch in common board including cost and conveyance of all materials to site of work, labour charges etc., complete for finished item of work.:

6

-

1237.86

... More
Maintenance and Repairs;S&F 12.7 mm N.P bib tap Indian make heavy duty, including transportation charges, labour charges, including all cost & conveyance of all the materials, complete for finished item of work.

3

-

1285.68

... More
Maintenance and Repairs;S&F 4" (101.6 mm ) multi floor trap with Jali- UPVC/SWR Pipe fittings including transportation charges, labour charges, including all cost & conveyance of all the materials, complete for finished item of work.

1

-

134.2

... More
Maintenance and Repairs;Supplying and fixing TV shape mirror with plastic frame size 609.6 mm x 457 .2 mm etc., including labour charges, transportation charges, cost & conveyance of all the materials etc., for complete finished item of work.

1

-

675.84

... More
Maintenance and Repairs;Supply & Fixing of 25.44mm & 609.6mm length Aluminium Anodized Towel Rod with brackets and aluminium screws etc., complete for finished item of work.

1

-

228.36

... More
Maintenance and Repairs;Supply of 12" (300mm) ISI, 900 RPM Heavy duty exhaust fan with metallic blades with Mark. Makes: Crompton / Almounard / Havells Turbo Force cost and conveyance of all materials to site of work etc., complete for finished item of work.

1

-

3230.98

... More
Maintenance and Repairs;Supply and Fixing of UPVC Aluminum Window Center Fly mesh Shutter Sliding: Section for Fly mesh shutter frame should be of size 20mm x 40mm and fitted with SS mesh (304 Grade). The supporting guide section of size 29mm x 20mm of 0.58mm thick at the bottom and 15mm x 19mm of 0.58mm thick at the top fixed horizontally to the Fly mesh frame and slides along the bottom and top guide tracks made of sections size 20mm x 20mm of 0.58mm thick and 29mm x 20mm of 0.58mm thick including all cost & coveyance of all the materials etc., for complete finished item of work.

4

-

24380.4

... More
Maintenance and Repairs;Supply & Fixing of 1" dia UPVC Pipe including cost of UPVC Pipe, Labour Charges for fixing, transportation of Pipe etc., complete for finished item of work -- 1 RM

15

-

396

... More
Maintenance and Repairs;Supply & Fixing of 1/2" dia UPVC Pipe including cost of UPVC Pipe, Labour Charges for fixing, transportation of Pipe etc., complete for finished item of work -- 1 RM

15

-

330

... More
Maintenance and Repairs;Supply and Fixing in position of 1.20 x 1.20M size window Grill including cost and conveyance of all materials to site, labour charges etc., complete for finished item of work

4

-

8340.4

... More
Maintenance and Repairs;Tor Steel Reinforcement, Wrought and Put up including decoiling, bending, cranking, tying them after placing them in position as directed by Engineer-in-charge of work, including cost and conveyance of steel, binding wire etc., complete for all works for all heights.

0.05

-

3117.13



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.